This document provides specifications for a hopper dredging project. The U.S. Army Corps of Engineers seeks dredging of the Sabine-Neches Waterway in Texas from the Sabine Bank Channel to the Sabine Jetty Channel and a 13-mile extension of the existing channel offshore. The solicitation includes base work and ten options that could add additional dredging reaches. Bids are due by September 13, 2021. The contractor will be required to dredge the entire estimated quantity within the contract price whether higher or lower than estimated. Dredged materials must be transported to the designated Ocean Dredged Material Disposal Site for placement. The contractor must perform pre-dredging hazard surveys and post-disposal monitoring surveys of the disposal sites.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The specifications for Unrestricted Procurement for Sabine-Neches Waterway, Texas, Channel Improvment Project, Sabine Extension Channel to Sabine Bank Channel in Jefferson County, Texas, for which Bid Opening is scheduled for 13 Sep 2021 at 2:00 P.M., Local Time is hereby amended as follows:
SEE CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HY21B0016
X 9B. DATED (SEE ITEM 11)
13-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2021
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY21B0016
A0001-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The specifications for Solicitation No. W912HY21B0016, Sabine-Neches Waterway, Texas, Channel Improvement Project, Sabine Extension Channel to Sabine Bank Channel Dredging in Jefferson County, Texas, are hereby amended as follows:
a) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE - The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.
(2) SECTION 00 21 00, INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS -
The enclosed SECTION 00 21 00 entitled INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS supersedes that issued with this Solicitation.
(3) SECTION 00 73 00.01 45, SPECIAL CONTRACT REQUIREMENTS, STANDARD – The enclosed SECTION 00 73 00.01 45 entitled SPECIAL CONTRACT REQUIREMENTS, STANDARD supersedes that issued with this Solicitation.
(4) SECTION 01 22 00.10, MEASUREMENT AND PAYMENT – The enclosed SECTION 01 22
00.10 entitled MEASUREMENT AND PAYMENT supersedes that issued with this Solicitation.
(5) SECTION 35 20 23.12 45, HOPPER DREDGING – The enclosed SECTION 35 20 23.12 45 entitled HOPPER DREDGING supersedes that issued with this Solicitation.
b) Drawings.
(1) DRAWINGS NO. G-001, G-003, and G-006 - The enclosed Drawings No. G-001, G-003, and G-006 supersedes that issued with this Solicitation.
(2) DRAWING NO. C-101 – The enclosed Drawing No. C-101 supersedes that issued with this solicitation.
(3) DRAWINGS NO. C-301 through C-327 – The enclosed Drawings No. C-301 through C-327 supersede that issued with this Solicitation.
2. This amendment shall be attached to and become a part of the Solicitation.
36 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
2. SECTION 00 21 00, INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
3. SECTION 00 73 00.01 45, SPECIAL CONTRACT REQUIREMENTS, STANDARD
4. SECTION 01 22 00.10, MEASUREMENT AND PAYMENT
5. SECTION 35 20 23.12 45, HOPPER DREDGING
6. DRAWINGS NO. G-001, G-003, and G-006
7. DRAWING NO. C-101
8. DRAWINGS NO. C-301 through C-327
SWG FILE NO.: SN 0101-0302 SOLICITATION NO.: W912HY21B0016
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE AMENDMENT NO. 0001
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
1.1.2 Option No. 1
1.1.3 Option No. 2
1.1.4 Option No. 3
1.1.5 Option No. 4
1.1.6 Option No. 5
1.1.7 Option No. 6
1.1.8 Option No. 7
1.1.9 Option No. 8
1.1.10 Option No. 9
1.1.11 Option No. 10
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
TO ACCOMPANY AMENDMENT NO. 0001 TO SOLICITATION: W912HY21B0016
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 2
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization
1 JOB SUM
0002 Pre-Dredge Hazard Survey - Section Nos. 1 thru 13
1 JOB SUM
0003 Debris Removal - Section Nos.
1, 2, 4, 5, and 7 thru 13
0003A Debris Removal - up to 5 Tons Total
5 TON $_________ $___________
0003B Debris Removal - Above 5 Tons up to 10 Tons Total
5 TON
0003C Debris Removal - Above 10 Tons up to 15 Tons Total
5 TON
0004 New Work Dredging - Section Nos. 1, 2, 4, 5, and 7 thru
3,370,000 CY
0005 ODMDS Monitor Surveys 1 JOB SUM $___________
0006 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time for Schedule No. 1 work is stated in SECTION 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD.
