Pre Bid Conference Slides.pdf
PDF 3 MB Posted
- Solicitation number
- W912HV24B0012
About this file
This document is a set of pre-bid conference slides for the solicitation W912HV24B0012 for the "FY23 OMA Convert Vehicle Storage Warehouse B122-S1, Sagami General Depot" project. The project will provide fire protection upgrades, including fire suppression, fire alarm, life safety, water distribution, electrical, mechanical, and plumbing systems to an existing warehouse at the Sagami General Depot in Japan. The solicitation is an Invitation for Bids (IFB) with a bid due date of August 22, 2024 at 2:00 PM JST. The contract will be performed entirely in Japan and is limited to local Japanese sources. Key requirements include submission of a SF1442, acknowledgment of amendments, completed representations and certifications, and a bid guarantee. The period of performance is 545 calendar days after receipt of the Notice to Proceed. Liquidated damages are set at ¥216,000 per calendar day of delay.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Bids W912HV24B0012.pdf | ||
| Site-Visit Attendance List.pdf | ||
| Pre Bid Conference Attendance List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
Presented by 作成者 :
FY23 OMA CONVERT VEHICLE STORAGE WAREHOUSE B122-S1, SAGAMI GENERAL DEPOT
W912HV-24-B-0012
PRE-BID CONFERENCE
DATE: 06 JUN 24
2023年度 OMA車両保管倉庫の改装工事 B122-S1、相模総合補給廠
W912HV-24-B-0012
入札前会議
日時:2024年6月6日
Jason Takimoto ジェイソン・ タキモト Project Manager プロジェクトマネージャー
Nakiba Jackson ナキーバ ・ジャクソン Contracting Officer 契約官
Ruben Romero ルーベン・ロメロ Contract Specialist 契約専門職
本プレゼンテーションに含まれる見解、意見及び所見は著者のものであり、他の公的な書類で指定 されていない場合、公式な米陸軍省の見解、方針又は決定と解釈されるべきではありません。
Ben Fisher ベン · フィッシャー Technical Lead 技術リード
Victor Wilhelm ビクター ・ウィルヘルム Resident Engineer 工事監理事務所長
WELCOME
歓 迎
❑Virtual Roll Call
実質的な参加者の点呼
Your Company name will be called. Please have one representative from your company identify themselves and identify who is on the line.
会社名をお呼びしましたら、代表の方が今回参加されている全員の方のお名前をお伝えください。
❑Introduction of Government Personnel
米政府関係者紹介
USACE, Japan Engineer District
米陸軍工兵隊・日本地区
DISCUSSION OVERVIEW
説明会概要
❑Rules of Conference 説明会のルール
❑Quick tips for Solicitations 入札公告の参考情報
❑Contracting requirements 契約要件
❑General Scope of Work 全般的工事内容
❑Construction Requirements 工事要件
❑Site Visit Location 現場視察場所
❑Please keep your phones on mute
電話はミュートにして下さい。
❑Conference will be presented in English. The Japanese translation is provided as a courtesy
本会議は英語で行われます。日本語の翻訳は厚意によるものです。
❑Unofficial and non-binding
非公式で法的拘束力はありません。
❑ If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern
当説明会で協議される情報と入札案内に矛盾がある場合は、入札案内の契約条件が優先されます。
❑All questions are to be submitted in writing via Projnet.
質問/問合わせは全てPROJNETを通じ書面で提出して下さい。
RULES FOR CONFERENCE
説明会のルール
❑Review all the solicitation requirements
全ての入札要件を確認する。
❑Follow solicitation format as required
入札要件に指示されているフォーマットに従う。
❑Acknowledge all amendment(s)
全ての改訂(アメンドメント)を確認同意する。
❑Respond to every submission requirement
全ての提出要件に回答・対応する。
QUICK TIPS FOR ALL SOLICITATIONS
全ての入札公告に対する参考情報
IFB SOLICITATION FORMAT
IFB入札公告書式
❑ Standard Form 1442 フォーム1442
❑ Section 00 10 00, Solicitation CLIN Schedule 契約項目一覧表
❑ Section 00 21 13, Instructions to Bidders 入札者への説明
❑ Section 00 45 00, Representation and Certifications 表明と証明書
❑ Section 00 70 00, Conditions of the Contract 契約条件
❑ Section 00 73 00, Supplementary Conditions 補足条件
❑ Division 01, General Requirements 一般要件
❑ Divisions 02 thru 33, Technical Divisions 技術要件
❑ Drawings 図面
❑ Make sure to note the bid due date and time in Block 13A of SF1442.
