W912HV25B0003 RTA Drawings.pdf

PDF 14 MB Posted

Attached to
Replace AFN Radio Transmission Tower, Camp Kinser, Okinawa, Japan
Solicitation number
W912HV25B0003
Issued by

About this file

This is a set of technical drawings and specifications for replacing an AFN Radio Transmission Tower at Camp Kinser, Okinawa, Japan, under solicitation W912HV25B0003. The drawings detail the demolition of the existing 91.44-meter AM medium frequency antenna system tower and installation of a new cylindrical guyed tower system.

The drawings include civil, structural, electrical, and radio engineering details showing foundation plans, grounding systems, cable trenches, and antenna specifications. Key components include a new antenna tuning unit (ATU-1), guy wire foundations, precast concrete cable trenches, electrical connections from Building 950, and a comprehensive grounding system with 240 copper radials. The electrical scope includes new underground power feeders, LED fencepost lighting, and weatherproof receptacles. Structural elements detail the tower foundations, guy wire attachments, and support systems. The radio frequency specifications indicate operation at 648 kHz with 10kW output power at 100% modulation. The drawings also show details for FAA-compliant obstruction lighting using OM-3C low-intensity and OM-6C medium-intensity marker lights.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

TR

U

E N

PATIO

ONLY

PATIO

PATIO

PATIO

PA

TI

O

FOUNDATION

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

UNPAVED PARKING

UNPA

VE

D

PA

RKI

NG

PA

RKI

NG

UNPA

VE

D

PA

TI

O

PA

TI

O

PA

TI

O

PA

TI

O

PATIO

PA

TI

O

PA

TI

O

PA

TI

O

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PA

TI

O

PATIO

PATIO

UNPAVED P

ARKIN

G

UNPAVED P

ARKIN

G

PATIO

UNPAVED PARKING

PARKING

UNPAVED

PARKING

2GA

TE

3GA

TE

TRAIL

TRAIL

PA

RKI

NG

UN

PA

VE

D

UN

PA

VE

D

PA

RKI

NG

UNPAVED

PARKING

TRAIL

TRAIL

GATE

GATE

98.0865

338.6750

N

TR

U

E N

K.

H

AR

AD

A

K.

H

AR

AD

A

G .M

AS

U

D A

G .M

AS

U

D A

G-001

C O

VE

R

S H

EE

T, L O

C

AT

IO

N

, A N

D V

IC

IN

IT

Y

M

AP

S

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

JAPAN DISTRICT

FY24 REPLACE AFN RADIO TRANSMISSION TOWER

CAMP KINSER, OKINAWA, JAPAN

READY TO ADVERTISE SUBMITTAL

W912HV-25-B-0003

JANUARY 2025

US Army Corps of Engineers

PRIME/ELECTRICAL

THIS WORK WAS PREPARED BY

ME OR UNDER MY SUPERVISION

CIVIL

THIS WORK WAS PREPARED BY

ME OR UNDER MY SUPERVISION

STRUCTURAL

THIS WORK WAS PREPARED BY

ME OR UNDER MY SUPERVISION

GARRET A. MASUDA, P.E. MOSTAFA ELMORSI

GEOTECHNICAL

THIS WORK WAS PREPARED BY

ME OR UNDER MY SUPERVISION

PRIME/ELECTRICAL: INSYNERGY ENGINEERING INC

1001 BISHOP STREET, SUITE 2500

HONOLULU HAWAII, 96813

CIVIL:

STRUCTURAL: AECOM

1001 BISHOP STREET, SUITE 1600

HONOLULU, HI 96813

ENVIRONMENTAL: ENVIRONMENTAL SCIENCE CORPORATION

ISURO BUILDING 4F, 3-7-2 KANDA-NISHIKICHO

CHIYODA-KU, TOKYO, JAPAN 101-0054

GEOTECHNICAL:

LOCATION MAP VICINITY MAP

GATE 2

THIS PROJECT KINSER

ANTENNA TOWER

CAMP KINSER

RADIO ENGINEER

THIS WORK WAS PREPARED BY

ME OR UNDER MY SUPERVISION

RADIO: AECOM

1001 BISHOP STREET, SUITE 1600

HONOLULU, HI 96813

ENVIRONMENTAL SCIENCE CORPORATION

ISURO BUILDING 4F, 3-7-2 KANDA-NISHIKICHO

CHIYODA-KU, TOKYO, JAPAN 101-0054

ENVIRONMENTAL SCIENCE CORPORATION

ISURO BUILDING 4F, 3-7-2 KANDA-NISHIKICHO

CHIYODA-KU, TOKYO, JAPAN 101-0054

W

2H V2

3F

-G

-0

.d w g

D

ES

IG

N

ED

B

Y:

1 2 3 4 5 6 7 8 9 10

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

B

IS

H O

P

ST

R

EE

T, S

U

IT

E

IN

SY

N

ER

G

Y

EN

G

IN

EE

R

IN

G

, I N

C

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D

R

AW

N B

Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

A1 (8

X

11 12 13 14 15 16 17 18 19 20

E

F

G

H

K

J

L

M

N

P

SHEET ID

O C

T

FY

R

EP

LA

C E

AF

N

R

AD

IO

T

R

AN

SM

IS

SI

O

N T

O W

ER

W

2H

-1 9-

D -0

C

AM

P

KI

N

SE

R , O

KI

N

AW

A, J

AP

AN

US Army Corps of Engineers ®

W

2H V-

-B

-0

D R

AW

IN

G C

O D

E:

R

EA

D Y

TO

A

D

VE

R

TI

SE

S

U

BM

IT

TA

L

JUSTIN SISONYOSHINORI OSHIRO, P.E.

S

SOY

I ORN

HI H

OIR

88102PE

RET

R

IS

EG

D P ES

L

ON

S I

A

ROFE

EG ENI

NE

R

O

OREGON

Exp. 12/31/2024

RYAN W. NELSON, P.E.

L

L

AT

S

CAF

C

O

TE

IVI

I

NRFO

AI

No. C 60451

RYAN W.

NELSON

DER

G

RE

TE

IS

OPR E SF S

AL

EER

GI

EN

N

ION

AutoCAD SHX Text

TH64

AutoCAD SHX Text

TS52D

AutoCAD SHX Text

TS5E

AutoCAD SHX Text

TH63

AutoCAD SHX Text

XMFR

AutoCAD SHX Text

SW39

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

TH54

AutoCAD SHX Text

TS68

AutoCAD SHX Text

TS66B

AutoCAD SHX Text

TH67A

AutoCAD SHX Text

TH69A

AutoCAD SHX Text

TH69B

AutoCAD SHX Text

TS46A

AutoCAD SHX Text

TS43D

AutoCAD SHX Text

TH72

AutoCAD SHX Text

TH69C

AutoCAD SHX Text

TS52

AutoCAD SHX Text

TS71B

AutoCAD SHX Text

TH42

AutoCAD SHX Text

TS90C

AutoCAD SHX Text

SW36

AutoCAD SHX Text

TS40B

AutoCAD SHX Text

TS17A

AutoCAD SHX Text

TS18

AutoCAD SHX Text

TS40A

AutoCAD SHX Text

TS37

AutoCAD SHX Text

TS36

AutoCAD SHX Text

TH13A

AutoCAD SHX Text

TS40C

AutoCAD SHX Text

TH13

AutoCAD SHX Text

TH36

AutoCAD SHX Text

TH30

AutoCAD SHX Text

TH31

AutoCAD SHX Text

SW70

AutoCAD SHX Text

TS104B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 867B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 407A

AutoCAD SHX Text

TS100

AutoCAD SHX Text A/C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SW44

AutoCAD SHX Text 1305A

AutoCAD SHX Text

AutoCAD SHX Text

PRIVATE

AutoCAD SHX Text 1471C

AutoCAD SHX Text A/C

AutoCAD SHX Text

1471TS

AutoCAD SHX Text 1471A

AutoCAD SHX Text 1471B

AutoCAD SHX Text

DRYING STAND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A/C

AutoCAD SHX Text

AutoCAD SHX Text 1463C

AutoCAD SHX Text

DOGOUTS

AutoCAD SHX Text 1463B

AutoCAD SHX Text 1463A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PERIMETER ROAD

AutoCAD SHX Text

CARSWELL DR.

