BID OPENING REMAINS ON 24 JUN 2019 AT 2:00 P.M. LOCAL TIME
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C1_FINAL-SIGNED-ABSTRACT_W912HY19B0018.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| W912HY19B0018_Specs.pdf | ||
| W912HY19B0018_Specs.zip | ZIP file | |
| W912HY19B00018-Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK90090034
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is show n on the follow ing pages, THE BID OPENING DATE REMAINS ON 24 JUN 2019 AT 2:00 P. M. LOCAL TIME
1. CONTRACT ID CODE PAGE OF PAGES
J 1 100
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY19B0018
X 9B. DATED (SEE ITEM 11)
21-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jun-2019
CODE
USAED, GALVESTON
CONTRACTING DIVISION
2000 FORT POINT ROAD
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY19B0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The required performance has changed from THE SOLICITATION IS BEING ISSUED AS AN
UNRESTRICTED PROCUREMENT FOR HOUSTON SHIP CHANNEL (HSC), TEXAS, REDFISH REEF TO
BEACON 78 HOPPER DREDGING, TEXASPER AFARS 5231.702(B) ‘FUNDS ARE NOT PRESENTLY
AVAILABLE FOR THIS ACQUISITION. NO CONTRACT WILL BE MADE UNTIL APPROPRIATED
FUNDS ARE MADE AVAILABLE.”ESTIMATE CONSTRACTION RANGE (FAR 36.302) – THE ESTIMATED
PRICE RANGE OF THE PROPOSED CONSTRUCTION IS BETWEEN $10,000,000.00 AND $15,000,000.00 to
THE SOLICITATION IS BEING ISSUED AS AN UNRESTRICTED PROCUREMENT FOR HOUSTON SHIP
CHANNEL (HSC), TEXAS, REDFISH REEF TO BEACON 78 HOPPER DREDGING, TEXASPER AFARS
5231.702(B) ‘FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT
WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE.”ESTIMATE CONSTRACTION
RANGE (FAR 36.302) – THE ESTIMATED PRICE RANGE OF THE PROPOSED CONSTRUCTION IS
BETWEEN $15,000,000.00 AND $20,000,000.00.
(End of Summary of Changes)
W912HY19B0018
A0001-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The specifications for Solicitation No. W912HY19B0018, HOUSTON SHIP CHANNEL, TEXAS
REDFISH TO BEACON 78 IN HARRIS COUNTY, TEXAS, DREDGING, are hereby amended as follows:
a) Pre-Bid Conference
(1) Pre-bid conference meeting minutes are attached.
b) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.
(2) SECTION 00 73 00.01 45, SPECIAL CONTRACT REQUIREMENTS – The enclosed
SECTION 00 73 00.01 45 entitled SPECIAL CONTRACT REQUIREMENTS supersedes that issued with this Solicitation.
(3) SECTION 01 22 00.10, MEASUREMENT AND PAYMENT – The enclosed SECTION 01
22 00.10 entitled MEASUREMENT AND PAYMENT supersedes that issued with this
Solicitation.
(4) SECTION 01 35 26.01 45, GOVERNMENTAL SAFETY REQUIREMENTS – The enclosed
SECTION 01 35 26.01 45 entitled GOVERNMENTAL SAFETY REQUIREMENTS supersedes that issued with this Solicitation.
(5) SECTION 35 20 23.12 45, DREDGING – The enclosed SECTION 35 20 23.12 45 entitled
DREDGING supersedes that issued with this Solicitation.
(6) APPENDIX I - QUANTITY SUMMARY TABLE – The enclosed APPENDIX I QUANTITY
SUMMARY TABLE, supersedes that issued with this Solicitation.
c) Drawings.
(1) DRAWINGS NO. G-002 through G-005, C-107, C-317 through C-323 - The enclosed
Drawing Sheets G-002 through G-005 supersedes that issued with this Solicitation, C-107, C-317 through C-323 have been added to this solicitation.
