W45VAK91433346 007780

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Unrestricted Procurement for Houston Ship Channel, Texas, Peggy Lake Placement Area Dewatering and Dike Raise in Harris County, Texas, Placement Area Improvements in which bids are due 26 Aug 19 @ 2:00 PM is hereby amended as follows:

Continued on Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY19B0029

X 9B. DATED (SEE ITEM 11)

26-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2019

CODE

USAED, GALVESTON

CONTRACTING DIVISION

2000 FORT POINT ROAD

GALVESTON TX 77553-1229

W912HY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HY19B0029

A0002-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. THE SPECIFICATIONS FOR SOLICITATION NO. W912HY19B0029, HOUSTON SHIP

CHANNEL, TEXAS, PEGGY LAKE PLACEMENT AREA, IN HARRIS COUNTY, TEXAS,

DEWATERING AND DIKE RAISE, ARE HEREBY AMENDED AS FOLLOWS:

a) Specifications.

(1) DOCUMENT 00 21 00, INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

– The enclosed DOCUMENT 00 21 00 entitled INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS supersedes that issued with this Solicitation.

(2) SECTION 35 41 00.01 45, EMBANKMENT CONSTRUCTION – The enclosed SECTION 35 41 00.01 45 entitled EMBANKMENT CONSTRUCTION supersedes that issued with this Solicitation.

b) Drawings.

(1) None.

2. This amendment shall be attached to and become a part of the solicitation.

2 Encl.:

1. DOCUMENT 00 21 00, INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

2. SECTION 35 41 00.01 45, EMBANKMENT CONSTRUCTION

SWG FILE NO.: HSC 401-571 Solicitation No.: W912HY19B0029

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

1.1 ESTIMATED CONSTRUCTION PRICE RANGE (APR 1985) (FAR 36.204)

The estimated price range of the proposed construction is between $5,000,000 and $10,000,000.

1.2 AVAILABILITY OF PLANS AND SPECIFICATIONS ON THE FEDERAL BUSINESS

OPPORTUNITIES WEBSITE ((FBO) (FAR 5.102(a)(1)

After solicitation issuance, contractors may register to be placed on a plan holders list, view and/or download this solicitation and all amendments at the Federal Business Opportunities (FBO) website at http://www.fbo.gov/

Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the FBO website daily (using the above link) for amendments to the solicitation. You must be registered in the System For Award Management (SAM) to receive a government contract award. The website for SAM https://www.sam.gov/SAM/ .

1.3 PREAWARD INFORMATION CONSTRUCTION (FAR 9.105-1) (AM#2)

The apparent Low bidder shall, upon request of the Contracting Officer, furnish a statement within 1 working day after Bid Opening, of whether he is now or has ever been engaged in any work similar to that covered by the specifications herein, the dollar value thereof, the year in which such work was performed, and the manner of its execution, and giving such information as will tend to show the bidder's ability to prosecute the required work. The "such other information" referred to above shall include but is not limited to the following:

(a) The name and address of the office or firm under which such similar work was performed.

(b) A list of key personnel available for the instant project and their qualifications.

(c) A copy of bidder's last year's financial statement, including the names of banks or other financial institutions with which the bidder conducts business. Such statement will be confidential.

(d) Business Financial Condition Evaluation. The evaluation factors listed below shall be prepared by the contractor's certified public accountant.

(1) Liquidity

- Current Ratio __________________

- Quick Ratio __________________

(2) Leverage -Debit/Net Worth __________________

(3) Operating Efficiency

- Return On Assets __________________

- Asset Turnover __________________

(4) Profitability

- % Return On Equity __________________

- % Return On Sales __________________

(e) A list of present commitments, including the dollar value thereof, and name of office under which the work is being performed.

AMENDMENT NO. 0002

Document 00 21 00 - Page 1

TO ACCOMPANY AMENDMENT NO 0002 TO SOLICITAITON NO W912HY19B0029

https://www.sam.gov/SAM/

(f) If bidder is a Large Business, a Sub-Contracting Plan, if required, must be submitted within 1 working day after Bid Opening.

