Solicitation No. W912HY-09-R-0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMD0002.pdf | ||
| AMD0001.pdf | ||
| ATTACHCWageDetermination.pdf | ||
| ATTACHBGalvestonDistrictMap.pdf | ||
| ATTACHAManpowerReport.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 3:00 pmCT local time 31 Mar 2009
X
A X B
C D
EX
G F K1 - 12
L1 - 21 X H M1 - 6
Maria.E.Rodriguez@swg02.usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 1
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912HY 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Block 7 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
MARIA E RODRIGUEZ 409 766 6331
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
B1- 21
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
E1 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA G1 - 3 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) H1 - 7 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
I1 - 71
PART II - CONTRACT CLAUSES
USAED, GALVESTON
CONTRACTING DIVISION
2000 FORT POINT ROAD
GALVESTON TX 77553-1229 409 766 3850
409 766 3010FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
J1
6. REQUISITION/PURCHASE NO.
W45VAK02020404
5. DATE ISSUED
28 Feb 2009
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912HY-09-R-0009
M3CTXMER
Typewritten Text C1-24
Solicitation No. W912HY-09-R-0009
SECTION B
NOTE 1: Offeror shall submit a price on all line items unless specifically stated in this price schedule.
NOTE 2: The quantities listed below are estimated only. The extended amount will be used by the Government for proposal evaluation purposes.
Quantities stated in the Bid Schedule do not represent an upper or lower limit to the contract.
Core Drilling, Soil Sampling and Laboratory Testing of Soil Samples for the U. S. Army Engineer District, Corps of Engineers, Galveston, Texas, in accordance with the Descriptions/Specifications/Work Statement (Section C), Contract Clauses (Section I) and subsequent Task Orders for a one (1) year period from date of contact award with the option at the Government's discretion to renew for for four (4) additional one year periods. NOTE: The entire Maximum Limitation of approximately $5,000,000.00 may be utilized within the base year or any option year.
TOTAL ESTIMATED BASE YEAR FOR ITEM NO. 0001 THRU
ITEM NO. 0074 FOR A ONE YEAR PERIOD
$1,000,000.00
TOTAL ESTIMATED OPTION YEAR 1 FOR ITEM NO. 0075
THRU ITEM NO. 0148
$1,000,000.00
TOTAL ESTIMATED OPTION YEAR 2 FOR ITEM NO. 0149
THRU ITEM NO. 0222
$1,000,000.00
TOTAL ESTIMATED OPTION YEAR 3 FOR ITEM NO. 0223
THRU ITEM NO. 0296
$1,000,000.00
TOTAL ESTIMATED OPTION YEAR 4 FOR ITEM NO. 0297
THRU ITEM NO. 0370
$1,000,000.00
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
M3CTXMER
Typewritten Text B-1
ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT
PRICES FOR BASE YEAR FY 2009
0001 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (rice or cane tires)
0002 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (terra tires)
0003 Mobilization and Demobilization - Land 1000 MI ____________ ____________ Based
0004 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (measured from Contractor's office to boat ramp) normal setup
0005 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (extra stability 4 point anchor spread & heavy duty casing)
0006 Mobilization and Demobilization - for Floating 100 MI ____________ ____________ Plant to Boat Ramp (for investigations of submerged areas)
0007 Mobilization and Demobilization - for Floating 25 MI ____________ ____________ Plant from Boat Ramp to work areas (for investigations of submerged areas)
0008 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas) regular setup
0009 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas) extra stability
0010 Mobilization and Demobilization - Track amphibious 400 MI ____________ ____________ buggy (TAB) Marsh Terrain
0011 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (regular setup)
0012 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (extra stability setup)
0013 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0014 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0015 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
B-2
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0016 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0017 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0018 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0019 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
0020 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0021 Undisturbed Sample Borings, Continuous 300 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0022 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0023 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (rice or cane tires)
0024 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (terra or floatation tires)
0025 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (rice or cane tires)
