W912HV25B0005 - B1585 Pre-bid Conference Slides Final.pdf
PDF 2 MB Posted
- Solicitation number
- W912HV25B0005
About this file
The document is a pre-bid conference presentation for the FY25 DHA SRM Facility Repairs project at Building 1585, Yokota Air Base, Japan, solicitation number W912HV25B0005. The project involves comprehensive interior facility repairs, including modernizing the existing HVAC system, relocating the Dental Instrument Processing Center (DIPC) from the second to the first floor, and renovating the second floor for a new purpose. Key renovation elements include replacing the building chiller, central station air handling units, installing a new hydronic reheat system, implementing DDC controls, and creating a three-room sterile processing department with dedicated areas for decontamination, sterile assembly, and sterile storage.
The solicitation is specifically targeted at local Japanese contractors, with a bid due date of August 22, 2025, at 1400 hrs JST. The contract has a performance period of 1,230 calendar days from the Notice to Proceed, with potential liquidated damages of ¥526,531 per calendar day of delay. Contractors must possess a Japanese civil or architectural construction license, comply with infection control and dust protocols, and navigate a complex permitting process that may include utility permits taking up to 30 days and temporary construction waivers potentially requiring 90 days. The project will be executed in 10 phases on the first floor and 12 phases on the second floor, with strict requirements for documentation, quality control, and adherence to safety and environmental standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Bids W912HV25B0005.pdf | ||
| Site Visit Roster DHA 1558 25B0005.pdf | ||
| Prebid Attendees.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY25 DHA SRM FACILITY REPAIRS
BUILDING 1585
YOKOTA AIR BASE, JAPAN
W912HV25B0005
PRE-BID CONFERENCE
DATE: 22 MAY 2025
FY25 施設修理工事、建物1585
米国防保健局、横田空軍基地
W912HV25B0005
入札前会議 日付: 2025年5月22日
Prepared by: 製作者: Brandon Taira, Project Manager ブランドン ・ タイラ(プロジェクトマネージャー) Nakiba Jackson, Contracting Officer ナキーバ ・スター・ジャクソン (契約官) Charles Qi, Contract Specialist チャールズ・キー(契約専門官) Ben Fisher, Technical Lead ベン・フィッシャー (技術リード) Evan Wakefield, Resident Engineer バン ワケフィエルド(工事監理事務所長) Hiroko Yamaguchi, Translator 山口博子(翻訳)
本プレゼンテーションに含まれる見解、意見及び所見は著者のものであり、他 の公的な書類で指定されていない場合、公式な米陸軍省の見解、方針又は 決定と解釈されるべきではありません。
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
WELCOME
歓 迎
Virtual Roll Call 実質的な参加者の点呼
Your Company name will be called. Please have one representative from your company identify themselves and identify who is on the line.
会社名をお呼びしましたら、代表の方が今回参加されている全員の方のお名前をお伝えください。
Introduction of Government Personnel 米政府関係者紹介
USACE, Japan Engineer District 米陸軍工兵隊・日本地区
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
DISCUSSION OVERVIEW
説明会概要
Rules of Conference 説明会のルール
Quick tips for Solicitations 入札公告の参考情報
Contracting requirements 契約要件
General Scope of Work 全般的工事内容
Construction Requirements 工事要件
Site Visit Location 現場視察場所
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
Please keep your phones on mute 電話はミュートにして下さい。
Conference will be presented in English. The Japanese translation is provided as a courtesy 本会議は英語で行われます。日本語の翻訳は厚意によるものです。
Unofficial and non-binding 非公式で法的拘束力はありません。
If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern 当説明会で協議される情報と入札案内に矛盾がある場合は、入札案内の契約条件が優先されます。
All questions are to be submitted in writing via Projnet.