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

CORAL

AutoCAD SHX Text

TS5G

AutoCAD SHX Text 1438A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1452A

AutoCAD SHX Text

TS1452

AutoCAD SHX Text

AutoCAD SHX Text

PG

AutoCAD SHX Text

PG

AutoCAD SHX Text

CORAL

AutoCAD SHX Text 1404A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1307E

AutoCAD SHX Text

TS52F

AutoCAD SHX Text 115C

AutoCAD SHX Text 1460C

AutoCAD SHX Text 1460D

AutoCAD SHX Text 1460B

AutoCAD SHX Text 1460A

AutoCAD SHX Text

TS5E

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text 1307D

AutoCAD SHX Text 1307C

AutoCAD SHX Text

1307TS

AutoCAD SHX Text 1307B

AutoCAD SHX Text 1307A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DEPOT BOULEVARD

AutoCAD SHX Text

(BS)

AutoCAD SHX Text 1303B

AutoCAD SHX Text 1399D

AutoCAD SHX Text 1399C

AutoCAD SHX Text 350A

AutoCAD SHX Text

DEPOT BOULBARD

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

FIFTH AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

WAREHOUSE AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AREA

AutoCAD SHX Text

OPEN STOR

AutoCAD SHX Text

AutoCAD SHX Text A/C

AutoCAD SHX Text

BLVD

AutoCAD SHX Text

DEPOT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SW38

AutoCAD SHX Text 104B

AutoCAD SHX Text

TH52A

AutoCAD SHX Text 104A

AutoCAD SHX Text

107TS

AutoCAD SHX Text 107C

AutoCAD SHX Text 107B

AutoCAD SHX Text

XMFR

AutoCAD SHX Text

TS52C

AutoCAD SHX Text 100A

AutoCAD SHX Text

SW39

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 105A

AutoCAD SHX Text

OPEN STORAGE AREA

AutoCAD SHX Text T-205

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TH53

AutoCAD SHX Text

TH54

AutoCAD SHX Text

AREA

AutoCAD SHX Text

OPEN STORAGE

AutoCAD SHX Text 329A

AutoCAD SHX Text 330E

AutoCAD SHX Text 330F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T-201

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1399B

AutoCAD SHX Text

AutoCAD SHX Text 330B

AutoCAD SHX Text

AutoCAD SHX Text 1399A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 203A

AutoCAD SHX Text

TS56A

AutoCAD SHX Text 201A

AutoCAD SHX Text

TH52

AutoCAD SHX Text 1416A

AutoCAD SHX Text 1416B

AutoCAD SHX Text 1408A

AutoCAD SHX Text 330D

AutoCAD SHX Text 205A

AutoCAD SHX Text 330C

AutoCAD SHX Text 330A

AutoCAD SHX Text 1415A

AutoCAD SHX Text 115B

AutoCAD SHX Text

TS4A

AutoCAD SHX Text

TS5A

AutoCAD SHX Text

TS330

AutoCAD SHX Text

TS55A

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text (A.C.)

AutoCAD SHX Text

OPEN STORAGE AREA

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 340A

AutoCAD SHX Text

AutoCAD SHX Text T-338

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 300D

AutoCAD SHX Text 300C

AutoCAD SHX Text 202B

AutoCAD SHX Text 202C

AutoCAD SHX Text

202TS

AutoCAD SHX Text 208A

AutoCAD SHX Text 300A

AutoCAD SHX Text 300B

AutoCAD SHX Text 300E

AutoCAD SHX Text 300C

AutoCAD SHX Text 202A

AutoCAD SHX Text

202TS

AutoCAD SHX Text

FH

AutoCAD SHX Text 331A

AutoCAD SHX Text

TH54A

AutoCAD SHX Text (A.C.)

AutoCAD SHX Text 302A

AutoCAD SHX Text

TS26A

AutoCAD SHX Text 309C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

301TS

AutoCAD SHX Text

TS24D

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

OPEN STORAGE AREA

AutoCAD SHX Text

STATIONS

AutoCAD SHX Text

FILLING

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 301A

AutoCAD SHX Text 301G

AutoCAD SHX Text

TH46A

AutoCAD SHX Text 301B

AutoCAD SHX Text 301C

AutoCAD SHX Text 301D

AutoCAD SHX Text 301F

AutoCAD SHX Text 301E

AutoCAD SHX Text 305A

AutoCAD SHX Text

STOR

AutoCAD SHX Text

HAZ/MET

AutoCAD SHX Text 325A

AutoCAD SHX Text 309B

AutoCAD SHX Text

NATIONAL HWY NO. 58

AutoCAD SHX Text

FOURTH AVENUE

AutoCAD SHX Text 401C

AutoCAD SHX Text 401B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A.C.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T-307

AutoCAD SHX Text

AutoCAD SHX Text 401A

AutoCAD SHX Text 309D

AutoCAD SHX Text 326A

AutoCAD SHX Text

TH21A

AutoCAD SHX Text

TH21

AutoCAD SHX Text

TB

AutoCAD SHX Text

DRIVE

AutoCAD SHX Text

(ROBERTS FIELD)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1203B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TH65

AutoCAD SHX Text

VB

AutoCAD SHX Text A/C

AutoCAD SHX Text

PARKING

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(BS)

AutoCAD SHX Text 1320A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1233B

AutoCAD SHX Text 1305D

AutoCAD SHX Text 1202A

AutoCAD SHX Text 1220E

AutoCAD SHX Text

1220TS

AutoCAD SHX Text 1220B

AutoCAD SHX Text 1220C

AutoCAD SHX Text 1220A

AutoCAD SHX Text 1220D

AutoCAD SHX Text 1316C

AutoCAD SHX Text 1316B

AutoCAD SHX Text 1317C

AutoCAD SHX Text

TH63A

AutoCAD SHX Text 1316A

AutoCAD SHX Text 1319A

AutoCAD SHX Text

TH64

AutoCAD SHX Text 1317B

AutoCAD SHX Text

TS1202

AutoCAD SHX Text 1202B

AutoCAD SHX Text

TS1305A

AutoCAD SHX Text 1233A

AutoCAD SHX Text

TS1202A

AutoCAD SHX Text 1305B

AutoCAD SHX Text 1305C

AutoCAD SHX Text

TS66F

AutoCAD SHX Text 1317A

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text 350C

AutoCAD SHX Text 350B

AutoCAD SHX Text 354A

AutoCAD SHX Text 354B

AutoCAD SHX Text 354C

AutoCAD SHX Text 353B

AutoCAD SHX Text

YOUNG

AutoCAD SHX Text

ROGER

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B.B.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1224D

AutoCAD SHX Text 1223E

AutoCAD SHX Text 1217A

AutoCAD SHX Text 1217C

AutoCAD SHX Text 1210C

AutoCAD SHX Text

SW49

AutoCAD SHX Text 353A

AutoCAD SHX Text 1311A

AutoCAD SHX Text 1223B

AutoCAD SHX Text 1223C

AutoCAD SHX Text 1224B

AutoCAD SHX Text 1217B

AutoCAD SHX Text 1224C

AutoCAD SHX Text 450C

AutoCAD SHX Text 1224A

AutoCAD SHX Text 1223D

AutoCAD SHX Text 1210B

AutoCAD SHX Text A/C

AutoCAD SHX Text 1210A

AutoCAD SHX Text

TS1210

AutoCAD SHX Text

TS67C

AutoCAD SHX Text

TH67

AutoCAD SHX Text 1223A

AutoCAD SHX Text

TS66G

AutoCAD SHX Text

TS66H

AutoCAD SHX Text 355A

AutoCAD SHX Text 355B

AutoCAD SHX Text 355C

AutoCAD SHX Text

TB

AutoCAD SHX Text

TB

AutoCAD SHX Text

TB

AutoCAD SHX Text

AutoCAD SHX Text 1205A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 520B

AutoCAD SHX Text 520C

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text 1216A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

AutoCAD SHX Text 1226C

AutoCAD SHX Text 1225C

AutoCAD SHX Text 400B

AutoCAD SHX Text 1226A

AutoCAD SHX Text

TS1226

AutoCAD SHX Text 1205B

AutoCAD SHX Text

1205TS

AutoCAD SHX Text 1225B

AutoCAD SHX Text

TS1225

AutoCAD SHX Text 1225A

AutoCAD SHX Text 1226B

AutoCAD SHX Text 519A

AutoCAD SHX Text

TS520

AutoCAD SHX Text 520A

AutoCAD SHX Text 1215A

AutoCAD SHX Text 1203A

AutoCAD SHX Text 400A

AutoCAD SHX Text 401F

AutoCAD SHX Text 422A

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text 401D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