SF1442のブロック13Aに記載された入札提出期日及び時間を必ず確認する。
❑ Bids currently due 22 August 2024 at 1400 hrs JST.
現在、入札提出期限は2024年8月22日、日本時間午後2時。
❑ Period for acceptance of bids shall be no less than 90 calendar days for
Government acceptance (see block 13D).
政府が受諾するための入札価格の有効期間は90日間以上とする。(ブロック13D参照)
❑ Fill out Blocks 14, 15, 17, 19, 20A, 20B, and 20C.
ブロック14, 15, 17, 19, 20A, 20B, 20Cにもれなく記入する。
STANDARD FORM (SF) 1442
SF1442
SECTION 00 10 00
SOLICITATION CONTRACT LINE ITEM (CLIN)
契約項目一覧
ITEM
NO.
DESCRIPTION QUANTITY UNIT UNIT
PRICE
AMOUNT
BASE ITEMS
B122-S1 Convert Vehicle
Storage Upgrades
1 JB - ¥________
TOTAL BASE CLIN SCHEDULE ¥________
NOTES 注意:
1. Failure of the bidder to bid price(s) for all item(s) in the CLIN Schedule may be cause for rejection of the bid as non responsive. 契約項目一覧表の全ての項目について価格を提案していない入札者は、受け入れられないとして却下されることがあります。
2. See Section 01 20 00, for additional line item description. 追加項目の詳細はセクション01 20 00を参照して下さい。
3. Any reference to “offer”, “offeror”, or “CLIN schedule” shall be construed to mean “bid”, “bidder” and “bid schedule”.
「 (offer)入札、(offeror)入札者」及び「(CLIN schedule)約項目一覧表は、 「(bid)入札」「(bidder)入札者」又は「(bidding schedule)入札一覧表」 を意味すると解釈するものとします。
4. LEGEND: JB = Job 凡例: JB = 作業
❑ Magnitude of the Proposed Project: 工事の規模:
► ¥100,000,000 and ¥500,000,000 1億円から5億円
❑ Requests For Information (RFIs): ALL Questions / Inquiries shall be submitted via the
PROJNET Bidder Inquiry Module at: https://www.projnet.org/projnet/ . Please see the solicitation for additional details and instructions.
質問書(RFI):全ての質問/問い合わせはPROJNETのサイト
https://www.projnet.org/projnet/ を介して提出する。追加の詳細および手順に関しては入札 案内書を参照。
❑ Requests For Information (RFIs) Due: RFI(質問書)期日:
► 11:59 (midnight) on 14 June 2024 (JST) 2024年6月14日、日本時間深夜11時59分
► The Bidder Inquiry Key is: AAV73M-QTZ6K7
入札者の照会キー: AAV73M-QTZ6K7
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS 入札者への説明
https://www.projnet.org/projnet/ https://www.projnet.org/projnet/
SIGNATURE OF BIDS. Bid must be signed by an officer of the company or an individual who is authorized to sign bids for and on behalf of the company. An individual, other than an officer of the company, who signs a bid must submit evidence of his authority to sign such bid. This evidence must accompany the bid. Failure to comply with this requirement may be cause for rejection of the bid.
入札書類の署名。 入札書類は、会社を代表して入札書類に署名する権限を持つ会社の役員又は個 人が署名しなければなりません。役員以外の個人が入札書類に署名する場合は、署名する権限が あることを示す証拠を入札書類に添付して提出しなければなりません。この要件に従わない場合は、 入札が却下される可能性があります。
SECTION 00 21 13
INSTRUCTIONS IFB PROVISIONS
IFB条件の説明
BIDDER ELIGIBILITY 入札者適格性。 This contract will be performed in its entirety in the country of Japan and is intended only for local sources. 本契約は日本国内で全て施工され、日本の業者だけを意図しています。
Specifically, a prospective bidder must be duly authorized to operate and conduct business in Japan and must fully comply with all applicable laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts. 特に将来の入札者は、日本で事業を運営する正式な権限を持ち、契約履行中に該当する日本の法律、 条令、労働基準及び規則を全て満たさなくてはなりません。
Bidders must be registered with the Government of Japan to do construction work in Japan and possess necessary construction licenses and permits to perform work required under this solicitation at the time a bid is submitted. 入札
者は、日本で建設作業を行うために日本政府に登録し、入札が提出される時点で本契約事案で必要な作業を行うために要 求される建設業許可証を保有していなければなりません。
Construction license will be verified through the Government of Japan – Ministry of Land, Infrastructure, Transport, and
Tourism (MILT) https://etsuran.mlit.go.jp/TAKKEN.