DOCUMENT 00 11 00.00 45 Page 3
1.1.2 Option No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 1
0007 Pre-Dredge Hazard Survey - Section No. 14
1 JOB SUM
0008 Debris Removal - Section No. 14
4 TON
0009 New Work Dredging - Section No. 14
361,000 CY
0010 ODMDS Monitor Surveys 1 JOB SUM
0011 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 1
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1
NOTE FOR OPTI ON NO. 1: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 25 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 4
1.1.3 Option No. 2
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 2
0012 Pre-Dredge Hazard Survey
- Section Nos. 15 and 16
1 JOB SUM
0013 Debris Removal - Section Nos. 15 and 16
3 TON
0014 Maintenance Dredging - Section No. 16
65,000 CY
0015 New Work Dredging - Section Nos. 15 and 16
440,000 CY
0016 ODMDS Monitor Surveys 1 JOB SUM
0017 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1 AND 2
NOTE FOR OPTI ON NO. 2: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 42 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 5
1.1.4 Option No. 3
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 3
0018 Pre-Dredge Hazard Survey - Section Nos. 17 and 18
1 JOB SUM
0019 Debris Removal - Section Nos. 17 and 18
4 TON
0020 Maintenance Dredging - Section Nos. 17 and 18
98,000 CY
0021 New Work Dredging - Section Nos. 17 and 18
533,000 CY
0022 ODMDS Monitor Surveys 1 JOB SUM
0023 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, AND 3
NOTE FOR OPTI ON NO. 3: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 49 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 6
1.1.5 Option No. 4
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 4
0024 Pre-Dredge Hazard Survey
- Section Nos. 20 and 21
1 JOB SUM
0025 Debris Removal - Section Nos. 20 and 21
1 TON
0026 Maintenance Dredging - Section Nos. 20 and 21
206,000 CY
0027 New Work Dredging - Section Nos. 20 and 21
588,000 CY
0028 ODMDS Monitor Surveys 1 JOB SUM
0029 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, 3, AND 4
NOTE FOR OPTI ON NO. 4: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 58 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 7
1.1.6 Option No. 5
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 5
0030 Pre-Dredge Hazard Survey
- Section Nos. 22 and 23
1 JOB SUM
0031 Debris Removal - Section Nos. 22 and 23
1 TON
0032 Maintenance Dredging - Section Nos. 22 and 23
232,000 CY
0033 New Work Dredging - Section Nos. 22 and 23
724,000 CY
0034 ODMDS Monitor Surveys 1 JOB SUM
0035 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, 3, 4, AND 5
NOTE FOR OPTI ON NO. 5: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 69 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 8
1.1.7 Option No. 6
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 6
0036 Debris Removal - Section No. 3
1 TON
0037 New Work Dredging Section No. 3 - Pipeline Avoidance Area 1
49,000 CY
0038 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, 3, 4, 5, AND 6
NOTE FOR OPTI ON NO. 6: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 12 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 9
1.1.8 Option No. 7
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 7
0039 Debris Removal - Section No. 6
2 TON
0040 New Work Dredging Section No. 6 - Pipeline Avoidance Area 2
100,000 CY
0041 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 7
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, 3, 4, 5, 6, AND 7
NOTE FOR OPTI ON NO. 7: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 15 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 10
1.1.9 Option No. 8
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 8
0042 Pre-Dredge Hazard Survey - Section No. 19
1 JOB SUM
0043 Debris Removal - Section No. 19
1 TON
0044 Maintenance Dredging Section No. 19 - Pipeline Avoidance Area 3
141,000 CY
0045 New Work Dredging Section No. 19 - Pipeline Avoidance Area 3
217,000 CY
0046 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM
TOTAL OPTION NO. 8
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, 3, 4, 5, 6, 7, AND 8
NOTE FOR OPTI ON NO. 8: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. An addi t i onal t i me of 28 cal ender days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 11
1.1.10 Option No. 9
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 9
0047 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
1 JOB SUM
0048 Sea Turtle Trawling and Relocation
571 DAY
TOTAL OPTION NO. 9
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, 3, 4, 5, 6, 7, 8, AND
9 $___________
NOTE FOR OPTI ON NO. 9: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. No addi t i onal Cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s opt i on. I n addi t i on t he quant i t y shown i n I t em 0048 i s f or eval uat i on pur poses onl y. Payment f or t hi s/ t hese l i ne i t em( s) wi l l be based on t he act ual quant i t y used and t hey shal l be excl uded f r om t he " VARI ATI ONS I N ESTI MATED QUANTI TI ES" cl ause.