TH72

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 517E

AutoCAD SHX Text 517F

AutoCAD SHX Text 1227D

AutoCAD SHX Text 1229C

AutoCAD SHX Text 401E

AutoCAD SHX Text 500C

AutoCAD SHX Text 500A

AutoCAD SHX Text 500B

AutoCAD SHX Text 517D

AutoCAD SHX Text 401D

AutoCAD SHX Text 517C

AutoCAD SHX Text 517A

AutoCAD SHX Text 517B

AutoCAD SHX Text 1229A

AutoCAD SHX Text 1229B

AutoCAD SHX Text 1227B

AutoCAD SHX Text 1227A

AutoCAD SHX Text

TS99

AutoCAD SHX Text

TS1229

AutoCAD SHX Text

1216TS

AutoCAD SHX Text

TB

AutoCAD SHX Text 1072A

AutoCAD SHX Text 1092A

AutoCAD SHX Text A/C

AutoCAD SHX Text

TS92A

AutoCAD SHX Text 1073B

AutoCAD SHX Text 1211D

AutoCAD SHX Text 1092C

AutoCAD SHX Text 1092B

AutoCAD SHX Text

AutoCAD SHX Text 1215B

AutoCAD SHX Text

AutoCAD SHX Text 1211C

AutoCAD SHX Text 1211B

AutoCAD SHX Text 1211A

AutoCAD SHX Text T968

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

TS90B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1072C

AutoCAD SHX Text 1074A

AutoCAD SHX Text

AutoCAD SHX Text 1073A

AutoCAD SHX Text

AutoCAD SHX Text 1072B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLAYGROUND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TS90C

AutoCAD SHX Text 1087A

AutoCAD SHX Text 1086B

AutoCAD SHX Text 1086C

AutoCAD SHX Text 1087B

AutoCAD SHX Text 1091B

AutoCAD SHX Text 1091A

AutoCAD SHX Text 968A

AutoCAD SHX Text

AutoCAD SHX Text A/C

AutoCAD SHX Text 408A

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text 409A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 425C

AutoCAD SHX Text 425B

AutoCAD SHX Text

425TS

AutoCAD SHX Text

407TS

AutoCAD SHX Text

424TS

AutoCAD SHX Text 410A

AutoCAD SHX Text

SW41

AutoCAD SHX Text 425A

AutoCAD SHX Text

GATE

AutoCAD SHX Text

YAFUSO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 610B

AutoCAD SHX Text 613B

AutoCAD SHX Text 831A

AutoCAD SHX Text 831C

AutoCAD SHX Text 837A

AutoCAD SHX Text

IMPOUND LOT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 616D

AutoCAD SHX Text

AutoCAD SHX Text 616E

AutoCAD SHX Text 508A

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text A/C

AutoCAD SHX Text

D STREET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 502B

AutoCAD SHX Text 502A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 424B

AutoCAD SHX Text 506B

AutoCAD SHX Text 424A

AutoCAD SHX Text 502D

AutoCAD SHX Text 600B

AutoCAD SHX Text 600A

AutoCAD SHX Text

TS42A

AutoCAD SHX Text 502C

AutoCAD SHX Text

TH41A

AutoCAD SHX Text

RH43A

AutoCAD SHX Text

TS43B

AutoCAD SHX Text

TH42

AutoCAD SHX Text 506A

AutoCAD SHX Text 610A

AutoCAD SHX Text 602A

AutoCAD SHX Text 616G

AutoCAD SHX Text 602D

AutoCAD SHX Text

E STREET

AutoCAD SHX Text

SECOND AVENUE

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A/C

AutoCAD SHX Text 616F

AutoCAD SHX Text 602B

AutoCAD SHX Text 616B

AutoCAD SHX Text 602C

AutoCAD SHX Text 701B

AutoCAD SHX Text 707A

AutoCAD SHX Text

SW40

AutoCAD SHX Text 508B

AutoCAD SHX Text

616TS

AutoCAD SHX Text 616C

AutoCAD SHX Text 616A

AutoCAD SHX Text

TH14

AutoCAD SHX Text

TS15B

AutoCAD SHX Text

TH13

AutoCAD SHX Text

TS40D

AutoCAD SHX Text

TH16/

AutoCAD SHX Text 869B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 915B

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

PLAYGROUND

AutoCAD SHX Text

PG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1086A

AutoCAD SHX Text 915A

AutoCAD SHX Text 872C

AutoCAD SHX Text 873B

AutoCAD SHX Text 1052B

AutoCAD SHX Text 600C

AutoCAD SHX Text 1227C

AutoCAD SHX Text 1052A

AutoCAD SHX Text 873A

AutoCAD SHX Text 872A

AutoCAD SHX Text

TS37A

AutoCAD SHX Text 872B

AutoCAD SHX Text

TS36B

AutoCAD SHX Text

TS30A

AutoCAD SHX Text 613D

AutoCAD SHX Text 613C

AutoCAD SHX Text 625A

AutoCAD SHX Text 626C

AutoCAD SHX Text 626D

AutoCAD SHX Text 626E

AutoCAD SHX Text 627A

AutoCAD SHX Text 871B

AutoCAD SHX Text 831F

AutoCAD SHX Text 831D

AutoCAD SHX Text 831E

AutoCAD SHX Text 831B

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

831TS

AutoCAD SHX Text

PG

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text 837B

AutoCAD SHX Text 831H

AutoCAD SHX Text 831G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TS837

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 609B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 868B

AutoCAD SHX Text 835C

AutoCAD SHX Text

SW831

AutoCAD SHX Text 871A

AutoCAD SHX Text 835B

AutoCAD SHX Text 867A

AutoCAD SHX Text 868A

AutoCAD SHX Text 869A

AutoCAD SHX Text 626B

AutoCAD SHX Text

626TS

AutoCAD SHX Text 626A

AutoCAD SHX Text

RH74

AutoCAD SHX Text

TS73A

AutoCAD SHX Text 613A

AutoCAD SHX Text

SW46

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

OEPC

AutoCAD SHX Text

AutoCAD SHX Text 706C

AutoCAD SHX Text 605B

AutoCAD SHX Text

TH13C

AutoCAD SHX Text 605C

AutoCAD SHX Text 727E

AutoCAD SHX Text 727D

AutoCAD SHX Text 727C

AutoCAD SHX Text 727B

AutoCAD SHX Text 727A

AutoCAD SHX Text 605A

AutoCAD SHX Text 706F

AutoCAD SHX Text 608B

AutoCAD SHX Text 607C

AutoCAD SHX Text

FIRST AVENUE

AutoCAD SHX Text 707A

AutoCAD SHX Text 611A

AutoCAD SHX Text 611B

AutoCAD SHX Text 607B

AutoCAD SHX Text 607A

AutoCAD SHX Text 611C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 706E

AutoCAD SHX Text 706B

AutoCAD SHX Text 705A

AutoCAD SHX Text 706A

AutoCAD SHX Text

TS15D

AutoCAD SHX Text 608A

AutoCAD SHX Text

TO KADENA

AutoCAD SHX Text

AutoCAD SHX Text

GATE

AutoCAD SHX Text

GUSUKUMA

AutoCAD SHX Text

AutoCAD SHX Text 706D

AutoCAD SHX Text

SW50

AutoCAD SHX Text 611F

AutoCAD SHX Text 611E

AutoCAD SHX Text

AutoCAD SHX Text 831I

AutoCAD SHX Text 831J

AutoCAD SHX Text

AutoCAD SHX Text T-825

AutoCAD SHX Text

DRMO

AutoCAD SHX Text 801B

AutoCAD SHX Text

AutoCAD SHX Text

OPEN STORAGE AREA

AutoCAD SHX Text A.C.

AutoCAD SHX Text

CORAL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

611TS

AutoCAD SHX Text 611D

AutoCAD SHX Text 826A

AutoCAD SHX Text 835A

AutoCAD SHX Text 801A

AutoCAD SHX Text

TH29A

AutoCAD SHX Text

SW48

AutoCAD SHX Text

TH29B

AutoCAD SHX Text

TH29

AutoCAD SHX Text

RUINS

AutoCAD SHX Text 950A

AutoCAD SHX Text

TS79B

AutoCAD SHX Text

(VOLLEY)

AutoCAD SHX Text

(BASKET)

