Houston Ship Channel, Texas, Clinton Placement Area Improvements in Harris County, Texas
Solicitation number
W912HY19B0030
Issued by

About this file

This document contains an abstract of offers and related federal contract opportunity notice for the Houston Ship Channel, Texas, Clinton Placement Area Improvements project. The U.S. Army Corps of Engineers, Galveston District Office is soliciting fixed-price bids for construction work including containment dike raising, ditching, and rehabilitation of two drop outlet structures at the Clinton Placement Area in Harris County, Texas. Bids were due on February 11, 2020 as outlined in solicitation W912HY19B0030. The apparent low bidder was Texas Dewatering LLC at $25,879,796. The work consists of improvements to approximately 575,000 CY of containment dikes, 70,000 LF of ditching, and rehabilitation of two existing drop outlet structures. The contractor must have experience with dredged material placement area construction and demonstrate past performance as a prime contractor on similar projects. Subcontracting goals include 50% for small businesses, 17% for small disadvantaged businesses, and other set-aside percentages.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT

PRICE TOTAL

1 JB SUM $696,167.00

1 JB SUM $284,690.00

1 JB SUM $48,775.00

14,138 LF $24.50 $346,381.00

17,617 LF $24.50 $431,616.50

1 JB SUM $79,866.00

120,000 CY $7.87 $944,400.00

205,000 CY $24.40 $5,002,000.00

1,200 CY $24.00 $28,800.00

1 JB SUM $32,612.00

1 JB SUM $263,650.00

$8,158,957.50

1 JB SUM $281,951.00

1 JB SUM $48,775.00

14,035 LF $24.50 $343,857.50

25,742 LF $24.50 $630,679.00

1 JB SUM $75,110.00

190,000 CY $8.63 $1,639,700.00

265,000 CY $24.50 $6,492,500.00

140 CY $33.23 $4,652.20

1 JB SUM $32,612.00

1 JB SUM $298,413.00

$9,848,249.70

$18,007,207.20

Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (East Clinton PA)

0018 Semi-Compacted Embankment Construction Using Imported Clayey Soils (East Clinton PA)

0019 Semi-Compacted Access Dike Using Imported Clayey Soils (East Clinton PA)

0020 Drop-Outlet Structure Repair (East Clinton PA)

0021 Turfing (East Clinton PA)

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO. 1 & OPTION NO. 1

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

* The apparent low bidder, Texas Dewatering, LLC is 0.41% below the Government's Estimate.

ABSTRACT OF OFFERS Page 1 of 6

Solicitation No.: W912HY19B0030 Date Issued: 26 Jul 19 Date Opened: 11 Feb 20 Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Clinton PA Improvements in Haris County, Texas.

Collector Sump Excavation (East Clinton PA)0013

Mobilization and Demobilization

Number of Amendments Issued: 0001 - 0007

Government Estimate (Without Profit)

NO.

SCHEDULE NO. 1ITEM

DESCRIPTION QUANTITY

OPTION NO. 1

TOTAL SCHEDULE NO. 1

CONTRACTING OFFICER

Clearing and Stripping (West Clinton PA)

0012 Clearing and Stripping (East Clinton PA)

0014 Perimeter Ditch (East Clinton PA)

Lateral Ditches (West Clinton PA)

Final Construction Survey (West Clinton PA)

Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (West Clinton PA)

0010 Drop-Outlet Structure Repair (West Clinton PA)

Lateral Ditches (East Clinton PA)

0016 Final Construction Survey (East Clinton PA)

Collector Sump Excavation (West Clinton PA)

Perimeter Ditch (West Clinton PA)

Semi-Compacted Embankment Construction Using Imported Clayey Soils (West Clinton PA) Semi-Compacted Access Dike Using Imported Clayey Soils (West Clinton PA)

Turfing (West Clinton PA)