0026 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (terra or floatation tires)
0027 Undisturbed Sample Borings, Continuous 1200 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0028 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0029 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0030 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0031 Disturbed Sample Borings - Land Based 30 LF ____________ ____________
0032 Environmental Sample Borings - Land 30 LF ____________ ____________ Based
B-3
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0033 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (regular setup)
0034 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (extra stability setup)
0035 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (regular setup)
0036 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (extra stability setup)
0037 Pipe Probing 30 EA ____________ ____________
0038 Hand Proving Ring Cone Penetrometer 30 EA ____________ ____________
0039 Surface Sediment "Grab" Sample 30 EA ____________ ____________
Surveys - providing horizontal coordinates and elevation (X,Y & Z) at each investigation location 30 DA ____________ ____________
0041 Visual Classification Test 800 EA ____________ ____________
0042 Moisture Content Test 700 EA ____________ ____________
0043 Unit Dry Weight Test 200 EA ____________ ____________
0044 Unit Wet Weight Test 200 EA ____________ ____________
0045 Specific Gravity of Solids Test 10 EA ____________ ____________
0046 Liquid Limit Test 150 EA ____________ ____________
0047 Plastic Limit Test 150 EA ____________ ____________
0048 Bar Linear Shrinkage 10 EA ____________ ____________
0049 Abbreviated Mechanical Analysis Test 300 EA ____________ ____________
0050 Complete Mechanical Analysis Test 5 EA ____________ ____________
0051 Hydrometer Analysis Test 10 EA ____________ ____________
0052 Standard Compaction Test 10 EA ____________ ____________
0053 Modified Compaction Test 10 EA ____________ ____________
0054 Unconfined Compression Test 100 EA ____________ ____________
0055 Torvane Shear Test 100 EA ____________ ____________
0056 Soil Salinity 10 EA ____________ ____________
B-4
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0057 Unconsolidated Undrained Compressive 10 EA ____________ ____________ Strength of Cohesive Soils in Triaxial Compression (Q-Test) (1 specimen)
0058 Consolidated Undrained Triaxial 5 EA ____________ ____________
(R-Test) (3 specimens)
0059 Direct Shear Test of Soils Under 2 EA ____________ ____________ Consolidated Drained Conditions (S-Test) (3 specimens)
0060 One Dimensional Consolidation Properties 1 EA ____________ ____________ of Soils
0061 Hand Vane Shear Test 1 EA ____________ ____________
0062 Miniature Vane Shear Test
0063 Percent Organic Content Test 10 EA
0064 Grouting of Borings 1 LF ____________ ____________
0065 150 Log ____________ ____________
0066 150 Log ____________ ____________
Matting for support the earthmoving equipment or vehicle when needed 10 Set ____________ ____________
0068 Track-Hoe equipment 5 DA ____________ ____________
0069 Small Bull Dozer 5 DA ____________ ____________
0070 Large Bull Dozer 5 DA ____________ ____________
0071 Mobilization and Demobilization - Track-Hoe 400 MI ____________ ____________
0072 Mobilization and Demobilization - Small Bulldozer 400 MI ____________ ____________
0073 Mobilization and Demobilization Large Bulldozer 400 MI ____________ ____________
0074 Mobilization and Demobilization Matting 400 MI ____________ ____________
TOTAL ESTIMATED AMOUNT FOR BASE YEAR
ITEMS NO. 0001 THRU 0074
Transferring field interpretations to GINT program
Transferring final lab interpretations to GINT program
B-5
PRICES FOR FIRST OPTOIN YEAR FY 2010
0075 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (rice or cane tires)
0076 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (terra tires)
0077 Mobilization and Demobilization - Land 1000 MI ____________ ____________ Based
0078 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (measured from Contractor's office to boat ramp) normal setup
0079 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (extra stability 4 point anchor spread & heavy duty casing)
0080 Mobilization and Demobilization - for Floating 100 MI ____________ ____________ Plant to Boat Ramp (for investigations of submerged areas)
0081 Mobilization and Demobilization - for Floating 25 MI ____________ ____________ Plant from Boat Ramp to work areas (for investigations of submerged areas)
0082 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0083 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0084 Mobilization and Demobilization - Track amphibious 400 MI ____________ ____________ buggy (TAB) Marsh Terrain
0085 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (regular setup)
0086 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (extra stability setup)