DOCUMENT 00 11 00.00 45 Page 12
1.1.11 Option No. 10
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 10
0049 Mobilization and Demobilization - Sea Turtle Trawling and Relocation (One Trawler Additional to Option 9)
1 JOB SUM
0050 Sea Turtle Trawling and Relocation (One Trawler Additional to Option 9)
571 DAY
TOTAL OPTION NO. 10
TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1, 2, 3, 4, 5, 6, 7, 8, 9,
AND 10 $___________
NOTE FOR OPTI ON NO. 10: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at t i me of awar d. No addi t i onal Cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s opt i on. I n addi t i on t he quant i t y shown i n I t em 0050 i s f or eval uat i on pur poses onl y. Payment f or t hi s/ t hese l i ne i t em( s) wi l l be based on t he act ual quant i t y used and t hey shal l be excl uded f r om t he " VARI ATI ONS I N ESTI MATED QUANTI TI ES" cl ause.
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 13
DOCUMENT 00 11 00.00 45 Page 14
Section 00 21 00 – Page 1
Section 00 21 00 – Instructions to Bidders (AM#1)
1.1 DISCLOSURE OF MAGNITUDE OF CONSTRUCTION PROJECTS (DFARS
236.204)
The estimated price range of the proposed construction is BETWEEN
$25,000,000 AND $100,000,000.
1.2 AVAILABILITY OF PLANS AND SPECIFICATIONS ON
BETA.SAM.GOV WEBSITE (FAR 5.102(a)(1))
After solicitation issuance, contractors may register to be placed on the Interested Vendors List, view and/or download this solicitation and all amendments at https://sam.gov/.
Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the Beta Sam website daily (using the above link) for amendments to the solicitation. You must be registered in the System For Award Management (SAM) to receive a government contract award. The website for SAM https://www.sam.gov/SAM/ .
1.3 TECHNICAL INFORMATION DREDGING (FAR 14.211)
(a) For technical information regarding the plans and specifications submit questions in PROJNET, see paragraph
1.9 of this section for details.
(b) The Contractor [ X ] shall [ ] shall not be permitted to use self- propelled hopper dredges to perform the work specified herein.
1.4 PREAWARD INFORMATION DREDGING (FAR 9.105-1)
Bidders shall submit Pre-award documents no later than the response date and time indicted in the solicitation the following information:
(a) A statement as to whether he is now or ever has been engaged in performing dredging of [ X ] deep or [ ] shallow draft channels.
(b) A list of key personnel available for the current project and their qualifications.
(c) A copy of the bidder's latest financial statement, including the names of banks or other financial institutions with which the bidder conducts business. If the financial statement is more than 60 days old, a certificate should be attached stating that the financial condition is substantially the same, or if not the same, the changes that have taken place. Such statement will be treated as confidential.
(d) A list of present commitments, including the dollar value thereof, name of office under which the work is being performed, the scheduled completion date of each, days ahead or behind schedule and the name of the dredge(s) to be used on the job.
Section 00 21 00 – Page 2
(e) Name and location of the firm's dredging plant to perform the work under this contract, the date this plant will commence work, and the plants capability to perform the work as required by the specifications.
(f) A preliminary schedule showing anticipated dates for start of work, based upon availability of contractor resources, and the plan for completing work within the contract performance period. For dredging contracts, this includes production rates for proposed dredging equipment together with an analysis showing how work will be accomplished within the contract performance period.
(g) If bidder is a Large Business, a Sub- Contracting Plan, shall be submitted not later than the response date and time indicated in the solicitation.
