This document contains an abstract of bids received in response to a solicitation for roadway and parking lot repair work. The solicitation sought bids for repairing approximately 300 potholes with compacted cement stabilized base, laying approximately 1263 cubic yards of asphalt roadway, and applying fog seal to approximately 9000 square yards of road. It also included stripping 1500 linear feet of 4-inch lines for four existing parking lots and creating a new parking lot with approximately 300 cubic yards of compacted fill, 80 cubic yards of flexible base, 50 tons of asphalt, and 150 linear feet of 4-inch line stripping. Five bids were received by the deadline with pricing and completion details provided. The apparent low bidder was 13.09% below the independent government estimate.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT
PRICE TOTAL
Road Prime Coat 2,240 Gal $49.74 $111,417.60
Road Asphaltic Concrete Payment 2,440 Ton $135.56 $330,766.40
Cement Stabilized Base Pot Holes Repair 100 Ton $502.88 $50,288.00
0004 Concrete Pot Holes Repair 2 EA $667.57 $1,335.14
0005 Smoothing Base Surface 16,800 L.F. $15.64 $262,752.00
0006 Repair Concrete Pavement 300 S.F. $23.94 $7,182.00
TOTAL SCHEDULE No. 1 $763,741.14
0007 Parking Lot 1 Sealing and Striping 1 Job $9,630.00 $9,630.00
0008 Parking Lot 3 Sealing and Striping 1 Job $25,950.00 $25,950.00
0009 Parking Lot 4 Sealing and Striping 1 Job $38,135.00 $38,135.00
0010 Parking Lot 5 Sealing and Striping 1 Job $17,150.00 $17,150.00
Road Slurry Sealing 1 Job $97,200.00 $97,200.00
Sealing Crack and Asphalt Paving 3,000 L.F. $4.93 $14,790.00
Asphalt Paving Patching 12 S.Y. $48.68 $584.16
TOTAL OPTION NO. 1 $203,439.16
TOTAL SCHEDULE NO.1 AND OPTION NO. 1 $967,180.30
Parking Lot 2 Stripping 1 Job $2,580.00 $2,580.00
Parking Lot 2 Turfing 1 Job $3,653.00 $3,653.00
Parking Lot 2 Stripping and Signage 1 Job $650.00 $650.00
Parking Lot 2 Fill 58 C.Y. $35.75 $2,073.50
Parking Lot 2 Fill Flexible Base 38 C.Y. $102.00 $3,876.00
Parking Lot 2 Prime Coat 33 Gal $40.50 $1,336.50
Parking Lot 2 Asphaltice Concrete Pavement 26 Ton $150.00 $3,900.00
Parking Lot 2 Wheel Stops 5 EA $150.00 $750.00
TOTAL OPTION NO. 2 $18,819.00
TOTAL SCHEDULE NO. 1 & OPTION NO. 1 &2 $985,999.30
QUANTITY
ABSTRACT OF OFFERS Page 1 of 6
Solicitation No.: W912HY20B0005 Date Issued: 31 Dec 2020 Date Opened: 06 Feb 2020 Issuing Office: USAED-Galveston Project Title: Repair West Dam Top Road Wallisville, Chambers County, Texas HUBZone Small Business Set Aside.
Number of Amendments Issued: 0001 - 0005
Government Estimate (Without Profit)
NO.
ITEM
I .
* The apparent low bidder, Briggs Brothers Enterprised Corporation is 13.09 % below the Independent Government's Estimate.
CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION
MARIA E. RODRIGUEZ
CONTRACTING OFFICER
Road Prime Coat 2,240 Gal $12.00 $26,880.00 Road Asphaltic Concrete Payment 2,440 Ton $155.00 $378,200.00 Cement Stabilized Base Pot Holes Repair 100 Ton $626.20 $62,620.00
0004 Concrete Pot Holes Repair 2 EA $5,237.75 $10,475.50 0005 Smoothing Base Surface 16,800 L.F. $3.56 $59,808.00 0006 Repair Concrete Pavement 300 S.F. $16.47 $4,941.00 Extended Price
Error TOTAL SCHEDULE No. 1 $542,924.50
0007 Parking Lot 1 Sealing and Striping 1 Job $70,212.00 $70,212.00
0008 Parking Lot 3 Sealing and Striping 1 Job $195,361.80 $195,361.80 0009 Parking Lot 4 Sealing and Striping 1 Job $322,300.80 $322,300.80
0010 Parking Lot 5 Sealing and Striping 1 Job $119,745.60 $119,745.60
Road Slurry Sealing 1 Job $209,532.00 $209,532.00
Sealing Crack and Asphalt Paving 3,000 L.F. $8.41 $25,230.00
Asphalt Paving Patching 12 S.Y. $455.53 $5,466.36
TOTAL OPTION NO. 1 $947,848.56
TOTAL SCHEDULE NO.1 AND OPTION NO. 1 $1,490,773.06
Parking Lot 2 Stripping 1 Job $788.54 $788.54
Parking Lot 2 Turfing 1 Job $3,432.00 $3,432.00
Parking Lot 2 Stripping and Signage 1 Job $1,029.60 $1,029.60
Parking Lot 2 Fill 58 C.Y. $73.17 $4,243.86
Parking Lot 2 Fill Flexible Base 38 C.Y. $35.00 $1,330.00
Parking Lot 2 Prime Coat 33 Gal $27.46 $906.18
Parking Lot 2 Asphaltice Concrete Pavement 26 Ton $171.60 $4,461.60
Parking Lot 2 Wheel Stops 5 EA $164.74 $823.70
TOTAL OPTION NO. 2 $17,015.48
TOTAL SCHEDULE NO. 1 & OPTION NO. 1 &2 $1,507,788.54 Corrected Total
ITEM
QUANTITY
Solicitation No.: W912HY20B0005 Date Issued: 31 DEC 2020 Date Opened: 06 FEB 2020
NO.
Offeror: #1 - GC Works Inc.
Issuing Office: USAED-Galveston
Business Size: HUBZone SB, SDB
Project Title: Repair West Dam Top Road Wallisville, Chambers County, Texas HUBZone Small Business Set Aside.
Road Prime Coat 2,240 Gal $7.15 $16,016.00
Road Asphaltic Concrete Payment 2,440 Ton $189.00 $461,160.00
Cement Stabilized Base Pot Holes Repair 100 Ton $474.00 $47,400.00
0004 Concrete Pot Holes Repair 2 EA $6,699.00 $13,398.00
0005 Smoothing Base Surface 16,800 L.F. $9.25 $155,400.00
0006 Repair Concrete Pavement 300 S.F. $20.30 $6,090.00 Extended Price Error
TOTAL SCHEDULE No. 1 $699,464.00
0007 Parking Lot 1 Sealing and Striping 1 Job $18,551.00 $18,551.00
0008 Parking Lot 3 Sealing and Striping 1 Job $51,220.00 $51,220.00
0009 Parking Lot 4 Sealing and Striping 1 Job $82,385.00 $82,385.00
0010 Parking Lot 5 Sealing and Striping 1 Job $32,315.00 $32,315.00
Road Slurry Sealing 1 Job $53,920.00 $53,920.00
Sealing Crack and Asphalt Paving 3,000 L.F. $1.15 $3,450.00
Asphalt Paving Patching 12 S.Y. $258.00 $3,096.00
TOTAL OPTION NO. 1 $244,937.00
TOTAL SCHEDULE NO.1 AND OPTION NO. 1 $944,401.00
Parking Lot 2 Stripping 1 Job $6,305.00 $6,305.00
Parking Lot 2 Turfing 1 Job $4,298.00 $4,298.00
Parking Lot 2 Stripping and Signage 1 Job $1,805.00 $1,805.00
Parking Lot 2 Fill 58 C.Y. $300.00 $17,400.00
Parking Lot 2 Fill Flexible Base 38 C.Y. $119.00 $4,522.00
Parking Lot 2 Prime Coat 33 Gal $7.15 $235.95
Parking Lot 2 Asphaltice Concrete Pavement 26 Ton $189.00 $4,914.00
Parking Lot 2 Wheel Stops 5 EA $155.00 $775.00
TOTAL OPTION NO. 2 $40,254.95
TOTAL SCHEDULE NO. 1 & OPTION NO. 1 &2 $984,655.95 Corrected Total
Offeror: #2 - J. Star Enterprises, Inc.