AutoCAD SHX Text

AutoCAD SHX Text 1041C

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DIRT

AutoCAD SHX Text 913A

AutoCAD SHX Text 866D

AutoCAD SHX Text A/C

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

PG

AutoCAD SHX Text A/C

AutoCAD SHX Text

PG

AutoCAD SHX Text

AutoCAD SHX Text

DIRT

AutoCAD SHX Text A/C

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

PLANTER

AutoCAD SHX Text

CONC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PG

AutoCAD SHX Text

AutoCAD SHX Text

PG

AutoCAD SHX Text

AutoCAD SHX Text

PG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1039C

AutoCAD SHX Text 1039B

AutoCAD SHX Text 866A

AutoCAD SHX Text 866C

AutoCAD SHX Text 866B

AutoCAD SHX Text 1039R

AutoCAD SHX Text 864H

AutoCAD SHX Text 1041D

AutoCAD SHX Text

TS102J

AutoCAD SHX Text 951B

AutoCAD SHX Text 864D

AutoCAD SHX Text 864A

AutoCAD SHX Text 864B

AutoCAD SHX Text 864C

AutoCAD SHX Text

864TS

AutoCAD SHX Text 864G

AutoCAD SHX Text 864F

AutoCAD SHX Text 864E

AutoCAD SHX Text

DUG OUT

AutoCAD SHX Text

STAND

AutoCAD SHX Text

STAND

AutoCAD SHX Text

TS104C

AutoCAD SHX Text 1041B

AutoCAD SHX Text

TS104

AutoCAD SHX Text 1039A

AutoCAD SHX Text

TS104A

AutoCAD SHX Text 1041A

AutoCAD SHX Text

TOWER

AutoCAD SHX Text

AutoCAD SHX Text

TS29F

AutoCAD SHX Text 851C

AutoCAD SHX Text 851D

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

PG

AutoCAD SHX Text 851A

AutoCAD SHX Text

TH79

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 847B

AutoCAD SHX Text 848B

AutoCAD SHX Text

PG

AutoCAD SHX Text 857A

AutoCAD SHX Text

851TS

AutoCAD SHX Text 859A

AutoCAD SHX Text 851G

AutoCAD SHX Text 851B

AutoCAD SHX Text

AutoCAD SHX Text 843A

AutoCAD SHX Text

859TS

AutoCAD SHX Text 858A

AutoCAD SHX Text 848A

AutoCAD SHX Text 847A

AutoCAD SHX Text 951A

AutoCAD SHX Text 857B

AutoCAD SHX Text

SW70

AutoCAD SHX Text 846B

AutoCAD SHX Text 851F

AutoCAD SHX Text 851E

AutoCAD SHX Text 846A

AutoCAD SHX Text

ANTENNA

AutoCAD SHX Text

204TS

AutoCAD SHX Text 204B

AutoCAD SHX Text 204C

AutoCAD SHX Text 204A

AutoCAD SHX Text 204D

AutoCAD SHX Text

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KADENA

AutoCAD SHX Text

NAHA C.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OKINAWA C.

AutoCAD SHX Text

URUMA C.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAGO C.

AutoCAD SHX Text E A S T C H I N A S E A

AutoCAD SHX Text

IE SHIMA

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HANSEN

AutoCAD SHX Text Northern Training Area

AutoCAD SHX Text

ASA

AutoCAD SHX Text

KAB

AutoCAD SHX Text

FUTENMA

AutoCAD SHX Text

FOSTER

AutoCAD SHX Text

KINSER

AutoCAD SHX Text

NAHA PORT

AutoCAD SHX Text Central Training Area

AutoCAD SHX Text

TORII

AutoCAD SHX Text

COURTNEY

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text No. PE40001080

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text No. 9756-E

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text exp. 6/30/26

MATCHLINE

BUILDING SECTION/ ELEVATION

DETAIL SECTION

DETAIL ENLARGEMENT

NUMBER INDICATES

BUILDING SECTION

SHEET NUMBER WHERE

SECTION IS DRAWN

NUMBER INDICATES DETAIL

X-X X

X-X

XX

PLAN

NORTH

NORTH ARROW

PLAN NORTH

X/X-XXX

LOCATION OF ADJACENT

DRAWING

MATCH LINE

SCALE: 1 : 100

2000 4000

GRAPHIC SCALE

DRAWING TITLE

ROOM NAME

150 SM

ROOM NAME

ROOM NAME

AREA

(WHERE

OCCURS)ROOM TAG

ROOM NUMBER

X-X X

NUMBER INDICATES

BUILDING SECTION

SHEET NUMBER WHERE

SECTION IS DRAWN

SHEET NUMBER WHERE

DETAIL IS DRAWN

TRUE NORTH

DRAWING SCALE

RFI XXX

REVISION TAG

NAME

ELEVATION

BUILDING LEVEL

XX

XX

BUILDING GRID

A1 1:200

VIEW TITLE

K.

H

AR

AD

A

K.

H

AR

AD

A

G . M

AS

U

D A

G . M

AS

U

D A

G-002

SH

EE

T

IN

D

EX

, G R

AP

H

IC

S

YM

BO

LS

, A

N D

G

EN

ER

AL

N O

TE

S

W

2H V2

3F

-G

-0

.d w g

GENERAL NOTES

CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND DIMENSIONS AT THE

JOB SITE AND IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF ANY

DISCREPANCIES BEFORE COMMENCING WITH WORK. COMMENCEMENT OF

WORK SIGNIFIES ACCEPTANCE OF EXISTING CONDITIONS.

THE CONTRACTOR IS TO FOLLOW DIRECTIONS OF ONLY THE CONTRACTING

OFFICER OR THEIR AUTHORIZED REPRESENTATIVE. CONTRACTOR SHALL

PROVIDE COPIES OF APPROVED PERMITS TO THE CONTRACTING OFFICER

PRIOR TO BEGINNING ANY EXCAVATION WORK.

3 ALL WORK SHALL STRICTLY CONFORM TO ALL APPLICABLE LOCAL AND FEDERAL

CODES, STANDARDS, AND REGULATIONS. EXPOSED CONCRETE FOUNDATIONS

SHALL BE CEMENT WASHED AND PAINTED.

4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY LOSS OR DAMAGE OF

EXISTING PROPERTY AND CONDITIONS TO REMAIN, RESULTING FROM

CONSTRUCTION ACTIVITIES, AND SHALL MAKE GOOD ANY LOSS, DAMAGE, OR

INJURY WITHOUT COST TO THE GOVERNMENT.

5 CONSTRUCTION ACTIVITIES SHALL NOT DISRUPT EXISTING ONGOING

OPERATIONS IN THE VICINITY.

6 CONFINE ALL OPERATIONS TO AREAS SPECIFICALLY AUTHORIZED BY THE

GOVERNMENT. KEEP WORK AREAS AND ADJACENT TO THE WORK AREA FREE

FROM ACCUMULATION OF TRASH AND DEBRIS.

7 CONTRACTOR TO FIELD VERIFY ALL EQUIPMENT AND MATERIAL SIZES AND

PROVIDE ADEQUATE CLEARANCE AS REQUIRED, BEFORE PROCEEDING WITH

THE WORK.

8 FOR ANY APPROVED SUBSTITUTIONS, CONTRACTOR IS RESPONSIBLE TO

PROVIDE A COMPLETE AND WORKING COMPONENT AND MUST BEAR ALL NEW

INCIDENTAL COSTS IMPACTED BY THE APPROVED SUBSTITUTION REQUEST.

9 UPON COMPLETION, REMOVE FOREIGN MATERIALS FROM ALL EXPOSED

SURFACES AND CLEAN THOROUGHLY.

10 FOLLOW SPEC SECTION 01 74 19 - "CONSTRUCTION AND DEMOLITION WASTE

MANAGEMENT" FOR PROPER DISPOSAL OF CONSTRUCTION AND DEMOLITION

DEBRIS. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL

OF ALL CONSTRUCTION MATERIAL, UNLESS NOTED OTHERWISE.

11 WHERE DEMOLITION AND CUTTING WORK HAS OCCURRED OR WHERE EXISTING

SURFACES, MATERIALS OR OTHER ITEMS HAVE BEEN DAMAGED OR DISTURBED

AS A RESULT OF THIS CONTRACT, THE SAID SURFACES AND AREAS SHALL BE

CAREFULLY CLOSED UP, PATCHED AND FINISHED, AND OR RESTORED AS

REQUIRED TO BE CONTIGUOUS TO EXISTING SURROUNDING SURFACES.

12 THE GENERAL CONTRACTOR, AT THE COMPLETION OF THIS WORK, SHALL LEAVE

ALL WORK AREAS AND FINISHED SPACES IN A CLEAN AND ACCEPTABLE

CONDITION. FINAL CLEAN-UP INCLUDES, BUT NOT LIMITED TO: IMPACTED

INTERIOR SURFACES, LIGHT FIXTURES, SITE, ETC.