建設業許可証は国土交通省 https://etsuran.mlit.go.jp/TAKKENを通じて確認されます。
* See solicitation for full Bidder Eligibility provision.
入札者適格性条項の全文は入札案内を参照して下さい。
SECTION 00 21 13
INSTRUCTIONS IFB PROVISIONS
IFB条件の説明
https://etsuran.mlit.go.jp/TAKKEN/ https://etsuran.mlit.go.jp/TAKKEN
❑ Completed and Signed SF1442 SF1442の必要事項を全て記入し署名して下さい。
❑ Acknowledge SF30 Amendments (if issued) SF30改訂(アメンドメント)があれば改訂を確認し了 承して下さい。
❑ Completed Section 00 10 00 セクション 00 10 00 の必要事項を全て記入して下さい。
❑ Completed Section 00 45 00 – Representations and Certifications
セクション 00 45 00 - 表明と証明書の必要事項を全て記入して下さい。
❑ Bid Guarantee (FAR 52.228-1) -- 20% or ¥300,000,000 (whichever is less) – Also see Original Bid Bond Requirements.
入札保証ボンド(FAR 52.228-1) -- 20%又は3億円(いずれか低い額)-入札保証ボンドの原文も
確認して下さい。
❑ Joint Venture Agreement (if applicable) 合弁事業合意書(該当する場合)
❑ Deliver Bids to: ELECTRONIC BID SUBMISSION - See solicitation for details.
入札法:電子入札法 - 詳細は入札案内を参照。
❑ Submitted via the PIEE Solicitation Module PIEE入札モジュール経由で入札して下さい。
❑ Emailed Bids are strictly prohibited Eメールによる入札は認められません。
SECTION 00 21 13
SUBMISSION OF BIDS
入札書類の提出
❑ Ensure the following is completed and submitted with bid:
以下も必要事項を全て記入し提出して下さい。
▪ Corporate Certificate 企業証明書
▪ FAR Clause 52.204-8, Annual Representation and Certification FAR 52.204-8項、年次表明及び証明書
▪ FAR Clause 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or
Equipment
FAR 52.204-24項、対象となる通信及び映像監視又は機器に関する表明
▪ FAR Clause 52.209-7, Information Regarding Responsibility Matters
FAR 52.209-7項、責任事項に関する情報
▪ FAR Clause 52.229-11 Tax on Certain Foreign Procurements – Notice and Representation
FAR 52.229-11項、外国からの調達に対する税金-報告及び表明
▪ DFARs Clause 252.204-7007 ALT A, Annual Representations and Certifications
DFARS 252.204-7007項代替A、年次表明及び証明書
▪ DFARs Clause 252.204-7017, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or
Services – Representation
DFARS 252.204-7017項、網羅された防衛用通信機器又はサービスの取得の禁止-表明
▪ DFARs Clause 252.229-7001, Tax Relief DFARS 252.229-7001項、税控除
SECTION 00 45 00
REPRESENTATIONS AND CERTIFICATIONS
表明と証明書
❑ FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work
連邦調達規則(FAR) 52.211-10 作業の開始、実行及び完了
❑ Period of Performance: 545 Calendar Days after receipt of NTP
契約期間:着工命令から545歴日
❑ FAR Clause 52.211-12, Liquidated Damages – Construction
¥216,000 for each Calendar Day of delay
連邦調達規則(FAR) 52.211-12 遅延損害-建設工事 遅延損害金1暦日に付き216,000円
SECTION 00 70 00
CONDITIONS OF THE CONTRACT
契約条件
❑ 252.225-7045 BALANCE OF PAYMENTS PROGRAM--CONSTRUCTION MATERIAL UNDER TRADE AGREEMENTS
(OCT 2023) ALTERNATE I (NOV 2023) – See solicitation for full clause.