ALDRICH NICHOLS

1 JB SUM $1,200,000.00

1 JB SUM $400,000.00

1 JB SUM $70,000.00

14,138 LF $32.00 $452,416.00

17,617 LF $18.00 $317,106.00

1 JB SUM $50,000.00

120,000 CY $7.00 $840,000.00

205,000 CY $32.50 $6,662,500.00

1,200 CY $32.50 $39,000.00

1 JB SUM $75,000.00

1 JB SUM $200,000.00

$10,306,022.00

1 JB SUM $400,000.00

1 JB SUM $70,000.00

14,035 LF $36.00 $505,260.00

25,742 LF $20.00 $514,840.00

1 JB SUM $50,000.00

190,000 CY $8.00 $1,520,000.00

265,000 CY $32.50 $8,612,500.00

140 CY $32.50 $4,550.00

1 JB SUM $75,000.00

1 JB SUM $200,000.00

$11,952,150.00

$22,258,172.00

0016 Final Construction Survey (East Clinton PA)

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO. 1 & OPTION NO. 1

0020 Drop-Outlet Structure Repair (East Clinton PA)

0012 Clearing and Stripping (East Clinton PA)

Collector Sump Excavation (West Clinton PA)

Final Construction Survey (West Clinton PA)

TOTAL SCHEDULE NO. 1

ITEM SCHEDULE NO. 1

QUANTITY

Solicitation No.: W912HY19B0030 Date Issued: 26 Jul 19 Date Opened: 11 Feb 20

NO.

0001 Mobilization and Demobilization

DESCRIPTION

ABSTRACT OF OFFERS (CONT'D) Page 2 of 6

Offeror: #1 - Affolter Contracting, Inc., PO Box 1436, La Marque, TX 77568

Business Size: Small Business

Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Clinton PA Improvements in Haris County, Texas.

0011 Turfing (West Clinton PA)

0007 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (West Clinton PA)

Clearing and Stripping (West Clinton PA)

Perimeter Ditch (West Clinton PA)

Lateral Ditches (West Clinton PA)

Semi-Compacted Access Dike Using Imported Clayey Soils (West Clinton PA) Drop-Outlet Structure Repair (West Clinton PA)

Issuing Office: USAED-Galveston

0008 Semi-Compacted Embankment Construction Using Imported Clayey Soils (West Clinton PA)

Turfing (East Clinton PA)

0019 Semi-Compacted Access Dike Using Imported Clayey Soils (East Clinton PA)

Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (East Clinton PA)

Semi-Compacted Embankment Construction Using Imported Clayey Soils (East Clinton PA)

OPTION NO. 1

0013 Collector Sump Excavation (East Clinton PA)

0014 Perimeter Ditch (East Clinton PA)

0015 Lateral Ditches (East Clinton PA)

1 JB SUM $1,318,520.00

1 JB SUM $468,900.00

1 JB SUM $73,850.00

14,138 LF $34.00 $480,692.00

17,617 LF $18.60 $327,676.20

1 JB SUM $38,970.00

120,000 CY $8.00 $960,000.00

205,000 CY $33.90 $6,949,500.00

1,200 CY $40.00 $48,000.00

1 JB SUM $73,220.00

1 JB SUM $182,670.00

$10,921,998.20

1 JB SUM $665,720.00

1 JB SUM $73,850.00

14,035 LF $38.00 $533,330.00

25,742 LF $21.00 $540,582.00

1 JB SUM $41,370.00

190,000 CY $8.20 $1,558,000.00

265,000 CY $33.90 $8,983,500.00

140 CY $50.00 $7,000.00

1 JB SUM $81,910.00

1 JB SUM $189,630.00

$12,674,892.00

$23,596,890.20

Offeror: #2 - Southern Contracting, LLC, 777 Alloy Drive, Newbern, TN 38059

Business Size: Small Business/HubZone

ABSTRACT OF OFFERS (CONT'D) Page 3 of 6

Solicitation No.: W912HY19B0030 Date Issued: 26 Jul 19 Date Opened: 11 Feb 20

Issuing Office: USAED-Galveston

Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Clinton PA Improvements in Haris County, Texas.

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

0002 Clearing and Stripping (West Clinton PA)

0003 Collector Sump Excavation (West Clinton PA)

0004 Perimeter Ditch (West Clinton PA)

0005 Lateral Ditches (West Clinton PA)

0006 Final Construction Survey (West Clinton PA)

0007 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (West Clinton PA)

0008 Semi-Compacted Embankment Construction Using Imported Clayey Soils (West Clinton PA)

0009 Semi-Compacted Access Dike Using Imported Clayey Soils (West Clinton PA)

0010 Drop-Outlet Structure Repair (West Clinton PA)

0011 Turfing (West Clinton PA)

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0014 Perimeter Ditch (East Clinton PA)

Turfing (East Clinton PA)