0087 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0088 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0089 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
BID SCHEDULE
B-6
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0090 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0091 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0092 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0093 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
0094 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0095 Undisturbed Sample Borings, Continuous 300 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0096 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0097 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (rice or cane tires)
0098 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (terra or floatation tires)
0099 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (rice or cane tires)
0100 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (terra or floatation tires)
0101 Undisturbed Sample Borings, Continuous 1200 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0102 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0103 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0104 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0105 Disturbed Sample Borings - Land Based 30 LF ____________ ____________
0106 Environmental Sample Borings - Land 30 LF ____________ ____________
B-7
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0107 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (regular setup)
0108 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (extra stability setup)
0109 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (regular setup)
0110 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (extra stability setup)
0111 Pipe Probing 30 EA ____________ ____________
0112 Hand Proving Ring Cone Penetrometer 30 EA ____________ ____________
0113 Surface Sediment "Grab" Sample 30 EA ____________ ____________
Surveys - locating or recording horizontal coordinates and providing elevations at each investigation location 30 DA ____________ ____________
0115 Visual Classification Test 800 EA ____________ ____________
0116 Moisture Content Test 700 EA ____________ ____________
0117 Unit Dry Weight Test 200 EA ____________ ____________
0118 Unit Wet Weight Test 200 EA ____________ ____________
0119 Specific Gravity of Solids Test 10 EA ____________ ____________
0120 Liquid Limit Test 150 EA ____________ ____________
0121 Plastic Limit Test 150 EA ____________ ____________
0122 Bar Linear Shrinkage 10 EA ____________ ____________
0123 Abbreviated Mechanical Analysis Test 300 EA ____________ ____________
0124 Complete Mechanical Analysis Test 5 EA ____________ ____________
0125 Hydrometer Analysis Test 10 EA ____________ ____________
0126 Standard Compaction Test 10 EA ____________ ____________
0127 Modified Compaction Test 10 EA ____________ ____________
0128 Unconfined Compression Test 100 EA ____________ ____________
0129 Torvane Shear Test 100 EA ____________ ____________
0130 Soil Salinity 10 EA ____________ ____________
B-8
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0131 Unconsolidated Undrained Compressive 10 EA ____________ ____________ Strength of Cohesive Soils in Triaxial Compression (Q-Test) (1 specimen)
0132 Consolidated Undrained Triaxial 5 EA ____________ ____________ Compression Test for Cohesive Soils (R-Test) (3 specimens)
0133 Direct Shear Test of Soils Under 2 EA ____________ ____________ Consolidated Drained Conditions (S-Test) (3 specimens)
0134 One Dimensional Consolidation Properties 1 EA ____________ ____________ of Soils
0135 Hand Vane Shear Test 1 EA ____________ ____________
0136 Miniature Vane Shear Test
0137 Percent Organic Content Test 10 EA ____________ ____________
0138 Grouting of Borings 1 LF ____________ ____________
0139 150 Log ____________ ____________
0140 150 Log ____________ ____________
Matting for support the earthmoving equipment or vehicle when needed 15 Set ____________ ____________
0142 Track-Hoe equipment 5 DA ____________ ____________
0143 Small Bull Dozer 5 DA ____________ ____________
0144 Large Bull Dozer 5 DA ____________ ____________
0145 Mobilization and Demobilization - Track-Hoe 400 MI ____________ ____________
0146 Mobilization and Demobilization - Small Bulldozer 400 MI ____________ ____________
0147 Mobilization and Demobilization Large Bulldozer 400 MI ____________ ____________
0148 Mobilization and Demobilization Matting 400 MI ____________ ____________
TOTAL ESTIMATED AMOUNT FOR FIRST OPTION YEAR ____________
ITEMS NO. 0075 THRU 0148
Transferring field interpretations to GINT program
Transferring final lab interpretations to GINT program
B-9
PRICES FOR SECOND OPTOIN YEAR FY 2011
0149 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (rice or cane tires)
0150 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (terra tires)
0151 Mobilization and Demobilization - Land 1000 MI ____________ ____________ Based