質問/問合わせは全てPROJNETを通じ書面で提出して下さい。
RULES FOR CONFERENCE
説明会のルール
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
Review all the solicitation requirements 全ての入札要件を確認する。
Follow solicitation format as required 入札要件に指示されているフォーマットに従う。
Acknowledge all amendment(s) 全ての改訂(アメンドメント)を確認同意する。
Respond to every submission requirement 全ての提出要件に回答・対応する。
QUICK TIPS FOR ALL SOLICITATIONS
全ての入札公告に対する参考情報
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
IFB SOLICITATION FORMAT
IFB入札公告 書式
Standard Form 1442 フォーム1442 Section 00 10 00, Solicitation CLIN Schedule 契約項目一覧表 Section 00 21 13, Instructions to Bidders 入札者への説明 Section 00 45 00, Representation and Certifications 表明と証明書 Section 00 70 00, Conditions of the Contract 契約条件 Section 00 73 00, Supplementary Conditions 補足条件 Division 01, General Requirements 一般要件 Divisions 02 thru 33, Technical Divisions 技術要件 Drawings 図面
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
Make sure to note the bid due date and time in Block 13A of SF1442.
SF1442のブロック13Aに記載された入札提出期日及び時間を必ず確認する。
Bids currently due 22 August 2025 at 1400 hrs JST.
現在、入札提出期限は2025年8月22日、日本時間午後2時。
Period for acceptance of bids shall be no less than 90 calendar days for Government acceptance (see block 13D).
政府が受諾するための入札価格の有効期間は90日間以上とする。(ブロック13D参照)
Fill out Blocks 14, 15, 17, 19, 20A, 20B, and 20C in the back page of SF1442 ブロック14, 15, 17, 19, 20A, 20B, 20Cにもれなく記入する。
STANDARD FORM (SF) 1442
SF1442
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
SECTION 00 10 00
SOLICITATION CONTRACT LINE ITEM (CLIN)
契約項目一覧
ITEM
NO.
DESCRIPTION QUANTITY UNIT UNIT
PRICE
AMOUNT
BASE ITEMS
0001 Interior Facility Repairs of Building 1585 1 JB - ¥________
TOTAL BASE CLIN SCHEDULE ¥________
NOTES 注意:
1. Failure of the bidder to bid price(s) for all item(s) in the CLIN Schedule may be cause for rejection of the bid as non responsive. 契約項目一覧表の全ての項目について価格を提案していない入札者は、受け入れられないとして却下されることがあります。
2. See Section 01 20 00, for additional line item description. 追加項目の詳細はセクション01 20 00を参照して下さい。
3. Any reference to “offer”, “offeror”, or “CLIN schedule” shall be construed to mean “bid”, “bidder” and “bid schedule”.
「 (offer)入札、(offeror)入札者」及び「(CLIN schedule)約項目一覧表 は、 「(bid)入札」「(bidder)入札者」又は「(bidding schedule)入札一覧表」を 意味すると解釈するものとします。
4. LEGEND: JB = Job 凡例: JB = 作業
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
Magnitude of the Proposed Project: 工事の規模: ► ¥1,000,000,000 and ¥2,500,000,000 10億円から25億円
Requests For Information (RFIs): ALL Questions / Inquiries shall be submitted via the PROJNET Bidder Inquiry Module at: https://www.projnet.org/projnet/ . Please see the solicitation for additional details and instructions.
質問書(RFI):全ての質問/問い合わせはPROJNETのサイト
https://www.projnet.org/projnet/ を介して提出する。追加の詳細および手順に関しては入札 案内書を参照。
Requests For Information (RFIs) Due: RFI(質問書)期日: ► 11:59 (midnight) on 05 June 2025 (JST) 2025年6月5日、日本時間深夜11時59分 ► The Bidder Inquiry Key is: QQT855-7NWMR9
入札者の照会キー: QQT855-7NWMR9
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS 入札者への説明
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
https://www.projnet.org/projnet/ https://www.projnet.org/projnet/
SIGNATURE OF BIDS. Bid must be signed by an officer of the company or an individual who is authorized to sign bids for and on behalf of the company. An individual, other than an officer of the company, who signs a bid must submit evidence of his authority to sign such bid. This evidence must accompany the bid. Failure to comply with this requirement may be cause for rejection of the bid.