TOTAL OPTION NO. 1

0012 Clearing and Stripping (East Clinton PA)

0013 Collector Sump Excavation (East Clinton PA)

TOTAL SCHEDULE NO. 1 & OPTION NO. 1

0015 Lateral Ditches (East Clinton PA)

0016 Final Construction Survey (East Clinton PA)

0017 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (East Clinton PA)

0018 Semi-Compacted Embankment Construction Using Imported Clayey Soils (East Clinton PA)

0019 Semi-Compacted Access Dike Using Imported Clayey Soils (East Clinton PA)

0020 Drop-Outlet Structure Repair (East Clinton PA)

1 JB SUM $775,000.00

1 JB SUM $540,000.00

1 JB SUM $56,000.00

14,138 LF $28.50 $402,933.00

17,617 LF $31.00 $546,127.00

1 JB SUM $150,000.00

120,000 CY $7.50 $900,000.00

205,000 CY $26.65 $5,463,250.00

1,200 CY $26.65 $31,980.00

1 JB SUM $69,000.00

1 JB SUM $158,000.00

$9,092,290.00

1 JB SUM $630,000.00

1 JB SUM $54,000.00

14,035 LF $28.50 $399,997.50

25,742 LF $30.30 $779,982.60

1 JB SUM $160,000.00

190,000 CY $7.00 $1,330,000.00

265,000 CY $26.60 $7,049,000.00

140 CY $30.00 $4,200.00

1 JB SUM $69,000.00

1 JB SUM $168,000.00

$10,644,180.10

$19,736,470.10

ABSTRACT OF OFFERS (CONT'D) Page 4 of 6

Solicitation No.: W912HY19B0030 Date Issued: 26 Jul 19 Date Opened: 11 Feb 20

Issuing Office: USAED-Galveston

Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Clinton PA Improvements in Haris County, Texas.

Offeror: #3 - Ceres Environmental Services, Inc., 3825 85th Avenue North, Brooklyn Park, MN 55443

Business Size: Large Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

0002 Clearing and Stripping (West Clinton PA)

0003 Collector Sump Excavation (West Clinton PA)

0004 Perimeter Ditch (West Clinton PA)

0005 Lateral Ditches (West Clinton PA)

0006 Final Construction Survey (West Clinton PA)

0007 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (West Clinton PA)

0008 Semi-Compacted Embankment Construction Using Imported Clayey Soils (West Clinton PA)

0009 Semi-Compacted Access Dike Using Imported Clayey Soils (West Clinton PA)

0010 Drop-Outlet Structure Repair (West Clinton PA)

0011 Turfing (West Clinton PA)

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0012 Clearing and Stripping (East Clinton PA)

0013 Collector Sump Excavation (East Clinton PA)

0014 Perimeter Ditch (East Clinton PA)

0015 Lateral Ditches (East Clinton PA)

0016 Final Construction Survey (East Clinton PA)

0017 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (East Clinton PA)

0018 Semi-Compacted Embankment Construction Using Imported Clayey Soils (East Clinton PA)

0019 Semi-Compacted Access Dike Using Imported Clayey Soils (East Clinton PA)

0020 Drop-Outlet Structure Repair (East Clinton PA)

0021 Turfing (East Clinton PA)

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO. 1 & OPTION NO. 1

1 JB SUM $1,124,119.00

1 JB SUM $154,636.48

1 JB SUM $129,126.59

14,138 LF $15.16 $214,332.08

17,617 LF $19.61 $345,469.37

1 JB SUM $58,510.64

120,000 CY $7.72 $926,400.00

205,000 CY $25.81 $5,291,050.00

1,200 CY $25.81 $30,972.00

1 JB SUM $56,179.78

1 JB SUM $171,383.33

$8,502,179.27

1 JB SUM $154,636.48

1 JB SUM $129,126.59

14,035 LF $15.46 $216,981.10

25,742 LF $20.15 $518,701.30

1 JB SUM $58,510.64

190,000 CY $7.31 $1,388,900.00

265,000 CY $25.28 $6,699,200.00

140 CY $25.28 $3,539.20

1 JB SUM $56,179.78

1 JB SUM $206,111.11

$9,431,886.20

$17,934,065.47

ABSTRACT OF OFFERS (CONT'D) Page 5 of 6

Solicitation No.: W912HY19B0030 Date Issued: 26 Jul 19 Date Opened: 11 Feb 20

Issuing Office: USAED-Galveston

Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Clinton PA Improvements in Haris County, Texas.

