This solicitation is for the construction of a Marine Corps Barracks Complex consisting of two buildings, P810 and P812, on Kadena Air Base in Okinawa, Japan. The scope of work includes design, construction services, and materials to build the barracks complex using a Design-Bid-Build contracting approach. The solicitation is a competitive acquisition with award being made to a single contractor. Responses are due according to the solicitation schedule, with the selected contractor responsible for completing the design and construction of the barracks complex in accordance with the contract requirements. The Department of the Army Corps of Engineers Engineering District Japan is the contracting agency overseeing this project.

View the file

Other files

File Type Posted
SF1442 W912HV23R0003 AM-0005.pdf PDF
W912HV23R0003_AM-0005.pdf PDF
23R0003_Site Visit Sign-In.pdf PDF
Pre-Proposal Conf Slides_23R0003.pptx PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Marine Corps Barracks Complex, P810 and P812 W912HV23R0003 Kadena Air Base, Okinawa Japan

SECTION TABLE OF CONTENTS

DIVISION 05 - METALS

SECTION 05 12 00

STRUCTURAL STEEL

08/18

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 MLIT QUALITY CERTIFICATION

1.4 QUALITY ASSURANCE

1.4.1 Preconstruction Submittals

1.4.2 Fabrication Drawing Requirements

1.4.3 Certifications

1.4.3.1 Welding Procedures and Qualifications

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.2 STEEL

2.2.1 Structural Steel

2.2.2 Structural Steel Tubing

2.2.3 Steel Pipe

2.3 BOLTS, NUTS, AND WASHERS

2.3.1 Common Grade Bolts

2.3.1.1 Bolts

2.3.1.2 Nuts

2.3.1.3 Washers

2.3.2 High-Strength Bolts

2.3.2.1 Bolts

2.3.2.2 Nuts

2.3.2.3 Washers

2.4 STRUCTURAL STEEL ACCESSORIES

2.4.1 Welding Electrodes and Rods

2.4.2 Non-Shrink Grout

2.4.3 Welded Shear Stud Connectors

2.5 GALVANIZING

2.6 FABRICATION

2.6.1 Markings

2.6.2 Shop Primer

2.6.2.1 Cleaning

2.6.3 Surface Finishes

2.7 DRAINAGE HOLES

PART 3 EXECUTION

3.1 ERECTION

3.1.1 STORAGE

3.2 CONNECTIONS

3.2.1 Common Grade Bolts

3.2.2 High-Strength Bolts

SECTION 05 12 00 Page 1 AM-0005

3.2.3 Tension Control Bolts

3.3 GAS CUTTING

3.4 WELDING

3.4.1 Removal of Temporary Welds, Run-Off Plates, and Backing Strips

3.5 SHOP PRIMER REPAIR

3.5.1 Field Priming

3.6 GALVANIZING REPAIR

3.7 FIELD QUALITY CONTROL

3.7.1 Welds

3.7.1.1 Visual Inspection

3.7.1.2 Nondestructive Testing

3.7.2 High-Strength Bolts

3.7.2.1 Testing Bolt, Nut, and Washer Assemblies

3.7.2.2 Inspection

3.7.2.3 Testing

3.7.3 Inspection and Testing of Steel Stud Welding

-- End of Section Table of Contents --

SECTION 05 12 00 Page 2 AM-0005

SECTION 05 12 00

STRUCTURAL STEEL

08/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 303 (2016) Code of Standard Practice for Steel Buildings and Bridges

AISC 325 (2017) Steel Construction Manual

AISC 360 (2016) Specification for Structural Steel Buildings

AISC 420 (2010) Certification Standard for Shop Application of Complex Protective Coating Systems

AMERICAN WELDING SOCIETY (AWS)

AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination

AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel

ASME INTERNATIONAL (ASME)

ASME B46.1 (2020) Surface Texture, Surface Roughness, Waviness and Lay

JAPANESE ARCHITECTURAL STANDARD SPECIFICATIONS (JASS)

JASS 6 (2015) Structural Steelwork Specification for Building Construction

JAPANESE INDUSTRIAL STANDARDS (JIS)