Signature block is located 20B. SIGNATURE of SF 1442 back page.
入札書類の署名。 入札書類は、会社を代表して入札書類に署名する権限を持つ会社の役員又は個 人が署名しなければなりません。役員以外の個人が入札書類に署名する場合は、署名する権限がある ことを示す証拠を入札書類に添付して提出しなければなりません。この要件に従わない場合は、入札が 却下される可能性があります。
SECTION 00 21 13
INSTRUCTIONS IFB PROVISIONS
IFB条件の説明
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
BIDDER ELIGIBILITY 入札者適格性。
This contract will be performed in its entirety in the country of Japan and is intended only for local sources. Only local sources will be considered under this solicitation. 本契約は日本国内で全て施工され、日本の業者だけを意図しています。
For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements 共同企業体(JV)の 場合、共同企業体自体が独立した事業体としてローカルソース要件を満たす必要があるか、または、共同企業体の各構成員が 個別にローカルソース要件を満たす必要がある。
A prospective bidder must be duly authorized to operate and conduct business in Japan and must fully comply with all applicable laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts. 特に将来の入札者は、日本で事業を運営する正式な権限を持ち、契約履行中に該当する日本の法律、 条令、労働基準及び規則を全て満たさなくてはなりません。
* See solicitation for full Bidder Eligibility provision in SECTION 00 21 13.
入札者適格性条項の全文は入札案内を参照して下さい。
SECTION 00 21 13
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
BIDDER ELIGIBILITY 入札者適格性。
Bidders must possess a Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license by the bid due date and time. The U.S. Government will verify that the bidder has the license through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website at https://etsuran2.mlit.go.jp/TAKKEN.入札者は、日本で建設作業を行うために日本政府に登録し、入札が提出される時点で本 契約事案で必要な作業を行うために要求される建設業許可証を保有していなければなりません。
Bidder to ensure that it has the license (Japanese civil construction or Japanese architectural construction), and that it is accurately shown on the MLIT website, by the bid due date and time 入札者は、(日本の土木工事業または建築工事業
の)許可を有しており、その情報が入札締切日時までに国土交通省のウェブサイトに正確に表示されていることを確認するもの とする。
The U.S. Government will not offer “United States Official Contractor” status under Article XIV of the US-Japan Status of Forces Agreement (SOFA) to U.S. contractors 建設業許可証は国土交通省 https://etsuran.mlit.go.jp/TAKKENを通じて 確認されます。
* See solicitation for full Bidder Eligibility provision in SECTION 00 21 13.
入札者適格性条項の全文は入札案内を参照して下さい。
SECTION 00 21 13
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
https://etsuran.mlit.go.jp/TAKKEN
Completed and Signed SF1442 SF1442の必要事項を全て記入し署名を行う。 Acknowledge SF30 Amendments (if issued) SF30改訂(アメンドメント)があれば改訂を確認し了
承する。 Completed Section 00 10 00 セクション 00 10 00 の必要事項を全て記入する。 Completed Section 00 45 00 – Representations and Certifications
セクション 00 45 00 - 表明と証明書の必要事項を全て記入する。 Bid Guarantee (FAR 52.228-1) -- 20% or ¥300,000,000 (whichever is less) – Also see Original
Bid Bond Requirements.
入札保証ボンド(FAR 52.228-1) -- 20%又は3億円(いずれか低い額)-入札保証ボンドの原文も
確認する。 Joint Venture Agreement (if applicable) 合弁事業合意書(該当する場合) Deliver Bids to: ELECTRONIC BID SUBMISSION - See solicitation for details.
