B3_W912HY19R0017-WWTP_Plans_P1_20190813.pdf
PDF 29 MB Posted
- Solicitation number
- W912HY-19-R-0017
About this file
Waste Water Treatment Plant Drawings Part 1
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2-GA001
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
USACE SIGNATURE BLOCK AREA
SMALL PROJECT INDEX AREA / AE STAMPS
BUFFALO DISTRICT
PORT ISABEL DETENTION CENTER
KITCHEN AND WASTEWATER
TREATMENT PLANT IMPROVEMENTS
VOLUME 2
W912HY-19-R-0017
W912HY-19-C-XXXX
17 JULY 2019
PROJECT
LOCATION
C O
V E
R S
H E
E T
P_
CO
VE
RA
_8
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
P_
NO
TE
S_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
S H
E E
T
IN
D E
X
2-GA002
SHEET INDEX TABLE
SHEET NUMBER SHEET TITLE
2-GA001 COVER SHEET
2-GA002 SHEET INDEX
2-GA003 SUMMARY OF QUANTITIES
2-G-001 GENERAL LEGEND AND ABBREVIATIONS
2-G-002 GENERAL NOTES
2-G-003 GENERAL NOTES
2-G-004 GENERAL NOTES
2-G-005 PROCESS FLOW DIAGRAM
2-G-006 PROCESS DESIGN SUMMARY
2-G-007 HYDRAULIC PROFILE
2-G-008 SITE PUMP STATION PROCESS AND INSTRUMENTATION DIAGRAM
2-G-009 WASTEWATER TREATMENT PLANT PROCESS AND INSTRUMENTATION DIAGRAM
2-G-010 WASTEWATER TREATMENT PLANT PROCESS AND INSTRUMENTATION DIAGRAM
2-G-011 WASTEWATER TREATMENT PLANT PROCESS AND INSTRUMENTATION DIAGRAM
2-G-012 WASTEWATER TREATMENT PLANT PROCESS AND INSTRUMENTATION DIAGRAM
2-G-013 EQUIPMENT SCHEDULES
2-G-014 EQUIPMENT SCHEDULES
2-G-015 PROJECT FIRM
2-C-100 SITE PUMP STATION EXISTING CONDITIONS
2-C-101 SITE PUMP STATION DEMOLITION PLAN
2-C-102 SITE PUMP STATION DEMOLITION PLAN
2-C-103 SITE PUMP STATION SITE PLAN
2-C-104 SITE PUMP STATION GRADING AND PAVING PLAN
2-C-105 SITE PUMP STATION PLAN AND PROFILE
2-C-106 SITE PUMP STATION SECTION VIEW
2-C-107 WASTEWATER TREATMENT PLANT EXISTING CONDITIONS
2-C-108 WASTEWATER TREATMENT PLANT DEMOLITION PLAN
2-C-109 OVERALL WASTEWATER TREATMENT PLANT DEMOLITION PLAN
2-C-110 HEADWORKS DEMOLITION PLAN
2-C-111 RAS WAS PUMP STATION DEMOLITION PLAN
2-C-112 WASTEWATER TREATMENT PLANT SITE PLAN
2-C-113 WASTEWATER TREATMENT PLANT GRADING AND PAVING PLAN
2-C-114 WASTEWATER TREATMENT PLANT POINT TABLE
2-C-115 WASTEWATER TREATMENT PLANT PLAN AND PROFILE
2-C-116 WASTEWATER TREATMENT PLANT PLAN AND PROFILE
2-C-300 HEADWORKS PLAN VIEW
2-C-301 HEADWORKS SECTION VIEWS
2-C-302 HEADWORKS SECTION VIEWS
2-C-303 HEADWORKS PIPING PLAN
2-C-304 HEADWORKS PIPING PLAN
2-C-305 CHLORINE CONTACT BASIN REHABILITATION
2-C-306 FINAL CLARIFIER NO. 1 SOUTH REHABILITATION
2-C-307 FINAL CLARIFIER NO.2 NORTH REHABILITATION
2-C-501 SITE PUMP STATION MANHOLE DETAILS
2-C-502 WASTEWATER TREATMENT PLANT MANHOLE DETAILS
2-C-503 JOINT LAYOUT
2-C-504 SITE DETAILS
2-C-505 SITE DETAILS
2-C-506 SITE DETAILS
2-C-507 SITE DETAILS
2-C-508 SITE DETAILS
2-C-509 SITE DETAILS
2-C-510 SITE DETAILS
2-C-511 SITE DETAILS
2-E-001 ELECTRICAL SYMBOL LEGEND AND NOTES
2-E-101 SITE PUMP STATION ELECTRICAL PLAN
2-E-102 WASTEWATER TREATMENT PLANT ELECTRICAL PLAN
2-E-501 ELECTRICAL BUILDING
2-E-502 ELECTRICAL BUILDING
2-E-503 ELECTRICAL BUILDING
2-E-504 ELECTRICAL BUILDING
2-E-505 ELECTRICAL BUILDING
2-E-601 ONE LINE DIAGRAM & SCHEDULES
2-E-602 ONE LINE DIAGRAM & SCHEDULES
2-S-101 HEADWORKS STRUCTURAL
2-S-102 HEADWORKS STRUCTURAL
2-S-103 HEADWORKS STRUCTURAL
2-S-104 RAS/WAS STRUCTURAL
2-S-501 STRUCTURAL DETAILS
2-S-502 STRUCTURAL DETAILS
2-S-503 STRUCTURAL DETAILS
TE
S_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
S U
M M
A R
Y O
F Q
U A
N
TI
TI
E
S
2-GA003
SITE PUMP STATION LIFT STATION SUMMARY OF INSTALLATION QUANTITIES
ITEM NO. QUANTITY UNITS DESCRIPTION
E1 90 LF 4" DISCHARGE PIPING
E2 1 EA 4" VENT
E3 1 EA ACCESS HATCH
E4 1 EA PRE-CAST LIFT STATION
E5 2 EA SUBMERSIBLE PUMP
E6 27 CY CONCRETE
E7 7 CY GROUT
E8 191 CY AGGREGATE BACKFILL
E9 2 EA 4" PLUG VALVES
E10 2 EA 4" CHECK VALVES
E11 1 EA JIB CRANE
E12 1 EA ACCESS HATCH
E13 1 EA CONTROL PANEL
WASTEWATER TREATMENT PLANT SUMMARY OF INSTALLATION QUANTITIES
ITEM NO. QUANTITY UNITS DESCRIPTION
C1 163.5 SY 6" CONCRETE SIDEWALK
C2 140.5 SY 6" CONCRETE DRIVEWAY
C3 29 SY 2" ASPHALT
C4 170 LF 6" CURB AND GUTTER
C5 131 LF SECURITY FENCE
C6 1 EA 20' ACCESS GATE
C7 2 EA INLETS
C8 240 LF 8" SANITARY SEWER MAIN
C9 4 EA 4' MANHOLES
C10 250 LF 4" RAW SEWAGE
C11 176 LF 4" RETURN ACTIVATED SLUDGE LINE
C12 210 LF 4" WASTE ACTIVATED SLUDGE LINE
C13 121 LF 6" SLUDGE LINE
C14 62 LF 8" FILTERED RETURN LINE
C15 193 LF 2" WATER LINE (?)
C16 1 EA POLYMER FEED SYSTEM
C17 1 EA ELECTRICAL BUILDING
WASTEWATER TREATMENT PLANT SUMMARY OF DEMOLITION QUANTITIES
ITEM NO. QUANTITY UNITS DESCRIPTION
A1 29 SY 2" ASPHALT
A2 120 LF SECURITY FENCE
A3 1 EA 20' ACCESS GATE
A4 99 LF 8" SANITARY SEWER MAIN
A5 66 LF 4" RAW SEWAGE LINE
A6 312 LF 8" RAW SEWAGE LINE
A7 31 LF 6" RETURN ACTIVATED SLUDGE LINE
A8 255 LF 6" WASTE ACTIVATED SLUDGE LINE
A9 163 LF 4" SLUDGE LINE
A10 111 LF 6" SLUDGE LINE
A11 125 LF 8" FILTERED RETURN LINE
A12 143 LF 6" DRAIN LINE
A13 33 LF 8" CLARIFIER BYPASS LINE
A14 33 LF 3/4" WATER LINE
A15 86 LF 1" WATER LINE
A16 61 LF 2" WATER LINE
A17 1 EA 24" TREE
A18 3 EA WATER STRUCTURES
A19 1 EA EXISTING HEADWORKS BUILDING
A20 1 EA EXISTING INFLUENT PUMP STATION
A21 1 EA EXISTING FLOW SPLITTER BOX
A22 1 EA EXISTING RECEIVING MANHOLE AND RAS/WAS PUMP STATION NO. 1
A23 1 EA EXISTING RAS/WAS PUMP STATION NO. 2
WASTEWATER TREATMENT PLANT SUMMARY OF REHABILITATION QUANTITIES
ITEM NO. QUANTITY UNITS DESCRIPTION
G1 2 EA FINAL CLARIFIER BRIDGE
G2 1 EA FINAL CLARIFIER NO. 2 (NORTH) SCUM RACK
G3 1 EA FINAL CLARIFIER NO. 2 (NORTH) EFFLUENT BOX
G4 133 SY CHLORINE CONTACT BASIN EPOXY
G5 133 SY CHLORINE CONTACT BASIN GROUT
SITE PUMP STATION SUMMARY OF DEMOLITION QUANTITIES
ITEM NO. QUANTITY UNITS DESCRIPTION
D1 46 LF 8" SANITARY SEWER MAIN
D2 42 LF 6" FORCE MAIN
D3 100 LF UNDERGROUND POWER LINE
D4 1 EA EX PUMP STATION
D5 230 SY GRAVEL
D6 420 SY INSTALL TEMPORARY STAGING SURFACING
SITE PUMP STATION SUMMARY OF INSTALLATION QUANTITIES
ITEM NO. QUANTITY UNITS DESCRIPTION
F1 57 LF 8" SANITARY SEWER MAIN
F2 2 EA 4' MANHOLES
F3 1 EA PRE-CAST LIFT STATION
F4 35 LF 4" FORCE MAIN
F5 22 LF 1" WATER LINE
F6 48 LF 12" RCP
F7 2 EA 12" END SECTION
F8 253 SY GRAVEL SURFACE
WASTEWATER TREATMENT PLANT SUMMARY OF HEADWORKS INSTALLATION QUANTITIES
ITEM NO. QUANTITY UNITS DESCRIPTION
B1 102 CY CONCRETE
B2 8 CY GROUT
B3 1 EA STAIRS
B4 40 LF HANDRAIL
B5 58.5 SY GRATING
B6 4 EA STOP PLATES
B7 204 LF DISCHARGE PIPING
B8 3 EA MAIN PUMP STATION PUMPS
B9 3 EA RAS/WAS PUMP STATION PUMPS
B10 2 EA 6" TELESCOPING VALVES
B11 16 EA 4" PLUG VALVES
B12 6 EA 4" CHECK VALVES
B13 5 EA FLOW METERS
B14 6 EA ACCESS HATCH
B15 2 EA CONTROL PANEL
B16 1 EA JIB CRANE
B17 1 EA FINE SCREEN
B18 1 EA COURSE SCREEN
B19 56 CY AGGREGATE BACKFILL
QUANTITIES NOTES:
1. DISCHARGE PIPING FOR HEADWORKS CALCULATED FROM BOTTOM OF PUMP STATIONS
THROUGH ABOVE GROUND PIPING TO CHANGE IN PIPING TYPE IN UNDERGROUND TRANSITION.