DFARS 252.225-7045、国際収支プログラム-建設資材取引合意(2023年10月)代替Ⅰ (2023年11月)-全項は入札案内を参照。
(c) The contractor shall use only domestic (U.S.) or designated country construction material in performing this contract, except for –
業者は下記を除き、本契約の実施に際し、米国製又は指定された国で製造された建設資材のみを使用するものとします。
(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition
Regulation;
連邦政府契約規則のパート2の単純契約限度額以下の建設資材
(2) Information technology that is a commercial product;
市販品である情報技術
(3) The construction material or components listed by the Government as follows: See clause.
政府による建設資材又は構成部品リストは下記の通り:条項を参照
SECTION 00 70 00
❑ 252.225-7045 BALANCE OF PAYMENTS PROGRAM--CONSTRUCTION MATERIAL UNDER TRADE
AGREEMENTS (OCT 2023) ALTERNATE I (NOV 2023) – continued
DFARS 252.225-7045、国際収支プログラム-建設資材取引合意(2023年10月)代替Ⅰ(2023年11月)-続き
“Simplified Acquisition Threshold” means $250,000
「単純契約限度額」とは25万ドルです。
“Designated Country” includes Japan. See clause in solicitation for full list of designated countries.
「指定された国」には日本を含みます。指定された国の全リストは入札案内書の条項を参照して下さい。
SECTION 00 70 00
❑ DFARS 252.247-7023, Transportation of Supplies by Sea
海路による輸送
❑ Required to utilize U.S. ocean transportation
米国の海上輸送会社を利用する必要があります。
❑ Submit any request for use of foreign-flag vessels in writing to the Contracting Officer at least 45 days prior to the sailing date necessary to meet its delivery schedules
外国の海上輸送会社の使用を希望する場合は、納期を満たすために必要な出航日の少なくとも45
日前までに、契約担当官に書面で提出すること。
SECTION 00 70 00
FY23 OMA Convert Vehicle Storage Warehouse B122-S1
USAG Sagami General Depot
2023年度 OMA車両保管倉庫の改装工事 B122-S1
在日米陸軍 相模総合補給廠
PROJECT INFORMATION
事案についての情報
SCOPE OVERVIEW
工事範囲の一覧
• New industrial water and sewer lines 工業用上下水道の新設
• Site work 現場作業
• New fire suppression and fire alarm systems, fire riser and pump 火災抑 制及び火災警報設備、スプリンクラー立上り管及び消火ポンプの新設
• Electrical upgrades 電気設備のアップグレード
• Fire and life safety code compliance updates 火災及び人命安全について の法律順守の更新
• Architectural updates 建築の更新
VICINITY MAP / HAUL ROUTE
付近地図 / 輸送経路
PROJECT SITE
工事現場
CONTRACTOR MUST
USE GATE 1
業者は入門/退出に正面 ゲートを使用すること
HAUL ROUTE
輸送経路
21LAYDOWN AREA
資材置き場
PROJECT SITE
事案現場
LAYDOWN AREA
資材置き場
22TYPICAL PROJECT ORGANIZATION AT KANAGAWA
RESIDENT OFFICE (KRO)
(神奈川工事監理事務所の通常のプロジェクト組織図) Japan Engineer District (Camp
Zama)
米陸軍工兵隊日本地区本部(キャ ンプ座間)
Resident Engineer / Administrative Contracting Officer (ACO) (KRO)
所長/契約担当官代理
Project Engineer (PE)
プロジェクト担当官
Quality Assurance Representative
品質保証担当官
Customer/Client
クライアント
GENERAL REQUIREMENTS
一般要件
Pre-Construction Submittals after NTP and prior to the preconstruction conference.