JIS B 1048 (2007) Fasteners - Hot Dip Galvanized Coatings

JIS B 1180 (2014) Hexagon Head Bolts and Hexagon Head Screws

JIS B 1181 (2014) Hexagon Nuts and Hexagon Thin Nuts

JIS B 1186 (2013) Sets of High Strength Hexagon Bolt, Hexagon Nut and Plain Washers for Friction

SECTION 05 12 00 Page 3 AM-0005

Grip Joints

JIS B 1198 (2011) Headed Studs

JIS G 3106 (2017) Rolled Steels for Welded Structure (Amendment 1 )

JIS B 1256 (2008) Plain Washers

JIS G 3136 (2012) Rolled Steel for Building Structures

JIS G 3192 (2014) Dimensions, Mass and Permissible Variations of Hot Rolled Steel Sections

JIS G 3193 (2008) Dimensions, Mass and Permissible Variations of Hot Rolled Steel Plates, Sheets, and Strips

JIS G 3444 (2016) Carbon Steel Tubes for General Structure

JIS G 3466 (2015) Carbon Steel Square and Rectangular Tubes for General Structure

JIS Z2305 (2013) Non-destructive Testing - Qualification and Certification of Personnel

JIS H 8641 (2007) Hot Dip Galvanized Coatings

JIS K 5674 (2019) Lead-Free, Chromium-Free Anticorrosive Paints

JIS Z 3021 (2016) Welding and Allied Processes - Symbolic Representation

JIS Z 3060 (2015) Method of Ultrasonic Testing for Welds of Ferritic Steel

MINISTRY OF LAND, INFRASTRUCTURE, TRANSPORT AND TOURISM,

GOVERNMENT OF JAPAN (MLIT)

MLIT-SS Chapter 7 (2019) Public Building Construction Standard Specifications - Ch.7 Steel Frame Work

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals

SSPC SP 3 (1982; E 2004) Power Tool Cleaning

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-301-01 (2019, with Change 1, 2022) Structural Engineering

SECTION 05 12 00 Page 4 AM-0005 j2ppsapm Line

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR Part 1926, Subpart R Steel Erection

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Fabrication Drawings Including Details of Connections; G

SD-03 Product Data

Shop Primer

Welding Electrodes and Rods

Non-Shrink Grout

SD-06 Test Reports

Class A Coating

Weld Inspection Reports

Bolt Testing Reports

SD-07 Certificates

MLIT Structural Steel Fabricator Quality Certification

MLIT Structural Steel Erector Quality Certification

Welding Procedure Specifications (WPS)

1.3 MLIT QUALITY CERTIFICATION

Work must be fabricated by MLIT Structural Steel Fabricator, Category M.

Submit MLIT Structural Steel Fabricator quality certification.

Work must be erected by MLIT Structural Steel Certified Erector. Submit MLIT Structural Steel erector quality certification.

1.4 QUALITY ASSURANCE

1.4.1 Preconstruction Submittals

1.4.2 Fabrication Drawing Requirements

Submit fabrication drawings for approval prior to fabrication. Prepare in accordance with JASS 6 and MLIT-SS Chapter 7 . Fabrication drawings must not be reproductions of contract drawings. Include complete information for the fabrication and erection of the structure's components, including

SECTION 05 12 00 Page 5 AM-0005 the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts. Use AWS A2.4 or JIS Z 3021 standard welding symbols. Clearly highlight any deviations from the details shown on the contract drawings highlighted on the fabrication drawings. Explain the reasons for any deviations from the contract drawings.

1.4.3 Certifications

1.4.3.1 Welding Procedures and Qualifications

Prior to welding, submit certification for each welder stating the type of welding and positions qualified for, the code and procedure qualified under, date qualified, and the firm and individual certifying the qualification tests.

Conform to all requirements specified in JASS 6 .

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

Conform the design of structural steel system to AISC 360 , AISC 303 , and

UFC 3-301-01 .

Provide the structural steel system, including shop primer, complete and ready for use. Provide structural steel systems including materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing in accordance with JASS 6 and MLIT-SS Chapter 7 , except as modified in this contract.