2. DISCHARGE PIPING FOR SITE PUMP STATION CALCULATED FROM BOTTOM OF PUMP STATION
THROUGH ABOVE GROUND PIPING TO CHANGE IN PIPING TYPE IN UNDERGROUND TRANSITION
TO FORCE MAIN.
EQ
S_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
G E
N E
R A
L
LE
G E
N D
A N
D A
B B
R E
V
IA
TI
O
N S
EQUIPMENT SYMBOL
EXPLANATORY NOTATIONS
2-C-100
SHEET DESIGNATION
DISCIPLINE
SHEET NUMBER
EQUIPMENT
NUMBER
EQUIPMENT
DESCRIPTION
VALVES LINE TYPES
CP CP CP
P-OH
P-UG
RS
EMERGENCY STOP
HAND OFF AUTO
LIMIT SWITCH
FLOW METER
PRESSURE GAUGE
PRESSURE SWITCH
SOLENOID
TEMPERATURE
THERMAL RESISTOR
FLOAT SWITCH
PLUG VALVE
CHECK VALVE
AIR RELEASE VALVE
PUMP
HORN (ALARM)
LIGHT (ALARM)
STOP PLATE
GENERATOR
VARIABLE FREQUENCY DRIVE
TELESCOPING VALVE
DUMPSTER
FINE SCREEN
COURSE SCREEN
PROPOSED STRUCTURE
EXISTING STRUCTURE
CAMLOCK CONNECTION
INPUT ANALOG
OUTPUT ANALOG
INPUT DISCRETE
OUTPUT DISCRETE
DIGITAL
EXISTING ANALOG
EXISTING DISCRETE
EXISTING DIGITAL
SIGNAL INDICATION
P&ID SYMBOLS
MATERIALS LEGEND
ABBREVIATIONS
A ALARM
AF AIR FILTER
B BLOWER
BCV BALL CHECK VALVE
BF BLIND FLANGE
BLV BALL VALVE
BS SCREEN
BV BUTTERFLY VALVE
C CONVEYOR
CF CENTRIFUGE
CH CHEMICAL FEED
CL CAMLOCK
CV CHECK VALVE
CY CUBIC FEET
DC DECANT
EC EXPANSION COUPLING
EL ELEVATION
EX EXISTING
F FLANGED PIPE JOINT
FFE FINISH FLOOR ELEVATION
FL FLOWLINE
FM FLOW METER
FS FLOAT SWITCH
GV GATE VALVE
HO HAND/OFF
HOA HAND/OFF/AUTOMATIC
HT HEIGHT
I INLET
KV KNIFE VALVE
LI LEVEL INDICATOR
LF LINEAR FOOT
M MANIFOLD
MH MANHOLE
MJ MECHANICAL JOINT
P PUMP
PE PIPE END
PG PRESSURE GAUGE
PP PROCESS PIPING
PRV PRESSURE RELIEF VALVE
PV PLUG VALVE
R MOTOR
RAS RETURN ACTIVATED SLUDGE
RCP REINFORCED CONCRETE PIPE
RS RAW SEWAGE
S SAMPLER
SA SURFACE AERATOR
SAN SANITARY WASTE MAIN
SG SLIDE GATE
SP STOP PLATE
SS SANITARY SEWER FORCE MAIN
ST SAMPLE TAP
TSS TOTAL SUSPENDED SOLIDS
TV TELESCOPING VALVE
UV ULTRA VIOLET
UVT UV TRANSMISSIVITY
WAS WASTE ACTIVATED SLUDGE
WP WEIR PLATE
CONCRETE
BAR GRATING (LINES IN
DIRECTION OF SPAN)
EARTH OR GRADE
SAND
NON-SHRINK GROUT
AGGREGATE / RIPRAP
XX-X
2-G-001
PLUG VALVE
BACKFLOW PREVENTER
3 WAY VALVE
4 WAY VALVE
BALL VALVE
BACKWATER VALVE
CHLORINE INSTITUTE VALVE
DIAPHRAGM VALVE
FLAME TRAP VALVE
GLOBE VALVE
ANGLE GATE VALVE
THROTTLE VALVE
HOSE FAUCET, OR DRAIN VALVE
HOSE FAUCET, OR DRAIN VALVE
W/ VACCUM BREAKER
CHECK VALVE
PLUG VALVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE SUBSTAINING VALVE
PRESSURE VACCUM RELIEF VALVE
RELIEF OR SAFETY VALVE
GATE VALVE
VACCUM RELIEF VALVE
THERMAL SHUT OFF VALVE
UNDERGROUND POWER
OVERHEAD POWER
STORM DRAIN CONDUIT
RAW SEWAGE
S
DCW DCW
D D
SAN SAN
S S
W W W
SS SS SS
RSL RSL RETURN ACTIVATED SLUDGE LINE
DRAIN
SANITARY SEWER - FORCE MAIN
WATER LINE
FENCE 2
FENCE-SECURITY-GENERIC
DOMESTIC WATER - COLD
SANITARY WASTE MAIN
CE
DE
WSL
FRL
WASTE ACTIVATED SLUDGE LINE
DRAIN EFFLUENT LINE
CHLORINE EFFLUENT LINE
FILTERED RETURN LINE
CBL
FE
CLARIFIER BYPASS LINE
FINISHED EFFLUENT LINE
DEMOLITION / ABANDON LINE
DEMOLITION LINE
CONSTRUCTION CONTRACT LIMIT
CL CHLORINE LINE
VOLUME
S
A
FIELD CONDITIONS LEGEND
BENCHMARK AND/OR CONTROL POINT ( AS NOTED)
BOLLARD
BOREHOLE
FIRE HYDRANT
GRATE INLET
GUY WIRE
LIGHT POLE
POWER POLE
SANITARY MANHOLE
SIGN
TELEPHONE PEDESTAL
TREE STUMP
COLUMN
ELECTRIC BOX
ELECTRIC BOX
ELECTRIC MANHOLE
AIR CONDITIONER
ELECTRIC METER
GAS MARKER
GAS METER
GAS VALVE
GAS VAULT
IRRIGATION VALVE
SPOT ELEVATION
MAILBOX
ASPHALT AREA
CONCRETE AREA
GRAVEL AREA
WATER METER
WOOD POST
SANITARY CLEANOUT
STORM MANHOLE
TRAFFIC SIGNAL BOX
TELEPHONE CABINET
TELEPHONE RISER
WATER METER
TELEVISION CABLE BOX
ELECTRICAL CABINET
WATER VALVE
SPRINKLER CONTROL VALVE
ELECTRICAL SWITCH
BORING & SITE CONTROL INFORMATION
ITEM DESCRIPTION NORTHING EASTING ELEVATION
1A SOIL BORING 16584689.77 1365431.05 17.1'
1B SOIL BORING 16583012.11 1366767.76 11.9'
2B SOIL BORING 16583011.88 1366818.20 12.1'
3B SOIL BORING 16582973.28 1366821.20 12.2'
SCP 1 1/2" IRON BAR W/ CAP 16584019.31 1366239.20 14.22'
SCP 2 1/2" IRON BAR W/ CAP 16584635.75 1365535.96 17.34'
SCP 3 1/2" IRON BAR W/ CAP 16584700.94 1365224.28 15.58'
SCP 4 1/2" IRON BAR W/ CAP 16583220.63 1366830.50 15.58'
SCP 5 1/2" IRON BAR W/ CAP 16582949.83 136694.08 13.17'
GEN
VFD
DECIDUOUS TREE
PRESSURE REGULATOR VALVE
DUMPSTER
45° BEND
90° BEND
FLOW DIRECTION
HEADWALL
S
MULTIFUNCTION VALVE
GATE VALVE
CALIBRATOR COLUMN
METERING PUMP
RATE OF FLOW CONTROLLER
POLYMER MIXING CHAMBER
BACKFLOW PREVENTER
SLUDGE VALVE
MOTOR
GENERAL CONSTRUCTION NOTES:
INTENT
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT PROJECT SPECIFICATIONS.
2. THE INTENTION OF THE DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS REASONABLY NECESSARY OF THE PROPER EXECUTION AND COMPLETION OF THE WORK AS STIPULATED IN THE
CONTRACT.