Offeror: #4 - Texas Dewatering LLC, 4691 FM 529, Bellville, TX 77418 ****APPARENT LOW BIDDER****

Business Size: Small Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

0002 Clearing and Stripping (West Clinton PA)

0003 Collector Sump Excavation (West Clinton PA)

0004 Perimeter Ditch (West Clinton PA)

0005 Lateral Ditches (West Clinton PA)

0006 Final Construction Survey (West Clinton PA)

0007 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (West Clinton PA)

0008 Semi-Compacted Embankment Construction Using Imported Clayey Soils (West Clinton PA)

0009 Semi-Compacted Access Dike Using Imported Clayey Soils (West Clinton PA)

0010 Drop-Outlet Structure Repair (West Clinton PA)

0011 Turfing (West Clinton PA)

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0012 Clearing and Stripping (East Clinton PA)

0013 Collector Sump Excavation (East Clinton PA)

0014 Perimeter Ditch (East Clinton PA)

0015 Lateral Ditches (East Clinton PA)

0016 Final Construction Survey (East Clinton PA)

0017 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (East Clinton PA)

0018 Semi-Compacted Embankment Construction Using Imported Clayey Soils (East Clinton PA)

0019 Semi-Compacted Access Dike Using Imported Clayey Soils (East Clinton PA)

0020 Drop-Outlet Structure Repair (East Clinton PA)

0021 Turfing (East Clinton PA)

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO. 1 & OPTION NO. 1

1 JB SUM $1,798,000.00

1 JB SUM $650,000.00

1 JB SUM $80,000.00

14,138 LF $28.00 $395,864.00

17,617 LF $28.00 $493,276.00

1 JB SUM $260,000.00

120,000 CY $12.00 $1,440,000.00

205,000 CY $33.00 $6,765,000.00

1,200 CY $35.00 $42,000.00

1 JB SUM $450,000.00

1 JB SUM $475,000.00

$12,849,140.00

1 JB SUM $442,000.00

1 JB SUM $80,000.00

14,035 LF $28.00 $392,980.00

25,742 LF $28.00 $720,776.00

1 JB SUM $180,000.00

190,000 CY $12.00 $2,280,000.00

265,000 CY $31.00 $8,215,000.00

140 CY $35.00 $4,900.00

1 JB SUM $425,000.00

1 JB SUM $290,000.00

$13,030,656.00

$25,879,796.00

ABSTRACT OF OFFERS (CONT'D) Page 6 of 6

Solicitation No.: W912HY19B0030 Date Issued: 26 Jul 19 Date Opened: 11 Feb 20 Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Clinton PA Improvements in Haris County, Texas.

Offeror: #5 - Pontchartrain Partners, LLC, 739 S. Clark St., New Orleans, LA 70119

Business Size: Small Buisness/SDB/SDVO/HubZone

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

0002 Clearing and Stripping (West Clinton PA)

0003 Collector Sump Excavation (West Clinton PA)

0004 Perimeter Ditch (West Clinton PA)

0005 Lateral Ditches (West Clinton PA)

0006 Final Construction Survey (West Clinton PA)

0007 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (West Clinton PA)

0008 Semi-Compacted Embankment Construction Using Imported Clayey Soils (West Clinton PA)

0009 Semi-Compacted Access Dike Using Imported Clayey Soils (West Clinton PA)

0010 Drop-Outlet Structure Repair (West Clinton PA)

0011 Turfing (West Clinton PA)

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0012 Clearing and Stripping (East Clinton PA)

0013 Collector Sump Excavation (East Clinton PA)

0014 Perimeter Ditch (East Clinton PA)

0020 Drop-Outlet Structure Repair (East Clinton PA)

0021 Turfing (East Clinton PA)

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO. 1 & OPTION NO. 1

0015 Lateral Ditches (East Clinton PA)

0016 Final Construction Survey (East Clinton PA)

0017 Semi-Compacted Stability Berm Construction Using Onsite Borrow Soils (East Clinton PA)

0018 Semi-Compacted Embankment Construction Using Imported Clayey Soils (East Clinton PA)

0019 Semi-Compacted Access Dike Using Imported Clayey Soils (East Clinton PA)

File details come from the government source that posted it. Updated .