2.2 STEEL

2.2.1 Structural Steel

Wide flange and WT shapes, JIS G 3136 , SN400B, 235 MPa (t >/- 40 mm) or 215 MPa (t > 40 mm). Angles and Channels JIS G 3106 , SS400, 245 MPa (t </- 16 mm), 235 MPa (16 mm < t </- 40 mm) and 215 MPa (t > 40 mm).

Plates, JIS G 3106 , SM520C, 365 MPa (t </- 16 mm), 355 MPa (16 mm < t </- 40 mm) and drawings.

2.2.2 Structural Steel Tubing

JIS G 3466 , STKR400, 245 MPa.

2.2.3 Steel Pipe

JIS G 3444 JIS G 3466 , STK490, 315 MPa, STK590, 440 MPa, HU590, 440 MPa or SEAH 590, 440 MPa. Pipe used for steel wing piles must meet the MLIT approved materials for either the Kenma II or AMZ installation methods, respectively.

2.3 BOLTS, NUTS, AND WASHERS

Submit the certified manufacturer's mill reports which clearly show the applicable JIS mechanical and chemical requirements together with the actual test results for the supplied fasteners.

SECTION 05 12 00 Page 6 AM-0005

USCB703456

Line

2.3.1 Common Grade Bolts

2.3.1.1 Bolts

JIS B 1180 with 420 MPa minimum tensile strength, hot dipped zinc coating in accordance with JIS B 1048 . The bolt heads and the nuts of the supplied fasteners must be marked with the manufacturer's identification mark, the strength grade and type specified by JIS or JASS 6 specifications.

2.3.1.2 Nuts

Heavy hex style JIS B 1181 , hot dipped zinc coating in accordance with

JIS B 1048 .

2.3.1.3 Washers

JIS B 1256 , hot dipped zinc coating in accordance with JIS B 1048 .

2.3.2 High-Strength Bolts

High strength bolts and nuts must be shipped together in the same shipping container. Fasteners indicated to be galvanized shall be tested by the supplier to show that the galvanized nut with the supplied lubricant provided may be rotated from the snug tight condition well in excess of the rotation required for pretentioned installation without stripping.

The supplier shall supply nuts that have been lubricated and tested with the supplied bolts.

2.3.2.1 Bolts

JIS B 1186 , Type F10T.

2.3.2.2 Nuts

JIS B 1186 , F10 hot dipped zinc coating.

2.3.2.3 Washers

JIS B 1186 , F35, hot dipped zinc coating.

2.4 STRUCTURAL STEEL ACCESSORIES

2.4.1 Welding Electrodes and Rods

AWS D1.1/D1.1M or JASS 6 . Submit product data for welding electrodes and rods.

2.4.2 Non-Shrink Grout

Packaged dry, hydraulic cement non-shrink grout, that is non-metallic, non-corrosive, non-bleed, with the following performance requirements when prepared using the highest water-to-solids ratio, maximum flow, or most fluid consistency at 23.0 plus/minus 2.0 degrees C:

a. Minimum compressive strengths: 2.5 MPa at 1 day; 25.0 MPa at 3 day;

40.0 MPa at 7 day; and 50.0 MPa at 28 day.

b. Early height change (maximum percent at time of final setting): + 4.0

SECTION 05 12 00 Page 7 AM-0005 percent.

c. Height change of moist cured hardened grout: 0.0 to + 0.3 percent at 1-day, 3-day, 14-day and 28-day.

2.4.3 Welded Shear Stud Connectors

JIS B 1198 , 450MPa minimum ultimate tensile strength and 350MPa minimum yield strength.

2.5 GALVANIZING

JIS B 1048 for threaded parts or JIS H 8641 for structural steel members, as applicable, unless specified otherwise galvanize after fabrication where practicable.

2.6 FABRICATION

Fabrication must be in accordance with the applicable provisions of AISC 325 and JASS 6 . Fabrication and assembly must be done in the shop to the greatest extent possible. Punch, subpunch and ream, or drill bolt holes perpendicular to the surface of the member.