0152 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (measured from Contractor's office to boat ramp) normal setup
0153 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (extra stability 4 point anchor spread & heavy duty casing)
0154 Mobilization and Demobilization - for Floating 100 MI ____________ ____________ Plant to Boat Ramp (for investigations of submerged areas)
0155 Mobilization and Demobilization - for Floating 25 MI ____________ ____________ Plant from Boat Ramp to work areas (for investigations of submerged areas)
0156 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0157 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0158 Mobilization and Demobilization - Track amphibious 400 MI ____________ ____________ buggy (TAB) Marsh Terrain
0159 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (regular setup)
0160 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (extra stability setup)
0161 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0162 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0163 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
BID SCHEDULE
B-10
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0164 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0165 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0166 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0167 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
0168 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0169 Undisturbed Sample Borings, Continuous 300 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0170 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0171 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (rice or cane tires)
0172 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (terra or floatation tires)
0173 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (rice or cane tires)
0174 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (terra or floatation tires)
0175 Undisturbed Sample Borings, Continuous 1200 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0176 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0177 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0178 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0179 Disturbed Sample Borings - Land Based 30 LF ____________ ____________
0180 Environmental Sample Borings - Land 30 LF ____________ ____________
B-11
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0181 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (regular setup)
0182 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (extra stability setup)
0183 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (regular setup)
0184 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (extra stability setup)
0185 Pipe Probing 30 EA ____________ ____________
0186 Hand Proving Ring Cone Penetrometer 30 EA ____________ ____________
0187 Surface Sediment "Grab" Sample 30 EA ____________ ____________
Surveys - locating or recording horizontal coordinates and providing elevations at each investigation location 30 DA ____________ ____________
0189 Visual Classification Test 800 EA ____________ ____________
0190 Moisture Content Test 700 EA ____________ ____________
0191 Unit Dry Weight Test 200 EA ____________ ____________
0192 Unit Wet Weight Test 200 EA ____________ ____________
0193 Specific Gravity of Solids Test 10 EA ____________ ____________
0194 Liquid Limit Test 150 EA ____________ ____________
0195 Plastic Limit Test 150 EA ____________ ____________
0196 Bar Linear Shrinkage 10 EA ____________ ____________
0197 Abbreviated Mechanical Analysis Test 300 EA ____________ ____________
0198 Complete Mechanical Analysis Test 5 EA ____________ ____________
0199 Hydrometer Analysis Test 10 EA ____________ ____________
0200 Standard Compaction Test 10 EA ____________ ____________
0201 Modified Compaction Test 10 EA ____________ ____________
0202 Unconfined Compression Test 100 EA ____________ ____________
0203 Torvane Shear Test 100 EA ____________ ____________
0204 Soil Salinity 10 EA ____________ ____________
B-12
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0205 Unconsolidated Undrained Compressive 10 EA ____________ ____________ Strength of Cohesive Soils in Triaxial Compression (Q-Test) (1 specimen)
0206 Consolidated Undrained Triaxial 5 EA ____________ ____________ Compression Test for Cohesive Soils (R-Test) (3 specimens)
0207 Direct Shear Test of Soils Under 2 EA ____________ ____________ Consolidated Drained Conditions (S-Test) (3 specimens)
0208 One Dimensional Consolidation Properties 1 EA ____________ ____________ of Soils
0209 Hand Vane Shear Test 1 EA ____________ ____________
0210 Miniature Vane Shear Test
0211 Percent Organic Content Test 10 EA ____________ ____________
0212 Grouting of Borings 1 LF ____________ ____________
0213 150 Log ____________ ____________
0214 150 Log ____________ ____________
Matting for support the earthmoving equipment or vehicle when needed 10 Set ____________ ____________
0216 Track-Hoe equipment 5 DA ____________ ____________