2. This amendment shall be attached to and become a part of the solicitation.
11 Encls:
1. Pre-Bid Conference Minutes
2. SECTION 00 11 00.00 45, BID SCHEDULE
3. SECTION 00 73 00.01 45, SPECIAL CONTRACT REQUIREMENTS
4. SECTION 01 22 00.10, MEASUREMENT AND PAYMENT
5. SECTION 01 35 26.01 45, GOVERNMENTAL SAFETY REQUIREMENTS
6. SECTION 35 20 23.12 45, DREDGING
7. APPENDIX I – QUANTITY SUMMARY TABLE
8. G-002 through G-005
9. C-107
10. C-317 through C-323
W912HY-19-B-0018, HSC Redfish to Beacon 78 Dredging
Pre Bid Conference Call
6/10/2019, 1pm Central Time
877-336-1280, access code 3719439, security code 1234
MINUTES
1. Attendees:
a. SWG: Tricia Campbell, Traci Robicheaux, Kirsten Snead, Cecily Solomon, Derek Anderson, Emily Drastata, Alexis Bragg, Al Meyer
b. Weeks: Keith Lindsey
c. Manson: James Fowler, Mike Warwick, Henry Schorr, Fred Paup
d. Great Lakes: Adam Zimmerman
e. Dutra: Eric Schuster
2. Overview of discussion topics: give KTRs a heads up regarding an amendment that’s about to come out and explain the reasons why we are doing this amendment, some of the constraints we have, and the measures we are taking to address some concerns that the KTRs may have.
3. Amendments:
a. Amendment #1: established this pre bid conference for the purpose of discussing our next amendment.
b. Amendment #2 Forthcoming, adding Bayport Flare dredging as an option to the contract as well as updating the HSC quantities.
4. Discussion about adding Bayport Flare:
a. Draft restrictions on other parts of the Houston Ship Channel are causing us to re-strategize where we are placing dredged material for each project. Our PAs in the bay are full from Harvey and we’re trying to do dike raises on several of the sites. We do not have an available placement area for the next iteration of Bayport Flare dredging. As a result, we are going to amend the HSC Redfish to Beacon 78 Dredging project to include Bayport Flare.
b. Our last dredging iteration of the Bayport Flare was performed mechanically with bucket and scow, which was first time we have attempted to take the flare offshore. We realize some challenges because of the high shoal rate of the flare. Amendment will include breaking acceptance sections into 4 different sections, two on red side and two on green side.
c. Bayport Flare will be an option. We currently do not anticipate exercising the option before the end of the fiscal year (unless a draft restriction etc forces us to do so). Anticipate likely issue of Bayport Flare option in early FY20. Amendment language will specify that when the option is exercised, the contractor would finish the HSC section that he is working on and begin dredging the Bayport Flare.
5. Other discussion:
a. Job can be performed via Hopper or mechanical dredge, contractor may use multiple dredges, but must maintain the 5nm separation requirements between dredges.
b. Order of work on HSC upstream to downstream due to channel conditions and other adjacent dredging projects.
c. Special contract requirements: 30 days to begin work after NTP
d. We will be updating contract duration to reflect the changes of scope and quantities.
e. Drawings: issuing new drawings for Bayport Flare. Re issuing HSC drawings.
6. Questions/Comments:
a. Quantity of Flare? Quantity just shy of 650,000 cy.
b. Different mob for Bayport Flare? We considered it but decided to not have separate mob, because when we exercise option, you will move from HSC directly to Bayport
i. Question about mob was based on the uncertainty of awarding the option and when it might be exercised.
ii. Also order of work upstream to downstream on HSC. So Contractor would need to plan accordingly.
c. Will option for sure be exercised? Very likely to exercise early FY20, however we cannot guarantee it.
Based on shoaling it is very likely that we will exercise the Bayport Flare option unless something unexpected happens (storm, etc).