13 SEE SPECIFICATION SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES FOR

CONTRACT LINE ITEM NUMBERS (CLIN) AND LIST OF BID OPTIONS

GRAPHIC SYMBOLS

SHEET INDEX

INDEX - GENERAL

COVER SHEET, LOCATION, AND VICINITY MAPSG-001

SHEET INDEX, GRAPHIC SYMBOLS, AND GENERAL NOTESG-002

TOPOGRAPHIC SURVEY PLANV-101

SITE DEMOLITION PLANCD101

SITE UTILITIES PLANCS101

STRUCTURAL GENERAL NOTES IS-001

STRUCTURAL GENERAL NOTES IIS-002

SITE DEMOLITION PLANSD101

DEMOLITION ELEVATIONSD201

STRUCTURAL SITE PLANS-101

STRUCTURAL ELEVATION - GRIDLINE AS-201

TYPICAL CONCRETE DETAILS IS-501

INDEX - TOPO

INDEX - CIVIL

INDEX - STRUCTURAL

GENERAL RADIO NOTESTR001

BUILDING 950 RADIO TRANSMISSION PLANTR101

EXISTING GROUND PLANE SYSTEM SITE PLANTG100

ELECTRICAL ABBREVIATIONS, SYMBOL LIST,

AND MOUNTING HEIGHT SCHEDULEE-001

ELECTRICAL DEMOLITION SITE PLANED101

ELECTRICAL SITE PLANES101

BUILDING 950 ELECTRICAL AND CABLE TRENCH PLANE-101

ELECTRICAL DETAILS

E-501 ELECTRICAL DETAILS

E-502

INDEX - ELECTRICAL

GENERAL ELECTRICAL NOTESE-002

ENLARGED ANTENNA AREA ELECTRICAL PLANE-401

14 REFER TO THE HAZARDOUS MATERIALS INSPECTION REPORT FY24 REPLACE

AFN RADIO TRANSMISSION TOWER CAMP KINSER, OKINAWA, JAPAN (ESC, DEC

2023), FOR MATERIALS CONFIRMED TO CONTAIN MORE THAN 0.1% ASBESTOS,

LEAD BASED PAINT AND LEAD CONTAING PAINTS.

15 ABATEMENT OF ASBESTOS CONTAINING MATERIAL (ACM) IS NOT INCLUDED IN

THIS DESIGN. ACM FOUND IN THE CONSTRUCTION AREA SHOULD BE

PROTECTED IN PLACE. IN THE EVENT DISTURBACNE OF ACM BECOMES

NECESSARY, CONDUCT ALL ACTIVITIES IN ACORDANCE WITH SPECIFICATION

SECTION 02 82 00.

16 IN ADDITION TO THOSE LISTED IN THE HAZMAT INSPECTION REPORT,

CONTRACTOR SHALL ASSUME ALL PAINTS AND COATINGS CONTAIN LEAD AT

DETECTABLE LEVELS. ENSURE WORKER PROTECTION IN ACCORDANCE WITH

SPECIFICATION SECTION 02 83 00.

17 PAINTS, COATINGS, AND OTHER LEAD ITEMS CONTAINING LEAD

CONCENTRATIONS EXCEEDING JEGS AND/OR GOJ WASTE MANAGEMENT AND

PUBLIC CLEANSING LAW HAZARDOUS WASTE REGULATORY LIMITS ARE TO BE

HANDLED AND DISPOSED OF AS SPECIALLY CONTROLLED INDUSTRIAL WASTE

IN ACCORDANCE WITH GOJ AND LOCAL PREFECTURE REGULATIONS.

18 IF HIDDEN OR OTHER SUSPECT POTENTIALLY HAZARDOUS MATERIAL, WHICH

HAS NOT BEEN PREVIOUSLY CHARACTERIZED, IS ENCOUNTERED DURING

DEMOLITION OR RENOVATIONS, THE SUSPECT MATERIAL SHALL BE ASSUMED

HAZARDOUS UNTIL PROVEN OTHERWISE BY A QUALIFIED INSPECTOR AND LAB

ANALYSIS. DO NOT DISTURB THE MATERIAL AND IMMEDIATELY REPORT TO THE

CONTRACTING OFFICER AND OBTAIN THE CONCURRENCE TO IDENTIFY,

SAMPLE, ANALYZE, AND EVALUATE SUCH MATERIAL IN ACCORDANCE WITH

PROJECT SPECIFICATIONS AND/OR THE JEGS.

D

ES

IG

N

ED

B

Y:

1 2 3 4 5 6 7 8 9 10

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

B

IS

H O

P

ST

R

EE

T, S

U

IT

E

IN

SY

N

ER

G

Y

EN

G

IN

EE

R

IN

G

, I N

C

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D

R

AW

N B

Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

A1 (8

X

11 12 13 14 15 16 17 18 19 20

E

F

G

H

K

J

L

M

N

P

SHEET ID

O C

T

FY

R

EP

LA

C E

AF

N

R

AD

IO

T

R

AN

SM

IS

SI

O

N T

O W

ER

W

2H

-1 9-

D -0

C

AM

P

KI

N

SE

R , O

KI

N

AW

A, J

AP

AN

US Army Corps of Engineers ®

W

2H V-

-B

-0

SIGNED

D R

AW

IN

G C

O D

E:

R

EA

D Y

TO

A

D

VE

R

TI

SE

S

U

BM

IT

TA

L

CONSTRUCTION HAUL ROUTE AND STAGING AREA DIAGRAMG-1213

BORING LOCATION PLAN AND BORING LOGSBB201

INDEX - BORING

ENLARGED PLAN - SITE GRADING AND DETAILSC-50110

CIVIL ABBREVIATIONS AND LEGENDC-0016

TYPICAL CONCRETE DETAILS IIS-50220

TYPICAL STEEL DETAILS IS-52121

TYPICAL STEEL DETAILS IIS-52222

TYPICAL STEEL DETAILS IVS-52424

RADIO FREQUENCY GROUNDING SITE PLANTG10137

LIGHT FIXTURE SCHEDULE AND CONTROL DIAGRAME-60133

TYPICAL STEEL DETAILS IIIS-52323

EARTH GROUNDING SYSTEM DETAILSTG50138

STRUCTURAL ELEVATION - GRIDLINE BS-20217

STRUCTURAL ELEVATION - GRIDLINE CS-20318

ELECTRICAL CABLE TRENCH PROFILECU1019

INDEX - RADIO

REFERENCED CODES & STANDARDS

1 JAPAN DISTRICT DESIGN GUIDE V7

2 DEPARTMENT OF DEFENSE JAPAN ENVIRONMENTAL GOVERNING STANDARDS

(JEGS)

3 OSHA 29 CFR 1910.1000 AIR CONTAMINANTS

4 OSHA 29 CFR 1910.1001 ASBESTOS

5 OSHA 29 CFR 1910.1200 HAZARD COMMUNICATION

6 OSHA 29 CFR 1926.1101 ASBESTOS

7 OSHA 29 CFR 1926.62 LEAD

8 EPA 40 CFR 61, SUBPART M, NATIONAL EMISSION STANDARD FOR ASBESTOS

9 EPA 40 CFR 76 POLYCHLORINATED BIPHENYLS (PCBS) MANUFACTURING,

PROCESSING, DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS

10 EPA 40 CFR 261 IDENTIFICATION AND LISTING OF HAZARDOUS WASTE

11 EPA 40 CFR 273 STANDARDS FOR UNIVERSAL WASTE MANAGEMENT

12 EPA 40 CFR 745 LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN

RESIDENTIAL STRUCTURES

13 EPA 40 CFR 763 ASBESTOS CONTAINING MATERIAL IN SCHOOLS

14 GOVERNMENT OF JAPAN, 2001. JAPAN WASTE MANAGEMENT AND PUBLIC

CLEANSING LAW OF 1970, UPDATED 2001.

15 UFC 1-200-01 DOD BUILDING CODE, WITH CHANGE 2, JUNE 12, 2023

16 UFC 3-201-01, CIVIL ENGINEERING, DECEMBER 20, 2022

17 UFC 3-220-01 GEOTECHNICAL ENGINEERING, WITH CHANGE 1, NOVEMBER 3,

18 UFC 3-230-01, WATER STORAGE AND DISTRIBUTION, WITH CHANGE 3, JULY 1,

19 UFC 3-301-01, STRUCTURAL ENGINEERING, WITH CHANGE 1. OCTOBER 2, 2023

20 UFC 4-022-03 SECURITY FENCES AND GATES, OCTOBER 1, 2023

21 OKINAWA PREF ORDINANCE NO.36: RED SOIL EROSION PREVENTION ORDINANCE

22 JAPANESE INDUSTRIAL STANDARD (JIS)

23 DESIGN CRITERIA FOR CIVIL ENGINEERING UNDER THE FACILITIES

IMPROVEMENT PROJECTS, 11 SEPTEMBER 2015

24 STRUCTURES STANDARDIZED DESIGN CRITERIA FOR CIVIL ENGINEERING UNDER

THE FACILITIES IMPROVEMENT PROJECTS, DEFENSE FACILITIES

ADMINISTRATION AGENCY, SEPTEMBER 1997

25 KADENA AIR BASE DESIGN GUIDE, 07 FEBRUARY 2020

26 BUILDING STANDARD LAW OF JAPAN

27 INTERNATIONAL BUILDING CODE (IBC)

28 ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES,

WITH MODIFICATIONS

29 TIA-222-H, STRUCTURAL STANDARD FOR ANTENNA SUPPORT STRUCTURES,

ANTENNAS AND SMALL WIND TURBINE SUPPORT STRUCTURES, OCTOBER 2017

30 ANSI/TIA-322-A - LOADING, ANALYSIS, AND DESIGN CRITERIA RELATED TO THE

INSTALLATION, ALTERATION AND MAINTENANCE OF COMMUNICATION

STRUCTURES, JULY 2023

31 ANSI/ASSP A10.48 - CRITERIA FOR SAFETY PRACTICES WITH THE

CONSTRUCTION, DEMOLITION, MODIFICATION AND MAINTENANCE OF

COMMUNICATIONS STRUCTURES, 2023

32 ANSI/AISC 360-16 – SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS

33 ACI 318-19 – BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE

REFERENCED CODES & STANDARDS, CONT.