1.5 DISPOSAL OF EXCAVATED MATERIAL
The following owners in the vicinity of the work to be accomplished under this Invitation for Bids are known to desire fill material:
NAME ADDRESS
If any of the areas owned by the above-listed owners are proposed to be utilized by the Contractor in the performance of the work, the provision for use of alternate areas DREDGING: PLACEMENT OF EXCAVATED MATERIAL of the specifications will be applicable.
1.6 BIDDER'S QUALIFICATIONS (FAR 9.105-1)
Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.
1.7 NOTICE TO BIDDERS (FAR 52.214-18)
All information required by the terms of the solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper offer. Check as you read.
◻ Have you acknowledged all amendments?
◻ Have you completed SECTION 00 45 00, REPRESENTATIONS & CERTIFICATIONS portion of the solicitation package to include 52.204-24 and 52.204-26?
◻ Is your offer properly signed?
◻ If a bid guarantee is required, is it included with your offer?
(A late bid guarantee is treated the same as a late offer).
Section 00 21 00 – Page 3
◻ Is your bid guarantee in the proper amount? Bid guarantee shall be in the amount of 20 percent of the amount of the offer, or $3 million, whichever is less.
◻ If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?
◻ Is the name in which you submitted the offer the same as your bid bond?
◻ If required have you entered a unit price for each item? (The solicitation will specifically state when this is necessary).
◻ Are decimals in unit prices in the proper places?
Are your figures legible?
◻ Are the extensions of your unit prices, and your total offer price correct?
◻ Are all erasures or corrections initialed by the person signing the offer?
◻ I have not restricted my offer by altering the provisions of the solicitation.
REMINDER TO BIDDERS
REMINDER #1 - Acknowledge all Amendments on the reverse side of SF 1442, Item 19, Solicitation, Offer, and Award.
REMINDER #2 - The Contracting Officer signing this contract is the Primary Contracting Officer. However, any Contracting Officer assigned to the Galveston District may take formal action. See Section entitled "Specific Project Requirements".
1.8 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION:
(FAR
14.302 and 14.304)
The Bid, a copy of the SF24 Bid Bond and Preaward Information as specified in Section 00 21 00, Instructions to Bidders, Paragraph 1.4, Preaward Information Dredging shall be submitted via email to SWG-CT- Execution-
Proposals@usace.army.mil , not later than the response date and time indicated in the solicitation. Identify the Solicitation Number W912HY21B0016 in subject line of the emai1.
Section 00 21 00 – Page 4
Bid Opening will be held by WebEx/teleconference.
WebEx:
https://usace1.webex .com/usace1/j.php?MT ID=mdb9b85bbe93ae16b 09bf40c3fa6480df
Meeting Number:
1 9 9 9 8 3 7 3 5 1
Password: 6PPx3TuBF5@
Join by phone +1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 983 7351
1.9 BIDDER INQUIRY – PROJNET (FAR 14.211)
1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet .
A. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
***Please Note: Offerors shall only submit one question per inquiry. Inquiries containing multiple questions may be rejected.
B. From this page, you may view all bidder inquiries or add inquiry.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
D. The Solicitation Number is: W912HY20B0016
The Bidder Inquiry Key is: CUY58K-3HF9GY
2. The Bidder Inquiry System will be unavailable for new inquires Ten
(10) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
4. The call center operates weekdays from 8AM to 5PM U.S.
Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Section 00 21 00 – Page 5
1.10 CONSTRUCTION WAGE RATE REQUIREMENTS (FAR 52.222-6)
Paragraph entitled CONSTRUCTION WAGE RATE REQUIREMENTS of (CONTRACT
CLAUSES -
Section 00 72 00, FAR 52.222-6) is applicable to this solicitation. Wage Rates will be incorporated by amendment, if they are not included in this solicitation.
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DOCUMENT 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD AMENDMENT NO. 0001
PART 1 GENERAL
1.1 (AM#1)COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR
52.211-10)ALTERNATE 1 (APR1984)
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
1.4 QUANTITY SURVEYS (APR 1984) (FAR 52.236-16)
1.5 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
1.6 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
DOCUMENT 00 73 00.01 45 Page 1
DOCUMENT 00 73 00.01 45 Page 2
DOCUMENT 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 (AM#1) COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10)
ALTERNATE 1 ( APR1984)
The Contractor shall be required to:
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed;
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than Oct ober 03, 2022 . The time stated for completion shall include final cleanup of the premises.