1.4 BIDDER'S QUALIFICATIONS (FAR 9.105-1)

Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.

1.5 CAUTIONS & REMINDERS TO BIDDERS (FAR 52.214-18)

All information required by the terms of the solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper offer. Check as you read.

Have you acknowledged all amendments?

Have you completed SECTION 00 45 00, REPRESENTATIONS &

CERTIFICATIONS portion of the solicitation package?

Is your offer properly signed?

If a bid guarantee is required, is it included with your offer? (A late bid guarantee is treated the same as a late offer).

Is your bid guarantee in the proper amount? Bid guarantee shall be in the amount of 20 percent of the amount of the offer, or $3 million, whichever is less.

If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?

Is the name in which you submitted the offer the same as your bid bond?

If required have you entered a unit price for each item? (The solicitation will specifically state when this is necessary).

Are decimals in unit prices in the proper places? Are your figures legible?

Are the extensions of your unit prices, and your total offer price correct?

Are all erasures or corrections initialed by the person signing the offer?

I have not restricted my offer by altering the provisions of the solicitation.

REMINDER TO BIDDERS

REMINDER #1 - Acknowledge all Amendments on the reverse side of SF 1442, Item 19, Solicitation, Offer, and Award.

REMINDER #2 - The Contracting Officer signing this contract is the Primary Contracting Officer. However, any Contracting Officer assigned to the Galveston District may take formal action. See Section entitled "Specific Project Requirements".

Document 00 21 00 - Page 2

1.6 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION: (FAR

14.302 and 14.304)

Bids and a copy of the SF24 Bid Bond must be submitted through the Federal Business Opportunities bid package submission via https://www.fbo.gov/ , not later than the response date and time indicated in the solicitation.

Original copies of the Bid Bond shall be submitted to USACE, Galveston District, ATTN:

Lucille Smith, 2000 Fort Point Road, Galveston, Texas 77553, on or before the response date and time.

SENDING FILES:

The Federal Business Opportunities bid package submission application can be accessed via https://www.fbo.gov/ under the Solicitation Number W912HY19B0029.

• A note will be visible within the "Notice Details" sub-tab. The “Electronic Response” sub-tab indicates that the opportunity allows for electronic responses. Note, a vendor must login to the system to be able to submit electronic responses for opportunities.

• There are two types of electronic response submissions possible:

1. Line Item Builder form (CLIN) - This can serve as a template for the items that vendors are sometimes requested to quote.

2. Document upload. Multiple documents with attachments can be loaded here.

• Choose “Document Upload”

• The Documents section allows the user to submit files as part of their electronic response to the opportunity.

a. The user can enter a description for every file to be uploaded, note this is optional.

b. To select a file for upload, the user clicks on the Browse button. (Note for files over

10 Mb, please use the large upload (JAVA) button). This will allow the user to select a file located on their computer for upload.

3. After selecting the file, the user can click and Add New button to select additional files for upload.

4. The user can delete any file(s) previously selected for upload by clicking on the Delete button.

5. The user has three options at the bottom of the Response page:

a. Submit saves and electronically submits the response to the government point of contact for that opportunity in the system. Note, the system will send an email to the email address on file for the user confirming the electronic submission;

b. Save as Draft saves the response created, but does not submit it to the government point of contact for the opportunity in the system; if selected, the system returns to the Notice Details tab and there is a note at the top indicating that the user has saved a draft response for the opportunity. The user can click on the blue Click here link in the note to review/submit a response.

After clicking the link to review/submit, the system opens the Electronic Response tab and displays the draft response for review. There is a note at the top which will advise the user whether or not the response deadline has passed. If not, the user can

Document 00 21 00 - Page 3

TO ACCOMPANY AMENDMENT NO 0002 TO SOLICITAITON NO W912HY19B0029

http://www.fbo.gov/ http://www.fbo.gov/ click on the blue Click here link to make changes to the draft response and submit if ready.

c. Return does not save the response and takes the user back to the Notice Details tab for the opportunity.

1.7 BIDDER INQUIRY – PROJNET (FAR 14.211)

1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet .

A. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

***Please Note: Offerors shall only submit one question per inquiry. Inquiries containing multiple questions may be rejected.

B. From this page, you may view all bidder inquiries or add inquiry.

C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

D. The Solicitation Number is: W912HY19B0029

The Bidder Inquiry Key is: FJUWRT-7KIA5P

2. The Bidder Inquiry System will be unavailable for new inquires fifteen (15) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1.8 CONSTRUCTION WAGE RATE REQUIREMENTS (FAR 52.222-6)

Paragraph entitled CONSTRUCTION WAGE RATE REQUIREMENTS of (CONTRACT CLAUSES - Section 00 72 00, FAR 52.222-6) is applicable to this solicitation.

Wage Rates will be incorporated by amendment, if they are not included in this solicitation.

Document 00 21 00 - Page 4 http://www.projnet.org/projnet

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-18 Commercial and Government Entity Code

Maintenance

JUL 2016

52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids

NOV 1999

52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.232-13 Notice Of Progress Payments APR 1984 52.232-14 Notice Of Availability Of Progress Payments

Exclusively For Small Business Concerns

APR 1984

52.232-38 Submission of Electronic Funds Transfer Information with Offer

JUL 2013

CLAUSES INCORPORATED BY FULL TEXT

52.214-15 PERIOD FOR ACCEPTANCE OF BIDS (APR 1984)

In compliance with the solicitation, the bidder agrees, if this bid is accepted within 60 calendar days from the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule.

(End of clause)

52.216-1 TYPE OF CONTRACT (APR 1984)

Document 00 21 00 - Page 5

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

Harris County 27.3% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following

Document 00 21 00 - Page 6 award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is SMSA Harris County, Texas.

(End of provision)

52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION

MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (JUN 2009)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act-- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an

Document 00 21 00 - Page 7 exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs

(c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer, US Army Corps of Engineers, Galveston District, PO Box 1229, Galveston, Texas 77553-1229, submitting the protest at SWG-CT-protests@usace.army.mil .

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

Document 00 21 00 - Page 8 mailto:SWG-CT-%20%20protests@usace.army.mil

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Mr. Derek Anderson, Resident Engineer Address: US Army Corps of Engineers, Houston Resident Office, 2000 Fort Point Road, Galveston, Texas 77553.

Telephone: 409-766-3116

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

(End of provision)