7. Conclusion
a. We appreciate everyone’s participation and cooperation helping us to meet our navigation mission.
b. Will publish notes from this conference call as part of the amendment
c. Any other questions after this call, can enter into projnet
FILE NO.: HSC 401-570 SOLICITATION NO.: W912HY19B0018
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE
11/17
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
1.1.2 Option No. 1
1.1.3 Option No. 2
1.1.4 Option No. 3
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
TO ACCOMPANY AMMENDMENT NO. 0002 TO SOLICITATION W912HY19B0018
SECTION 00 11 00.00 45
BID SCHEDULE
11/17
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $___________
0002 Dredging HSC, Sections 1-11 1,742,000 C.Y.
0003 ODMDS No. 1 Monitor Surveys 1 JOB SUM $___________
0004 Sea Turtle Protection, Sections 1-11
1 JOB SUM $___________
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 2
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.2 Option No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 1
0005 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
1 JOB SUM $___________
0006 Sea Turtle Trawling and Relocation
30 Day $_________ $___________
TOTAL OPTION NO. 1 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________
NOTE FOR OPTI ON NO. 1: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Option.
DOCUMENT 00 11 00.00 45 Page 3
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.3 Option No. 2
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 2
0007 Mobilization and Demobilization - Sea Turtle Trawling and Relocation (One Trawler Additional to Option No. 1)
1 JOB SUM $___________
0008 Sea Turtle Trawling and Relocation (One Trawler Additional to Option No. 1)
30 Day $_________ $___________
TOTAL OPTION NO. 2 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 AND 2 $___________
NOTE FOR OPTI ON NO. 2: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Option.
DOCUMENT 00 11 00.00 45 Page 4
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.4 Option No. 3
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 3
0009 Dredging Bayport Flare, Sections 12-15 642,300 CY SUM $___________
0010 Sea Turtle Protection, Sections 12-15
1 Job $_________ $___________
TOTAL OPTION NO. 3 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2 AND 3 $___________
NOTES FOR OPTION NO. 3:
1) The Government may exercise this Option by written notice to the Contractor prior to the completion of all authorized work. Additional time of 81 calendar days will be added to this Contract for completion of this work.
2) If a bucket dredge and scows are used to dredge Bayport Flare, sea turtle protection is not required.
DOCUMENT 00 11 00.00 45 Page 5
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 6
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD
11/17
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (FAR
52.211-10)
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
1.4 LIABILITY (APR 1984) (FAR 28.307-2)
1.5 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
1.6 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
1.7 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
DOCUMENT 00 73 00.01 45 Page 1
SECTION 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD
11/17
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (FAR
52.211-10)
The Contractor shall be required to:
(a) Commence work under this contract within 10(AM#2)30 calendar days after the date the Contractor receives the Notice to Proceed;
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 180 (AM#2)205 calendar days after the date the Contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,322 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.
(b) Weather Conditions. Under ordinary conditions, the mean tidal range is about 1.5 feet. The height of tide is largely dependent on the force, direction, and duration of the wind. Strong northerly winds may depress the water surface as much as, and in some instances more than 3.0 feet below Mean Lower Low Water (MLLW), while southerly winds may raise the water surface as much as, and in some instances more than 1.7 feet above MLLW. (AM#2)Galveston Bay typically experiences fog between the months of November and February, inclusive. Periods of dense fog will impact the ability to navigate on the channels.
(c) Transportation Facilities. The immediate vicinity is served by
DOCUMENT 00 73 00.01 45 Page 2 railroad, highway, and deep and shallow draft channels.
(d) Other Information. Channel traffic consists of (deep draft ships, small boats of various sizes, fishing vessels, ferries, tugs, tows consisting of a tug and one or more barges). Traffic will interfere with dredging operations to some extent.
The general shape of the existing section of channel to be dredged is shown by cross sections on the Contract drawings.
1.4 LIABILITY (APR 1984) (FAR 28.307-2)
(a) Workmen's compensation and employer's liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contracting officer shall require aircraft public and passenger liability insurance.
Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel liability. When contract performance involves use of vessels, the contracting officer shall require, as determined by the
DOCUMENT 00 73 00.01 45 Page 3 agency, vessel collision liability and protection and indemnity liability insurance.
1.5 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the con-tractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region VI. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
NOTE: A copy of EP 1110-1-8, "CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE," is available at the following website:
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx.
1.6 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting
DOCUMENT 00 73 00.01 45 Page 4 to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations.
When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rms.usace.army.mil/) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data;
ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.
1.7 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 65 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Document --
DOCUMENT 00 73 00.01 45 Page 5
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
09/18
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LUMP SUM (JOB) PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 ODMDS No. 1 Monitor Surveys
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Mobilization and Demobilization - Sea Turtle Trawling and
Relocation
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.2.4 Sea Turtle Protection
1.2.4.1 Payment
1.2.4.2 Unit of Measure
1.2.5 (AM#2)Sea Turtle Protection, Sections 12-15
1.2.5.1 Payment
1.2.5.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Dredging
1.3.1.1 Payment
1.3.1.2 Dredging Partial Payment
1.3.1.3 Measurement
1.3.1.4 Government Surveys
1.3.1.5 Surveys During Progress of Work
1.3.1.6 Unit of Measurement
1.3.2 Sea Turtle Trawling and Relocation
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 22 00.10 Page 1
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
09/18
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys ; G, RO
1.2 LUMP SUM (JOB) PAYMENT ITEMS
Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.
All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, are included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed constitutes full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
Payment will be made for costs associated with "Mobilization and Demobilization" in Schedule No. 1, as defined in the SECTION 00 72 00 CONTRACT CLAUSES. Payment for costs in connection with the plant necessary to perform the work, to include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation, and after completion of the work for removal of the plant and equipment from the work site.
1.2.1.2 Unit of Measure
Unit of Measure: Job.
SECTION 01 22 00.10 Page 2
1.2.2 ODMDS No. 1 Monitor Surveys
1.2.2.1 Payment
The Contract price for "ODMDS No. 1 Monitor Surveys" in Schedule No. 1, will include the cost necessary to perform hydrographic surveys of ODMDS No. 1 before and after completion of dredge material placement operations.
1.2.2.2 Unit of Measure
Unit of Measure: Job.
1.2.3 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
1.2.3.1 Payment
The Contract price for "Mobilization and Demobilization - Sea Turtle Trawling and Relocation" in Option No. 1 will include the cost in connection with mobilization and demobilization of one Trawler. The Contract price for "Mobilization and Demobilization - Sea Turtle Trawling and Relocation (One Trawler Additional to Option No. 1)" in Option No. 2 includes the cost in connection with mobilization and demobilization of one Trawler in addition to that in Option No. 1. Payment for mobilization and demobilization will be made pursuant to the conditions of the SECTION
00 72 00 CONTRACT CLAUSES.
1.2.3.2 Unit of Measure
Unit of Measure: Job.
1.2.4 Sea Turtle Protection
1.2.4.1 Payment
Payment for fabrication of Turtle Deflector Device will be made for "Sea Turtle Protection, Sections 1-11" in Schedule No. 1.
1.2.4.2 Unit of Measure
Unit of Measure: Job.
1.2.5 (AM#2)Sea Turtle Protection, Sections 12-15
1.2.5.1 Payment
If Option No. 3 is exercised and a hopper dredge used to perform the work, payment for fabrication of Turtle Deflector Device will be made for "Sea Turtle Protection, Sections 12-15" in Option No. 3, which will include the costs of materials and other execution requirements for Turtle Deflector Device and Endangered Species Observers associated with the protection and monitoring of sea turtles as specified in the SECTION 35 20 23.14 45
PROTECTION OF SEA TURTLES.