34 JAPANESE RADIO LAW

35 JAPANESE AVIATION LAWS

36 FAA ADVISORY CIRCULAR AC 70/7460-1M FOR THE INSTALLATION OF THE

LIGHTNING SYSTEM

37 UFC 3-501-01, ELECTRICAL ENGINEERING, WITH CHANGE 1, NOVEMBER 2019

38 UFC 3-520-01, INTERIOR ELECTRICAL SYSTEMS, WITH CHANGE 2, APRIL 2021

39 UFC 3-530-01, INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS,

WITH CHANGE 4, NOVEMBER 2019

40 UFC 3-550-01, EXTERIOR ELECTRICAL POWER DISTRIBUTION, WITH CHANGE 3,

NOVEMBER 2019

40 NATIONAL ELECTRICAL CODE (NEC). 2023

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text No. 9756-E

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

PATIO

ONLY

PATIO

PATIO

PATIO

PA

TI

O

FOUNDATION

PARKIN

G

UNPA

VE

D

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

UNPAVED PARKING

UNPA

VE

D

PA

RKI

NG

PA

RKI

NG

UNPA

VE

D

PA

TI

O

PA

TI

O

PA

TI

O

PA

TI

O

PATIO

PA

TI

O

PA

TI

O

PA

TI

O

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PA

TI

O

PATIO

PATIO

UNPAVED P

ARKIN

G

UNPAVED P

ARKIN

G

PATIO

UNPAVED PARKING

PARKING

UNPAVED

PARKING

GATE 2

TRAIL

950A

TS79

B

TRAIL

DIRT

DUG OUT

STAND

ST

AN

D

TRAIL

15.2500

52.6555

GATE 4

GATE 3

GATE 1

GATE 5

ANTENNA TOWER

PA

RKI

NG

UNPA

VE

D

950A

TS

B

TRAIL

DIRT

DUG OUT

STAND

ST

AN

D

TRAIL

ANTENNA TOWER

PA

RK

IN

G

UN

PA

VE

D

ALL DIMENSIONS AND/OR DIMENSIONS SHOWN IN

CALLOUT/ NOTES ARE IN MILLIMETERS UNLESS

OTHERWISE NOTED.

GRAPHIC SCALE

SCALE: 1 : 1000

20000 40000

C O

N

ST

R U

C

TI

O N

H

AU

L R

O U

TE

A

N D

S

TA

G

IN

G A

R

EA

D

IA

G R

AM

GENERAL NOTES:

1. UTILIZE PROJECT SITE FOR STAGING. CONTRACTOR

TO VERIFY WITH CONTRACTING OFFICER PRIOR TO

ON-SITE ACTIVITIES.

2. COORDINATE WITH CONTRACTING OFFICER ON THE

ACTUAL LIMIT ON SITE, PRIOR TO MOBILIZATION.

3. CONTRACTOR IS RESPONSIBLE TO SECURE ANY ON

SITE AND OFF SITE WORK AREA. PRIOR TO THE

COMPLETION, CONTRACTOR MUST RESTORE TO THE

ORIGINAL CONDITION IN CASE ANY DAMAGE ARE

CAUSED BY THE CONTRACTOR.

4. REFER TO PROJECT SPECIFICATION FOR TEMPORARY

CONSTRUCTION FACILITIES AND CONTROLS.

LEGEND:

PROJECT SITE

HAUL ROUTE

PROJECT LIMIT AND

CONTRACTOR

LAYDOWN AREA

DEPOT BOULEVARD

PROJECT SITE

CONTRACTOR ENTRANCE

CAMP KINSER GATE2

GATE 2

GATE 4

GATE 3

GATE 1

GATE 5

D ST

SIERRA BLVD

F ST

PERIMETER RD

A12 STAGING AREA DIAGRAM

SCALE: 1:1000A1 CONSTRUCTION HAUL ROUTE AND STAGING AREA DIAGRAM

NOT TO SCALE

L

L

AT

S

CAF

C

O

TE

IVI

I

NRFO

AI

No. C 60451

RYAN W.

NELSON

DER

G

RE

TE

IS

OPR E SF S

AL

EER

GI

EN

N

ION

D

ES

IG

N

ED

B

Y:

1 2 3 4 5 6 7 8 9 10

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

B

IS

H O

P

ST

R

EE

T, S

U

IT

E

IN

SY

N

ER

G

Y

EN

G

IN

EE

R

IN

G

, I N

C

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D

R

AW

N B

Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

A1 (8

X

11 12 13 14 15 16 17 18 19 20

E

F

G

H

K

J

L

M

N

P

SHEET ID

O C

T

FY

R

EP

LA

C E

AF

N

R

AD

IO

T

R

AN

SM

IS

SI

O

N T

O W

ER

W

2H

-1 9-

D -0

C

AM

P

KI

N

SE

R , O

KI

N

AW

A, J

AP

AN

US Army Corps of Engineers ®

Z:\#Projects (numbered)\2022\22130\400 Drawings\General\USACE LOGO.jpg

W

2H V-

-B

-0

SIGNED

D R

AW

IN

G C

O D

E:

R

EA

D Y

TO

A

D

VE

R

TI

SE

S

U

BM

IT

TA

L

O C

T

S.

U

EZ

AT

O

N . I

SA

D

A

R . N

EL

SO

N

S.