Document 00 21 00 - Page 9 http://farsite.hill.af.mil/

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 41 00.01 45

EMBANKMENT CONSTRUCTION

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 REFERENCE

1.4 DEFINITIONS

1.4.1 Classification of Soil

1.4.2 Containment Dike and Embankment

1.4.3 Over-excavation

1.5 PROTECTION OF EXISTING SERVICE LINES AND UTILITY STRUCTURES

1.6 SITE CONDITION

1.6.1 Subsurface Soil Information of Borrow Materials

1.6.2 QUANTITY SURVEYS

1.7 CHANGES IN DIKE ALIGNMENT

1.8 EXCAVATION FROM DESIGNATED ONSITE BORROW AREAS AND STOCKPILING

1.9 IMPORTING SATISFACTORY MATERIALS AND STOCKPILING

1.10 SUBMITTALS

1.11 EXCAVATION PLAN

1.12 CONSTRUCTION AND COMPACTION EQUIPMENT PLANS

PART 2 PRODUCTS

2.1 GENERAL

2.1.1 Satisfactory Onsite Borrow Materials

2.1.2 Satisfactory Imported Materials

2.1.3 Unsatisfactory Materials

2.2 HAUL ROAD MATERIALS

2.3 FILL MATERIALS

2.3.1 Containment and Access Dike

PART 3 EXECUTION

3.1 CONSTRUCTION

3.1.1 General

3.1.2 Lines and Grades

3.1.3 Drainage

3.1.4 Conduct of the Work

3.1.5 Bid Volume Estimate

3.1.6 Tolerances

3.2 Excavation

3.2.1 General

3.2.2 Borrow Excavation

3.2.3 Disposition of Excavated Materials

3.2.4 Utilities

3.3 FOUNDATION PREPARATION

3.4 EMBANKMENT CONSTRUCTION

SECTION 35 41 00.01 45 Page 1

3.4.1 General

3.4.1.1 Gradation and Distribution

3.4.1.2 Placing

3.4.1.3 Equipment Traffic

3.4.2 Satisfactory Fills

3.4.3 Fill Placement for Designated Semi-Compacted Fills

3.4.4 Moisture Control

3.4.4.1 Insufficient Moisture for Suitable Bond

3.4.4.2 Excessive Moisture for Suitable Bond

3.4.4.3 Drying Wet Material

3.4.4.4 Increase Moisture in Dry Materials

3.4.4.5 Uncompacted Random Fill Training Dike

3.4.5 Compaction Equipment

3.4.5.1 Vibratory Steel-wheel Roller for Sandy Soils

3.4.5.2 Tamping Rollers

3.4.5.3 Rubber-tired Rollers for Cohesive and Cohesionless Soils

3.4.5.4 Hand Operated Compactors

3.4.5.5 Crawler-type Tractors

3.4.5.6 Sprinkling Equipment

3.4.5.7 Miscellaneous Equipment

3.4.6 Compaction of Semi-compacted Fill

3.4.7 Compaction of Uncompacted Fill

3.5 EROSION AND SLIDES

3.6 Turfing

3.7 QUALITY CONTROL

3.7.1 Excavation

3.7.2 Containment Dike

3.7.2.1 General

3.7.2.2 Fill Placement

3.7.3 Records

-- End of Section Table of Contents --

SECTION 35 41 00.01 45 Page 2

35 41 00.01 45

EMBANKMENT CONSTRUCTION

AMENDMENT NO. 0002

PART 1 GENERAL

1.1 SUMMARY

The work covered in this Section consists of furnishing labor, equipment, and tools or other incidentals to perform construction of semi-compacted perimeter containment dike raise and access dike using imported clayey soils, construction of a semi-compacted berm using using onsite borrow soils, and construction of an uncompacted training dike using onsite borrow soils. All work shall be completed in accordance with these specifications to the lines and grades, and typical cross-sections shown.

Other associated incidental earthwork includes, but is not limited to, ensuring positive surface runoff away from the construction activity, provide interior perimeter trenches and other drainage features as necessary; excavate and maintain trenches of adequate number and size within the limits of the Placement Area (PA) to drain to the weir, and grading of the borrow areas to drain. The Bidder is advised to perform a field inspection of the PA prior to preparing its bid.

1.2 MEASUREMENT AND PAYMENT

Measurement and payment for embankment construction specified herein will be paid for in accordance with provisions of the SECTION 01 22 00.10

MEASUREMENT AND PAYMENT.

1.3 REFERENCE

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D2487 (2017) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

SECTION 35 41 00.01 45 Page 3

1.4 DEFINITIONS

1.4.1 Classification of Soil

Material used to construct the containment dike and for backfill shall be classified in accordance with ASTM D2487 (Unified Soil Classification System). Cohesionless materials include materials classified as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Material classified as SW, SP, GM, GW, GP and SM will be identified as cohesionless only when the fines are nonplastic.

1.4.2 Containment Dike and Embankment

The terms "Embankment" and "Containment Dike" are interchangeable in these specifications and drawings. Embankment or containment dike are defined as the earth fill portions of the earthen structural system or other fills related to earthen construction, perimeter dike, and berms.

1.4.3 Over-excavation

Excavation performed beyond lines and grades shown on the plans that is made at and for the convenience of the Contractor or incidental to the work. No separate payment will be made for over-excavation or for additional embankment materials needed to backfill the over-excavation.

1.5 PROTECTION OF EXISTING SERVICE LINES AND UTILITY STRUCTURES

No existing utility lines are known on site. If the Contractor damages existing utility lines that are not shown or the locations of which are not known to the Contractor, report of this damage shall be made immediately to the Contracting Officer. If it is determined that repairs are to be made by the Contractor, these repairs will be ordered in accordance with the CONTRACT CLAUSE entitled CHANGES.