1.2.5.2 Unit of Measure
Uni t of measur e: Job
SECTION 01 22 00.10 Page 3
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.3.1 Dredging
1.3.1.1 Payment
(AM#2)Payment for "Dredging HSC, Sections 1-11" in Schedule No. 1, and if exercised, "Dredging Bayport Flare, Sections 12-15" in Option No. 3, will be made for costs associated with the removal of dredged material, transportation, placement at the designated placement area, and the National Dredging Quality Management Program for the hopper dredge and/or the scow barges.
1.3.1.2 Dredging Partial Payment
Partial payment will be based on approximate quantities determined by fathometer soundings or sweepings taken behind the dredge. The Contractor may use its own hydrographic surveys to determine quantities for pay requests, but final quantities will be based on Government Before-Dredging and After-Dredging surveys.
1.3.1.3 Measurement
The material removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. The total quantity of dredged material will be the theoretical quantity between the bottom surface shown by fathometer soundings of the last survey made "before-dredging" and the bottom surface shown by the fathometer soundings of a survey made "after-dredging", within the limits of the overdepth and side and end slopes, less deductions that may be required for misplaced material.
1.3.1.4 Government Surveys
The Government will use the tide staffs shown on the drawings for vertical control. Real Time Kinematic (RTK) or Virtual Reference Station (VRS) will not be used. Differential Global Positioning System (DGPS) will be used for horizontal control.
Processing survey data will be performed with HYPACK 2016 software using the Kingfisher Method (updated 5/6/2016). Volumes will be computed by average end area using cross sectional survey lines. Before and After Dredge cross sections will be run on 100-foot stations and at changes in the template. If the Contractor elects to use HYPACK 2016 software, the Government will provide the survey line files for the Contractor's use.
1.3.1.5 Surveys During Progress of Work
Contract depth will be determined by surveys taken behind the dredge as work progresses. The Contractor shall take progress soundings or sweepings and submit drawings of the surveys.
SECTION 01 22 00.10 Page 4
1.3.1.6 Unit of Measurement
Unit of Measure: cubic yard.
1.3.2 Sea Turtle Trawling and Relocation
1.3.2.1 Payment
Payment for "Sea Turtle Trawling and Relocation" in Option No. 1, and "Sea Turtle Trawling and Relocation (One Trawler Additional to Option No. 1)" in Option No. 2, will be made for costs associated with trawling ahead of the hopper dredge and relocation of turtles.
1.3.2.2 Measurement
Sea Turtle trawling and relocation will be measured by the day utilized for trawling and relocation as specified in the SECTION 35 20 23.14 45
PROTECTION OF SEA TURTLES
1.3.2.3 Unit of Measure
Unit of Measure: Day.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 22 00.10 Page 5
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 26.01 45
GOVERNMENTAL SAFETY REQUIREMENTS
03/19
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Competent Person (CP)
1.2.2 Competent Person, Confined Space
1.2.3 Competent Person, Cranes and Rigging
1.2.4 Competent Person, Fall Protection
1.2.5 Competent Person (CP) Trainer
1.2.6 High Risk Activities
1.2.7 High Visibility Accident
1.2.8 Load Handling Equipment (LHE)
1.2.9 Medical Treatment
1.2.10 Near Miss
1.2.11 Operating Envelope
1.2.12 Qualified Person (QP)
1.2.13 Qualified Person, Fall Protection (QP for FP)
1.2.14 USACE Property and Equipment
1.2.15 Load Handling Equipment (LHE) Accident or Load Handling
Equipment Mishap
1.2.16 Recordable Injuries or Illnesses
1.3 SUBMITTALS
1.4 MONTHLY EXPOSURE REPORTS
1.5 REGULATORY REQUIREMENTS
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer (SSHO)