3. MINOR DEVIATIONS FROM THE DESIGN LAYOUT MAY OCCUR AND SHALL BE CONSIDERED AS PART OF THE WORK. NO CHANGES THAT ALTER THE INTENT OF THE WORK WILL BE MADE OR PERMITTED BY THE
OWNER WITHOUT APPROVING A CHANGE ORDER.
4. THE EXISTING TREATMENT PLANT, APPARATUS AND OPERATIONS SHALL REMAIN IN FULL OPERATION AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL INSTALL AND MAINTAIN NECESSARY ACCESS
DRIVES FOR OWNERS USE. CONTRACTOR SHALL ALLOW ACCESS TO EACH SEGMENT OF THE
WASTEWATER TREATMENT PLANT TO OWNER AT ALL TIMES.
CONFLICTS
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL MEASUREMENTS AT THE SITE PRIOR TO ORDERING ANY MATERIALS OR DOING ANY WORK. NO EXTRA CHARGE OR COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCE BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE CONSTRUCTION DRAWINGS. ANY SUCH DISCREPANCY IN DIMENSION WHICH MAY BE FOUND SHALL BE SUBMITTED TO THE OWNER FOR CONSIDERATION BEFORE THE CONTRACTOR PROCEEDS WITH
THE WORK IN THE AFFECTED AREAS.
6. NO PLEA OF IGNORANCE OF CONDITIONS THAT EXIST, OR OF DIFFICULTIES OR CONDITIONS THAT EXIST, OR OF DIFFICULTIES OR CONDITIONS THAT MAY BE ENCOUNTERED OR OF ANY OTHER RELEVANT MATTER CONCERNING THE WORK TO BE PERFORMED IN THE EXECUTION OF THE WORK WILL BE ACCEPTED AS AN EXCUSE FOR ANY FAILURE OR OMISSION ON THE PART OF THE CONTRACTOR TO FULFILL EVERY DETAIL
OF ALL THE REQUIREMENTS OF THE CONTRACT DOCUMENTS GOVERNING THE WORK.
FIELD QUALITY CONTROL
7. THE LOCATION OF UNDERGROUND UTILITIES DEPICTED ON THESE DRAWINGS ARE BASED ON VISUAL SURFACE EVIDENCE AND/OR AS-BUILT DRAWINGS PROVIDED BY OTHERS AND, THEREFORE; MAY NOT REPRESENT ALL UTILITIES PRESENT OR THEIR ACTUAL LOCATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR COORDINATING WITH INDIVIDUAL UTILITY OWNERS TO ASCERTAIN THE EXACT LOCATION OF EXISTING UTILITIES AT SPECIFIC POINTS OF CONNECTION AND FOR NOTIFYING THE CALL
TEXAS 811 CALL SYSTEM PRIOR TO ANY EXCAVATION ON SITE.
8. ALL ELEVATIONS SHOWN ON THE CONSTRUCTION DOCUMENTS ARE BASED UPON NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88), HORIZONTAL DATUM NAD 83, TEXAS STATE PLANE SOUTH - US FOOT, UNLESS OTHERWISE NOTED.
9. THE CONTRACTOR SHALL VERIFY THE FLOW LINE AND TOP OF PIPE ELEVATIONS OF THE EXISTING UTILITIES PRIOR TO LAYING ANY NEW PIPE. ALL CROSSINGS AND TIE-ON LOCATIONS SHALL BE EXCAVATED AHEAD OF CONSTRUCTION TO VERIFY THE FLOW LINE OF EXISTING UTILITIES. CONTRACTOR TO NOTIFY ENGINEER OF DISCREPANCIES BETWEEN FIELD ELEVATIONS/FLOWLINES AND THESE PLANS
PRIOR TO CONSTRUCTION AND STRUCTURE FABRICATION.
10. CONTRACTOR SHALL VERIFY THAT PIPING SHOWN TO BE ABANDONED OR AS ABANDONED PREVIOUSLY IS NO LONGER IN SERVICE. LINES IN SERVICE SHALL BE MAINTAINED UNTIL NO LONGER REQUIRED BY THE
PLANT.
11. ALL EXISTING PIPES THAT ARE TO BE ABANDONED IN PLACE OR REMOVED MAY NOT BE SHOWN. WHERE PIPING IS TO BE ABANDONED AND MUST REMAIN IN SERVICE UNTIL COMPLETION OF OTHER PHASES OF WORK, AND IT CONFLICTS WITH NEW PIPING, TEMPORARILY RELOCATE PIPING AS REQUIRED TO MAINTAIN
SERVICE BY THE PLANT.
12. CONTRACTOR SHALL REROUTE THE EXISTING PIPING IF REQUIRED TO MISS THE PROPOSED STRUCTURES. THE EXISTING PIPE SHALL REMAIN IN SERVICE UNTIL NEW PIPING IS READY TO BE PLACED INTO SERVICE. DOWNTIME SHALL BE A MAXIMUM OF 2 HOURS, UNLESS SPECIFIED, SHOWN, OR
OTHERWISE APPROVED.
ACCESS
13. THE CONTRACTOR SHALL CONTACT THE PORT ISABEL DETENTION CENTER STAFF PRIOR TO ACCESSING THE SITE. PLEASE SEE DIVISION 1 OF THE PROJECT SPECIFICATIONS FOR CONTACT INFORMATION AND
NOTICE REQUIREMENTS.
PERMITTING
14. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE WORK AS SPECIFIED.
CONTRACTOR SHALL RECEIVE COPY OF TEXAS COMMISSION OF ENVIRONMENTAL QUALITY (TCEQ), AND
ANY ADDITIONAL PERMITS REQUIRED BY THE USACE, ICE AND/OR A-E.
15. IT IS EXPECTED THAT LAND DISTURBANCE FOR EACH CONSTRUCTION ACTIVITY WILL BE LESS THAN ONE
(1) ACRE. IF CONSTRUCTION ACTIVITIES RESULT IN LAND DISTURBANCE OF EQUAL TO OR GREATER THAN ONE (1) ACRE A STORM DISCHARGE FROM CONSTRUCTION ACTIVITIES PERMIT (FORM TXR-040000) MUST BE OBTAINED FROM TCEQ. THE CONTRACTOR IS RESPONSIBLE TO SUBMIT ALL FORMS, FEES AND OBTAIN
ALL NECESSARY EARTHWORK PERMITS.
EMERGENCY CONTACTS NUMBERS
16. IN CASE OF AN EMERGENCY, IMMEDIATELY CONTACT LOCAL AUTHORITIES AT:
POLICE
CAMERON COUNTY EMERGENCY MANAGEMENT.........956-547-7000
PUBLIC CONVENIENCES AND SAFETY
17. ALL STORED WORK MATERIALS AND EQUIPMENT SHALL BE PLACED IN A MANNER THAT IT DOES NOT CREATE AN INCONVENIENCE TO THE PUBLIC. STREETS, HIGHWAYS, SIDEWALKS, DRIVEWAYS SHALL
MAINTAIN FREE PASSAGE AT ALL TIMES. THESE STORED MATERIALS SHALL BE SECURE.
PROTECTION OF EXISTING PROPERTY, STRUCTURES, AND UTILITIES
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF AND SHALL USE EVERY PRECAUTION NECESSARY TO PREVENT DAMAGE TO ALL TREES, FENCES, CULVERTS, PAVEMENT, ETC. TO ALL WATER, SEWER, GAS, AND/OR ELECTRIC LINES AND/OR APPURTENANCES THEREOF AND TO ALL
OTHER PUBLIC OR PRIVATE PROPERTY ALONG OR ADJACENT TO THE WORK.
19. THE CONTRACTOR SHALL NOTIFY THE PROPER REPRESENTATIVES OF ANY PUBLIC AND/OR PRIVATE SERVICE CORPORATION, COMPANY, AND/OR INDIVIDUAL NOT LESS THAN THREE (3) BUSINESS DAYS IN
ADVANCE OF ANY WORK WHICH MAY DAMAGE OR INTERFERE WITH THE PREPARATION OF THEIR
PROPERTY ALONG AND/OR ADJACENT TO THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE OR INJURY TO PROPERTY OR ANY CHARACTER RESULTING FROM AN ACT, OMISSION, NEGLECT AND/OR MISCONDUCT IN THE MANNER OR METHOD OF EXECUTING THE WORK OR DUE TO
NON-EXECUTION OF THE WORK OR AT ANY TIME DUE TO DEFECTIVE WORK OR MATERIALS.
CONTRACTORS RESPONSIBILITY SHALL NOT BE RELEASED UNTIL THE IMPROVEMENTS HAVE BEEN
COMPLETED AND APPROVED OF BY OWNER.
20. THE CONTRACTOR SHALL PROVIDE NECESSARY SHEETING, SHORING, AND OTHER BRACING AND
SUPPORTS TO PROTECT IMPROVEMENTS ADJACENT TO THE CONSTRUCTION AREA.
21. FENCES, SIGNS, OR OTHER IMPROVEMENTS REQUIRED TO BE DISTURBED OR REMOVED TO PERMIT CONSTRUCTION SHALL BE RESTORED OR REPLACED IN THE SAME LOCATION AND IN A CONDITION AS
GOOD OR BETTER THAN PRIOR TO CONSTRUCTION. NO COMPENSATION SHALL BE GIVEN TO THE
CONTRACTOR FOR REMOVAL AND REPLACEMENT OF FENCES, SIGNS, OR OTHER IMPROVEMENTS ON
PRIVATE PROPERTY. THIS WORK SHALL BE INCLUDED IN OTHER ITEMS OF WORK.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION STAKING. THE STAKING MUST BE DONE BY A REGISTERED PROFESSIONAL LAND SURVEYOR, IN THE STATE OF TEXAS, WHICH WILL BE
VERIFIED AT THE PRE-WORK CONFERENCE.