0217 Small Bull Dozer 5 DA ____________ ____________
0218 Large Bull Dozer 5 DA ____________ ____________
0219 Mobilization and Demobilization - Track-Hoe 400 MI ____________ ____________
0220 Mobilization and Demobilization - Small Bulldozer 400 MI ____________ ____________
0221 Mobilization and Demobilization Large Bulldozer 400 MI ____________ ____________
0222 Mobilization and Demobilization Matting 400 MI ____________ ____________
TOTAL ESTIMATED AMOUNT FOR SECOND OPTION YEAR ____________
ITEMS NO. 0149 THRU 0222
Transferring field interpretations to GINT program
Transferring final lab interpretations to GINT progra
B-13
PRICES FOR THIRD OPTOIN YEAR FY 2012
0223 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (rice or cane tires)
0224 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (terra tires)
0225 Mobilization and Demobilization - Land 1000 MI ____________ ____________ Based
0226 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (measured from Contractor's office to boat ramp) normal setup
0227 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (extra stability 4 point anchor spread & heavy duty casing)
0228 Mobilization and Demobilization - for Floating 100 MI ____________ ____________ Plant to Boat Ramp (for investigations of submerged areas)
0229 Mobilization and Demobilization - for Floating 25 MI ____________ ____________ Plant from Boat Ramp to work areas (for investigations of submerged areas)
0230 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0231 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0232 Mobilization and Demobilization - Track amphibious 400 MI ____________ ____________ buggy (TAB) Marsh Terrain
0233 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (regular setup)
0234 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (extra stability setup)
0235 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0236 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0237 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
BID SCHEDULE
B-14
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0238 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0239 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0240 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0241 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
0242 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0243 Undisturbed Sample Borings, Continuous 300 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0244 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0245 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (rice or cane tires)
0246 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (terra or floatation tires)
0247 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (rice or cane tires)
0248 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (terra or floatation tires)
0249 Undisturbed Sample Borings, Continuous 1200 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0250 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0251 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0252 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0253 Disturbed Sample Borings - Land Based 30 LF ____________ ____________
0254 Environmental Sample Borings - Land 30 LF ____________ ____________
B-15
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0255 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (regular setup)
0256 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (extra stability setup)
0257 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (regular setup)
0258 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (extra stability setup)
0259 Pipe Probing 30 EA ____________ ____________
0260 Hand Proving Ring Cone Penetrometer 30 EA ____________ ____________
0261 Surface Sediment "Grab" Sample 30 EA ____________ ____________
Surveys - locating or recording horizontal coordinates and providing elevations at each investigation location 30 DA ____________ ____________
0263 Visual Classification Test 800 EA ____________ ____________
0264 Moisture Content Test 700 EA ____________ ____________
0265 Unit Dry Weight Test 200 EA ____________ ____________
0266 Unit Wet Weight Test 200 EA ____________ ____________
0267 Specific Gravity of Solids Test 10 EA ____________ ____________
0268 Liquid Limit Test 150 EA ____________ ____________
0269 Plastic Limit Test 150 EA ____________ ____________
0270 Bar Linear Shrinkage 10 EA ____________ ____________
0271 Abbreviated Mechanical Analysis Test 300 EA ____________ ____________
0272 Complete Mechanical Analysis Test 5 EA ____________ ____________
0273 Hydrometer Analysis Test 10 EA ____________ ____________
0274 Standard Compaction Test 10 EA ____________ ____________
0275 Modified Compaction Test 10 EA ____________ ____________
0276 Unconfined Compression Test 100 EA ____________ ____________
0277 Torvane Shear Test 100 EA ____________ ____________
0278 Soil Salinity 10 EA ____________ ____________
