DRAFT_00 10 00 CLIN SCHEDULE_AC Refueler Parking_FIO.docx

DOCX document 27 KB Posted

Attached to
FY24 FWCF LXEZ221052 Repair/Upgrade Aircraft Refueler Parking Area, Kadena Air Base, Okinawa, Japan
Solicitation number
W912HV-24-Z-0025
Issued by

About this file

This document is a draft Solicitation, Contract Line Item Number (CLIN) Schedule for a federal contract opportunity to repair and upgrade the aircraft refueler parking area at Kadena Air Base in Okinawa, Japan.

The key details are:

  • The project involves removing and disposing of the Aqueous Film Forming Foam (AFFF) firefighting system, removing existing pavement, constructing new concrete pavement, and installing new floodlights and a spill containment pit. The total estimated cost is between $5 million and $10 million (600 million to 1.2 billion Japanese Yen).
  • The U.S. Army Corps of Engineers, Japan District is performing market research for this Design-Bid-Build construction project. A formal Invitation for Bids (IFB) solicitation is anticipated to be issued in the 1st quarter of FY25.
  • This opportunity is intended for local sources physically located and licensed to conduct business in Japan. Interested firms are requested to complete a capabilities survey and submit it by August 27, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

513779 FY26 DWCF LXEZ221052 Upgrd Acft Refueler Prkg 24SF0004 Kadena Air Base, Okinawa, Japan

SECTION 00 10 00

SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

ITEM NO.
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
AMOUNT

BASE ITEMS

0001
Remove and dispose of the Aqueous Film Forming Foam firefighting system solution, hydrants, and piping
1
JB
-
¥________
0002
Remove existing parking lot pavement and construct new pavement, construct spill containment pit, and install new floodlights
1
JB
-
¥________

TOTAL CLIN SCHEDULE

NOTES:

1. Failure of the offeror to propose prices for all items in the CLIN Schedule may be cause for rejection of the proposal as unacceptable.

2. See Section 01 20 00, for additional line item description.

3. Any reference to “Offer”, “offeror”, or “Proposal Schedule” shall be construed to mean “Bid”, “Bidder” and “Bid schedule”

4. LEGEND: EA = Each, JB = Job