23. ANY UTILITY LINES TEMPORARILY TAKEN OUT OF SERVICE FOR MAKING CONNECTIONS AND INSTALLING PLUGS SHALL BE MADE AT LOW DEMAND TIMES. THE CONTRACTOR SHALL PROVIDE SEVEN (7) DAYS
NOTICE TO OWNER PRIOR TO TAKING ANY UTILITY LINE OUT OF SERVICE.
24. WHEN EXISTING SEWERS, DRAINS, OR DITCHES ARE BLOCKED, CUT, OPENED, OR REMOVED IN THE COURSE OF THE WORK, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY OUTLETS AND CONNECTIONS. CONTRACTOR SHALL PROVIDE FOR DISPOSAL OF ALL SEWAGE OR DRAINAGE UNTIL THE PERMANENT FACILITIES HAVE BEEN RESTORED. THIS MAY INCLUDE MAINTENANCE OF ANY PUMPS, DIVERSION PIPING, CONTAINERS, AND OTHER FACILITIES REQUIRED FOR THIS PURPOSE.
25. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING STRUCTURES, FENCES, AND
LANDSCAPING NOT SHOWN TO BE REMOVED AND SHALL BE RESPONSIBLE FOR THE COST OF ANY
REPAIRS.
26. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN THE VICINITY OF ANY OVERHEAD ELECTRIC LINES. CONTRACTOR SHALL ABIDE BY THE NATIONAL ELECTRIC CODE AND ANY REQUIREMENT BY THE
OWNER OF THE ELECTRIC LINES.
STORM WATER MANAGEMENT
27. EACH SITE IS CONSIDERED TO BE SEPARATE CONSTRUCTION ACTIVITIES AND EARTH DISTURBANCE ACTIVITIES WILL BE LESS THAN ONE (1) ACRE IN SIZE. THE CONTRACTOR SHALL INSTALL EROSION AND SEDIMENT CONTROL DEVICES BASED ON BEST MANAGEMENT PRACTICES TO PREVENT THE FREE RUN OF
STORM WATER AND SILT ONTO ADJACENT AREAS.
28. CONTRACTOR RESPONSIBLE FOR ALL EROSION CONTROL IN ADHERENCE TO FEDERAL, STATE, AND LOCAL STANDARDS. A COPY OF THE EROSION CONTROL SITE PLAN MUST BE ON SITE AT ALL TIMES AND MADE AVAILABLE TO THE INSPECTOR UPON REQUEST. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSPECTION, MAINTENANCE, REPAIR AND/OR REPLACEMENT OF ALL EROSION CONTROL DEVICES.
29. CONTRACTOR SHALL APPLY WATER AND/OR OTHER DUST PALLIATIVES AS NECESSARY TO PREVENT OR
ALLEVIATE DUST.
30. THE CONTRACTOR SHALL KEEP PAVEMENT AREAS FREE OF ANY MUD OR EXCAVATION WASTE FROM
TRUCKS OR OTHER EQUIPMENT.
EXCAVATION AND BACKFILL
31. TRENCHING, BEDDING AND BACKFILL FOR ALL UTILITY LINES SHALL BE IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS.
32. EXCAVATED AND TRENCHING WORK SHALL INCLUDE REMOVAL AND SUBSEQUENT HANDLING OF ALL
MATERIALS EXCAVATED OR OTHERWISE REMOVED IN PERFORMANCE OF THE CONTRACT WORK,
REGARDLESS OF THE TYPE, CHARACTER, COMPOSITION OR CONDITIONS THEREOF.
33. EXCAVATION WORK SHALL BE PERFORMED IN A SAFE AND PROPER MANNER WITH SUITABLE
PRECAUTIONS BEING TAKEN AGAINST ALL HAZARDS. EXCAVATIONS SHALL PROVIDE ADEQUATE WORKING
SPACE AND CLEARANCES FOR THE WORK TO BE PREFORMED.
34. EXCAVATED MATERIAL REQUIRED TO BE USED FOR BACKFILL MAY BE DEPOSITED BY THE CONTRACTOR
IN STORAGE PILES AT POINTS CONVENIENT FOR REHANDLING OF THE MATERIAL DURING THE
BACKFILLING OPERATIONS. THE LOCATION OF STORAGE PILES SHALL, HOWEVER, BE SUBJECT TO THE
APPROVAL OF THE ENGINEER AND/OR OWNER.
35. THE EXISTING TOPSOIL AT ALL AREAS WHICH IS TO BE DISTURBED DURING CONSTRUCTION SHALL BE STRIPPED AND STOCKPILED ONSITE PRIOR TO EXCAVATION. THE STOCKPILE SHALL BE LOCATED IN A
AREA TO NOT RESTRICT SURFACE FLOWS AND REDUCE SEDIMENT RUNOFF FROM THE SITE.
INSTALLATION OF SEDIMENT CONTROL DEVICES WILL BE NECESSARY. THE STOCKPILED TOPSOIL SHALL
BE SPREAD OVER ALL AREAS WHICH ARE SCHEDULED TO BE SEEDED OR.
36. THE CONTRACTOR SHALL PROVIDE ADEQUATE SHEETING AND BRACING OF EXCAVATION WORK OR USE
OF A TRENCH BOX IN ORDER TO PROVIDE FOR THE SAFETY OF WORKMAN, AS WELL AS
REPRESENTATIVES OF THE OWNER.
37. COMPLIANCE TO "TRENCH SAFETY ACT" IS REQUIRED FOR ALL EXCAVATIONS IN EXCESS OF 5 FEET DEEP.
CONTRACTOR SHALL COMPLY WITH THE U. S. DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATIONS STANDARDS OSHA 29 CFR 1910.146, 'PERMIT-REQUIRED CONFINED SPACES' AND OSHA 29 CFR 1926, 'SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION'. ALL EXCAVATIONS AND SHORING AND SHIELDING SHALL BE DESIGNED BY A STATE OF TEXAS REGISTERED PROFESSIONAL
ENGINEER.
38. COMPLIANCE WITH USACE SAFETY MANUAL EM 385-1-1 SHALL BE MAINTAINED.
39. IF THE CONTRACTOR OVER CUTS A TRENCH, THE ADDITIONAL BEDDING AND BACKFILL MATERIAL
REQUIRED WILL BE AT THE CONTRACTOR'S EXPENSE. COMPACTION REQUIREMENTS REFERENCED
WITHIN THE SPECIFICATIONS SHALL BE MET.
40. TRENCH EXCAVATION MAY REQUIRE DEWATERING. THE CONTRACTOR SHALL AT ALL TIMES DEWATER THE GROUND SUFFICIENTLY TO KEEP THE GROUNDWATER ELEVATION A MINIMUM OF 6" BELOW THE
STRUCTURE. A WORK PLAN FOR DEWATERING SHALL BE SUBMITTED TO OWNER FOR REVIEW AND
APPROVAL.
41. SPOILS MATERIAL MAY BE DISPOSED OF BY THE CONTRACTOR ON-SITE AT A LOCATION CONFIRMED BY CONTRACTING OFFICER'S REPRESENTATIVE (COR). UPON COMPLETION OF THE PROJECT, THE SPOILS
AREA SHALL BE GRADED SMOOTH AS NOT TO OBSTRUCT THE DRAINAGE AND SEEDED TO MATCH
SURROUNDING AREA. THE CONTRACTOR SHALL EXERCISE PROPER PRECAUTIONS WHEN DISPOSING OF
THE EXCAVATED MATERIAL.
PAVING
42. ALL P.C. CONCRETE PAVEMENT, CURBS, DRIVEWAYS AND SIDEWALKS DISTURBED BY THIS PROJECT
SHALL BE REPLACED WITH HIGH EARLY STRENGTH (HES) CONCRETE, 4,000 PSI MIN.
43. ALL NEW PAVING SHALL BE DOWELED INTO EXISTING PAVEMENT PER PROJECT SPECIFICATIONS.
44. ALL PAVING AREAS SHALL BE STRIPPED OF VEGETATION, TOPSOIL, AND SOFT OR OTHERWISE
UNSUITABLE MATERIAL. FOLLOWING SITE STRIPPING, THE EXPOSED SUBGRADE SHALL BE
PROOF-ROLLED WITH A FULLY LOADED TANDEM AXLE DUMP TRUCK.
45. BEFORE FINAL COMPLETION OF THIS WORK, ALL ROADWAYS, SLOPES, DITCHES, AND BERMS SHALL BE
RESTORED TO THEIR ORIGINAL CONDITION.
TRAFFIC CONTROL
46. ALL BARRICADES, WARNING SIGNS, LIGHTS, TRAFFIC CALMING DEVICES, ETC., FOR THE GUIDANCE AND PROTECTION OF TRAFFIC AND PEDESTRIANS SHALL CONFORM TO THE LATEST REVISION OF THE MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
FINAL CLEANUP
47. TO THE MAXIMUM EXTENT POSSIBLE, EXCESS EARTH OBTAINED FROM STRUCTURE AND TRENCH EXCAVATIONS SHALL BE USED FOR LEVELING AND GRADING IN AREAS DESIGNATED ON THE PLANS.
48. EXISTING TOPSOIL SHALL BE REMOVED AND STOCKPILED DURING CONSTRUCTION OPERATIONS.
STOCKPILES SHALL BE LOCATED SO AS NOT TO INTERFERE WITH AREA DRAINAGE.
49. ALL DISTURBED AREAS DURING THE COURSE OF CONSTRUCTION SHALL BE LEVELED WITH TOPSOIL (4"
MINIMUM) AND SEEDDED ACCORDING TO THE PROJECT SPECIFICATIONS.