EVERY EFFORT HAS BEEN MADE TO GIVE PERTINENT DETAILS ON THE LOCATION

OF THE PIPELINES/UTILITIES. THE DATA FURNISHED ON THE PLANS ARE

BELIEVED TO BE SUBSTANTIALLY CORRECT. HOWEVER, THE EXACT LOCATIONS

MAY VARY FROM THAT SHOWN: THEREFORE, THE CONTRACTOR SHALL COOPERATE

WITH THE RESPECTIVE OWNERS TO ESTABLISH THE ACTUAL POSITION OF THE

PIPELINES/UTILITIES. THE U.S. ARMY CORPS OF ENGINEERS PERMITS OF THE

RESPECTIVE PIPELINES/UTILITIES AND PREVIOUS SURVEYS ARE AVAILABLE.

THE FOLLOWING IS FURNISHED FOR INFORMATION ON VERIFYING PIPELINE/UTILITY

OWNERSHIPS:

Lonestar Notification Center 1-800-545-6005 or online at www.Lonestar811.com

Texas 811 (Dig-Tess) 1-800-344-8377

1.6 SITE CONDITION

1.6.1 Subsurface Soil Information of Borrow Materials

Available subsurface soil borings from 2013 soil investigations are provided in SECTION 00 31 32.13 45 SUBSURFACE DRILLING AND SAMPLING INFORMATION. These data represent subsurface information at each soil boring location; however, variations may exist in the subsurface between

SECTION 35 41 00.01 45 Page 4 each boring location. Groundwater levels encountered at the time of exploration are indicated on the soil borings. The groundwater level in the PA can vary significantly depending on the time of year and the amount of precipitation.

1.6.2 QUANTITY SURVEYS

(1) Quantity surveys are to be conducted, and the data derived from these surveys will be used in computing the quantities of work performed and the actual construction completed and in place.

(2) The Contractor is to conduct the original and final surveys and surveys for any periods for which progress payments are requested.

These surveys will be conducted under the direction of a representative of the Contracting Officer, unless the Contracting Officer waives this requirement in a specific instance. The Government will make the computations that are necessary to determine the quantities of work performed or finally in place. The Contractor is to make the computations based on the surveys for any periods for which progress payments are requested.

(3) Promptly upon completing a survey, the Contractor is to submit the originals of field notes and other records relating to the survey or to the layout of the work to the Contracting Officer, who will use them as necessary to determine the amount of progress payments.

Field notes for original and final surveys and surveys for any periods for which progress payments are requested will be provided to the Contracting Officer in an ASCII data file format in the form, point name, easting, northing, and elevation. The Contractor is to retain copies of the material submitted to the Contracting Officer.

1.7 CHANGES IN DIKE ALIGNMENT

The Government reserves the right to make such changes in the dike alignment as may be found necessary before completion of the work. If it becomes necessary, through no fault of the Contractor, to abandon a line or location on which work has been performed, payment for materials placed will be made as specified in the corresponding payment line item.

1.8 EXCAVATION FROM DESIGNATED ONSITE BORROW AREAS AND STOCKPILING

When the excavation from designated borrow sources progresses at a faster rate than placement in the fill area is being accomplished, such excavated material is to be stockpiled at approved locations adjacent to the work until its use is authorized.

1.9 IMPORTING SATISFACTORY MATERIALS AND STOCKPILING

The Contractor is to identify and import satisfactory soils from outside the project limits. When the importing from identified borrow sources progresses at a faster rate than placement of the fill is being accomplished, such imported materials shall be stockpiled at approved locations adjacent to the work until its use is authorized. No payment will be made for such stockpiling nor for the reloading and hauling of this material to its final position in the containment dike.