1.6.1.1.1 Additional Site Safety and Health Officer (SSHO)
Requirements and Duties
1.6.1.2 Competent Person Qualifications
1.6.1.2.1 Competent Person for Confined Space Entry
1.6.1.2.2 Competent Person for Fall Protection
1.6.1.2.3 Crane Operators/Riggerse
1.6.1.3 Dredging Contract Requirements
1.6.1.3.1 Dredging Safety Personnel Requirements
1.6.1.3.2 SSHO Requirements for Dredging
1.6.1.3.3 Safety Personnel Training Requirements for Dredging
1.6.1.4 Crane Operators/Riggers
1.6.2 Personnel Duties
1.6.2.1 Duties of the Site Safety and Health Officer (SSHO)
1.6.3 Meetings
1.6.3.1 Preconstruction Conference
1.6.3.2 Safety Meetings
1.7 ACCIDENT PREVENTION PLAN (APP)
1.7.1 Names and Qualifications
1.7.2 Plans
SECTION 01 35 26.01 45 Page 1
1.7.2.1 Confined Space Entry Plan
1.7.2.2 Standard Lift Plan (SLP)
1.7.2.3 Barge Mounted Mobile Crane Lift Plan
1.7.2.4 Multi-Purpose Machines, Material Handling Equipment, and
Construction Equipment Lift Plan
1.7.2.5 Critical Lift Plan - Crane or Load Handling Equipment
1.7.2.5.1 Lifts over 50 percent of the capacity of barge mounted mobile crane's hoist.
1.7.2.5.2 When working around energized power lines where the work will get closer than the minimum clearance distance in EM 385-1-1 Table 16-1.e
1.7.2.5.3 For lifts with anticipated binding conditions.
1.7.2.5.4 When erecting cranes.
1.7.2.5.5 Critical Lift Plan Planning and Schedule
1.7.2.5.6 Lifts of Personnel
1.7.2.6 Rescue and Evacuation Plan
1.7.2.7 Fall Protection and Prevention (FP&P) Plan
1.7.2.8 Hazardous Energy Control Program (HECP)
1.8 ACTIVITY HAZARD ANALYSIS (AHA)
1.8.1 AHA Management
1.8.2 AHA Signature Log
1.9 DISPLAY OF SAFETY INFORMATION
1.9.1 Safety Bulletin Board
1.9.2 Safety and Occupational Health (SOH) Deficiency Tracking System
1.9.3 (AM#2)Public Notices
1.10 SITE SAFETY REFERENCE MATERIALS
1.11 EMERGENCY MEDICAL TREATMENT
1.12 NOTIFICATIONS AND REPORTS
1.12.1 Mishap Notification
1.12.2 Accident Reports
1.12.3 LHE Inspection Reports
1.12.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and Rigging
1.13 HOT WORK
1.13.1 Permit and Personnel Requirements
1.13.1.1 Work Around Flammable Materials
1.13.2 Work Around Flammable Materials
1.14 CONFINED SPACE ENTRY REQUIREMENTS
1.14.1 Entry Procedures
1.14.2 Forced Air Ventilation
1.14.3 Rescue Procedures and Coordination with Local Emergency
Responders
1.15 DIVE SAFETY REQUIREMENTS
1.16 SEVERE STORM PLAN
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 Worksite Communication
3.1.2 Hazardous Material Exclusions
3.1.3 Unforeseen Hazardous Material
3.2 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
3.2.1 Lockout/Tagout Isolation
3.2.2 Lockout/Tagout Removal
3.3 FALL PROTECTION PROGRAM
3.3.1 Training
SECTION 01 35 26.01 45 Page 2
3.3.2 Fall Protection Equipment and Systems
3.3.2.1 Additional Personal Fall Protection
3.3.2.2 Personal Fall Protection Harnesses
3.3.3 Horizontal Lifelines (HLL)
3.3.4 Guardrails and Safety Nets
3.3.5 Rescue and Evacuation Plan and Procedures
3.4 EQUIPMENT
3.4.1 Material Handling Equipment (MHE)
3.4.2 Load Handling Equipment (LHE)
3.4.3 Machinery and Mechanized Equipment
3.5 SUBMERGED AND FLOATING PIPELINE
3.6 Utility Locations
3.7 ELECTRICAL
3.7.1 Portable Extension Cords
3.7.2 Conduct of Electrical Work