50. AFTER COMPLETION OF THE FINISHED WORK, THE CONTRACTOR SHALL REMOVE ALL EXCESS MATERIAL AND SHALL GRADE THE AREA AS REQUIRED. THE FINAL GRADE SHALL BE DRESSED TO SMOOTH, EVEN
CONTOURS TO PROVIDE SATISFACTORY DRAINAGE.
51. UPON COMPLETION OF THE WORK, AND BEFORE ACCEPTANCE AND FINAL PAYMENT WILL BE MADE, THE
CONTRACTOR SHALL CLEAN AND REMOVE DEBRIS, FROM THE SITE OF WORK.
52. ALL REMOVED PAVEMENT SHALL BE SAWCUT.
P_
NO
TE
S_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
G E
N E
R A
L N
O
TE
S
2-G-002
TE
S_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
G E
N E
R A
L N
O
TE
S
2-G-003
GENERAL CONSTRUCTION NOTES:
SANITARY SEWER
1. CONTRACTOR SHALL MAKE CONNECTIONS TO EXISTING PIPE, EQUIPMENT, ETC. AS REQUIRED AND SHALL PROVIDE ALL FITTINGS, ADAPTERS, AND APPURTENANCES REQUIRED TO MAKE THE CONNECTIONS.
PROVIDE ALL SUPPORTS REQUIRED FOR A RIGIDLY SUPPORTED COMPLETE AND WORKING SYSTEM.
2. ALL WORK SHALL BE DONE IN A NEAT AND ORDERLY FASHION BY SKILLED WORKERS. ALL WORK WILL
REQUIRE INSPECTION TO INSURE ACCEPTABLE CONSTRUCTION
3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SEWAGE FLOW IN THE EXISTING LINE BY PUMPING
OR OTHER MEANS DURING CONSTRUCTION.
4. COMPACTION OF TRENCH BACKFILL IN PAVED AREAS SHALL BE 95% STANDARD PROCTOR DENSITY.
5. THE CONTRACTOR SHALL AT ALL TIMES, DURING PIPE LAYING, DEWATER THE GROUND SUFFICIENTLY TO KEEP THE GROUNDWATER ELEVATION A MINIMUM OF 6" BELOW THE PIPE BEING LAID WITHIN THE AREA OF THE TRENCH. A SEPARATE WORK PLAN FOR DEWATERING SHALL BE SUBMITTED TO OWNER FOR
REVIEW AND APPROVAL.
6. ALL PIPES SHALL BE LAID ON A FIRM FOUNDATION. SOFT OR SPONGY BEDDING FOR PIPES WILL NOT BE ACCEPTED. ANY UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH A DRY, COMPACTED, GRANULAR MATERIAL SATISFACTORY TO THE OWNER.
7. ALL UNSUITABLE MATERIAL DISCOVERED DURING EXCAVATION SHALL BE REMOVED UPON APPROVAL FROM THE ENGINEER OR INSPECTOR. ALL UNSTABLE MATERIAL REMOVED SHALL BE REPLACED WITH
SUITABLE FILL MATERIAL AND COMPACTED TO 95% STANDARD PROCTOR DENSITY.
8. MANHOLES TO BE CONSTRUCTED WITHIN THE 100-YEAR FLOOD ZONE SHALL HAVE A SEALED LID AT THE
LOCATIONS INDICATED ON THE DRAWINGS.
9. MANHOLE CONSTRUCTION OVER EXISTING SANITARY SEWER MAINS MAY BE DOGHOUSE OR OTHER
ACCEPTABLE METHODS.
10. DROP MANHOLES SHALL BE INSTALLED FOR SEWER PIPES ENTERING A MANHOLE AT 24" OR MORE ABOVE
THE MANHOLE INVERT.
11. ADJUST ALL VALVE BOXES, VAULTS, PULL BOXES, AND MANHOLES TO FINISHED GRADE UNLESS OTHER-WISE SHOWN OR DIRECTED. MANHOLES IN OPEN FIELDS SHALL BE SET TWELVE INCHES ABOVE
FINISHED GRADE AND VAULTS SHALL BE SIX INCHES ABOVE FINISHED GRADE.
12. ALL SANITARY SEWER PRESSURE PIPE (FORCE MAINS) SHALL BE RESTRAINED MECHANICAL JOINT OF
FLANGED CONNECTIONS.
13. SANITARY SEWER PVC PIPE IS ONLY AN ACCEPTABLE MATERIAL FOR BURIED APPLICATIONS.
14. CONTRACTOR SHALL PROVIDE WHATEVER MEANS NECESSARY TO MAINTAIN PROVIDE RESTRAINED
FLEXIBLE CONNECTIONS FOR ALL PIPING AT POINTS OF CONNECTION TO STRUCTURES AND
ENCASEMENTS.
15. ALL SANITARY SEWER LINES WHICH ARE CONSTRUCTED AS NEW LINES SHALL BE TESTED FOR LEAKAGE
IN ACCORDANCE WITH TCEQ AND PROJECT SPECIFICATIONS.
WATER
16. ALL WATER MAINS AND SERVICE LINES SHALL MAINTAIN A MINIMUM COVER OF 30 INCHES.
17. THIS WATER DISTRIBUTION SYSTEM MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) RULES AND REGULATIONS FOR PUBLIC WATER SYSTEMS. WHEN CONFLICTS ARE NOTED WITH PROJECT SPECIFICATIONS, THE MORE STRINGENT
REQUIREMENT SHALL BE APPLIED.
18. NO PIPE WHICH HAS BEEN USED FOR ANY PURPOSE OTHER THAN THE CONVEYANCE OF DRINKING WATER SHALL BE ACCEPTED OR RELOCATED FOR USE IN ANY PUBLIC DRINKING WATER SUPPLY.
19. ALL WATER LINE CROSSINGS OF WASTEWATER MAINS SHALL BE PERPENDICULAR.
20. THE TOP OF THE WATER LINE MUST BE LOCATED BELOW THE FROST LINE AND IN NO CASE SHALL THE
TOP OF THE WATER LINE BE LESS THAN 24 INCHES BELOW GROUND SURFACE.
21. THE MAXIMUM ALLOWABLE LEAD CONTENT OF PIPES, PIPE FITTINGS, PLUMBING FITTINGS, AND FIXTURES
IS 0.25 PERCENT.
22. THE CONTRACTOR SHALL NOT PLACE THE PIPE IN WATER OR WHERE IT CAN BE FLOODED WITH WATER
OR SEWAGE DURING ITS STORAGE OR INSTALLATION [§290.44(F)(1)].
23. HYDROSTATIC LEAKAGE TESTING SHALL BE PREFORMED FOR ALL WATER PIPE. THE HYDROSTATIC
LEAKAGE RATE SHALL NO EXCEED THE MOST RECENT AWWA FORMULAS.
24. THE CONTRACTOR SHALL DISINFECT THE NEW WATERLINES IN ACCORDANCE WITH AWWA STANDARD C-651-14 OR MOST RECENT, THEN FLUSH AND SAMPLE THE LINES BEFORE BEING PLACED INTO SERVICE.
25. DECHLORINATION OF DISINFECTING WATER SHALL BE IN STRICT ACCORDANCE WITH CURRENT AWWA
STANDARD C655-09 OR MOST RECENT.
CONSTRUCTION SEQUENCING
SITE PUMP STATION
1. INSTALL NECESSARY EROSION AND SEDIMENT CONTROL MEASURES AND
2. FIELD VERIFY UTILITIES.
3. CLEAR AND GRUB AS NECESSARY.
4. INSTALL SITE PUMP STATION.
5. INSTALL SANITARY SEWER IMPROVEMENTS.
6. INSTALL WATER IMPROVEMENTS.
7. PREPARE SITE PUMP STATION FOR COMMISSIONING.
8. TIE-IN EXISTING SANITARY SEWER MAIN CONNECTIONS.
9. ABANDON SANITARY SEWER MAINS AS SPECIFIED.
10. ABANDON EXISTING SITE PUMP STATION.
11. CONDUCT FINAL GRADING ACTIVITIES.
12. INSTALL STORM SEWER CONDUIT AND END SECTIONS.
13. INSTALL FINAL SURFACE AGGREGATE.
14. CONDUCT FINAL DRESSING AND CLEANING OF SITE.
15. CLEAN SITE FROM DEBRIS.
16. REMOVES EROSION AND SEDIMENT CONTROL MEASURES.
WASTEWATER TREATMENT PLANT
1. INSTALL NECESSARY EROSION AND SEDIMENT CONTROL MEASURES AND
2. FIELD VERIFY UTILITIES.
3. CLEAR AND GRUB AS NECESSARY.
4. SHUT DOWN SOUTH PLANT.
4.1. ALL WASTEWATER FLOWS WILL BE DELIVERED TO THE NORTH STRUCTURES.
5. INSTALL HEADWORKS STRUCTURE.
6. INSTALL SANITARY SEWER IMPROVEMENTS.
7. INSTALL WATER IMPROVEMENTS.
8. PREPARE HEADWORKS STRUCTURE FOR COMMISSIONING.
9. TIE-IN EXISTING SANITARY SEWER MAIN CONNECTIONS.
10. ABANDON SANITARY SEWER MAINS AS SPECIFIED.
11. ABANDON EXISTING SOUTH WASTEWATER STRUCTURES STATION.
12. CONDUCT FINAL GRADING ACTIVITIES.
13. CONDUCT FINAL DRESSING AND CLEANING OF SITE.
14. CLEAN SITE FROM DEBRIS.
15. REMOVES EROSION AND SEDIMENT CONTROL MEASURES.
TE
S_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
G E
N E
R A
L N
O
TE
S
2-G-004
LIFT STATION TCEQ INFORMATION:
1. THIS LIFT STATION AND/OR FORCE MAIN MUST BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH
THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY'S (TCEQ) EDWARDS AQUIFER RULES 30 TEXAS ADMINISTRATIVE CODE (TAC) §213.5(C), THE DESIGN CRITERIA FOR DOMESTIC WASTEWATER SYSTEMS 30
TAC CHAPTER 217, AND THE UNITED FACILITIES GUIDE SPECIFICATIONS (UFGS).