SECTION 35 41 00.01 45 Page 5

1.10 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with the SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Excavation Plan ; G Construction Plan ; G Compaction Equipment Plan ; G

SD-07 Certificates

Compaction Equipment Certificate Of Conformance Construction Equipment

SD-08 Manufacturer's Instructions

Compaction Equipment

1.11 EXCAVATION PLAN

Submit a written Excavation Plan 21 calendar days prior to the beginning of excavation. Approval of the detailed Plan shall be obtained prior to starting the work. If necessary, modify the Plan as required to meet field conditions upon modification approval. As a minimum, the Plan shall contain the following:

1. The proposed methods for controlling surface and ground water in the borrow areas and required excavations.

2. A complete listing of equipment used for excavation and to transport the excavated material.

3. Sequence of work for excavating the borrow areas with plan and cross sectional views showing starting and final work locations and clearing, grubbing, and stripping limits.

1.12 CONSTRUCTION AND COMPACTION EQUIPMENT PLANS

Submit a written Construction Plan and Compaction Equipment Plan for approval 30 days prior to placement of material for containment dike construction. The Plan shall include, but is not limited to,

1. Location of haul roads and construction methods.

2. Listing of equipment for fill material placement, handling, transport, and compaction.

3. Sequence of construction for containment dike.

4. Methods for controlling drainage.

5. Compaction equipment proposed to be used.

SECTION 35 41 00.01 45 Page 6

PART 2 PRODUCTS

2.1 GENERAL

Any materials for dike and berm fills shall be secured from required excavations and from the borrow areas. The intention is to use the most suitable materials for fill placement. Material to be wasted will be specifically designated at the time the material is excavated. Materials containing brush, roots, sod or other perishable materials will not be considered suitable. The suitability of the materials shall be subject to approval and their disposition in the embankment will be as directed.

2.1.1 Satisfactory Onsite Borrow Materials

Satisfactory onsite borrow materials for construction of the berm and training dike shall consist of clayey, and sandy soils, classified as SW, SP, GW, GP, GM, SC, CH, CL, CL-ML and shell fragments free from oversized soil materials, roots, trash, debris, and other organic materials in accordance with ASTM D2487.

2.1.2 Satisfactory Imported Materials

Satisfactory imported materials for dike construction shall consist of clayey soils with Plasticity Index (PI) values less than 20 in accordance with ASTM D4318, including clays, sandy clays and silty clays classified as CH, CL, CL-ML, and shell fragments free from oversized soil materials, roots, trash, debris, and other organic materials in accordance with

ASTM D2487.

2.1.3 Unsatisfactory Materials

Unsatisfactory materials shall not be used in any containment dike or other required fill area. Unsatisfactory materials includes all other materials that are not defined above as satisfactory materials.

2.2 HAUL ROAD MATERIALS

Materials for haul roads shall consist of satisfactory onsite borrow materials.

2.3 FILL MATERIALS

2.3.1 Containment and Access Dike

Dike fill materials shall consist of satisfactory imported materials as specified above. Dike materials include perimeter containment dike and access dike.

PART 3 EXECUTION

3.1 CONSTRUCTION

3.1.1 General

The soil boring profiles shown represent samples taken in specific locations during subsurface soil investigations in 2013. If the designated borrow area materials are not suitable for a specified fill, the Contractor is permitted to relocate to a different borrow area within the PA as a borrow source upon the approval of the Contracting Officer.

SECTION 35 41 00.01 45 Page 7

The Contractor shall be aware that the placement area has been utilized as adredge deposit storage facility periodically throughout the years.

Therefore the deposited soil characteristic are nonuniform and vary from one location to another location depending on the origin of a dredge reach in the ship channels. The Contractor shall anticipate to encounter extremely soft and saturated materials throughout the interior placement area.

Submit a Construction Plan and Construction Equipment for containment dike construction for approval. The Plan shall include, but not be limited to, the sequence of construction for the containment dike, construction methods, equipment to be utilized for construction including excavation, handling, placement, and compaction. The Contractor shall also identify haul route locations and method of construction.

3.1.2 Lines and Grades

The containment dike construction shall be constructed to the lines, grades, and cross sections indicated, unless otherwise directed. The Government reserves the right to increase or decrease the foundation widths and containment dike slopes or to make other changes in the containment dike or berm sections as may be considered necessary to produce a safe earthen structure. Changes in quantities resulting from revisions will not constitute justification for change in Contract unit prices, except as provided for in the CONTRACT CLAUSE entitled VARIATIONS

IN ESTIMATED QUANTITIES.