入札法:電子入札法 - 詳細は入札案内を参照。 Submitted via the PIEE Solicitation Module PIEE入札モジュール経由で入札する。 Emailed Bids are strictly prohibited Eメールによる入札は認められない。
SECTION 00 21 13
SUBMISSION OF BIDS
入札書類の提出
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
Ensure the following is completed and submitted with bid:
以下も必要事項を全て記入し提出して下さい。
Corporate Certificate 企業証明書 FAR Clause 52.204-8, Annual Representation and Certification FAR 52.204-8項、年次表明及び証明書 FAR Clause 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
FAR 52.204-24項、対象となる通信及び映像監視又は機器に関する表明
FAR 52.204-29 Federal Acquisition Supply Chain Security Act Orders--representation And Disclosures (Dec 2023) FAR
52.204-29項連邦調達サプライチェーン安全保障法に基づく命令 ― 表明および情報開示 FAR Clause 52.209-7, Information Regarding Responsibility Matters FAR 52.209-7項、責任事項に関する情報 FAR Clause 52.229-11 Tax on Certain Foreign Procurements – Notice and Representation FAR 52.229-11項、外国からの調達
に対する税金-報告及び表明 DFARS Clause 252.204-7007 ALT A, Annual Representations and Certifications DFARS 252.204-7007項 代替A、年次表明及び
証明書 DFARS Clause 252.204-7017, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services –
Representation DFARS 252.204-7017項、網羅された防衛用通信機器又はサービスの取得の禁止- 表明 DFARS 252.225-7966 Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (Deviation 2024-o0006, Revision 1) (Mar 2024) DFARS 252.225-7966項逸脱2024-o0006 修正 1 ロシアの化石燃料事業に関する禁止事項 ― 表明 DFARS Clause 252.229-7001, Tax Relief DFARS 252.229-7001項、税控除
SECTION 00 45 00
REPRESENTATIONS AND CERTIFICATIONS
表明と証明書
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work
連邦調達規則(FAR) 52.211-10 作業の開始、実行及び完了
Period of Performance: 1,230 Calendar Days after receipt of NTP 契約期間:着工命令から1,230歴日
FAR Clause 52.211-12, Liquidated Damages – Construction ¥526,531 for each Calendar Day of delay
連邦調達規則(FAR) 52.211-12 遅延損害-建設工事 遅延損害金1暦日に付き526,531円
SECTION 00 70 00
CONDITIONS OF THE CONTRACT
契約条件
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
252.225-7045 BALANCE OF PAYMENTS PROGRAM--CONSTRUCTION MATERIAL UNDER TRADE AGREEMENTS--BASIC (FEB 2024) – See solicitation for full clause.
DFARS 252.225-7045、国際収支プログラム-建設資材取引合意(2024年2月)基本-全項は入札案内を参照。
(c) The contractor shall use only domestic (U.S.) or designated country construction material in performing this contract, except for – 業者は下記を除き、本契約の実施に際し、米国製又は指定された国で製造された建設資材のみを使用すること
(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation;
連邦政府契約規則のパート2の単純契約限度額以下の建設資材
(2) Information technology that is a commercial product;
市販品である情報技術
(3) The construction material or components listed by the Government as follows: See clause.
政府による建設資材又は構成部品リストは下記の通り:条項を参照
SECTION 00 70 00
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
252.225-7045 BALANCE OF PAYMENTS PROGRAM--CONSTRUCTION MATERIAL UNDER TRADE
AGREEMENTS--BASIC (FEB 2024) – continued
DFARS 252.225-7045、国際収支プログラム-建設資材取引合意(2024年2月)基本-続き
“Simplified Acquisition Threshold” means $250,000 「単純契約限度額」とは25万ドルです。
“Designated Country” includes Japan. See clause in solicitation for full list of designated countries.