3.7.3 Qualifications
3.7.3.1 Arc Flash
3.7.3.2 Grounding
3.7.3.3 Testing
-- End of Section Table of Contents --
SECTION 01 35 26.01 45 Page 3
SECTION 01 35 26.01 45
GOVERNMENTAL SAFETY REQUIREMENTS
03/19
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.34 (2001; R 2012) Protection of the Public on or Adjacent to Construction Sites
ASSP A10.44 (2014) Control of Energy Sources (Lockout/Tagout) for Construction and Demolition Operations
ASSP Z244.1 (2016) The Control of Hazardous Energy Lockout, Tagout and Alternative Methods
ASSP Z359.0 (2012) Definitions and Nomenclature Used for Fall Protection and Fall Arrest
ASSP Z359.1 (2016) The Fall Protection Code
ASSP Z359.2 (2017) Minimum Requirements for a Comprehensive Managed Fall Protection Program
ASSP Z359.3 (2017) Safety Requirements for Lanyards and Positioning Lanyards
ASSP Z359.4 (2013) Safety Requirements for Assisted-Rescue and Self-Rescue Systems, Subsystems and Components
ASSP Z359.6 (2016) Specifications and Design Requirements for Active Fall Protection Systems
ASSP Z359.7 (2011) Qualification and Verification Testing of Fall Protection Products
ASSP Z359.11 (2014) Safety Requirements for Full Body Harnesses
ASSP Z359.12 (2009) Connecting Components for Personal Fall Arrest Systems
ASSP Z359.13 (2013) Personal Energy Absorbers and
SECTION 01 35 26.01 45 Page 4
Energy Absorbing Lanyards
ASSP Z359.14 (2014) Safety Requirements for Self-Retracting Devices for Personal Fall Arrest and Rescue Systems
ASSP Z359.15 (2014) Safety Requirements for Single Anchor Lifelines and Fall Arresters for Personal Fall Arrest Systems
ASME INTERNATIONAL (ASME)
ASME B30.3 (2016) Tower Cranes
ASME B30.5 (2014) Mobile and Locomotive Cranes
ASME B30.8 (2015) Floating Cranes and Floating Derricks
ASME B30.9 (2014; INT Feb 2011 - Nov 2013) Slings
ASME B30.20 (2013; INT Oct 2010 - May 2012) Below-the-Hook Lifting Devices
ASME B30.22 (2016) Articulating Boom Cranes
ASME B30.26 (2015; INT Jun 2010 - Jun 2014) Rigging Hardware
ASTM INTERNATIONAL (ASTM)
ASTM F855 (2015) Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 1048 (2003) Guide for Protective Grounding of Power Lines
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2018; TIA 18-1) Standard for Portable Fire Extinguishers
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
NFPA 70E (2018; TIA 18-1; TIA 81-2) Standard for Electrical Safety in the Workplace
SECTION 01 35 26.01 45 Page 5
NFPA 241 (2013; Errata 2015) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1910.333 Selection and Use of Work Practices
29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment
29 CFR 1915.89 Control of Hazardous Energy (Lockout/Tags-Plus)
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.500 Fall Protection
CPL 2.100 (1995) Application of the Permit-Required Confined Spaces (PRCS) Standards, 29 CFR 1910.146
1.2 DEFINITIONS
1.2.1 Competent Person (CP)
The CP is a person designated in writing, who, through training, knowledge and experience, is capable of identifying, evaluating, and addressing existing and predictable hazards in the working environment or working conditions that are dangerous to personnel, and who has authorization to take prompt corrective measures with regards to such hazards.