S

U

ZU

KI

W

2H V2

3F

-G

-1

.d w g

G-121

PROJECT LIMIT AND CONTRACTOR

LAYDOWN AREA

VEHICLE ACCESS

GATE

PLAN

NORTH

TR

U

E N

EU x

EU x

EU x

EU

x

LP

EMH

EMH

LP

LP

LP

EMH

LP

EMH

LP

LP

EMH

LP

LP

EP

EP

EP

EP

EP

EP

EP

EP

EP

2-3

5.982

6.041 6.020

6.0456.078 6.127

5.720

5.853

5.718

5.945 5.941

5.941 5.865

5.845

5.916 5.972

6.052 6.055

5.971

6.053 6.056

5.970

7.200

6.416

6.095

5.942

5.949 5.974

6.026 6.069

6.079 6.018

6.030

6.1636.146 6.305

6.407 6.192

6.618 6.587

6.541 6.361

6.401

6.166

6.074 6.136

6.147

6.137

5.788

5.843

5.8265.802 6.022

5.970

6.081

6.298

6.186 6.185

6.3646.433

6.637

7.116 7.163

6.965

6.538

6.423 6.568

6.846

7.0347.174

7.2296.923 6.807

6.515

6.316 6.501

6.745 7.300

7.266 6.548

6.464 6.121

6.452 7.280

6.458 6.449

7.409 6.247

7.452 7.322

6.289

7.441 6.677

7.422 6.2457.4966.1306.226

5.893 7.547 7.506

5.923 7.506

7.5756.8295.457 5.754 5.802

6.326

6.317 5.980

5.847 5.847

5.803 5.855

5.845

5.671 5.8355.770

7.037 7.045

7.102 7.105

7.126 7.141

7.154 7.173

7.181

7.203

7.278

7.342

7.432

7.484

7.542

7.556 7.574

7.594

7.5756.7795.447

5.146 5.426 7.595

7.5886.7185.068

6.6465.220

7.678 6.5755.153

7.6936.5425.199

5.2266.530 6.851

6.7926.517

6.655

6.483 5.583

5.4815.275

5.301 5.3386.445

6.537 6.417

6.289

6.015

5.801

5.935 6.043

6.074

6.299

6.488 6.503 6.451

6.0796.129 6.146

6.102 6.045

5.924

5.762

5.921 5.628 5.762

5.592

5.654

6.014

5.754

5.699 5.723 5.738

5.765 5.623

5.6155.5905.675

5.565

5.2455.060 5.043

5.264 5.5795.415

5.109

5.067 4.829 4.555

4.5344.996

5.128 4.563

4.4024.7595.270

5.511

5.272 4.844

4.902

4.817 4.417

4.3314.687

4.646

4.657 5.445

5.475 5.513

5.519 5.490

5.567

5.568

5.897

5.578 5.598

5.145

5.3104.982 5.3525.181

5.499 4.918

4.4044.466 5.053

4.692 4.807

4.617 4.714

5.649 5.708

5.955

5.908

5.589

5.898 5.787

5.953 5.973

5.710

5.594 5.455

4.936

4.9714.836

5.495 5.597 5.657

4.833 4.824

4.826

4.617 4.672

4.595

4.5604.440

4.589 4.609

4.546

4.602 4.683

4.520

4.738

4.519

4.552

4.5514.480

4.360

4.394 4.524 4.570 4.568 4.704 4.853 5.144

5.1774.8254.7124.5594.4554.378

4.520 4.545 4.699 4.851 5.163

5.1514.8424.7714.6294.5424.449

4.637 4.692 4.719 4.846 4.859 5.059

5.1195.0154.8964.783

4.606 4.715 4.851 4.871 4.927 5.027 5.235

3.770

4.897 4.859 4.706

5.101 4.802 5.125

4.967 5.042 5.207 5.054

5.079 5.310 5.286

5.336

5.112

5.238

5.132 5.101

5.234 4.982

5.159 5.314

5.323 5.217

5.294

5.347

5.360

5.453 5.427

5.536

5.505 5.491

5.467 5.408

5.382 5.076

5.227

4.321 4.379

4.344 4.275

4.252

4.162

4.149

4.135

4.062

3.963

3.871

3.863

3.817

3.828

3.714

3.662

3.548

3.5553.538

3.489

3.386 3.645

3.657

3.752 3.783 3.816

3.8274.082

3.951 3.902

3.836 3.7013.698

3.837 3.889

3.868

3.871 3.898

3.7053.863 3.7293.736

3.654 3.7233.760

3.752 3.416

3.649 3.860

3.734 3.659

3.673 3.642

3.332 3.439 3.3923.599

4.010

3.894 3.838

4.212

3.928 3.895

4.141 3.977

3.943

3.692 3.831

3.937 3.897

3.792 3.925

3.867

3.840 3.804

3.875

3.810 3.708

3.5863.600 3.581

3.658 3.736

3.683

3.834 3.956

3.996

3.9913.908

3.9063.869

3.8533.846

3.8023.800

3.839

3.838 3.910 3.926 3.9534.107 4.266

4.097

4.100

4.332

4.198 4.151 4.262

4.2604.0163.9613.9423.898

4.028 4.112 4.165 4.222 4.329

4.216 4.217

4.371 4.435 4.174

4.188 4.222

4.259

4.474 4.560

4.1884.272 4.6274.540

4.483

4.199 4.467

4.180 4.559

4.102 3.954 4.041 4.401 4.1644.234

4.251 3.906

3.877

4.261 4.0904.153

4.229 4.059

4.254 3.873

4.250 3.824

4.253 4.169 4.0574.328

4.292 3.951 3.868

3.796

4.028 3.815

4.235 3.823

3.912 3.608

3.722 4.269

3.995

3.890 3.729

4.388 4.156

3.825 4.024

4.285 3.811 4.251 3.912

4.213

3.863

3.492

3.836

3.895

3.730

3.969

3.856

4.312

4.121 4.158

3.9644.149

4.316 4.190

4.738

4.7434.6444.506

4.5044.370

4.366 4.223

4.265 4.194

4.1664.050

4.137

4.061

4.255 4.362 4.409 4.489 4.540 4.567 4.739 4.857 4.847

4.984 4.924

4.658 4.526

4.292 4.488

4.764 4.853

4.682 4.718

4.935

4.930 5.103 5.121

5.3945.1765.087

5.2494.981

4.9724.923

4.844

4.971

5.031 5.382

5.140

5.176

5.2235.115 4.7494.830

5.043

4.801

4.9654.865 4.650

4.818 4.6444.798

4.695

4.6884.608 4.483 4.422

4.5354.378 4.219 4.159

3.748 3.720

3.7213.778

3.966

3.712 3.768

3.776

4.078 3.747 4.258

4.264

4.553 4.824

4.715 4.663

4.729

4.2393.954 4.165

4.2194.207 4.196

3.9643.923 4.142 4.141

3.959 4.018

4.028 3.747

3.832

3.629 3.717

3.872

3.490

3.744

3.557 3.5513.336

3.677

3.415

3.183

3.406

3.624 3.413

3.425 3.311

3.445 3.286 3.2243.261

3.305 3.354

3.439 3.440

3.482 3.428

3.423

3.501

3.451

3.661

3.887

3.895

3.456

3.347 3.495

3.362 3.668 3.293

3.742 3.405

3.343

3.351 3.761

3.315 3.454

3.419 3.987

3.605 3.726 3.775 4.042 3.7453.919

4.111 3.837

3.738 3.691

3.769 4.092 3.6073.709

4.130 3.675 4.157

3.696 3.831

4.305 3.999

4.396

4.234 4.369

4.223 4.454

4.281 4.711 4.636

4.7864.6864.228 4.195

4.440 4.520

4.117

4.1023.902 4.038 4.365

3.9843.874

4.335 3.959

4.079

3.7043.663 3.857 4.249 4.0283.910 3.8423.806

3.764 4.159 3.743 3.6363.831

3.837 4.104 3.942 3.870

3.901

3.484

3.748

3.711 3.793

3.950

3.457 3.241 3.340 3.715

3.3503.311 3.412 3.701 3.341 3.3183.436

3.668

3.2603.152 3.231 3.623 3.413 3.2503.245

3.284 3.576 3.338 3.1633.540

3.568 3.348 3.366

3.440

3.497

3.460 3.508

3.5933.480

3.6803.584 3.5763.448

3.464

3.492 3.728 3.725 3.783

3.343 3.317 3.736 3.793 3.539 3.501

3.495 3.850 3.649

3.608 3.808

3.713 3.954

3.7533.729 4.022

3.909 4.118 3.955 3.9403.719

4.019 4.170 3.981 3.901

3.837 3.852

4.123 3.978 3.944

3.979 4.176

3.973 4.068

4.181

4.033 4.190 4.400 4.229

4.207 4.224

4.153 4.484

4.240 4.290

4.278 4.235

4.186 4.540

4.407 4.619

4.351 4.417 4.426

4.804 4.701

4.770

4.396 4.868

4.621 4.574

4.357 4.709 4.533 4.472

4.489 4.188

4.539

4.408 4.165

4.3914.412 4.526

4.164 4.151

4.012 4.398

4.034

4.185

4.322

4.093 3.946 4.119 4.257

4.075 4.105

3.9403.745 4.171

4.0083.947

3.913 4.064

3.950 4.118

4.017 3.841 3.967

3.9263.687 3.769

3.855 3.6133.613

3.781

3.575

3.738

3.803

3.6443.757

3.730

3.8823.695

3.6743.608

3.6593.596

3.5613.540

3.575

3.841

3.914

3.8033.620

3.903 3.776 3.789

3.912 3.903

3.876 3.902 3.953

3.632 3.858

3.955

3.957

3.726

3.716 3.6383.894

3.943

3.942

4.043 3.943

4.085 3.793 3.707

4.101

4.055 4.179

4.106

4.0874.090 4.097

4.292 4.364

4.304 4.218

4.145 4.401 4.290 4.2324.057

4.148 4.419 4.250

4.292 4.468 4.507 4.200

4.235 4.209

4.569

4.427 4.508

4.583

4.641 4.477

4.673 4.597 4.828 4.647

4.634 4.688

4.670 4.921

4.764 4.694 4.814

4.795 4.7094.718

5.043 5.016

5.259 5.394

4.940 4.993

5.113

4.672 4.926

4.836 4.7994.683

4.846

4.733 4.647 4.787

4.420 4.728

4.4424.044

4.609

4.5074.270 4.448 3.986 3.956

4.052 4.408 4.131

4.388

3.7723.857 3.857 4.326 4.365 4.287

4.162 4.327 3.829 3.728

3.693 4.178 4.047

3.894 3.930

4.110 3.708

3.7923.967

3.777 4.081

3.868 3.849

4.109 3.901

4.482 4.389

4.202 4.223 4.522

4.463 4.576

4.247 4.518 4.498

4.655

4.491

4.713 4.491

4.704

4.453 4.830

4.435

4.161 4.269

4.519

4.675

4.985

4.500 4.606

4.673 4.704

4.819 4.586

4.731

4.647

5.1245.167

5.211

5.099

5.187

4.644

4.585

4.712 4.670

5.002

4.340

4.635 4.440

4.885 4.4914.167

4.691 4.329 4.242

4.297 4.621

4.683 4.669

4.352 4.169

4.526

4.540 4.455

4.584 4.498

4.152

4.460 4.3173.791

4.297 4.188

4.040 3.450

4.272

4.190 4.023

3.933

3.680 3.695

3.724 4.177

3.835 3.463 4.1634.332

3.945 4.391 4.533

4.080 4.410

4.609

3.985

4.453 4.550 4.041

4.2484.273

4.506 4.772

4.427

4.810 4.754

4.868 4.633 5.133 4.8655.175

4.950

4.6144.796 5.252

4.807 4.922

7.508

7.431

EMH

EMH

E=

E=

E=

E=

E=

E=

E=

N=29790

N=29820

N=29850

N=29880

N=29910

N=29940

N=29970

N=30000

N=30030

4.0 4.