「指定された国」には日本を含みます。指定された国の全リストは入札案内書の条項を参照して下さい。
SECTION 00 70 00
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
DFARS 252.247-7023, Transportation of Supplies by Sea 海路による輸送
Required to utilize U.S. ocean transportation 米国の海上輸送会社を利用する必要があります
Submit any request for use of foreign-flag vessels in writing to the Contracting Officer at least 45 days prior to the sailing date necessary to meet its delivery schedules 外国の海上輸送会社の使用を希望する場合は、納期を満たすために必要な出航日の少なくとも45 日前までに、契約担当官に書面で提出すること。
SECTION 00 70 00
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
• Modernize existing HVAC system
• Renovation of HVAC supporting facilities
• Relocate existing Dental Instrument
Processing Center (DIPC) to first floor
• Renovate second floor for new use
• 既存のHVACシステムを近代化する
• HVACサポート設備の改修
• 既存の歯科器具加工センター(DIPC)を
1階に移転する
• 新しい用途のために2階を改装する
Image: Building 1585 画像:建物1585
GENERAL SCOPE OF WORK
全般的工事内容
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
20SITE LOCATION
現場所在地
Construction Gate 工事ゲート
Project Site プロジェクト現場
Haul Route 運搬経路
Yokota Air Base 横田基地
Reference: Drawing GC100
参考:設計図GC100
North 北
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
21LAYDOWN AREA
資材置き場
Limits of Construction 建設工事限界
Reference: Drawing C-100 参考:設計図C-100
Laydown Area 資材置き場
Building 1585 建物1585
North 北
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
22CHANGES SINCE LAST SOLICITATION
前回広告からの範囲変更概要
Increased period of performance 工事施行期間の延長
Daytime working hours instead of overnight work.
日中の労働時間(夜間勤務は不要)
Improved phasing plan 工事段階計画の改善
Contractor will retain control of spaces until construction completed.
工事段階完了までそれぞれスペースを管理する
Only need to clean rooms to ICRA standards one time, before turning over to end-users. 占有者に引き渡される前に、ICRA基準に準拠した ルームクリーニングを一回行うだけでよい
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
23IMPORTANT SCOPE ITEMS
重要な範囲項目
Reference: Drawings GC100-GC407
参考:設計図GC100-GC407
Phasing 建設段階
• Working is to be performed in accordance with the general phasing shown per contract documents.
工事は、契約文書に示された一般的な段階に従って行われる。
• Area is divided into 10 phases at 1F and 12 phases at 2F to maximum contractor and occupant utilization of space.
建設工事は1階で10フェーズ、2階で12フェーズに分割され、工 事者と占有者が全スペースを最大限に利用できるように。
• Contractor will keep rooms in each phase until completion, then hand over to continue to subsequent phase. 工事者は
各フェーズの部屋がそのフェーズが完了まで持ち続き、占有者 に戻すと次のフェーズの部屋に続く。
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
24IMPORTANT SCOPE ITEMS
Cleaning and ICRA Permit
清掃とICRA許可
• Infection Control Risk Assessment (ICRA) permit must be obtained from 374th prior to start of work.
感染管理リスクアセスメント(ICRA)の許可は、作業開始前に374メディカ
ルグループから取得しなければならない。
• Each space must be cleaned and meet ICRA requirements. This will happen one time before acceptance by the stakeholders.
各スペースは清掃され、ICRAの要件を満たさなければならない。これは、
占有者に引き渡される前一度だけ行われる。
• Contractor must comply with Class V infection and dust protocols.
請負業者は、クラスVの感染及び粉塵処理を遵守しなければならない。
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
25IMPORTANT SCOPE ITEMS
Hazmat Concerns 危険物に関する懸念
• Abatement work may be required for HVAC equipment replacement.
HVAC機器の交換には、除害作業が必要となる場合がある。
• Asbestos found in several materials, including concrete – drilling or cutting require remediation コンクリートを含むいくつかの材料からアスベストが検出され た。コンクリートを掘削又は切断する場合は、除害措置が必要 である。
• Lead (Pb), Cadmium (Cd) and Chromium (Cr) containing materials found in several materials.
鉛(Pb)、カドミウム(Cd)、クロム(Cr)を含む材料がいくつかの 材料に含まれている。
Reference: Drawings H-101 – H103 参考:設計図H-101 – H103
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
26IMPORTANT SCOPE ITEMS
Fire Protection Concerns 防火設備に関する懸念
Fire sprinkler system required at first floor DIPC spaces, per plan.