2. ANY MODIFICATION TO THE ACTIVITIES DESCRIBED IN THE REFERENCED LIFT STATION/FORCE MAIN SYSTEM APPLICATION FOLLOWING THE DATE OF APPROVAL MAY REQUIRE THE SUBMITTAL OF A LIFT STATION/FORCE MAIN SYSTEM APPLICATION TO MODIFY THIS APPROVAL, INCLUDING THE PAYMENT OF
APPROPRIATE FEES AND ALL INFORMATION NECESSARY FOR ITS REVIEW AND APPROVAL.
3. PRIOR TO COMMENCING ANY REGULATED ACTIVITY, THE APPLICANT OR HIS AGENT MUST NOTIFY THE HARLINGEN REGIONAL OFFICE (REGION 15), IN WRITING, OF THE DATE ON WHICH THE REGULATED
ACTIVITY WILL BEGIN.
4. UPON COMPLETION OF THE WET WELL EXCAVATION, A GEOLOGIST MUST CERTIFY THAT THE EXCAVATION HAS BEEN INSPECTED FOR THE PRESENCE OF SENSITIVE FEATURES AND THE CERTIFICATION MUST BE SUBMITTED TO THE APPROPRIATE REGIONAL OFFICE. FURTHER ACTIVITIES MAY NOT PROCEED UNTIL THE EXECUTIVE DIRECTOR HAS REVIEWED AND APPROVED THE METHODS PROPOSED TO PROTECT ANY SENSITIVE FEATURE AND THE EDWARDS AQUIFER FROM POTENTIALLY ADVERSE IMPACTS TO WATER QUALITY FROM THE LIFT STATION. CONSTRUCTION MAY CONTINUE IF THE GEOLOGIST CERTIFIES THAT
NO SENSITIVE FEATURE OR FEATURES ARE PRESENT.
5. IF ANY SENSITIVE FEATURES ARE DISCOVERED DURING THE WASTEWATER LINE TRENCHING ACTIVITIES, ALL REGULATED ACTIVITIES NEAR THE SENSITIVE FEATURE MUST BE SUSPENDED IMMEDIATELY. THE APPLICANT MUST IMMEDIATELY NOTIFY THE APPROPRIATE REGIONAL OFFICE OF THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY OF THE FEATURE DISCOVERY. A GEOLOGIST'S ASSESSMENT OF THE LOCATION AND EXTENT OF THE FEATURE DISCOVERED MUST BE REPORTED TO THAT REGIONAL OFFICE IN WRITING WITHIN TWO WORKING DAYS. THE APPLICANT MUST SUBMIT A PLAN FOR ENSURING THE STRUCTURAL INTEGRITY OF THE SEWER LINE OR FOR MODIFYING THE PROPOSED COLLECTION SYSTEM ALIGNMENT AROUND THE FEATURE. THE REGULATED ACTIVITIES NEAR THE SENSITIVE FEATURE MAY
NOT PROCEED UNTIL THE EXECUTIVE DIRECTOR HAS REVIEWED AND APPROVED THE METHODS
PROPOSED TO PROTECT THE SENSITIVE FEATURE AND THE GULF COAST AQUIFER FROM ANY
POTENTIALLY ADVERSE IMPACTS TO WATER QUALITY WHILE MAINTAINING THE STRUCTURAL INTEGRITY
OF THE LINE.
6. LIFT STATIONS SHALL BE DESIGNED TO WITHSTAND AND OPERATE DURING A 100-YEAR FLOOD EVENT
AND SHALL BE ACCESSIBLE DURING A 25-YEAR FLOOD. ALL LIFT STATIONS SHALL BE
INTRUDER-RESISTANT WITH A CONTROLLED ACCESS.
7. PUMP CONTROLS.
7.1. A LIFT STATION PUMP MUST OPERATE AUTOMATICALLY, BASED ON THE WATER LEVEL IN A WET WELL.
7.2. THE LOCATION OF A WET WELL LEVEL MECHANISM MUST ENSURE THAT THE MECHANISM IS
UNAFFECTED BY CURRENTS, RAGS, GREASE, OR OTHER FLOATING MATERIALS.
7.3. A LEVEL MECHANISM MUST BE ACCESSIBLE WITHOUT ENTERING THE WET WELL.
7.4. WET WELL CONTROLS WITH A BUBBLER SYSTEM REQUIRE DUAL AIR SUPPLY AND DUAL CONTROLS.
7.5. MOTOR CONTROL CENTERS MUST BE MOUNTED AT LEAST 4.0 INCHES ABOVE GRADE TO PREVENT
WATER INTRUSION AND CORROSION FROM STANDING WATER IN THE ENCLOSURE.
7.6. ELECTRICAL EQUIPMENT AND ELECTRICAL CONNECTIONS IN A WET WELL OR A DRY WELL MUST MEET
NATIONAL FIRE PREVENTION ASSOCIATION 70 NATIONAL ELECTRIC CODE EXPLOSION PREVENTION
REQUIREMENTS, UNLESS CONTINUOUS VENTILATION IS PROVIDED.
8. WET WELLS.
8.1. A WET WELL MUST BE ENCLOSED BY WATERTIGHT AND GAS TIGHT WALLS.
8.2. A PENETRATION THROUGH A WALL OF A WET WELL MUST BE GAS TIGHT.
8.3. A WET WELL MUST NOT CONTAIN EQUIPMENT REQUIRING REGULAR OR ROUTINE INSPECTION OR
MAINTENANCE, UNLESS INSPECTION AND MAINTENANCE CAN BE DONE WITHOUT STAFF ENTERING
THE WET WELL.
8.4. A GRAVITY PIPE DISCHARGING TO A WET WELL MUST BE LOCATED SO THAT THE INVERT ELEVATION IS
ABOVE THE LIQUID LEVEL OF A PUMP'S "ON" SETTING.
8.5. GATE VALVES AND CHECK VALVES ARE PROHIBITED IN A WET WELL.
8.6. GATE VALVES AND CHECK VALVES MAY BE LOCATED IN A VALVE VAULT NEXT TO A WET WELL OR IN A
DRY WELL.
8.7. PUMP CYCLE TIME, BASED ON PEAK FLOW, MUST EQUAL OR EXCEED THOSE IN THE FOLLOWING
TABLE:
8.8. PUMP HORSEPOWER MINIMUM CYCLE TIMES (MINUTES) < 50 6 50-100 10 > 100 15
8.9. AN EVALUATION OF MINIMUM WET WELL VOLUME REQUIRES THE FOLLOWING FORMULA:
V = T * Q / 4 * 7.48
WHERE:
V = ACTIVE VOLUME (CUBIC FEET)
Q = PUMP CAPACITY (GALLONS PER MINUTE)
T = CYCLE TIME (MINUTES)
7.48 = CONVERSION FACTOR (GALLONS/CUBIC FOOT)
9. WET WELL SLOPES.
9.1. A WET WELL FLOOR MUST HAVE A SMOOTH FINISH AND MINIMUM SLOPE OF 10% TO A PUMP INTAKE.
9.2. A WET WELL DESIGN MUST PREVENT DEPOSITION OF SOLIDS UNDER NORMAL OPERATING
CONDITIONS.
9.3. A LIFT STATION WITH GREATER THAN 5.0 MILLION GALLONS PER DAY FIRM PUMPING CAPACITY MUST
HAVE ANTI-VORTEX BAFFLING.
10. VENTILATION SHALL BE PROVIDED FOR LIFT STATIONS, INCLUDING BOTH WET AND DRY WELLS.
11. HOISTING EQUIPMENT. A LIFT STATION MUST HAVE PERMANENT HOISTING EQUIPMENT OR BE ACCESSIBLE TO PORTABLE HOISTING EQUIPMENT FOR REMOVAL OF PUMPS, MOTORS, VALVES, PIPES, AND OTHER SIMILAR EQUIPMENT.
12. PUMPS.
12.1. GENERAL REQUIREMENTS. A RAW WASTEWATER PUMP, WITH THE EXCEPTION OF A GRINDER PUMP, MUST:
12.1.1. BE DESIGNED TO PREVENT CLOGGING;
12.1.2. BE CAPABLE OF PASSING A SPHERE OF 2.5 INCHES IN DIAMETER OR GREATER;
12.1.3. HAVE GREATER THAN 3.0 INCH DIAMETER SUCTION AND DISCHARGE OPENINGS.
12.2. SUBMERSIBLE AND NON-SUBMERSIBLE PUMPS.
12.2.1. A NON-SUBMERSIBLE PUMP MUST HAVE INSPECTION AND CLEANOUT PLATES ON BOTH THE
SUCTION AND DISCHARGE SIDES OF EACH PUMPING UNIT THAT FACILITATE LOCATING AND
REMOVING BLOCKAGE-CAUSING MATERIALS, UNLESS THE PUMP DESIGN ACCOMMODATES EASY
REMOVAL OF THE ROTATION ELEMENTS.
12.2.2. A PUMP SUPPORT MUST PREVENT MOVEMENT AND VIBRATION DURING OPERATION.
12.2.3. A SUBMERSIBLE PUMP MUST USE A RAIL-TYPE PUMP SUPPORT SYSTEM WITH
MANUFACTURER-APPROVED MECHANISMS DESIGNED TO ALLOW PERSONNEL TO REMOVE AND
REPLACE ANY SINGLE PUMP WITHOUT ENTERING OR DEWATERING THE WET WELL.
12.2.4. SUBMERSIBLE PUMP RAILS AND LIFTING CHAINS MUST BE CONSTRUCTED OF A MATERIAL THAT
PERFORMS TO AT LEAST THE STANDARD OF SERIES 300 STAINLESS STEEL.