3.1.3 Drainage

Provide for the collection and disposal of surface and subsurface water encountered during construction. Keep the designated borrow areas continuously drained during borrow excavation. Construct storm drainage features that can include ponds or basins, at the earliest stages of site development, and throughout construction. Grade the construction area to provide positive surface water runoff away from the construction activity or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. Once drainage of the PA and sufficient drying of the foundation surfaces have been accomplished, additional excavation and dike construction can proceed. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil as specified herein. It is the responsibility of the Contractor to assess the soil and groundwater conditions and to employ necessary methods that will permit construction to proceed.

Surface and groundwater control shall be accomplished in coordination with the required excavation and dike construction. In the event of heavy rain fall, the surface and groundwater control may necessitate the use of temporary diversion ditches and pumps. Methods for care of surface water and for controlling the surface and groundwater levels shall be subject to approval.

The borrow areas for the access dike shall be drained continuously via drainage ditches which shall be connected to either interior or perimeter ditches during and after the completion of the construction work.

SECTION 35 41 00.01 45 Page 8

3.1.4 Conduct of the Work

Maintain and protect the newly reconstructed perimeter containment dike, and access dike in a satisfactory condition during construction until final completion and acceptance of the work under this Contract. If, in the opinion of the Contracting Officer, the hauling equipment causes horizontal shear planes or slickensides, rutting, quaking, heaving, cracking, or excessive deformation of the dikes or backfill berms, limit the type, load, or travel speed of the hauling equipment on the dike or backfill berm. The Contractor may be required to remove, at no additional payment, material placed outside of prescribed slope lines. Approved dike or backfill material which is lost in transit or rendered unsuitable after being placed in the dike or backfill and before final acceptance of the work shall be replaced using a satisfactory method at no additional cost to the Government.

3.1.5 Bid Volume Estimate

The "neat-line volumes" have been used by the U.S. Army Corps of Engineers to prepare the Government estimate. The volumes are estimated only and the Contractor is responsible for interpreting the volume numbers used to prepare his estimate for bid opening. "Neat-line volumes" is defined as the unadjusted, raw quantities computed from the containment dike templates. The percentage for items including overbuilding, compaction, settlement, foundation displacement, or construction waste, is the responsibility and decision of the Contractor.

3.1.6 Tolerances

The dikes shall be constructed to the grades, lines, and cross-sections shown. At every point a tolerance of half foot above or zero foot below the prescribed grade will be permitted in the final dressing, provided that excess material is distributed to ensure that the crown of the containment dike drains to the PA interior and that there are no abrupt humps or depressions in the surfaces.

3.2 Excavation

3.2.1 General

Excavation shall consist of removal of material in preparing the foundations for effluent pipe installation, removal of material to the lines and grades based on the existing pipe elevation, removal of objectionable materials, and reuse of the excavated perimeter dike material for reconstruction of the perimeter dike. Over excavation shall be backfilled to grade with similar over excavated material or satisfactory material and compacted to a density of at least that of the surrounding material.

Borrow and reshape the previous dredge deposits which had been discharged to higher than the foundation areas of the perimeter containment dike; and shall grade these areas to drain toward the new drop-outlet structure.

Where there are washout gullies, the Contractor shall excavate materials from adjacent areas and/or borrow areas to backfill the gullies and semi-compact to 1 on vertical and 3 on horizontal slope to an acceptable condition.

SECTION 35 41 00.01 45 Page 9

3.2.2 Borrow Excavation

The borrow areas for which an Excavation Plan shall be submitted prior to initiating any containment dike lift operation are shown. The permissible depth(s) in the borrow areas vary with the existing PA interior ground elevation. The maximum depths shall not be deeper than the invert elevation of the drainage structure. Borrow areas shall be drained and kept draining continuously during the entire construction period. The bottom of borrow areas shall be graded smooth and drain toward the drop-outlet structure during and after the borrow excavation is completed.