図面通り、1階のDIPCスペースにスプ
リンクラー設備が必要。
Fire sprinkler system per plans is conceptual.
図面通りのスプリンクラーシステムは 概念的なものである。
Fire protection system must meet UFC, NFPA and NEC requirements.
防火システムは、UFC、NFPA、および
NECの要件に適合していなければなら
ない。
All devices and equipment must be UL listed, or FM approved.
すべての機器および装置は、UL規格ま
たはFM規格に適合していなければなら
ない。
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
Required Submittals 必要な着工前提出物
Notice to Proceed 工事開始指示書
Kickoff Conference キックオフ会議
Project Schedule プロジェクト日程 SPEC Section 01 32 01 (仕様書)
Submittal Register 提出物登録 SPEC Section 01 33 00 (仕様書)
Accident Prevention Plan 事故防止計画 SPEC Section 01 35 26 (仕様書)
Contractor Quality Control Plan 業者品質管理計画 SPEC Section 01 45 00 (仕様書)
Environmental Protection Plan 環境保護計画 SPEC Section 01 57 19 (仕様書)
This is not a comprehensive list, the Contractor MUST review all requirements prior to commencing work.
これが全てではないので、業者は着工前に
要件を全て注意深く確認して下さい。
PRECONSTRUCTION REQUIREMENTS
工事前の一般要件
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
28PRECONSTRUCTION REQUIREMENTS
Required Submittals 必要な着工前提出物
Required Submittals 必要な着工前提出物
Notice to Proceed 工事開始指示書
Contract Award 契約締結
Interpreter Qualifications and Background History 通訳者の資格と経歴
SPEC 仕様書 01 11 00.00 10, 1.7
Environmental Protection Plan 環境保護計画
SPEC 仕様書 01 57 19, 1.9
15 days after Award 契約締結後15日間までに
5 days after NTP 工事開始指示書後5日間までに
Key Personnel Organization Chart 主要人事組織図
SPEC 仕様書 01 11 00.00 10, 1.7
Contract Cost Breakdown 契約費用内訳
SPEC 仕様書 01 20 00, 3.3
15 days after NTP 工事開始指示書後15日間までに
Project Schedule プロジェクト日程
SPEC仕様書 01 32 01.00 10, 3.4.1
Contractor Quality Control Plan 業者品質管理計画
SPEC仕様書 01 45 00.00 10.3.2
Initial Materials Status Report 初回材料状況報告
SPEC仕様書 01 33 00 1.16
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
29PRECONSTRUCTION REQUIREMENTS
Required Submittals 必要な着工前提出物
Notice to Proceed 工事開始指示書
Preconstruction Meeting
建設前会議
30 days after NTP 工事開始指示書後30日間までに
Contract Cost Breakdown 契約費用内訳
SPEC 仕様書 01 20 00, 3.3
15 days before PreCon 建設前会議5日間前までに
Accident Prevention Plan 事故防止計画
SPEC仕様書 01 35 26, 1.7
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
30CONSTRUCTION
GENERAL REQUIREMENTS
工事一般要件
• This project is required to complete documentation through the RMS Contractor Module system. New Project now uses RMS 3.0.
https://rmsdocumentation.com/
本プロジェクトはRMSの業者側モジュールを通して書類提出を完成させることが義務
付けられています。新しいいプロジェクトは現在 RMS 3.0. https://rmsdocumentation.com/ 使用しています。
• This contract is required to implement the Three Phase Inspection process for all features of work as part of the Contractor’s Quality Control Plan.
本契約は、業者の品質計画の一部として、全ての工種項目において3段階検査プロ セスに従うことが義務付けられています。
• Project schedule reviews and updates shall be made and submitted monthly with the requested progress payments.