12.3. LIFT STATION PUMPING CAPACITY. THE FIRM PUMPING CAPACITY OF A LIFT STATION MUST HANDLE
THE EXPECTED PEAK FLOW.
12.4. PUMP HEAD CALCULATIONS.
12.4.1. AN OWNER SHALL SELECT A PUMP BASED UPON ANALYSIS OF THE SYSTEM HEAD AND PUMP
CAPACITY CURVES THAT DETERMINE THE PUMPING CAPACITIES ALONE AND WITH OTHER PUMPS
AS THE TOTAL DYNAMIC-HEAD INCREASES DUE TO ADDITIONAL FLOWS PUMPED THROUGH A
FORCE MAIN.
12.4.2. THE PIPE HEAD LOSS CALCULATIONS, USING THE HYDRAULIC INSTITUTE STANDARDS, PERTAINING TO HEAD LOSSES THROUGH PIPES, VALVES, AND FITTINGS, MUST BE INCLUDED IN
THE REPORT.
12.4.3. THE SELECTED FRICTION COEFFICIENT (HAZEN-WILLIAMS "C" VALUE) USED IN FRICTION HEAD
LOSS CALCULATIONS MUST BE BASED ON THE PIPE MATERIAL SELECTED.
12.4.4. FOR A LIFT STATION WITH MORE THAN TWO PUMPS, A FORCE MAIN IN EXCESS OF ONE-HALF MILE, OR FIRM PUMPING CAPACITY OF 100 GALLONS PER MINUTE OR GREATER, SYSTEM CURVES MUST
BE PROVIDED FOR BOTH THE NORMAL AND PEAK OPERATING CONDITIONS AT C VALUES FOR
PROPOSED AND EXISTING PIPE.
13. FLOW CONTROL.
13.0.1. A LIFT STATION OR A TRANSFER PUMPING STATION LOCATED AT OR DISCHARGING DIRECTLY TO
A WASTEWATER TREATMENT SYSTEM MUST HAVE A PEAK PUMP CAPACITY EQUAL TO OR LESS
THAN THE PEAK DESIGN FLOW, UNLESS EQUALIZATION IS PROVIDED.
13.0.2. A WASTEWATER TREATMENT SYSTEM WITH A PEAK FLOW THAT IS GREATER THAN 300,000
GALLON PER DAY MUST USE THREE OR MORE PUMPS, UNLESS DUPLEX, AUTOMATICALLY
CONTROLLED, VARIABLE CAPACITY PUMPS ARE PROVIDED.
13.1. VERTICAL POSITIONING OF PUMPS. A RAW WASTEWATER PUMP MUST HAVE POSITIVE STATIC
SUCTION HEAD DURING NORMAL ON-OFF CYCLING, EXCEPT A SUBMERSIBLE PUMP WITH "NO
SUCTION" PIPES, A VACUUM-PRIMED PUMP, OR A SELF-PRIMING UNIT CAPABLE OF SATISFACTORY
OPERATION UNDER ANY NEGATIVE SUCTION HEAD ANTICIPATED FOR THE LIFT STATION.
13.2. INDIVIDUAL GRINDER PUMPS. A GRINDER PUMP SERVING ONLY ONE RESIDENTIAL OR COMMERCIAL STRUCTURE THAT IS PRIVATELY OWNED, MAINTAINED, AND OPERATED IS NOT SUBJECT TO THE
RULES OF THIS CHAPTER.
13.3. PUMP FOR LOW-FLOW LIFT STATION. A PUMP USED FOR A LIFT STATION WITH A PEAK FLOW OF LESS
THAN 120 GALLONS PER MINUTE MUST BE SUBMERSIBLE AND INCLUDE A GRINDER.
14. PIPING.
14.1. HORIZONTAL PUMP SUCTIONS.
14.1.1. EACH PUMP MUST HAVE A SEPARATE SUCTION PIPE THAT USES AN ECCENTRIC REDUCER.
14.1.2. PIPES IN A WET WELL MUST HAVE A TURNDOWN TYPE FLARED INTAKE.
14.2. VALVES.
14.2.1. THE DISCHARGE SIDE OF EACH PUMP FOLLOWED BY A FULL-CLOSING ISOLATION VALVE MUST
ALSO HAVE A CHECK VALVE.
14.2.1.1. A CHECK VALVE MUST BE A SWING TYPE VALVE WITH AN EXTERNAL LEVER.
14.2.1.2. A VALVE MUST INCLUDE A POSITION INDICATOR TO SHOW ITS OPEN AND CLOSED POSITIONS, UNLESS A FULL-CLOSING VALVE IS A RISING-STEM GATE VALVE.
14.2.2. A GRINDER PUMP INSTALLATION MAY USE A RUBBER-BALL CHECK VALVE OR A SWING-TYPE
CHECK VALVE.
14.2.3. A BUTTERFLY VALVE, TILTING-DISC CHECK VALVE, OR ANY OTHER VALVE USING A TILTING-DISC IN
A FLOW PIPE IS PROHIBITED.
14.3. PIPES.
14.3.1. A LIFT STATION PIPE MUST HAVE FLANGED OR FLEXIBLE CONNECTIONS TO ALLOW FOR REMOVAL
OF PUMPS AND VALVES WITHOUT INTERRUPTION OF THE LIFT STATION OPERATIONS.
14.3.2. WALL PENETRATIONS MUST ALLOW FOR PIPE FLEXURE WHILE EXCLUDING EXFILTRATION OR
INFILTRATION.
14.3.3. PIPE SUCTION VELOCITIES MUST BE AT LEAST 3.0 FEET PER SECOND BUT NOT MORE THAN 7.0
FEET PER SECOND.
15. EMERGENCY PROVISIONS FOR LIFT STATIONS.
15.1. A COLLECTION SYSTEM LIFT STATION MUST BE EQUIPPED WITH A TESTED QUICK-CONNECT
MECHANISM OR A TRANSFER SWITCH PROPERLY SIZED TO CONNECT TO A PORTABLE GENERATOR, IF
NOT EQUIPPED WITH AN ONSITE GENERATOR.
15.2. LIFT STATIONS MUST INCLUDE AN AUDIOVISUAL ALARM SYSTEM AND THE SYSTEM MUST TRANSMIT ALL ALARM CONDITIONS THROUGH USE OF AN AUTO-DIALER SYSTEM, SUPERVISORY CONTROL AND
DATA ACQUISITION SYSTEM, OR TELEMETERING SYSTEM CONNECTED TO A CONTINUOUSLY
MONITORED LOCATION.
15.3. AN ALARM SYSTEM MUST SELF-ACTIVATE FOR A POWER OUTAGE, PUMP FAILURE, OR A HIGH WET
WELL WATER LEVEL.
15.4. A LIFT STATION CONSTRUCTED TO PUMP RAW WASTEWATER MUST HAVE SERVICE RELIABILITY
BASED ON:
15.4.1. RETENTION CAPACITY.
15.4.1.1. THE RETENTION CAPACITY IN A LIFT STATION'S WET WELL AND INCOMING GRAVITY PIPES
MUST PREVENT DISCHARGES OF UNTREATED WASTEWATER AT THE LIFT STATION OR ANY
POINT UPSTREAM FOR A PERIOD OF TIME EQUAL TO THE LONGEST ELECTRICAL OUTAGE
RECORDED DURING THE PAST 24 MONTHS, BUT NOT LESS THAN 20 MINUTES
15.4.1.2. FOR CALCULATION PURPOSES, THE OUTAGE PERIOD BEGINS WHEN A LIFT STATION PUMP
FINISHED ITS LAST NORMAL CYCLE, EXCLUDING A STANDBY PUMP.
15.4.2. ON-SITE GENERATORS. A LIFT STATION MAY BE PROVIDED EMERGENCY POWER BY ON-SITE, AUTOMATIC ELECTRICAL GENERATORS SIZED TO OPERATE THE LIFT STATION AT ITS FIRM
PUMPING CAPACITY OR AT THE AVERAGE DAILY FLOW, IF THE PEAK FLOW CAN BE STORED IN
THE COLLECTION SYSTEM.
15.4.3. PORTABLE GENERATORS AND PUMPS.
15.4.3.1. A LIFT STATION MAY USE PORTABLE GENERATORS AND PUMPS TO GUARANTEE SERVICE IF
THE REPORT INCLUDES:
15.4.3.1.1. THE STORAGE LOCATION OF EACH GENERATOR AND PUMP;
15.4.3.1.2. THE AMOUNT OF TIME THAT WILL BE NEEDED TO TRANSPORT EACH GENERATOR OR
PUMP TO A LIFT STATION;
15.4.3.1.3. THE NUMBER OF LIFT STATIONS FOR WHICH EACH GENERATOR OR PUMP IS DEDICATED
AS A BACKUP; AND
15.4.3.1.4. THE TYPE OF ROUTINE MAINTENANCE AND UPKEEP PLANNED FOR EACH PORTABLE
GENERATOR AND PUMP TO ENSURE THAT THEY WILL BE OPERATIONAL WHEN NEEDED.
15.4.3.2. AN OPERATOR THAT IS KNOWLEDGEABLE IN OPERATION OF THE PORTABLE GENERATORS
AND PUMPS SHALL BE ON CALL 24 HOURS PER DAY EVERY DAY.
15.4.3.3. THE SIZE OF A PORTABLE GENERATOR MUST HANDLE THE FIRM PUMPING CAPACITY OF THE
LIFT STATION.
15.5. SPILL CONTAINMENT STRUCTURES.
15.5.1. THE USE OF A SPILL CONTAINMENT STRUCTURE AS A SOLE MEANS OF PROVIDING SERVICE
RELIABILITY IS PROHIBITED.
15.5.2. A LIFT STATION MAY USE A SPILL CONTAINMENT STRUCTURE IN ADDITION TO ONE OF THE
SERVICE RELIABILITY OPTIONS DETAILED IN THIS IN SUBSECTION (A) OF THIS SECTION.