Compression joints depending on contact bearing must have a surface roughness not in excess of 13 micrometer as determined by ASME B46.1 , and ends must be square within the tolerances for milled ends specified in JIS G 3192 , JIS G 3193 , and JASS 6 .

Shop splices of members between field splices will be permitted only where indicated on the Contract Drawings. Splices not indicated require the approval of the Contracting Officer.

2.6.1 Markings

Prior to erection, identify members by a painted erection mark.

Connecting parts assembled in the shop for reaming holes in field connections must be match marked with scratch and notch marks. Do not locate erection markings on areas to be welded. Do not locate match markings in areas that will decrease member strength or cause stress concentrations. Affix embossed tags to hot-dipped galvanized members.

2.6.2 Shop Primer

Shop prime structural steel, JIS K 5674 lead Free, chromium Free, anticorrosive paint, except as modified herein, in accordance with SSPC PA 1 . Do not prime steel surfaces embedded in concrete, galvanized surfaces, surfaces to receive sprayed-on fireproofing, slip critical surfaces of high strength bolted connections, or surfaces within 13 mm of the toe of the welds prior to welding (except surfaces on which metal decking and shear studs are to be welded). If flash rusting occurs, re-clean the surface prior to application of primer. Apply primer of AISC 420 or approved equal NACE or SSPC certification to a minimum dry film thickness of 0.05 mm. Submit shop primer product data.

Prime slip critical surfaces with a Class A coating in accordance with

AISC 325 .

Prior to assembly, prime surfaces which will be concealed or inaccessible after assembly. Do not apply primer in foggy or rainy weather; when the

SECTION 05 12 00 Page 8 AM-0005 ambient temperature is below 7 degrees C or over 35 degrees C; or when the primer may be exposed to temperatures below 4 degrees C within 48 hours after application, unless approved otherwise by the Contracting Officer.

Repair damaged primed surfaces with an additional coat of primer.

2.6.2.1 Cleaning

SSPC SP 6/NACE No.3 , except steel exposed in spaces above ceilings, attic spaces, furred spaces, and chases that will be hidden to view in finished construction may be cleaned to SSPC SP 3 when recommended by the shop primer manufacturer. Maintain steel surfaces free from rust, dirt, oil, grease, and other contaminants through final assembly.

2.6.3 Surface Finishes

ASME B46.1 maximum surface roughness of 125 for pin, pinholes, and sliding bearings, unless indicated otherwise.

2.7 DRAINAGE HOLES

Drill adequate drainage holes to eliminate water traps. Hole diameter must be 13 mm and location indicated on the detail drawings. Hole size and locations must not affect the structural integrity.

PART 3 EXECUTION

3.1 ERECTION

a. Erection of structural steel must be in accordance with the applicable provisions of AISC 325 , AISC 303 and 29 CFR Part 1926, Subpart R or MLIT-SS Chapter 7 and JASS 6 .

After final positioning of steel members, provide full bearing under base plates and bearing plates using nonshrink grout. Place nonshrink grout in accordance with the manufacturer's instructions or MLIT-SS Chapter 7 and

JASS 6 .

3.1.1 STORAGE

Store the material out of contact with the ground in such manner and location as to minimize deterioration.

3.2 CONNECTIONS

Except as modified in this section, design connections indicated in accordance with AISC 360 . Build connections into existing work. Do not tighten anchor bolts set in concrete with impact torque wrenches. Holes must not be cut or enlarged by burning. Bolts, nuts, and washers must be clean of dirt and rust, and lubricated immediately prior to installation.

3.2.1 Common Grade Bolts

Tighten JIS B 1180 bolts to a "snug tight" fit. "Snug tight" is the tightness that exists when plies in a joint are in firm contact. If firm contact of joint plies cannot be obtained with a few impacts of an impact wrench, or the full effort of a man using a spud wrench, contact the Contracting Officer for further instructions.

SECTION 05 12 00 Page 9 AM-0005

3.2.2 High-Strength Bolts

Provide direct tension indicator washers in all JIS B 1186 bolted connections. Bolts must be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, fully tension bolts, progressing from the most rigid part of a connection to the free edges.

