AMEND-0002_W912HY19B0031.pdf

PDF 2 MB Posted

Attached to
UNRESTRICTED Mouth of Colorado Maintenance Dredging
Solicitation number
W912HY-19-B-0031
Issued by

About this file

This document provides details for a federal contract solicitation for maintenance dredging services at the Mouth of the Colorado River in Texas. The U.S. Army Corps of Engineers, Galveston District Office is seeking dredging of approximately 7.5 miles of the entrance channel, jetty channel, and main channel, with material to be placed on adjacent beaches or in a confined placement area. The contract includes a base scope from channel station 0+000 to 37+200, with options for advanced maintenance dredging and clearing a placement area. Work must be completed between October and February to avoid environmental windows. The estimated value is between $5-10 million. Responses are due on July 24, 2019. Award is expected in August 2019. The NAICS code is 237990 and the small business size standard is $27.5 million for dredging.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the Bid Opening date and provide updated Plans and Specifications.

1. The required response date/time has changed from Indefinitely to 6 Dec 2019 at 2:00 pm CT.

2. Bids will no longer be submitted through FBO.gov, as a result, Section 00 21 00, paragraph 1.9 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION is amended is follows:

- Bids and a copy of the SF24 Bid Bond must be submitted by email to: SWG-CT-Supplemental-Proposals@usace.army.mil not later than the response date and time indicated above.

- The Original copies of the Bid Bond shall still be submitted to USACE, Galveston District, ATTN: Debora Wells, 2000 Fort Point Road, Galveston, Texas 77553, on or before the response date and time.

- Include in the email Subject Line the solicitation number, project title, and your firm name, ie: IFB No. W912HY19B0031 - Mouth of the Colorado Entrance, Jetty and Main Channel

Pipeline Dredging - Your Firm Name

3. See continuation pages for the amended Plans and Specifications.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY19B0031

X 9B. DATED (SEE ITEM 11)

24-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE DATE

22 Nov-2019

CODE

US ARMY CORPS OF ENGINEERS

2000 POINT FORT ROAD

P.O. BOX 1229

GALVESTON TX 77553-1229

W912HY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HY19B0031

Page 2 of XX

A0002-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. THE SPECIFICATIONS FOR SOLICITATION NO. W912HY19B0031, MOUTH OF THE

COLORADO RIVER CHANNEL, MOUTH OF THE COLORADO, ENTRANCE, JETTY,

AND MAIN CHANNELS, ARE HEREBY AMENDED AS FOLLOWS:

a) Specifications.

(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.

(2) SECTION 35 20 23.16 45, APPENDIX 1 - QUANTITY SUMMARY TABLE– The enclosed SECTION 35 20 23.16 45 entitled APPENDIX 1 - QUANTITY SUMMARY TABLE supersedes that issued with this Solicitation.

b) Drawings.

(1) DRAWINGS NO. C-107 AND C-301 - The enclosed Drawings No. C-107 and C-301, supersedes that issued with this Solicitation.

2. This amendment shall be attached to and become a part of the solicitation.

3 Encls:

1. SECTION 00 11 00.00 45, BID SCHEDULE

2. SECTION 35 20 23.16 45, APPENDIX 1 - QUANTITY SUMMARY TABLE

3. DRAWINGS NO. C-107 AND C-301

SWG FILE NO.: COLO 601-128 SOLICITATION NO.: W912HY19B0031

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 11 00.00 45

BID SCHEDULE AMENDMENT NO. 0002

11/17

PART 1 GENERAL

1.1 BID SCHEDULE

1.1.1 Schedule No. 1

-- End of Section Table of Contents --

DOCUMENT 00 11 00.00 45 Page 1

(TO ACCOMPANY AMENDMENT NO. 0002 TO W912HY19B0031)

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 11 00.00 45 Page 2

SECTION 00 11 00.00 45

BID SCHEDULE

AMENDMENT NO. 0002

11/17

PART 1 GENERAL

1.1 BID SCHEDULE

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.1 Schedule No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

SCHEDULE NO. 1

0001 Mobilization and Demobilization

1 JOB SUM $___________

0002 Pipeline Management 1 JOB SUM $___________

0003 Dredging Sections 1-3 234,300 C.Y. $_________ $___________

0004 Dredging Sections 4-6 180,000 C.Y. $_________ $___________

0005 Drop-Outlet Structure Rehabilitation at PA 108

1 JOB SUM $___________

0006 Endangered Species Monitoring - Beach Placement

1 JOB SUM

TOTAL SCHEDULE NO. 1 $___________

NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.