The compl et i on dat e i s based on t he assumpt i on t hat t he successf ul of f er or wi l l r ecei ve t he not i ce t o pr oceed by December 30, 2021. The compl et i on dat e wi l l be ext ended by t he number of cal endar days af t er t he above dat e t hat t he Cont r act or r ecei ves t he not i ce t o pr oceed, except t o t he ext ent t hat t he del ay i n i ssuance of t he not i ce t o pr oceed r esul t s f r om t he f ai l ur e of t he Cont r act or t o execut e t he cont r act and gi ve t he r equi r ed per f or mance and payment bonds wi t hi n t he t i me speci f i ed i n t he of f er .
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,461.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by survey, magetometer and core borings.
(b) Weather Conditions. Under ordinary conditions, the mean tidal range is about 2 feet. The height of tide is largely dependent on the force, direction, and duration of the wind. Strong northerly winds
DOCUMENT 00 73 00.01 45 Page 3 may depress the water surface as much as, and in some instances more than 2 feet below Mean Lower Low Water (MLLW), while southerly winds may raise the water surface as much as, and in some instances more than 2 feet above MLLW.
(c) Transportation Facilities. The immediate vicinity is served by railroad, highway, and deep and shallow draft channels.
(d) Other Information. Channel traffic consists of deep draft ships, small boats of various sizes, fishing vessels, and tugs. Traffic will interfere with dredging operations to some extent.
The general shape of the existing section of channel to be dredged is shown by cross sections on the Contract drawings.
1.4 QUANTITY SURVEYS (APR 1984) (FAR 52.236-16)
(a) Quantity surveys shall be conducted, and the data derived from these surveys shall be used in computing the quantities of work performed and the actual construction completed and in place.
(b) The Government shall conduct the original and final surveys and make the computations based on them. The Contractor shall conduct the surveys for any periods for which progress payments are requested and make the computations based on these surveys. All surveys conducted by the Contractor shall be conducted under the direction of the Contracting Officer, unless the Contracting Officer waives this requirement in a specific instance.
(c) Promptly upon completing a survey, the Contractor shall furnish the originals of all field notes and all other records relating to the survey or to the layout of the work to the Contracting Officer, who shall use them as necessary to determine the amount of progress payments. The Contractor shall retain copies of all such material furnished to the Contracting Officer.
1.5 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the con-tractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region VI. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
DOCUMENT 00 73 00.01 45 Page 4
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
NOTE: A copy of EP 1110-1-8, "CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE," is available at the following website:
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx.
1.6 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the Contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations.
When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the Contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rms.usace.army.mil/ ) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to
DOCUMENT 00 73 00.01 45 Page 5 produce contractor-certified electronic versions of weekly payroll data;
ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Document --
DOCUMENT 00 73 00.01 45 Page 6
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT AMENDMENT NO. 0001
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LUMP SUM PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Pre-Dredge Hazard Survey
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Mobilization and Demobilization - Sea Turtle Trawling and
Relocation
1.2.3.1 Payment AM#1
1.2.3.2 Unit of Measure
1.2.4 Turtle Deflector Device and Endangered Species Observers
1.2.4.1 Payment
1.2.4.2 Unit of Measure
1.2.5 ODMDS Monitoring Surveys
1.2.5.1 Payment
1.2.5.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Debris Removal
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measure
1.3.2 Sea Turtle Trawling and Relocation
1.3.2.1 Payment AM#1
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
1.3.3 Dredging
1.3.3.1 Payment
1.3.3.2 Dredging Partial Payment
1.3.3.3 Measurement
1.3.3.4 Electronic Positioning AM#1
1.3.3.5 Surveys During Progress of Work
1.3.3.6 Table of Typical Government Performed Survey AM#1
1.3.3.7 Unit of Measurement
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 22 00.10 Page 1
SECTION 01 22 00.10 Page 2
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys ; G
SD-07 Certificates
Certified Weight Tickets ; G
Certified Barge Displacement Tickets ; G
Submit Certified Weight Certificates for Debris Removal
1.2 LUMP SUM PAYMENT ITEMS
Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.