Fastener components shall be protected from dirt and moisture in closed containers at the site of the installation. Fastener components that are not incorporated into the work shall be returned to protected storage at the end of the work shift.

3.2.3 Tension Control Bolts

Bolts must be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, fully tension bolts, progressing from the most rigid part of a connection to the free edges.

3.3 GAS CUTTING

Use of gas-cutting torch in the field for correcting fabrication errors is not permitted on any major member in the structural framing. Use of a gas cutting torch will be permitted on minor members not under stress only after approval has been obtained from the Contracting Officer.

3.4 WELDING

Welding must be in accordance with JASS 6 . Grind exposed welds smooth as indicated. Provide JASS 6 qualified welders, welding operators, and tackers.

Develop and submit the Welding Procedure Specifications (WPS) for all welding, including welding done using prequalified procedures. Submit for approval all WPS, whether prequalified or qualified by testing.

3.4.1 Removal of Temporary Welds, Run-Off Plates, and Backing Strips

Remove only from finished areas.

3.5 SHOP PRIMER REPAIR

Repair shop primer in accordance with the paint manufacturer's recommendation for surfaces damaged by handling, transporting, cutting, welding, or bolting.

3.5.1 Field Priming

Field prime steel exposed to the weather, or located in building areas without HVAC for control of relative humidity. After erection, the field bolt heads and nuts, field welds, and any abrasions in the shop coat must be cleaned and primed with paint of the same quality as that used for the shop coat.

3.6 GALVANIZING REPAIR

Repair damage to galvanized coatings using JASS 6 zinc rich paint for galvanizing damaged by handling, transporting, cutting, welding, or

SECTION 05 12 00 Page 10 AM-0005 bolting. Do not heat surfaces to which repair paint has been applied.

3.7 FIELD QUALITY CONTROL

Perform field tests, and provide labor, equipment, and incidentals required for testing, except that electric power for field tests will be furnished as set forth in Division 1. Notify the Contracting Officer in writing of defective welds, bolts, nuts, and washers within 7 working days of the date of the inspection.

3.7.1 Welds

3.7.1.1 Visual Inspection

Perform in accordance with JASS 6 . Furnish the services of certified welding inspectors for fabrication and erection inspection and testing and verification inspections. A Certified Welding Inspector must perform visual inspection on 100 percent of all welds. Document this inspection in the Visual Weld Inspection Log. Submit certificates indicating that certified welding inspectors meet the requirements of Japanese Welding Engineering Society (JWES) and JASS 6 .

Inspect proper preparation, size, gaging location, and acceptability of all welds; identification marking; operation and current characteristics of welding sets in use.

3.7.1.2 Nondestructive Testing

Nondestructive testing must be in accordance with JASS 6 and JIS Z 3060 .

Ultrasonic testing must be performed in accordance with Table 6.2 or 6.3 of AWS D1.1/D1.1M . Test locations must be as indicated or selected by the Contracting Officer. All personnel performing NDT must be certified in accordance with JIS Z2305 in the method of testing being performed.

Submit certificates showing compliance with JIS Z2305 for all NDT technicians. If more than 20 percent of welds made by a welder contain defects identified by testing, then all groove welds made by that welder must be tested by ultrasonic testing, and all fillet welds made by that welder must be inspected by magnetic particle testing (MT) or dye penetrant testing (PT) as approved by the Contracting Officer. When groove welds made by an individual welder are required to be tested, magnetic particle or dye penetrant testing may be used only in areas inaccessible to ultrasonic testing. Retest all repaired areas. Submit weld inspection reports.

Testing frequency: Provide the following types and number of tests:

Test Type Number of Tests

Ultrasonic 100 percent of CJP Welds

Magnetic Particle 50 percent of PJP and Fillet Welds

3.7.2 High-Strength Bolts

3.7.2.1 Testing Bolt, Nut, and Washer Assemblies

Test a minimum of 3 bolt, nut, and washer assemblies from each mill certificate batch in a tension measuring device at the job site prior to the beginning of bolting start-up. Demonstrate that the bolts and nuts, SECTION 05 12 00 Page 11 AM-0005 when used together, can develop tension not less than the provisions specified in AISC 360 , depending on bolt size and grade. The bolt tension must be developed by tightening the nut. A representative of the manufacturer or supplier must be present to ensure that the fasteners are properly used, and to demonstrate that the fastener assemblies supplied satisfy the specified requirements. Submit bolt testing reports.