Business Size: HUBZone SB, WOSB, EDWOSB, SDB
QUANTITY
ITEM
NO.
Road Prime Coat 2,240 Gal $11.00 $24,640.00
Road Asphaltic Concrete Payment 2,440 Ton $178.00 $434,320.00
Cement Stabilized Base Pot Holes Repair 100 Ton $522.00 $52,200.00
0004 Concrete Pot Holes Repair 2 EA $3,396.00 $6,792.00
0005 Smoothing Base Surface 16,800 L.F. $5.00 $84,000.00
0006 Repair Concrete Pavement 300 S.F. $54.00 $16,200.00
TOTAL SCHEDULE No. 1 $618,152.00
0007 Parking Lot 1 Sealing and Striping 1 Job $17,842.00 $17,842.00
0008 Parking Lot 3 Sealing and Striping 1 Job $42,056.00 $42,056.00
0009 Parking Lot 4 Sealing and Striping 1 Job $59,167.00 $59,167.00
0010 Parking Lot 5 Sealing and Striping 1 Job $28,409.00 $28,409.00
Road Slurry Sealing 1 Job $42,035.00 $42,035.00
Sealing Crack and Asphalt Paving 3,000 L.F. $8.00 $24,000.00
Asphalt Paving Patching 12 S.Y. $1,092.00 $13,104.00
TOTAL OPTION NO. 1 $226,613.00
TOTAL SCHEDULE NO.1 AND OPTION NO. 1 $844,765.00
Parking Lot 2 Stripping 1 Job $1,715.00 $1,715.00
Parking Lot 2 Turfing 1 Job $2,339.00 $2,339.00
Parking Lot 2 Stripping and Signage 1 Job $1,871.00 $1,871.00
Parking Lot 2 Fill 58 C.Y. $176.00 $10,208.00
Parking Lot 2 Fill Flexible Base 38 C.Y. $202.00 $7,676.00
Parking Lot 2 Prime Coat 33 Gal $44.00 $1,452.00
Parking Lot 2 Asphaltice Concrete Pavement 26 Ton $646.00 $16,796.00
Parking Lot 2 Wheel Stops 5 EA $187.00 $935.00
TOTAL OPTION NO. 2 $42,992.00
TOTAL SCHEDULE NO. 1 & OPTION NO. 1 &2 $887,757.00
ITEM
NO.
QUANTITY
Offeror: #3 - Alamo City Constructors, Inc.
Business Size: HUBZone SB, WOSB, EDWOSB, SDB
Road Prime Coat 2,240 Gal $20.07 $44,956.80 Road Asphaltic Concrete Payment 2,440 Ton $264.56 $645,526.40 Cement Stabilized Base Pot Holes Repair 100 Ton $866.64 $86,664.00
0004 Concrete Pot Holes Repair 2 EA $8,027.87 $16,055.74 0005 Smoothing Base Surface 16,800 L.F. $1.84 $30,912.00 0006 Repair Concrete Pavement 300 S.F. $91.23 $27,369.00
TOTAL SCHEDULE No. 1 $851,483.94 0007 Parking Lot 1 Sealing and Striping 1 Job $1,128.05 $1,128.05 0008 Parking Lot 3 Sealing and Striping 1 Job $1,128.05 $1,128.05 0009 Parking Lot 4 Sealing and Striping 1 Job $1,128.05 $1,128.05 0010 Parking Lot 5 Sealing and Striping 1 Job $1,128.05 $1,128.05
Road Slurry Sealing 1 Job $33,525.79 $33,525.79 Sealing Crack and Asphalt Paving 3,000 L.F. $6.51 $19,530.00 Asphalt Paving Patching 12 S.Y. $830.54 $9,966.48
TOTAL OPTION NO. 1 $67,534.47
TOTAL SCHEDULE NO.1 AND OPTION NO. 1 $919,018.41