Lump sum items are designated on the Bid Schedule as "JOB." All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, will be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for which separate payment is not otherwise provided.
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
The Contract price for "Mobilization and Demobilization" in Schedule No. 1 will include the costs in connection with mobilization and demobilization of the plant necessary to perform work under the various bid items. The Contract price will include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation and, after the completion of the work, for removal of the plant and equipment from the work site(s). Payment for mobilization and demobilization will be pursuant to the conditions as defined in the SECTION 00 72 00 CONTRACT CLAUSES.
SECTION 01 22 00.10 Page 3
1.2.1.2 Unit of Measure
Unit of measure: Job.
1.2.2 Pre-Dredge Hazard Survey
1.2.2.1 Payment
The Contract Price for:
"Pre-Dredge Hazard Survey - Section Nos. 1 thru 13" in Schedule No. 1, "Pre-Dredge Hazard Survey - Section No. 14" in Option No 1, "Pre-Dredge Hazard Survey - Section Nos. 15 and 16" in Option No. 2, "Pre-Dredge Hazard Survey - Section Nos. 17 and 18" in Option No. 3, "Pre-Dredge Hazard Survey - Section Nos. 20 and 21" in Option No. 4, "Pre-Dredge Hazard Survey - Section Nos. 22 and 23" in Option No. 5 and "Pre-Dredge Hazard Survey - Section No. 19" in Option No. 8 will include costs in connection with performing pre-dredge hazard survey and preparation of Hazard Survey Report in accordance with SECTION 35 20
23.12 45 HOPPER DREDGING.
1.2.2.2 Unit of Measure
Unit of measure: Job.
1.2.3 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
1.2.3.1 Payment AM#1
The Contract price for "Mobilization and Demobilization - Sea Turtle Trawling and Relocation" in Option Nos. 9 and 10 will include the cost in connection with mobilization and demobilization of one Trawler. Payment for mobilization and demobilization will be made pursuant persuant to the conditions of the SECTION 00 72 00 CONTRACT CLAUSES.
1.2.3.2 Unit of Measure
Unit of Measure: Job
1.2.4 Turtle Deflector Device and Endangered Species Observers
1.2.4.1 Payment
Payment for Endangered Species Observers and Turtle Deflector Device will be made under the pay item "Turtle Deflector Device and Endangered Species Observers" in Schedule No. 1 and Option Nos. 1 through 8. Payment will include the costs of materials and other execution requirements associated with the protection and monitoring of sea turtles as specified in SECTION
35 20 23.14 45 PROTECTION OF SEA TURTLES.
1.2.4.2 Unit of Measure
Unit of measure: Job.
SECTION 01 22 00.10 Page 4
1.2.5 ODMDS Monitoring Surveys
1.2.5.1 Payment
The Contract Price for "ODMDS Monitor Surveys" in Schedule No. 1 and Option Nos. 1 through 5 will include the costs necessary to perform before dredging, after dredging, and monthly hydrographic surveys of Ocean Dredged Material Disposal Sites (ODMDS).
1.2.5.2 Unit of Measure
Unit of measure: Job.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for each of the unit price items.
1.3.1 Debris Removal
1.3.1.1 Payment
(1) Payment for the following debris removal items will be made at the Contract unit price for costs associated with materials, labor, and equipment for removal and disposal of debris from the dredging template, as specified in SECTION 35 20 23.12 45 (HOPPER DREDGING):
a. Debris Removal-Section Nos. 1, 2, 4, 5, and 7 thru 13 in Schedule No. 1:
- "Debris Removal-up to 5 Tons Total"
- "Debris Removal-Above 5 Tons up to 10 Tons Total"
- "Debris Removal-Above 10 Tons up to 15 Tons Total"
b. "Debris Removal-Section No. 14" in Option No. 1
c. "Debris Removal-Section Nos. 15 and 16" in Option No. 2
d. "Debris Removal-Section Nos. 17 and 18" in Option No. 3
e. "Debris Removal-Section Nos. 20 and 21" in Option No. 4
f. "Debris Removal-Section Nos. 22 and 23" in Option No. 5
g. "Debris Removal-Section No. 3" in Option No. 6
h. "Debris Removal-Section No. 6" in Option No. 7
i. "Debris Removal-Section No. 19" in Option No. 8
(2) Debris removal during construction will include all of the debris in Appendix B, "Geophysical Surveys" drawings that is within the dredging template, and any additional debris encountered within the dredging template during the course of work, that cannot be removed through ordinary dredging. Incidental debris will not be included in this pay item.