DOCUMENT 00 11 00.00 45 Page 3

-- End of Document --

DOCUMENT 00 11 00.00 45 Page 4

SWG FILE NO.: COLO 601-128 SOLICITATION NO.:W9126HY19B0031

Section 35 20 23.16 45 - APPENDIX 1 - QUANTITY SUMMARY TABLE - Page 1

(TO ACCOMPANY AMENDMENT NO. 0002 TO W912HY19B0031)

Section No.

From Station

To Station

Length of Station (Feet)

Required Depth

(CY)

Allowable Overdepth

(CY)

Total Estimated

(CY)

1 -16+00.00 0+00.00 1,600 75,200 10,200 85,400 Beach 2 0+00.00 50+00.00 5,000 43,800 22,500 66,300 Beach 3 50+00.00 100+00.00 5,000 60,000 22,600 82,600 Beach

4 218+80.00 268+39.00 4,959 19,800 13,500 33,300 PA 108

5 268+39.00 318+64.69 5,026 94,200 18,800 113,000 PA 108

6 318+64.69 366+00.00 4,735 24,000 9,700 33,700 PA 108

26,320 317,000 97,300 414,300

The term “Required Depth” is synonymous with the term “Prescribed Depth” and “Required Dredging Prism” used elsewhere in the specifications.

Includes anticipated shoaling.

Placement Area

Distribution

APPENDIX 1 - QUANTITY SUMMARY TABLE

SECTIONS

LOWER MOUTH COLORADO RIVER CHANNEL - SCHEDULE NO. 1

QUANTITIES

TOTAL, SCHEDULE NO. 1, OPTION

NO. 1, & OPTION NO. 2

of Engineers U.S. Army Corps

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

A re a E n g in e e r

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

R A

L P

H E S

T E

IN

E R P .E P

M P

C-107

A .H .M

L .A .C

D .R .A

W

IL

L

IE

J

O E H

O N

Z A P .E

C h ie f, E n g in e e ri n g B ra n c h

R e s id e n t E n g in e e r

D E

R E

K A

N D

E R

S O

N P .E

W912HY19B0031

SOLICITATION NO.:

COLO 601-128SWG FILE NO.