This list is not all inclusive; the Contractor shall review all the requirements prior to commencing work. 工事開始指示書(着工命令)の発行後かつ着工前会議の前までに必要な
着工前提出物の一覧です。これが全てではないので、業者は着工前の要件を全て注意深く確認 して下さい。
• Project Schedule プロジェクト日程 o SPEC Section 01 32 01.00 10
• Submittal Register 提出物登録 o SPEC Section 01 33 00-B
• Accident Prevention Plan 事故防止計画 o SPEC Section 01 35 26
• Contractor Quality Control Plan 業者品質管理計画 o SPEC Section 01 45 00.00 10
• Environmental Protection Plan 環境保護計画 o SPEC Section 01 57 19
CONSTRUCTION GENERAL REQUIREMENTS
工事の一般要件 Below is a summary of Pre-Construction Submittals required after Award and prior to the project kickoff conference. This list is not all inclusive; the contractor shall review all the requirements prior to commencing work. 以下は契約締結後かつプロジェクトのキックオフ会
議前までに必要な着工前提出物一覧です。これが全てではないので、業者は着工前の要件を全 て確認して下さい。
Preconstruction Submittals List
No. Submittals/Activities Submission Dates Specifications
1 Key Personnel Qualifications 5 days after NTP 01 11 00.00 10 1.6
2 Qualifications & Background History of Interpreter 15 days after Award 01 11 00.00 10 1.6.3
3 Contract Cost Breakdown 30 days after NTP 01 20 00 3.3
4 Preliminary Project Schedule 15 days after NTP 01 32 01.00 10 3.4.1
5 Initial Material Status Report 15 days after NTP 01 33 00 1.16
6 Accident Prevention Plan (APP) 15 days prior to
PreCon 01 35 26 1.7
7 Contractor Quality Control Plan (CQC) 15 days after NTP 01 45 00.00 10 3.2
9 Environmental Protection Plan (EPP)
Within 15 days after
NTP and
Not Less than 10 days before Precon
01 57 19 1.9
CONSTRUCTION GENERAL REQUIREMENTS
工事の一般要件
• This project is required to complete documentation through the RMS Contractor Module system. New Project now uses RMS 3.0. https://rmsdocumentation.com/
(本プロジェクトはRMSの業者側モジュールを通して書類提出を完成させることが義務付けられ
ています。新規プロジェクトはRMS3.0 https://rmsdocumentation.com/ を現在使用しています)
• This contract is required to implement the Three Phase Inspection process for all features of work as part of the Contractor’s Quality Control Plan.
(本契約は業者品質管理計画の全ての工種項目において3段階検査プロセスに従うことが義務 付けられています。)
• Project schedule reviews and updates shall be made and submitted monthly with the requested progress payments.
(工期全体のプロジェクト日程を作成、更新し、そして毎月の進捗に応じた支払いの請求時に提 出しなければなりません。)
• The project will be required to follow EM 385-1-1 March 2024.
(本プロジェクトは2024年3月バージョンのEM385-1-1に従わなくてはなりません。)
• Contract regular working hours are Mon~ Fri 0800~1700. Saturday work is allowed on this contract and does not require additional approvals. Notify the Contracting Officer at least three days in advance when scheduling Saturday work.(契約の通常作業時間は平日午前8
時から午後5時までです。本プロジェクトでは土曜日の作業が許可されており、追加承認は不要 です。土曜日の作業を計画する際は、3歴日前までに契約官へ連絡して下さい。) https://rmsdocumentation.com/ https://rmsdocumentation.com/
26TYPICAL CHALLENGES FOR CONTRACTORS
業者が直面する一般的な課題
• Scheduling 日程
• Submission Timeline after NTP 着工命令後の提出日程
• Monthly Schedule Updates: schedules are to be updated every month at a minimum. The standard submission time line is the following. 月次日程更新:日程は少なくとも毎月更新するものとします。標準的な提出日程は下記の通りです。
NTP
Pre-liminary
Schedule Initial Project Schedule (IPS)
Periodic Schedule Updates
Design?
No
Yes
Design Schedule
Construction Schedule
9/14/2023 3/14/2024
42d After NTP15d After NTP Monthly until CCD
95% design submitted.
Submit Draft Reports & Schedule
Correction needed?
Submit to RMSNo
Yes
Apply correction within 4d of meeting
Periodic Schedule Meeting
Schedule Data Date
Within 4d after meetingSchedule Data Date 2d prior to meeting Within 5d of Data Date
着工命令 暫定的日程
設計? 最初のプロジェクト日程
設計日程 工事日程
定期的日程更新
日程データ日時
レポート案と 日程案を提出
定期的日程会議
修正必要?
RMSへ提出
着工命令後15日 着工命令後42日 月次ユニット契約完了日
95%設計提出済
会議から4 日以内に修 正を適用
日程データ日時 会議2日前 データ日付の5日以内 会議後4日以内
27TYPICAL CHALLENGES FOR CONTRACTORS
(業者が頻繁に直面する課題)
• Scheduling 日程
• Payment will be derived from Primavera P6 Schedules. Contractor updates the schedule, an SDEF file is generated from the Primavera Schedule and uploaded into RMS. Pay requests are generated from data imported from SDEF file.