工期全体のプロジェクト日程を作成、更新し、そして毎月の進捗に応じた支払いの請 求時に提出しなければなりません。
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
https://rmsdocumentation.com/
31CONSTRUCTION
GENERAL REQUIREMENTS
工事一般要件
• The project will be required to follow EM 385-1-1 Mar 2024.
本プロジェクトは2024年3月バージョンのEM385-1-1に従わなくて
はなりません。
• Contract regular working hours are Mon~ Fri 0800~1700.
Weekend, federal holiday, and other than normal working hours may be arranged if coordinated in advance and if approved by the government.
契約の通常の作業時間は平日午前8時から午後5時までです。 もし事前に調整し承認されれば、週末、米国の祭日及び他の通 常の作業時間以外の時間に作業することが可能です。
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
32TYPICAL CHALLENGES FOR
CONTRACTORS
業者が頻繁に直面する課題
• Communication コミュニケーション
• Lost in translation 通訳/翻訳の誤差により間違った理解をしてしまう
• Do your research 下調べや準備を行なって下さい
• Understand the differences between construction in Japan vs. US
MILCON 一般的な日本の工事と米国予算工事の違いを理解して下さ
い
• Scheduling 日程
• Understanding requirements 要求事項を理解すること
• Impacts to project schedules on long lead items 調達に時間の
かかる材料はプロジェクト日程に影響を与える
• Yokota permit approval process and timelines. Utility permits (AF103) may take up to 30 days for approval and Temporary Construction Waivers (TCW) may take up to 90 days
横田基地の許可承認プロセス及び日程。ユーティリティー許可(AF103)は
承認に最大30日、また一時的工事免除(TCW)は最大90日かかる場合が
あります。
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
33TYPICAL CHALLENGES FOR
CONTRACTORS
業者が頻繁に直面する課題
• Submittal documentation 承認願い提出物の書類作り
• Not reading and understanding the specifications 仕様書を読んでいない
• Impacts to project schedules プロジェクト日程に影響がある
• U.S. manufactured products vs. Japanese manufactured products 米国製品vs. 日本製品
• Working with multiple stakeholders at Yokota Air Base 横田空軍基地の多数の関係者と働く必要がある
• Using Form AF103 書式AF103を使う
• Airfield/Base access 滑走路/基地への出入り
• Key personnel education and experience requirements may be more stringent that you may be accustomed to. 主要人物の教育及び経験の要件が皆さんが慣れている事案より厳しい場合がある
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
THANK YOU
どうもありがとうございました
* The Japanese translation is provided as a courtesy. If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern.
| FY25 DHA SRM Facility Repairs�Building 1585 �Yokota Air Base, Japan�W912HV25B0005�pre-bid conference �date: 22 May 2025��FY25 施設修理工事、建物1585�米国防保健局、横田空軍基地�w912hv25b0005�入札前会議�日付: 2025年5月22日� | |
| Welcome�歓 迎 | |
| Discussion overview�説明会概要 | |
| Slide Number 4 | |
| Slide Number 5 | |
| �IFB SOLICITATION FORMAT�IFB入札公告 書式 | |
| Slide Number 7 | |
| SECTION 00 10 00�SOLICITATION CONTRACT LINE ITEM (CLIN)�契約項目一覧 | |
| Slide Number 9 | |
| Slide Number 10 | |
| Slide Number 11 | |
| Slide Number 12 | |
| Slide Number 13 | |
| Slide Number 14 | |
| Slide Number 15 | |
| Slide Number 16 | |
| Slide Number 17 | |
| Slide Number 18 | |
| Slide Number 19 | |
| Slide Number 20 | |
| Slide Number 21 | |
| Slide Number 22 | |
| Slide Number 23 | |
| Slide Number 24 | |
| Slide Number 25 | |
| Slide Number 26 | |
| Slide Number 27 | |
| Slide Number 28 | |
| Slide Number 29 | |
| Slide Number 30 | |
| Slide Number 31 | |
| Slide Number 32 | |
| Slide Number 33 | |
| THANK YOU |
File details come from the government source that posted it. Updated .