3.7.2.2 Inspection

Inspection procedures must be in accordance with JASS 6 and MLIT-SS Chapter 7 . As a minimum, high-strength bolting inspection tasks shall be in accordance with Section 01 45 35 SPECIAL INSPECTION. Confirm and report to the Contracting Officer that the materials meet the project specification and that they are properly stored. Confirm that the faying surfaces have been properly prepared before the connections are assembled. Observe the specified job site testing and calibration, and confirm that the procedure to be used provides the required tension.

Monitor the work to ensure the testing procedures are routinely followed on joints that are specified to be fully tensioned.

3.7.2.3 Testing

The Government has the option to perform nondestructive tests on 5 percent of the installed bolts to verify compliance with pre-load bolt tension requirements. Provide the required access for the Government to perform the tests. The nondestructive testing will be done in-place using an ultrasonic measuring device or any other device capable of determining in-place pre-load bolt tension. The test locations must be selected by the Contracting Officer. If more than 10 percent of the bolts tested contain defects identified by testing, then all bolts used from the batch from which the tested bolts were taken, must be tested at the Contractor's expense. Retest new bolts after installation at the Contractor's expense.

3.7.3 Inspection and Testing of Steel Stud Welding

Perform verification inspection and testing of steel stud welding conforming to the requirements of JASS 6 , Stud Welding Clause. The Contracting Officer will serve as the verification inspector. Bend test studs that do not show a full 360 degree weld flash or have been repaired by welding as required by JASS 6 , Stud Welding Clause. Studs that crack under testing in the weld, base metal or shank will be rejected and replaced by the Contractor at no additional cost.

-- End of Section --

SECTION 05 12 00 Page 12 AM-0005

STRUCTURAL STEEL
05 12 00 - STRUCTURAL STEEL
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 MLIT QUALITY CERTIFICATION
1.4 QUALITY ASSURANCE
1.4.1 Preconstruction Submittals
1.4.2 Fabrication Drawing Requirements
1.4.3 Certifications
1.4.3.1 Welding Procedures and Qualifications
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 STEEL
2.2.1 Structural Steel
2.2.2 Structural Steel Tubing
2.2.3 Steel Pipe
2.3 BOLTS, NUTS, AND WASHERS
2.3.1 Common Grade Bolts
2.3.1.1 Bolts
2.3.1.2 Nuts
2.3.1.3 Washers
2.3.2 High-Strength Bolts
2.3.2.1 Bolts
2.3.2.2 Nuts
2.3.2.3 Washers
2.4 STRUCTURAL STEEL ACCESSORIES
2.4.1 Welding Electrodes and Rods
2.4.2 Non-Shrink Grout
2.4.3 Welded Shear Stud Connectors
2.5 GALVANIZING
2.6 FABRICATION
2.6.1 Markings
2.6.2 Shop Primer
2.6.2.1 Cleaning

2.6.3 Surface Finishes

2.7 DRAINAGE HOLES

PART 3 EXECUTION
3.1 ERECTION
3.1.1 STORAGE
3.2 CONNECTIONS
3.2.1 Common Grade Bolts
3.2.2 High-Strength Bolts
3.2.3 Tension Control Bolts
3.3 GAS CUTTING
3.4 WELDING
3.4.1 Removal of Temporary Welds, Run-Off Plates, and Backing Strips
3.5 SHOP PRIMER REPAIR
3.5.1 Field Priming
3.6 GALVANIZING REPAIR
3.7 FIELD QUALITY CONTROL
3.7.1 Welds
3.7.1.1 Visual Inspection
3.7.1.2 Nondestructive Testing
3.7.2 High-Strength Bolts
3.7.2.1 Testing Bolt, Nut, and Washer Assemblies
3.7.2.2 Inspection
3.7.2.3 Testing

3.7.3 Inspection and Testing of Steel Stud Welding

File details come from the government source that posted it. Updated .