(3) The Contract Price for Debris Removal will include relocating the debris to a disposal facility in accordance with applicable laws and ordinances. Contractor shall be responsible for any disposal fees charged by the disposal facility.
SECTION 01 22 00.10 Page 5
1.3.1.2 Measurement
Measurement for Debris Removal will be per short ton of 2000 pounds based on the Contractor's submittal of either Certified Barge Displacement Tickets or Certified Weight Tickets for Debris actually removed. Sediment will not be included in the debris weight. Unless prior approval is obtained from Engineer, weights of less than 5 tons will not be measured through barge displacement; only Certified Weight Tickets will be accepted. Contractor is required to provide photographs of the debris as measured.
1.3.1.3 Unit of Measure
Unit of measure: Ton.
1.3.2 Sea Turtle Trawling and Relocation
1.3.2.1 Payment AM#1
Payment for "Sea Turtle Trawling and Relocation" in Option Nos. 9 and 10 will be made at the unit price per day, which will include costs associated with trawling ahead of the hopper dredge, Sea Turtle Trawling Relocation Supervisor, and relocation of turtles. I f Cont r act or opt s t o ut i l i ze mul t i pl e hopper dr edges concur r ent l y, one t r awl er and one Rel ocat i on Super vi sor i s r equi r ed f or each dr edge, and t hi s pr i ce shal l cover t he Sea Tur t l e Tr awl i ng and Rel ocat i on Super vi sor s f or al l concur r ent l y- oper at ed dr edges. The estimated number of days in the bid item is a maximum number of days estimated for bidding purposes. If the number of days is less, the Contractor will be paid at the daily unit price for the actual number of days conducting this activity. If there is a requirement for a greater number of days, the daily unit price will be used for payment for the additional days.
1.3.2.2 Measurement
Sea Turtle trawling and relocation will be measured by the day utilized for trawling and relocation as specified in the SECTION 35 20 23.14 45
PROTECTION OF SEA TURTLES
1.3.2.3 Unit of Measure
Unit of Measure: Day.
1.3.3 Dredging
1.3.3.1 Payment
Payment for:
"New Work Dredging - Section Nos. 1, 2, 4, 5, and 7 thru 13" in Schedule No. 1, "New Work Dredging - Section No. 14" in Option No. 1, "Maintenance Dredging - Section No. 16" and "New Work Dredging - Section Nos. 15 and 16" in Option No. 2, "Maintenance Dredging - Section Nos. 17 and 18" and "New Work Dredging -
SECTION 01 22 00.10 Page 6
Section Nos. 17 and 18" in Option No. 3, "Maintenance Dredging - Section Nos. 20 and 21" and "New Work Dredging - Section Nos. 20 and 21" in Option No. 4, "Maintenance Dredging - Section Nos. 22 and 23" and "New Work Dredging - Section Nos. 22 and 23" in Option No. 5, "New Work Dredging Section No. 3 - Pipeline Avoidance Area 1" in Option No. 6, "New Work Dredging Section No. 6 - Pipeline Avoidance Area 2" in Option No. 7, and
"Maintenance Dredging Section No. 19 - Pipeline Avoidance Area 3" and "New Work Dredging Section No. 19 - Pipeline Avoidance Area 3" in Option No. 8 will be made for costs associated with the removal of dredged material, transportation, and placement at the designated Ocean Dredged Material Disposal Sites (ODMDS).
1.3.3.2 Dredging Partial Payment
Partial payment will be based on estimated quantities determined by fathometer soundings or sweepings taken behind the dredge. The Contractor may use its own hydrographic surveys to determine quantities for pay requests, but final quantities will be based on Government Before-Dredging and After-Dredging surveys.