支払いはプリマベーラP6スケジュールに由来します。業者は日程を更新し、SDEFファイルはプリマベーラスケジュールから作成されRMSにアップロードされます。支払依頼は
SDEFファイルからインポートされたデータから生成されます。
• Contract Modifications involving time extensions will require a Time Impact Analysis Schedule. 期間延長を含む契約修正は期
間影響解析(TIA)日程を要求します。
KTR Schedule Approved
SDEF File Imported
KTR submits Pay Request in
RMS
PE/COR
reviews Pay request
Approval? Withholding?
Payment Processing
RMS/CEFMs
Payment Request sent to Millington
KTR receives payment
By the 1st of each month KTR Receives Payment
Approval Date within RMS.
Pay Request Approval
PE/COR Complete Payment Processing
Millington Payment Deadline 15th of each month
Gov t processes Pay Request within 1wk
Millington District processes Pay Request within 1~2wks
Transacting 1~2wks
Yes
Yes
Up to 10% from Pay Request withheld
No
No
Current Date Approved Schedule
Data Date Delay Occurred!
Activity A Activity B Activity C
Activity E
Activity D
NTP CCD
Overall Delay
Current DateNTP Approved Schedule
Data Date CCDDelay Occurred!
Approved Schedule
TIA Schedule
Fragnet
契約課が日 程を承認
SDEFファイル
をインポート
契約課が支払依
頼をRMSに提出
プロジェクト担当官/
契約官代理が支払 依頼を確認
承認? 保留?
支払処理 RMS/CEFMs
契約課が支 払を受領
支払依頼を ミリングトン 地区へ送付
保留支払依頼から10%まで
米政府は支払依頼を1週間以内に処理 ミリングトン地区は支払依頼を 1-2週間以内に処理
1-2週間で処理
契約課が支払を受領 ミリングトン支払期限 は毎月15日
プロジェクト担当 官/契約担当官が 支払処理を完了
支払依頼承認
毎月1日までにRMS内の承認日
承認された日程
TIA日程
着工命令
着工命令
承認された日 程データ日時
承認された日 程データ日時
遅延発生!
遅延発生!
現在の日時
現在の日時
遅延全体
活動A 活動B 活動C 活動D
活動E
契約完了日
契約完了日
日程ネット ワークの一部
UNCLASSIFIED (FOUO)
SITE VISIT LOCATION 現場視察場所
1. BASE ENTRY LOCATION
基地入門場所
3. WALK TO SITE
現場まで徒歩
2. MEETING/PARKING
LOCATION FOR VISITORS
MEET AT PARKING LOT
FRIDAY, 07 JUN 24, 0930
訪問者の集合/駐車場所 駐車場で集合 2024年6月7日(金)、9時30分
THANK YOU
どうもありがとうございました
| Default Section |
| Slide 1: FY23 OMA Convert Vehicle Storage Warehouse B122-S1, Sagami General Depot W912HV-24-B-0012 pre-BID conference date: 06 Jun 24 2023年度 OMA車両保管倉庫の改装工事 B122-S1、相模総合補給廠 W912HV-24-B-0012 入札前会議 日時:2024年6月6日 |
| Slide 2: Welcome 歓 迎 |
| Slide 3: Discussion overview 説明会概要 |
| Slide 4 |
| Slide 5 |
| Slide 6: IFB SOLICITATION FORMAT IFB入札公告 書式 |
| Slide 7 |
| Slide 8: SECTION 00 10 00 SOLICITATION CONTRACT LINE ITEM (CLIN) 契約項目一覧 |
| Slide 9 |
| Slide 10 |
| Slide 11 |
| Slide 12 |
| Slide 13 |
| Slide 14 |
| Slide 15 |
| Slide 16 |
| Slide 17 |
| Slide 18 |
| Slide 19 |
| Slide 20 |
| Slide 21 |
| Slide 22 |
| Slide 23: General requirements 一般要件 |
| Slide 24 |
| Slide 25: CONSTRUCTION General requirements 工事の一般要件 |
| Slide 26 |
| Slide 27 |
| Slide 28 |
| Slide 29 |
File details come from the government source that posted it. Updated .