B-16
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0279 Unconsolidated Undrained Compressive 10 EA ____________ ____________ Strength of Cohesive Soils in Triaxial Compression (Q-Test) (1 specimen)
0280 Consolidated Undrained Triaxial 5 EA ____________ ____________ Compression Test for Cohesive Soils (R-Test) (3 specimens)
0281 Direct Shear Test of Soils Under 2 EA ____________ ____________ Consolidated Drained Conditions (S-Test) (3 specimens)
0282 One Dimensional Consolidation Properties 1 EA ____________ ____________ of Soils
0283 Hand Vane Shear Test 1 EA ____________ ____________
0284 Miniature Vane Shear Test
0285 Percent Organic Content Test 10 EA ____________ ____________
0286 Grouting of Borings 1 LF ____________ ____________
0287 150 Log ____________ ____________
0288 150 Log ____________ ____________
Matting for support the earthmoving equipment or vehicle when needed 15 Set ____________ ____________
0290 Track-Hoe equipment 5 DA ____________ ____________
0291 Small Bull Dozer 5 DA ____________ ____________
0292 Large Bull Dozer 5 DA ____________ ____________
0293 Mobilization and Demobilization - Track-Hoe 400 MI ____________ ____________
0294 Mobilization and Demobilization - Small Bulldozer 400 MI ____________ ____________
0295 Mobilization and Demobilization Large Bulldozer 400 MI ____________ ____________
0296 Mobilization and Demobilization Matting 400 MI ____________ ____________
TOTAL ESTIMATED AMOUNT FOR THIRD OPTION YEAR ____________
ITEMS NO. 0223 THRU 0296
Transferring field interpretations to GINT program
B-17
PRICES FOR FOURTH OPTOIN YEAR FY 2013
0297 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (rice or cane tires)
0298 Mobilization and Demobilization - Marsh Terrain 400 MI ____________ ____________ (terra tires)
0299 Mobilization and Demobilization - Land 1000 MI ____________ ____________ Based
0300 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (measured from Contractor's office to boat ramp) normal setup
0301 Mobilization and Demobilization - for Floating 400 MI ____________ ____________ Plant to Boat Ramp (extra stability 4 point anchor spread & heavy duty casing)
0302 Mobilization and Demobilization - for Floating 100 MI ____________ ____________ Plant to Boat Ramp (for investigations of submerged areas)
0303 Mobilization and Demobilization - for Floating 25 MI ____________ ____________ Plant from Boat Ramp to work areas (for investigations of submerged areas)
0304 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0305 Mob & Demob for Floating Plant in water 20 MI ____________ ____________ (from boat ramp to work areas)
0306 Mobilization and Demobilization - Track amphibious 400 MI ____________ ____________ buggy (TAB) Marsh Terrain
0307 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (regular setup)
0308 Undisturbed Sample Borings, Continuous 250 LF ____________ ____________ Sampling, 3-inch Samples - From Floating Plant (extra stability setup)
0309 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0310 Undisturbed Sample Borings, Continuous 200 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0311 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
BID SCHEDULE
B-18
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0312 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0313 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (rice or cane tires)
0314 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Marsh Terrain (terra or floatation tires)
0315 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (rice or cane tires)
0316 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Marsh Terrain (terra or floatation tires)
0317 Undisturbed Sample Borings, Continuous 300 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0318 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - TAB
0319 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (rice or cane tires)
0320 Disturbed Sample Borings - Marsh Terrain 20 LF ____________ ____________ (terra or floatation tires)
0321 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (rice or cane tires)
0322 Environmental Sample Borings - Marsh 30 LF ____________ ____________ Terrain (terra or floatation tires)
0323 Undisturbed Sample Borings, Continuous 1200 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0324 Undisturbed Sample Borings, Continuous 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0325 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 3-inch Samples - Land Based
0326 Undisturbed Sample Borings, Intermittent 30 LF ____________ ____________ Sampling, 6-inch Samples - Land Based
0327 Disturbed Sample Borings - Land Based 30 LF ____________ ____________
0328 Environmental Sample Borings - Land 30 LF ____________ ____________
B-19
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0329 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (regular setup)
0330 Environmental Sample Borings - Floating 30 LF ____________ ____________ Plant (extra stability setup)