1.3.3.3 Measurement
The material removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. The total quantity of dredged material will be the theoretical quantity between the bottom surface shown by fathometer soundings of the last survey made "before-dredging" and the bottom surface shown by the fathometer soundings of a survey made "after-dredging," within the limits of the required depth, overdepth, and side and end slopes, as defined by template and depicted in the cross-sectional views and within, less deductions that may be required for misplaced material.
1.3.3.4 Electronic Positioning AM#1
The survey control monuments depicted on the plans are the monument locations that the Government uses to establish tide staffs that are used to measure before and after dredging in-situ volume estimates. The hor i zont al cont r ol poi nt s shown ar e t he cont r ol poi nt s t he Gover nment wi l l use t o per f or m el ect r oni c sur veys on t he wat er way. The Government does not guarantee permanent access to these control points; therefore, it may be necessary for the Contractor to establish its own network of survey points from these survey points or from other U.S. Coast and Geodetic Survey (USCGS) monuments. Location and description of the horizontal control points which the Government plans to use to perform electronic surveys on the channels are available at the Port Arthur Resident Office.
The Contractor shall be responsible for establishing its own reference line to conduct hydrographic surveys and dredging operations if electronic positioning equipment is not used.
SECTION 01 22 00.10 Page 7
1.3.3.5 Surveys During Progress of Work
Contract depth will be determined by surveys taken behind the dredge as work progresses. The Contractor shall take progress soundings or sweepings and submit drawings of the surveys.
1.3.3.6 Tabl e of Typi cal Gover nment Per f or med Sur vey AM#1
The Gover nment wi l l per f or m el ect r oni c sur veys of t he channel , wi t h mul t i beam sur veys bei ng per f or med f or accept ance pur poses. Mul t i beam sur veys won' t be appl i ed t o det er mi ne pay vol umes, but wi l l be used t o cer t i f y t he channel dept h. The Cont r act or wi l l not be r equi r ed t o f ur ni sh f aci l i t i es f or t he Gover nment ’ s sur veys speci f i ed i n t he SECTI ON 35 20
23. 12 45 HOPPER DREDGI NG, Par agr aph t i t l ed FI NAL EXAMI NATI ON AND ACCEPTANCE. The Gover nment wi l l appl y t he ver t i cal and hor i zont al sur vey cont r ol i ndi cat ed on t he dr awi ngs. Real Ti me Ki nemat i c ( RTK) and Vi r t ual Ref er ence St at i on ( VRS) wi l l be used f or posi t i oni ng.
Pr ocessi ng t he sur vey dat a wi l l be per f or med wi t h t he most r ecent ver si on of HYPACK sof t war e avai l abl e at t he t i me of awar d, usi ng t he Ki ngf i sher Met hod. Dat a wi l l be post - pr ocessed usi ng POSpac t o per f or m qual i t y checks of r esul t s when necessar y. Vol umes wi l l be comput ed by aver age end ar ea usi ng cr oss sect i onal sur vey l i nes. Bef or e and Af t er Dr edge cr oss sect i ons wi l l be r un on 100- f oot st at i ons and at changes i n t he t empl at e unl ess ot her wi se speci f i ed i n t he dr awi ngs. The Gover nment wi l l pr ovi de t he sur vey l i ne f i l es at t he Cont r act or s r equest .
The per f or mance of t hi s Sur vey wor k by t he Gover nment and pr esence of t he i nspect or shal l not r el i eve t he Cont r act or of r esponsi bi l i t y f or t he pr oper execut i on of t he wor k i n accor dance wi t h t he Cont r act Dr awi ngs and Specifications.
SECTION 01 22 00.10 Page 8
Survey I nt ended Pur pose I nspect i on I nt er val s
Channel
Before Dredging
("BD")
Cross Sections:
To establish baseline condition for calculation of Pay volumes.
Prior to commencing dredging
Survey:
Required by USACE for general, overall documentation of pre-dredging bathymetry.
Prior to commencing dredging with Channel Reach
After Dredging ("AD") Cross Sections:
To document final dredging locations and depths, verify that material extraction has not occurred beyond specified limits, and determine Pay volumes.
Upon completion of physical material extraction (required with each Invoice).
Survey:
Required by USACE to document final dredging locations and depths and verify that material extraction has not occurred…
This is the start of the file's text. The full file is on GovTribe.