Parking Lot 2 Stripping 1 Job $1,239.62 $1,239.62 Parking Lot 2 Turfing 1 Job $1,797.44 $1,797.44 Parking Lot 2 Stripping and Signage 1 Job $1,239.62 $1,239.62 Parking Lot 2 Fill 58 C.Y. $192.13 $11,143.54 Parking Lot 2 Fill Flexible Base 38 C.Y. $371.88 $14,131.44 Parking Lot 2 Prime Coat 33 Gal $61.98 $2,045.34 Parking Lot 2 Asphaltice Concrete Pavement 26 Ton $595.02 $15,470.52 Parking Lot 2 Wheel Stops 5 EA $235.52 $1,177.60
TOTAL OPTION NO. 2 $48,245.12
TOTAL SCHEDULE NO. 1 & OPTION NO. 1 &2 $967,263.53
Solicitation No.: W912HY20B0005 Date Issued: 31 DEC 2020 Date Opened: 06 FEB 2020 Issuing Office: USAED-Galveston Project Title: Repair West Dam Top Road Wallisville, Chambers County, Texas HUBZone Small Business Set Aside.
Offeror: #4 - Randy Kinder Excavating, Inc. DBA RKE Contractors Business Size: HUBZone SB, SDB, SDVOSB
ITEM
NO. QUANTITY
Road Prime Coat 2,240 Gal $8.00 $17,920.00 Road Asphaltic Concrete Payment 2,440 Ton $190.00 $463,600.00 Extended Price
Error Cement Stabilized Base Pot Holes Repair 100 Ton $100.00 $10,000.00
0004 Concrete Pot Holes Repair 2 EA $1,000.00 $2,000.00 0005 Smoothing Base Surface 16,800 L.F. $3.00 $50,400.00 0006 Repair Concrete Pavement 300 S.F. $25.00 $7,500.00
TOTAL SCHEDULE No. 1 $551,420.00 0007 Parking Lot 1 Sealing and Striping 1 Job $15,000.00 $15,000.00 0008 Parking Lot 3 Sealing and Striping 1 Job $15,000.00 $15,000.00 0009 Parking Lot 4 Sealing and Striping 1 Job $15,000.00 $15,000.00 0010 Parking Lot 5 Sealing and Striping 1 Job $15,000.00 $15,000.00
Road Slurry Sealing 1 Job $133,000.00 $133,000.00 Sealing Crack and Asphalt Paving 3,000 L.F. $3.00 $9,000.00 Asphalt Paving Patching 12 S.Y. $500.00 $6,000.00
TOTAL OPTION NO. 1 $208,000.00
TOTAL SCHEDULE NO.1 AND OPTION NO. 1 $759,420.00
Parking Lot 2 Stripping 1 Job $40,000.00 $40,000.00 Parking Lot 2 Turfing 1 Job $26,500.00 $26,500.00 Parking Lot 2 Stripping and Signage 1 Job $15,000.00 $15,000.00 Parking Lot 2 Fill 58 C.Y. $50.00 $2,900.00 Parking Lot 2 Fill Flexible Base 38 C.Y. $30.00 $1,140.00 Parking Lot 2 Prime Coat 33 Gal $35.00 $1,155.00 Parking Lot 2 Asphaltice Concrete Pavement 26 Ton $225.00 $5,850.00 Parking Lot 2 Wheel Stops 5 EA $1,000.00 $5,000.00
TOTAL OPTION NO. 2 $97,545.00
TOTAL SCHEDULE NO. 1 & OPTION NO. 1 &2 $856,965.00
Business Size: HUBZone SB, SDB
ITEM
NO. QUANTITY
Offeror: #5 - Briggs Brother Enterprises Corporation
| 2020-02-10T19:54:25-0600 | |
| RODRIGUEZ.MARIA.E.1231838984 |
File details come from the government source that posted it. Updated .