0331 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (regular setup)
0332 Disturbed Sample Borings - Floating Plant 30 LF ____________ ____________ (extra stability setup)
0333 Pipe Probing 30 EA ____________ ____________
0334 Hand Proving Ring Cone Penetrometer 30 EA ____________ ____________
0335 Surface Sediment "Grab" Sample 30 EA ____________ ____________
Surveys - locating or recording horizontal coordinates and providing elevations at each investigation location 30 DA ____________ ____________
0337 Visual Classification Test 800 EA ____________ ____________
0338 Moisture Content Test 700 EA ____________ ____________
0339 Unit Dry Weight Test 200 EA ____________ ____________
0340 Unit Wet Weight Test 200 EA ____________ ____________
0341 Specific Gravity of Solids Test 10 EA ____________ ____________
0342 Liquid Limit Test 150 EA ____________ ____________
0343 Plastic Limit Test 150 EA ____________ ____________
0344 Bar Linear Shrinkage 10 EA ____________ ____________
0345 Abbreviated Mechanical Analysis Test 300 EA ____________ ____________
0346 Complete Mechanical Analysis Test 5 EA ____________ ____________
0347 Hydrometer Analysis Test 10 EA ____________ ____________
0348 Standard Compaction Test 10 EA ____________ ____________
0349 Modified Compaction Test 10 EA ____________ ____________
0350 Unconfined Compression Test 100 EA ____________ ____________
0351 Torvane Shear Test 100 EA ____________ ____________
0352 Soil Salinity 10 EA ____________ ____________
B-20
BID SCHEDULE
SUPPLIES OR SERVICES AND PRICES/COSTS
0353 Unconsolidated Undrained Compressive 10 EA ____________ ____________ Strength of Cohesive Soils in Triaxial Compression (Q-Test) (1 specimen)
0354 Consolidated Undrained Triaxial 5 EA ____________ ____________ Compression Test for Cohesive Soils (R-Test) (3 specimens)
0355 Direct Shear Test of Soils Under 2 EA ____________ ____________ Consolidated Drained Conditions (S-Test) (3 specimens)
0356 One Dimensional Consolidation Properties 1 EA ____________ ____________ of Soils
0357 Hand Vane Shear Test 1 EA ____________ ____________
0358 Miniature Vane Shear Test
0359 Percent Organic Content Test 10 EA ____________ ____________
0360 Grouting of Borings 1 LF ____________ ____________
0361 150 Log ____________ ____________
0362 150 Log ____________ ____________
Matting for support the earthmoving equipment or vehicle when needed 15 Set ____________ ____________
0364 Track-Hoe equipment 5 DA ____________ ____________
0365 Small Bull Dozer 5 DA ____________ ____________
0366 Large Bull Dozer 5 DA ____________ ____________
0367 Mobilization and Demobilization - Track-Hoe 400 MI ____________ ____________
0368 Mobilization and Demobilization - Small Bulldozer 400 MI ____________ ____________
0369 Mobilization and Demobilization Large Bulldozer 400 MI ____________ ____________
0370 Mobilization and Demobilization Matting 400 MI ____________ ____________
TOTAL ESTIMATED AMOUNT FOR FOURTH OPTION YEAR ____________
ITEMS NO. 0297 THRU 0370
TOTAL EST AMOUNT FOR BASE YEAR AND OPTIONS 1-4 _______________
Transferring field interpretations to GINT program
B-21
SECTION C
PERFORMANCE WORK STATEMENT
CORE DRILLING, SOIL SAMPLING AND LABORATORY TESTING OF SOIL SAMPLES
U.S. ARMY ENGINEER DISTRICT, GALVESTON
CORPS OF ENGINEERS
GALVESTON, TEXAS
1. GENERAL: The intent of the work specified herein to be performed by the Contractor is to determine the type, nature and characteristics of the subsurface materials at existing and proposed project sites under investigation by the United States Government, principally the U.S. Army Engineer District, Galveston, Corps of Engineers, Galveston, Texas. The required work will normally be located within the boundaries of the Galveston District, shown on Plate 1 (see Section J); however, work may occur outside these boundaries with concurrence of the Contractor and approval of the Contracting Officer. Services may be performed in connection with both military and civil projects assigned to any entity of the United States Government.
Project locations will be identified in each task order. The Contractor, operating as an independent contractor and not as an agent of the Government, shall provide all labor, equipment, and transport of equipment and personnel to the site necessary to determine the type, nature and characteristics of the subsurface materials at the specified drilling, sampling, and testing locations, by core drilling, soils sampling and laboratory testing of the soil samples utilizing procedures which are acceptable to the U. S. Army Corps of Engineers and provide to the Contracting Officer the required products with supporting data. All work shall be performed in accordance with the terms and conditions of the contract and this Performance Work Statement (PWS). During the prosecution of the work, the Contractor shall provide adequate supervision and quality control to assure the accuracy, quality, completeness and progress of the work.