Over excavation outside the limits of the dike foundations or structures shall be backfilled to the grade with similar over excavated material or satisfactory material and compacted to a density of at least that of the surrounding material.

Over excavation within the limits of the dike foundations or structures shall be backfilled to grade as specified.

3.2.3 Disposition of Excavated Materials

Satisfactory excavated material shall be incorporated in the appropriate zones of the dike templates. When direct placement is not practicable, satisfactory material from the excavation shall be stockpiled for subsequent use in parts of the work for which it is specified herein or as indicated. Satisfactory material in excess of the quantity necessary to construct backfills and dike shall be stockpiled for future construction work.

3.2.4 Utilities

The Contractor is responsible for movement of construction machinery and equipment over pipes and utilities during construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the Contract excavation until approval for backfill is received. Report damage to utility lines immediately to the Contracting Officer.

3.3 FOUNDATION PREPARATION

The foundation areas shall be stripped and shall be semi-compacted before placing new fill materials for the dike raising. If there are holes, cavities and for depressions in the stripped foundation areas, it shall be filled with the same materials and compacted prior to the initial fill.

The fill shall be placed in layers ranging from 12 inches to 18 inches, moistened, and compacted in accordance with the applicable PLACEMENT, MOISTURE CONTROL, and COMPACTION for the specific material type.

Before placing material for compacted fill, the foundation surface shall be cleared of existing vegetation and debris. Material not meeting the requirements for fill material as determined by the Contracting Officer shall be removed. Foundation surfaces and existing surfaces shall be scarified to a depth of 2 to 4 inches before placing the fill. Sloping ground surfaces, steeper than 1 Vertical to 6 Horizontal on which fill or compacted backfill is to be placed, shall be stepped or benched to form a proper bond with the existing surface.

SECTION 35 41 00.01 45 Page 10

Remove and replace unsatisfactory or very soft materials in the foundation areas with satisfactory materials by methods of displacing or excavation, as directed by the Contracting Officer.

Survey shall be performed after the foundation areas are prepared to receive fill materials.

3.4 EMBANKMENT CONSTRUCTION

3.4.1 General

The Government shall be notified prior to the placement of fills on the prepared foundation surface shown that the foundation surface is ready to receive fill and drainage pipe installation. No fill shall be placed on the foundation surface until these areas have been inspected and given final approval. Unless otherwise directed, the embankment shall be maintained at approximately the same level regardless of the number of types of materials being placed.

3.4.1.1 Gradation and Distribution

The gradation and distribution of materials throughout each zone of the dike shall be so that the dike will be free from lenses, pockets, streaks, and layers of material differing substantially in texture or gradation from surrounding material of the same class. If lenses, pockets, or layers of materials differing substantially in texture or gradation from surrounding material occur in the spread material, the layer shall be mixed by harrowing or another approved method to blend the materials.

During the placing and spreading process, continuously maintain a force of workers adequate to remove roots, debris, and oversize stones from the containment dike materials.

3.4.1.2 Placing

Fill material shall not be placed against concrete which has not been in place at least 14 days. Heavy equipment shall not be operated over pipes and buried structures until at least 2 feet of fill material has been placed and compacted over them. The fill shall be compacted with approved mechanical hand tamping equipment within the structural backfill zone approximately 2-foot distance measured from the pipes and buried structures. Compacted fill shall be placed with suitable equipment in uniform layers which, before compaction, shall not exceed 8 inches in depth if a tamping roller is used or 6 inches in depth if a light rubber-tired roller is used. No fill material shall be placed in water.

3.4.1.3 Equipment Traffic

Equipment traffic on a dike zone shall be routed to distribute the compactive effort as much as practicable. Ruts formed in the surface of a layer of spread material shall be filled before that material is compacted. If, in the opinion of the Contracting Officer, the compacted surface of a layer of material is too smooth to bond properly with the succeeding layer, the surface shall be loosened by scarifying or other approved methods before material from the succeeding layer is placed.

3.4.2 Satisfactory Fills

Appropriate satisfactory fills shall be placed for dike and berm

SECTION 35 41 00.01 45 Page 11…