15.5.3. THE REPORT MUST INCLUDE A DETAILED MANAGEMENT PLAN FOR CLEANING AND MAINTAINING
EACH SPILL CONTAINMENT STRUCTURE.
15.5.4. A SPILL CONTAINMENT STRUCTURE MUST HAVE A LOCKED GATE AND BE SURROUNDED AN INTRUDER RESISTANT FENCE THAT IS 6.0 FEET HIGH CHAIN LINK, MASONRY, OR BOARD FENCE WITH AT LEAST THREE STRANDS OF BARBED WIRE OR 8.0 FEET HIGH CHAIN LINK, MASONRY, OR
BOARD FENCE WITH AT LEAST ONE STRAND OF BARBED WIRE.
15.6. A LIFT STATION MUST BE FULLY ACCESSIBLE DURING A 25-YEAR 24-HOUR RAINFALL EVENT.
15.7. LIFT STATION SYSTEM CONTROLS MUST PREVENT OVER-PUMPING UPON RESUMPTION OF NORMAL
POWER AFTER A POWER FAILURE. BACKUP OR STANDBY UNITS MUST BE ELECTRICALLY
INTERLOCKED TO PREVENT OPERATION AT THE SAME TIME THAT OTHER LIFT STATIONS PUMPS ARE
OPERATING ONLY ON THE RESUMPTION OF NORMAL POWER AFTER A POWER FAILURE.
TO DISCHARGE
LIQUID PROCESS
ROLL OFF
RAS
WAS
POLYMER
EXISTING SAND
BEDS
(SECONDARY)
EXISTING BIOLOGICAL PROCESS
REHABILITATE
FINAL CLARIFIER
NEW RAS/WAS
PUMP STATION SOLIDS DEWATERING
DECANT TO
HEADWORKS
WAS
SOLIDS PROCESS
DECANT TO
HEADWORKS
NEW
RECEIVING
MANHOLE
NEW
HEADWORKS
NEW
MAIN PUMP STATION
EXISTING
BIOLOGICAL PROCESS
REHABILITATE
FINAL CLARIFIER
REHABILITATE
CHLORINE BASIN
EXISTING
PUMP STATION
LEGEND
SCREEN
PUMP
EXISTING
STRUCTURE
PROPOSED
STRUCTURE
REHABILITATED
STRUCTURE
P_
PF
D_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
P R
O C
E S
S F
LO
W
D
IA
G R
A M
2-G-005
DS
UM
M_
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
BM
IT
TE
D
BY
PL
OT
S
CA
LE
SI
ZE
AN
SI
_D
IS
SU
E
DA
TE
MA
RK
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MA
RK
FI
LE
N
AM
E:
SHEET ID
W
2H Y-
-C
-X
XX
X
FOUO
JU
LY
E
TE
G R
A
O
LI
V
E
TT
E E
X E
C P
K W
Y
S U
IT
E
O
LI
V E
TT
E
, M O
PO
RT
IS
AB
EL
D
ET
EN
TI
ON
C
EN
TE
R
KI
TC
HE
N
AN
D W
AS
TE
W
AT
ER
T
RE
AT
ME
NT
P
LA
NT
IM
PR
OV
EM
EN
TS
US Army Corps of Engineers ®
BUFFALO DISTRICT
FINAL RTA
W
2H Y-
-R
-0
N W
3R
D S
T S
U
IT
E
O
K
LA
H O
M A
C
IT
Y , O
K
FA
X
: 4
.3
.5
P
H O
N E
: 4
.2
.6
U .S
. I M
M
IG
R A
TI
O
N A
N D
C U
S
TO
M S
E N
FO
R
C E
M E
N T
P O
R T
IS
A
B E
L D
E
TE
N
TI
O N
C E
N
TE
R P
O R
T
IS
A B
E L, T X
BR
C
CJ
W
KL
R
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
P R
O C
E S
S D
E S
IG
N
S U
M M
A R
Y
2-G-006
DESIGN ANALYSIS
DESIGN LOADINGS
THE DESIGN LOADINGS AND FLOWS TO BE USED FOR SIZING VARIOUS
PROCESSES AT THE PIDC WWTP ARE SUMMARIZED AS FOLLOWS:
ACRONYMS: ADF - AVERAGE DAILY FLOW, PDF - PEAK DAILY FLOW
PROCESS DESIGN ANALYSIS
DESIGN PARAMETERS
DESIGN CONDITIONS:
FLOW VALUE UNIT
ADF 0.16 MGD
PDF 0.21 MGD
CURRENT CONDITIONS:
FLOW VALUE UNIT
ADF 0.08 MGD
PDF 0.12 MGD
PARAMETER VALUE UNIT
BOD 200 MG/L
TSS 250 MG/L
AMMONIA 25 MG/L
TEMPERATURE 20 °C
EFFLUENT CONDITIONS
NPDES PERMIT
PARAMETER VALUE UNIT
FLOW 0.16 MGD
BOD 5.0 MG/L
A. NEW HEADWORKS
1. FINE SCREEN
NO. OF UNITS 1 DUTY
TYPE 1/4" PERFORATED PLATE
FLOW 0.21 MGD
AMOUNT OF SCREENINGS 7 - 13.5 FT3/MGAL
DISPOSAL DUMPSTER TO LANDFILL
2. COARSE SCREEN
NO. OF UNITS 1 STANDY
TYPE MANUAL, BAR SCREEN BAR SPACING 3/4"
DISPOSAL DUMPSTER TO LANDFILL
B. NEW MAIN PUMP STATION
NO. OF UNITS 2 DUTY, 1 STANDBY
TYPE SUBMERSIBLE
PUMP SPEED VARIABLEFLOW150 GPM PER DUTY
PUMP TDH 21 FT
MOTOR 1.5 HP
C. EXISTING BIOLOGICAL TREATMENT (TWO TRAINS)
1. OXIDATION DITCH NO. 1 - SOUTH
NO. OF OXIDATION DITCHES 1
DESIGN VOLUME 12,940 FT3
TOTAL VOLUME 19,380 FT3
TYPE EXTENDED AERATION PROCESS
MIXING (PER BASIN) BRUSH ROTOR
NUMBER OF ROTORS 2
HP OF ROTORS 7.5 HP
2. OXIDATION DITCH NO. 2 - NORTH
NO. OF OXIDATION DITCHES 1
DESIGN VOLUME 13,006 FT3
TOTAL VOLUME 25,025 FT3
TYPE EXTENDED AERATION PROCESS
MIXING (PER BASIN) BRUSH ROTOR
NUMBER OF ROTORS 2
HP OF ROTORS 7.5 HP
3. PROCESS OF BOTH
TEMPERATURE 20°C
HYDRAULIC RETENTION TIME 20 HRS
SLUDGE AGE 23 DAYS
F/M RATIO 0.124
WAS 197 LB/DAY
MLSS 4400 MG/L AT LWL
D. EXISTING FINAL CLARIFIER - REHABILITATED
1. FINAL CLARIFIER NO. 1 - SOUTH
DIAMETER 20 FT
DEPTH 13.5 FT
SURFACE AREA 279 FT2
VOLUME 3,348 FT3
SURFACE OVERFLOW RATE 774 GPD/FT2
WEIR OVERFLOW RATE 3,789 GPD/FT
HYDRAULIC DETENTION TIME 2.7 HRS
2. FINAL CLARIFIER NO. 2 - NORTH
DIAMETER 20 FT
DEPTH 14 FT
SURFACE AREA 286 FT2
VOLUME 3,586 FT3
SURFACE OVERFLOW RATE 755 GPD/FT2
WEIR OVERFLOW RATE 3,429 GPD/FT
HYDRAULIC DETENTION TIME 2.9 HRS
3. PROCESS OF BOTH
RESIDUAL SOLIDS CONC 9,000 MG/L
E. EXISTING DISINFECTION SYSTEM - REHABILITATED
1. CHLORINE CONTACT BASIN
NUMBER 2 DUTY
TYPE OPEN CHAMBER
DOSAGE 5 MG/L
VOLUME 1,237 FT3
DEPTH 3.4 FT
EFFLUENT FLOW METER ULTRASONIC OVER V NOTCH WEIR
F. NEW RASWAS PUMP STATION
1. RAS/WAS PUMP STATION
NO. OF RAS PUMPS 2 DUTY
NO. OF WAS PUMPS 1 DUTY, STANDBY FOR RAS
TYPE SUBMERSIBLE PUMP
SPEED VARIABLE
FLOW 150 GPM
TDH 21 FT
MOTOR 1.5 HP
G. DEWATERING UNIT
1. DESIGN - POLYMER FEED SYSTEM
NUMBER OF UNITS 1
FLOW 150 GPM
CAPACITY 18 YD3
CONCENTRATION 0.9% DRY SOLIDS
CAKE CONCENTRATION 15%
FILLS/ROLL OFF 17 FILLS
RATE EMPTY EVERY 2 TO 3 WEEKS
POLYMER CATIONIC EMULSION
POLYMER DOSAGE 20 LBS/DRY TON
2. CURRENT - SAND BEDS
NUMBER 2
FLOW
CAPACITY YD3
CONCENTRATION % DRY SOLIDS
CAKE CONCENTRATION %
FILLS/ROLL OFF FILLS
RATE EMPTY EVERY WEEKS
H. DISPOSAL
OPERATIONS CONTRACT
BIOSOLIDS MANAGEMENT
-6
-4
-2
15 20
28 29
-6
-4
-2
14S
15S
16S
17S
18S
14N
15N
16N
17N
18N
P_
HP
RO
_8
CO
NT
RA
CT
D
AT
E:
SO
LIC
IT
AT
IO
N
NO
CO
NT
RA
CT
N O.
FI
LE
N
UM
BE
R:
DE
SI
GN
ED
B Y:
DW
N
BY
CK
D
BY
SU
B…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.