2. DIRECTION OF WORK: The Contracting Officer will direct the Contractor to initiate core drilling and sampling operations at designated work areas and to perform related laboratory testing through the issuance of subsequent task orders. Task orders will identify the purpose and location of the required drilling, the number and depth of the soils borings, the type and number of soil samples to be obtained, the laboratory tests to be performed on the samples, the frequency of testing required and the required completion date of the work. The Contractor shall begin the subsurface investigations at the designated work site within fourteen (14) calendar days after receipt of a task order, unless otherwise approved by the Contracting Officer. If laboratory testing is directed by a separate task order, the Contractor shall begin laboratory testing of the soil samples within five (5) calendar days after receipt of the task order, unless otherwise approved by the Contracting Officer. The Contracting Officer reserves the right to set aside a certain portion of core drilling work to be performed by Government personnel or other commercial sources. Testing of samples obtained by Government personnel may be designated for testing by the Contractor or may be tested at a Government and/or other commercial laboratory as selected by the Contracting Officer. The portion of work to be set aside is not included in the estimate of the quantity of work to be performed under this contract.
C-2
3. SUPERVISION OF WORK: The Contractor shall be responsible for the supervision of the core drilling and sampling operations and the laboratory testing of the soil samples. The Contractor shall assign a professional engineer or geologist to supervise the work to be performed under each individual task order. This representative of the Contractor shall be responsible for coordinating the drilling and sampling operations to assure that drilling procedures and directions specified in this contract and in the individual task orders are being followed, that the soil samples are being properly obtained and handled, and that the samples are representative of the subsurface materials being encountered. The Contractor's representative shall communicate with representatives of the Contracting Officer during the drilling and sampling operations to advise the Contracting Officer of any difficulties being encountered in the performance of the work. Upon receipt of the driller's logs, described in Section C, Paragraph 10, the Contractor's representative shall review the logs for completeness and, to the extent practicable, for agreement with the samples obtained. Upon receipt of a task order for laboratory testing, the Contractor's representative shall inform laboratory personnel of the tests to be performed and shall supervise the testing to assure that proper testing procedures are followed and that test results are properly recorded. The presence of a representative of the Contracting Officer during the drilling operations and/or the laboratory testing shall not relieve the Contractor of the responsibilities specified in this paragraph.
4. LOCATION OF WORK: The location of the drilling to be performed will be identified in each task order. Locations will include terrain of varying types, steepness and consistencies ranging from hard-surfaced dry land to soft marsh lands, including swamps and dredged material placement areas, lands with excessive moisture or soft to very soft surface and subsurface conditions, partially to fully submerged areas with varying depths of ponded or standing water, and areas which may be covered by heavy vegetation or brush. Locations may include inland waterways and channels, portions of other bodies of water, and waters of and in close proximity of deep draft navigation channels including entrance channels offshore.
The locations of the projects will at times be on islands that are only accessible by water. The exact location of each soil boring to be drilled will either be provided to the contractor in the form of horizontal coordinates, be staked by the Contracting Officer's representative, be provided in relation to an existing physical or topographic feature, or be positioned in accordance with other instructions provided in the individual task orders. The locations of borings specified in the task order or task order attachments shall not be changed unless approved by the Contracting Officer.
5. ACCESS TO BORING AND ELECTRONIC CPT LOCATIONS: The Contractor shall be required to perform some minor clearing of small vegetation where necessary to provide access for drilling and electronic CPT equipment, which shall be considered a subsidiary obligation of the Contractor. Where major clearing is needed as determined by the government, one or more of the equipment types in the below paragraph entitled “EARTHWORK” may be ordered by the government for use in a given task order.
Rights-of-Entry or assurances that core drilling, CPT testing, and associated clearing and earthwork activities are permitted in the designated areas will be furnished to the Contractor by the Contracting Officer prior to the initiation of the drilling or CPT testing and associated clearing and earthwork activities. Access to the project sites for water drilling may be obtained
C-3 via public or private boat ramps or other launching sites located by the Contractor. The Contractor shall exercise care in the use of the public ramps to avoid disturbance to the area and shall be responsible for leaving the area in conditions comparable to those presently existing. The Contractor shall make arrangements for use of private ramps. The Government will provide water boring locations in the form of Texas State Plane coordinates, as necessary.
6. DRILLING EQUIPMENT: Equipment to be furnished and utilized by the Contractor for core drilling shall be dependable equipment in good condition and of sufficient size to efficiently perform the drilling and sampling to the required depths at the required locations and within the approved time period specified for the work.