J U

L Y

P

IP

E L

IN

E D

R E

D G

IN

G

E N

T R

A N

C E J E

T T

Y

A N

D M

A

IN

C

H A

N N

E L S

M O

U T

H O

F T

H E C

O L

O R

A D

O

C O

L O

R A

D O R

IV

E R C

H A

N N

E L T

E X

A S

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

RIVER CHANNEL

LOWER COLORADO

C .S P .I .4

C .S

C .S

C .S P .I .0

C .S -1

C .S -1

C .S

C .S

C .S

C .S

C .S

C .S

C .S

C .S

M A

T C

H L

IN

E S

T A

C .S

-3 .5

,4

,5

2,93 9,00

,4

,5

2,93 8,00

,4

,0

2,93 5,00

,4

,0

2,93 6,00

RED TOE

RIVER CHANNEL

LOWER COLORADO

GREEN TOE

RIVER CHANNEL

LOWER COLORADO

JETTY

NEW EAST

EAST JETTY

EXISTING

S T

A

T

O S

T A -3

L O

W E

R C

O L

O R

A D

O R

IV

E R C

H A

N N

E L

P L

A N

WEST JETTY

EXISTING

ROUTE

PIPELINE

DREDGING

N

SCALE IN FEET

0 200 400 600

PLAN

SOLICITATION NO. W912HY19B0031

AMENDMENT NO. 0002 TO

THIS DRAWING ACCOMPANIES

J D

C A

D J

U S

T E

D

R

E D

G

IN

G

A C

H

SECTION NO. 1

SCHEDULE NO. 1

C H

A N

N E

L D

R E

D G

IN

G S

O U

T H

E R

N L

IM

IT

S O

F S

T A -1

SECTION NO. 2

SCHEDULE NO. 1

of Engineers U.S. Army Corps

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

A re a E n g in e e r

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

R A

L P

H E S

T E

IN

E R P .E P

M P

C-301

A .H .M

L .A .C

D .R .A

W

IL

L

IE

J

O E H

O N

Z A P .E

C h ie f, E n g in e e ri n g B ra n c h

R e s id e n t E n g in e e r

D E

R E

K A

N D

E R

S O

N P .E

W912HY19B0031

SOLICITATION NO.:

COLO 601-128SWG FILE NO.

J U

L Y

P

IP

E L

IN

E D

R E

D G

IN

G

E N

T R

A N

C E J E

T T

Y

A N

D M

A

IN

C

H A

N N

E L S

M O

U T

H O

F T

H E C

O L

O R

A D

O

C O

L O

R A

D O R

IV

E R C

H A

N N

E L T

E X

A S

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

-5

-10

-15

-20

-25

-5

-10

-15

-20

-25

-5

-10

-15

-20

-25

-5

-10

-15

-20

-25

-5

-10

-15

-20

-25

-5

-10

-15

-20

-25 50100150 50 100 150

50100 500 100 150150

200 200

200 200

1 1

C CHANNEL

L

75'75'

1 1

C CHANNEL

L

75'75'

050100150 50 100 150200 200050100150 50 100 150200 200

50100 500 100 150150200 200

1 1

C CHANNEL

L

GROUND

EXISTING

C CHANNEL

L

75.3'75.3'

1' ALLOWABLE OVERDEPTH

17' REQUIRED DEPTH

-16+00

-10+00

-0+01

SKEWED

SKEWED

C CHANNEL

L

C CHANNEL

L

C CHANNEL

L

50100 500 100 150150200 200

1' ALLOWABLE OVERDEPTH

14' REQUIRED DEPTH GROUND

EXISTING

75.3'75.3'

TRANSITION

START

72.62'72.46'

2+00

4+00

70.15'70'

8+00

65.23'65.08'

1' ALLOWABLE OVERDEPTH

14' REQUIRED DEPTH

GROUND

EXISTING

P.I. 0+00

C CHANNEL

L

6+00

67.69'67.54'

S T

A -3

T

O S

T A

L O

W E

R C

O L

O R

A D

O R

IV

E R C

H A

N N

E L

C R

O S

S S

E C

T

IO

N S

SKEWED

SKEWED

3. ALL PROFILE ELEVATIONS ARE M.L.L.W. DATUM

2. ALL SECTIONS-LOWER COLORADO RIVER CHANNEL TAKEN LOOKING TOWARDS INCREASING STATIONS & UPSTREAM.

NOTES: 1. DATE OF SURVEYS MARCH & MAY 2019.

GROUND

EXISTING

1 1

1' ALLOWABLE OVERDEPTH

17' REQUIRED DEPTH

SOLICITATION NO. W912HY19B0031

AMENDMENT NO. 0002 TO

THIS DRAWING ACCOMPANIES

J D

C A

D J

U S

T

E D

G

IN

G

A C

H

U P

D A

T

C

O S

C T

IO

N S

A N

D

SF-30_W912HY19B0031_AMD 0002
Amend 0002 page-2
00 11 00.00 45
00 11 00.00 45 - BID SCHEDULE AMENDMENT NO. 0002
00 11 00.00 45 - BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
35 20 23.16 451
BID SCHEDULE (OPT reaches)
AMD#2_W912HY19B0031-PLANS
C-1
013-AMD#2_COLO_601_128_SHT_C107_CO_PLAN
C-3
021-AMD#2_COLO_601_128_SHT_C301_CO_XSEC

File details come from the government source that posted it. Updated .