This document provides an amendment to a solicitation for maintenance dredging services at the Mouth of the Colorado River in Matagorda County, Texas. The U.S. Army Corps of Engineers, Galveston District Office is seeking a contractor to perform maintenance dredging and advanced maintenance dredging of approximately 7.5 miles of channel. Work will include dredging from channel station 0+000 to 37+200 and varying depths of advanced maintenance and over-depth dredging. Material dredged from the entrance channel and jetty channel will be placed on the adjacent beach, while material from the main channel may be placed in an upland confined placement area requiring repairs to railings. The amendment extends the response deadline from November 11, 2019 to December 18, 2019 and increases the contractor period of performance from 210 to 322 days, with an estimated completion date of December 31, 2020. The order of work language is also revised to prohibit placement of material or debris removal on the beach placement area between March 15 and September 30 each year.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to extend the bid opening date and the contractor period of performance.
1. The required response date/time has changed from 11-Dec-2019 02:00 PM to 18-Dec-2019 02:00 PM.
2. The contractor period of performance end date has increased by 112 days from 210 days to 322 days. Based on an estimated award date of Jan 24, 2020 and NTP of February 14, 2020 and a completion date of Dec 31, 2020.
3. The Order of Work language is revised.
4. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Dec-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HY19B0031
X 9B. DATED (SEE ITEM 11)
24-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Dec-2019
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY19B0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
1.9 ORDER OF WORK
Currently it states:
In order to avoid Sea Turtle nesting season, the Contractor shall commence dredging so that all material designated to be placed on the Beach Placement Area is placed, and the debris clean-up performed no later than March 15 of the calendar year. The Contractor will be required to reflect this requirement in the initial schedule submitted to the Government. The Contractor may commence dredging the remaining portions of the work in the order it desires. The Government reserves the right to change the order of work at any time.
Revised per this amendment to read:
In order to avoid Sea Turtle nesting season, no material shall be placed on the Beach Placement Area or debris clean-up performed on the Beach Placement Area from March 15 through September 30.
The Contractor will be required to reflect this requirement in the initial schedule submitted to the Government. The Contractor may commence dredging the remaining portions of the work in the order it desires. The Government reserves the right to change the order of work at any time.
(End of Summary of Changes)