1.2.2 Competent Person, Confined Space
The CP, Confined Space, is a person meeting the competent person requirements as defined EM 385-1-1 Appendix Q, with thorough knowledge of OSHA’s Confined Space Standard, 29 CFR 1910 .146, and designated in writing to be responsible for the immediate supervision, implementation and monitoring of the confined space program, who through training, knowledge and experience in confined space entry is capable of identifying, evaluating and addressing existing and potential confined space hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
SECTION 01 35 26.01 45 Page 6
1.2.3 Competent Person, Cranes and Rigging
The CP, Cranes and Rigging, as defined in EM 385-1-1 Appendix Q, is a person meeting the competent person, who has been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the Crane and Rigging Program, who through training, knowledge and experience in crane and rigging is capable of identifying, evaluating and addressing existing and potential hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
1.2.4 Competent Person, Fall Protection
The CP, Fall Protection, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and in accordance with ASSP Z359.0 , who has been designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
1.2.5 Competent Person (CP) Trainer
A competent person trainer as defined in EM 385-1-1 Appendix Q, who is qualified in the material presented, and who possesses a working knowledge of applicable technical regulations, standards, equipment and systems related to the subject matter on which they are training Competent Persons. A competent person trainer must be familiar with the typical hazards and the equipment used in the industry they are instructing. The training provided by the competent person trainer must be appropriate to that specific industry. The competent person trainer must evaluate the knowledge and skills of the competent persons as part of the training process.
1.2.6 High Risk Activities
High Risk Activities are activities that involve work at heights, crane and rigging, excavations and trenching, scaffolding, electrical work, and confined space entry.
1.2.7 High Visibility Accident
A High Visibility Accident is any mishap which may generate publicity or high visibility.
1.2.8 Load Handling Equipment (LHE)
LHE is a term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used with rigging to raise, lower or horizontally move a load).
1.2.9 Medical Treatment
Medical Treatment is treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even
SECTION 01 35 26.01 45 Page 7 through provided by a physician or registered personnel.
1.2.10 Near Miss
A Near Miss is a mishap resulting in no personal injury and zero property damage, but given a shift in time or position, damage or injury may have occurred (e.g., a worker falls off a scaffold and is not injured; a crane swings around to move the load and narrowly misses a parked vehicle).
1.2.11 Operating Envelope
The Operating Envelope is the area surrounding any crane or load handling equipment. Inside this "envelope" is the crane, the operator, riggers and crane walkers, other personnel involved in the operation, rigging gear between the hook, the load, the cranes supporting structure (i.e. ground or rail), the load's rigging path, the lift and rigging procedure.
1.2.12 Qualified Person (QP)
The QP is a person designated in writing, who, by possession of a recognized degree, certificate, or professional standing, or extensive knowledge, training, and experience, has successfully demonstrated their ability to solve or resolve problems related to the subject matter, the work, or the project.
1.2.13 Qualified Person, Fall Protection (QP for FP)
A QP for FP is a person meeting the requirements of EM 385-1-1 Appendix Q, and ASSP Z359.0 , with a recognized degree or professional certificate and with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, and evaluating and specifying fall protection and rescue systems.
1.2.14 USACE Property and Equipment
Interpret "USACE" property and equipment specified in USACE EM 385-1-1 as Government property and equipment.
1.2.15 Load Handling Equipment (LHE) Accident or Load Handling Equipment Mishap
A LHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment;
two-blocking; overload; or collision, including unplanned contact between the load, crane, or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents, even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, or roll over). Document an LHE mishap using the Crane Hazard working group mishap reporting form.
1.2.16 Recordable Injuries or Illnesses
Recordable Injuries or Illnesses are any work-related injury or illness that results in:
SECTION 01 35 26.01 45 Page 8
a. Death, regardless of the time between the injury and death, or the length of the illness;
b. Days away from work (any time lost after day of injury/illness onset);
c. Restricted work;
d. Transfer to another job;
e. Medical treatment beyond first aid;
f. Loss of consciousness; or
g. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in
(a) through (f) above.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
Government acceptance, as defined in EM 385-1-1 , is required for submittals with a "G,A" designation.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP) ; G,A
SD-06 Test Reports
Monthly Exposure Reports Notifications and Reports Accident Reports ; G LHE Inspection Reports
SD-07 Certificates
Crane…