4.0 4.0

4.0

4.0

7.

6.0

5.0

5.

5.0

5.0

7.

5.0

4.0

EUx EUx

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

Wx

Wx

Wx

Wx

Wx

Wx

Wx

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

79B-TS CIR 6A

COMBINATION LIGHTING CONTROLLER

FUEL TANK

DMH

IN4.40

DMH

OUT4.40 300CP

PROP

UNKNOWN

79-TH CIR 6A

GUY WIRE

VALVE

BOLLARDS

PROTECTION PILLAR

79A-TS CIR 6A

CJPー79B

GUY WIRE

GUY WIRE

ANTENNA

GUY WIRE

CO CO

AS

AS

ASAS

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

COCO

CO

CO

CO

PROP

R5-201

R5-202

TELEPHONE POLE

A1 TOPOGRAPHIC SURVEY PLAN

SCALE 1:500

E

20709.357

6.076

ELEVATION

R5-202

R5-201 29823.543

29805.106 20669.873

COORDINATES

N

6.293

No.

NOTES:

1. TOPOGRAPHIC SURVEY COORDINATE SYSTEM IS THE

JAPAN GEODETIC DATUM (JGD) 2011, ZONE 15 AND IS IN

INTERNATIONAL METRIC UNITS.

2. THE "CONTROL POINTS SUMMARY TABLE" SHOWS THE

INFORMATION FOR THE BENCHMARKS ESTABLISHED

AROUND THE ENTIRE PERIMETER OF THE SITE IN CAMP

KINSER, OKINAWA, JAPAN.

3. SURVEY CONDUCTED BY:

ENVIRONMENTAL SCIENCE CORPORATION

NAKAGAMI SHOJI BLDG 201, 3-11-33 AGEDA, OKINAWA CITY

OKINAWA, 904-0012 JAPAN TEL. 011-81-098-989-0426

REGISTERED SURVEYOR: MR. KOJI CHINEN

JAPAN REGISTERED SURVEYOR, REGISTRATION NO:

H7-724

4. DATE OF TOPOGRAPHIC SURVEY: OCTOBER 2023

5. LOCATION OF EXISTING MAINS AND SERVICE LATERAL

LINES FOR WATER, ELECTRICAL AND COMMUNICATION

SYSTEMS SHOWN IN THE SURVEY MAP ARE APPROXIMATE

AND BASED ON BEST AVAILABLE INFORMATION PROVIDED

BY OTHERS. UTILITIES SHOWN IN THE TOPO MAP SHALL BE

FIELD VERIFIED.

TELEPHONE MANHOLE

TRAFFIC SIGN

SEWER MANHOLE

WATER VALVE

ELECTRIC MANHOLE

WV

TMH

EMH

SMH

WATER MANHOLE

ASPHALT PAVEMENT

CONTROL POINT

WATER PIPE

ELECTRIC LINE

Wx

EUx

T

AS

WV

R5-201

STORM DRAINAGE MANHOLEDMH

OVERHEAD ELECTRICAL LINE

SEWER PIPE

STORM DRAIN PIPE

EOS

S

SD

Co

(WIRE = TENSION WIRE)

WIRE

TP TELEPHONE POLE

ASPHALT BOUNDARY LINE

LP

LEGEND

TITLE

CONCRETE PAVEMENT

BUILDING

SYMBOL

VEGETATION BOUNDARY

LIGHT POLE

ELECTRIC POLE

FIRE HYDRANT

EP

FH

CONCRETE PIPECP

CONTROL POINTS SUMMARY TABLE

(BASED ON JGD 2011 ZONE 15 DATUM)

TO

PO

G R

AP

H

IC

S

U R

VE

Y

PL

AN

V-101

L

L

AT

S

CAF

C

O

TE

IVI

I

NRFO

AI

No. C 60451

RYAN W.

NELSON

DER

G

RE

TE

IS

OPR E SF S

AL

EER

GI

EN

N

ION

S.

U

EZ

AT

O

Y.

S

AK

IH

AR

A

R . N

EL

SO

N

S.

S

U

ZU

KI

W

2H V2

3F

-V

-1

.d w g

D

ES

IG

N

ED

B

Y:

1 2 3 4 5 6 7 8 9 10

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

B

IS

H O

P

ST

R

EE

T, S

U

IT

E

IN

SY

N

ER

G

Y

EN

G

IN

EE

R

IN

G

, I N

C

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D

R

AW

N B

Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

A1 (8

X

11 12 13 14 15 16 17 18 19 20

E

F

G

H

K

J

L

M

N

P

SHEET ID

O C

T

FY

R

EP

LA

C E

AF

N

R

AD

IO

T

R

AN

SM

IS

SI

O

N T

O W

ER

W

2H

-1 9-

D -0

C

AM

P

KI

N

SE

R , O

KI

N

AW

A, J

AP

AN

US Army Corps of Engineers ®

W

2H V-

-B

-0

SIGNED

D R

AW

IN

G C

O D

E:

R

EA

D Y

TO

A

D

VE

R

TI

SE

S

U

BM

IT

TA

L

TELEPHONE LINE

PLAN

NORTH

TR

U

E N

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUT/ NOTES ARE IN

MILLIMETERS UNLESS OTHERWISE

NOTED.

GRAPHIC SCALE

SCALE: 1 : 500

10000 20000MM

EU

x

LP

EMH

LP

EMH

LP

LP

EMHLP

EP

EP

EP

EP

EP

EP

EP

EP

EP951

N=29820

N=29850

N=29880

N=29910

N=29940

N=29970

N=30000

4.0

4.

4.0 4.0

4.0

4.0

7.

6.0

5.0

5.

5.0

5.0

7.

5.0

4.0

EUx EUx

EU

x

EU

x

EU

x

EU

x

EU

x

Wx

Wx

Wx

Wx

Wx

Wx

Wx

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W xCO CO

ASAS

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

COCO

CO

CO

CO

R5-201

B-2

B-1

E=

E=

E=

E=

E=

N=30030

N=30060

B-3

2.00

1.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Bottom of Hole

18 4, 6, 8 3.15m

3.45m

2.15m

12 3, 4, 5 1.15m

1.45m

-8.94 15.43

2 1, 1 4.15m

4.45m

6 1, 2, 3 5.15m

5.45m

6.15m

36 13, 13, 10 7.15m

7.45m

8.15m

7 2, 2, 3 9.15m

9.45m

30 16, 8, 6 10.15m

10.45m

5 1, 2, 2 11.15m

11.45m

3 1, 1, 1 12.15m

12.45m

50/5cm 50/5 13.15m

13.20m

16 3, 4, 9 2.45m

6.18m

23 2, 9, 12 8.45m

PP: 370 kPa

PP: 370 kPa

PP: 100 kPa

PP: 245 kPa

SAMPLE

TEST

LEGEND

STANDARD PENETRATION TEST

DEPTH

(m) DEPTH & Blow count

/10 cm

Total Blow Count Of

S.P.T

EL

(m) 10 20 30 40 50

CLASSIFICATION OF MATERIALS

(Description)

SPT N Value

Percentage of limestone content

HOLE No.

B-1

UNDISTURBED SAMPLELEGEND: DISTURBED SAMPLE ROCK CORE SAMPLE

PT: GEO-PHYSICAL TESTS, UCT: UNCONFINED COMPRESSION TEST, UU: UU TRIAXIAL TEST, CU: CU TRIAXIAL TEST, CON: CONSOLIDATION TEST PP: POCKET PENETROMETER, [qu], LLT: LATERAL LOADING TEST (PRESSUREMETER TEST), [E], COR: LAB TESTS FOR CORROSIVITY POTENTIAL (SULFATES, CHLORIDES, PH, SOIL CONDUCTIVITY)

0% 20% 40% 60% 80% 100%0.006.49

DRILLING LOG INSTALLATION SHEET 1 OF 2 SHEETS

1. PROJECT 10. SIZE AND TYPE OF BIT 66mm Dia. Single Core Tube Bit & Split Spoon sampler

2. LOCATION (Coordinates or Station)

3. DRILLING AGENCY

Shindo Soil Investigation Co., Ltd.

4. HOLE ID NO. B-1

5. NAME OF DRILLER

6. DIRECTION OF HOLE VERTICAL INCLINED ____ DEG. FROM VERT.

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

DISTURBED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .