Amend-0002_W912HY21B0011.pdf
PDF 518 KB Posted
- Solicitation number
- W912HY21B0011
About this file
This document package includes an amendment to a solicitation and the related federal contract opportunity. The amendment modifies the bid schedule for a solicitation seeking dredging services along the Houston Ship Channel, Texas from Exxon to Carpenters Bayou and the Jacintoport Channel in Harris County, Texas. The amendment updates the bid schedule to include revised pricing tables for Schedule No. 1 work and Option No. 1. Schedule No. 1 covers base mobilization, management, and dredging services totaling approximately 2.4 million cubic yards along the ship channel. Option No. 1 includes additional dredging of approximately 72,000 cubic yards at Jacintoport Dock A and CARE Docks, as well as debris removal and standby services. Bids are due by June 3, 2021 for the estimated $5-10 million contract to be awarded by the Department of the Army Corps of Engineers Galveston District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C1_Signed_Abstract_W912HY21B0011_3 Jun 2021.pdf | ||
| Amend 0001 W912HY21B0011.pdf | ||
| W912HY21B0011-PLANS.pdf | ||
| W912HY21B0011-Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amandment is shown on page 2.
THE BID OPENING DATE REMAINS ON 3 JUN 2021 @ 2:00 P.M. LOCAL TIME.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HY21B0011
X 9B. DATED (SEE ITEM 11)
04-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jun-2021
CODE
US ARMY CORPS OF ENGINEERS
GALVESTON DISTRICT
CONTRACTING DIVISION
2000 FORT POINT ROAD
GALVESTON TX 77550-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY21B0011
A0002-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. THE SPECIFICATIONS FOR SOLICITATION NO. W912HY21B0011, HOUSTON SHIP
CHANNEL, TEXAS EXXON TO CARPENTERS BAYOU AND JACINTOPORT CHANNEL,
PIPELINE DREDGING, IN HARRIS COUNTY, TEXAS, FOR WHICH BIDS ARE DUE 03
JUNE 2021 AT 2:00 PM, ARE HEREBY AMENDED AS FOLLOWS:
a) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with Amendment 0001.
2. This amendment shall be attached to and become a part of the solicitation.
1 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
SWG FILE NO.: HSC 0401-0588 SOLICITATION NO.: W912HY21B0011
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE AMENDMENT NO. 0002
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1 AM#1
1.1.2 Option No. 1 AM#1,AM#2
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
TO ACCOMPANY AMENDMENT NO. 0002 TO SOLICITATION: W912HY21B0011
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 2
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1 AM#1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $___________
0002 Pipeline Management
1 JOB SUM $___________
0003 Dredging, Houston Ship Channel, Section 1 through 4
1,128,000 C.Y. $_________ $___________
0004 Dredging, Houston Ship Channel, Section 5 through 8
1,311,000 C.Y. $_________ $___________
0005 Dredging, Jacintoport Channel, Section 9 94,000 C.Y. $_________ $___________
0006 Site Management 1 JOB SUM $___________
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 3
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.2 Option No. 1 AM#1,AM#2
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 1
0007 Dredging, Jacintoport Dock A, Section 10
27,000 C.Y. $_________ $___________
0008 Dredging, CARE Docks, Section 11 45,000 C.Y. $_________ $___________
0009 Debris Removal
30 TON $_________ $___________
0010 Standby for Docks
60 HR $_________ $___________
TOTAL OPTION NO. 1 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________
NOTE FOR OPTION NO. 1: The Government may exercise this Option by written notice to the Contractor 60 calendar days after the Notice to Proceed for Schedule No.1 work. An additional time of 40 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 4
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 6
| Amend0002_2 Jun 2021 |
| Amend 0002 page-2 |
| 00 11 00.00 45 |
| 00 11 00.00 45 - BID SCHEDULE AMENDMENT NO. 0002 |
| 00 11 00.00 45 - BID SCHEDULE |
| PART 1 GENERAL |
| 1.1 BID SCHEDULE |
| 1.1.1 Schedule No. 1 AM#1 |
| 1.1.2 Option No. 1 AM#1,AM#2 |
1.2 EVALUATION OF OPTIONS July 1990 FAR 52.217-5