AM-0003 Stearley Heights Specs 1DEC21.pdf
PDF 2 MB Posted
- Attached to
- FY19 LXEZ 194643 Improve Military Family Housing, Stearley Heights, Kadena Air Base, Okinawa, Japan
- Solicitation number
- W912HV21B0003
About this file
This solicitation provides the specifications and drawings for the FY19 LXEZ 194643 project to improve military family housing at Stearley Heights in Kadena Air Base, Okinawa, Japan. The project scope includes whole-house interior and exterior modernization, renovation, and repair of 130 single family dwelling units, including restoration of unit lots, building systems, and spaces. Work comprises management, design, supplies, equipment, labor and services to improve utilities, pavements, structures, mechanical and electrical systems, plumbing, fire and life safety, and environmental aspects. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Japan for construction with a magnitude between YEN2,500,000,000 and YEN10,000,000,000.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Consolidated GFP Attachment V.M.1.1
Government Furnished Property
Attachment Number
Attachment File of
Attachment Date
Government Contracting Officer
Name Email Phone
Contract Award Contract Modification Solicitation AmendmentOR
Modification Number Amendment Number
Reference Procurement Instrument Number
Custodial Procurement Instrument Identification
Solicitation, Contract or Uniform PIID Number Issuing Office
DoDAAC Issue Year
(YY)
Contract
Type Sequence Number
Order Number (PIID Format FY16+) Issuing Office
DoDAAC Issue Year
(YY)
Contract
Type Sequence Number OR
Old Order Format
Reset Form Validate
01 11 00.00 10-A (AM-0003)
Government Furnished Property
ADD SERIALLY MANAGED ITEMS LIST
Line Number Item Name Item Description NSN CAGE Part
Number Model
Number Serial
Number UII QTY Unit of Measure Unit Cost Use As Is
Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes
ADD NON-SERIALLY MANAGED ITEMS LIST
Line Number Item Name Item Description NSN CAGE Part
Number Model
Number QTY Unit of Measure Unit Cost Use As Is
Refrigerator 509L Top Freezer Refrigerator WRT138FZDM
Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes
Line Number Item Name Item Description NSN CAGE Part
Number Model
Number QTY Unit of Measure Unit Cost Use As Is
Refrigerator 594L Top Freezer Refrigerator WRT311SFY
Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes
Line Number Item Name Item Description NSN CAGE Part
Number Model
Number QTY Unit of Measure Unit Cost Use As Is
Range 762mm Freestanding Electric Range WFC150M0JB
Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes
Line Number Item Name Item Description NSN CAGE Part
Number Model
Number QTY Unit of Measure Unit Cost Use As Is
Dishwasher Undercounter Dishwasher WDT750SAHZ
Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes
Line Number Item Name Item Description NSN CAGE Part
Number Model
Number QTY Unit of Measure Unit Cost Use As Is
Washer Top Loading Washer WTW7000DW
Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes
Line Number Item Name Item Description NSN CAGE Part
Number Model
Number QTY Unit of Measure Unit Cost Use As Is
Dryer Electric & Gas Dryer WED7000DW
Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes
Items Authorized to be Requisitioned by the Contractor and Paid for by DoD
ADD Line Number Item Name Item Description NSN CAGE Part
Number QTY Unit of Measure Unit Cost Use As Is
Remove
FY21 Improve Family Housing Stearley Heights 19AF0002 Kadena, Okinawa, Japan
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 GENERAL
Payment items for the work of this Contract for which payments shall be made are listed in the CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, topographic surveys, cost of bond premiums, and for performing all work required by drawings and specifications for which separate payment is not otherwise provided. Work paid for under one item shall not be paid for under any other item. No separate payment shall be made for the work, services, or operations required by the Contractor, as specified in DIVISION 01, GENERAL REQUIREMENTS, to complete the project in accordance with these specifications; all costs thereof shall be considered as incidental to the work.
1.2 LINE ITEMS
1.2.1 CLIN 0001, Building Renovation within Phase I(BASE)
1.2.1.1 Payment
Payment shall be made at the Contract job price for CLIN 0001 "Building Renovation within Phase I" for work completed including, but not limited to renovation of thirteen(13) D3-53 Housing Units, nine(9) G3-53 Housing Units, one(1) H4-53 Housing Unit, nine(9) L3-53 Housing Units, and one(1) N3-53 Housing unit, in Phase I as shown on Sheet G-007 and Sheet G-008.
Payment for work completed shall constitute full compensation of CLIN 0001, complete.
1.2.1.2 Unit of Measure
Unit of measure: job.
1.2.2 CLIN 0002, Building Renovation within Phase II (BASE)
1.2.2.1 Payment
Payment shall be made at the Contract job price for CLIN 0002 "Building Renovation within Phase II" for work completed including, but not limited to, renovation of twelve(12) D3-53 Housing Units, nine(9) G3-53 Housing Units, nine(9) L3-53 Housing Units, and four(4) N3-53 Housing Units, in Phase II as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0002, complete.
SECTION 01 22 00.00 10 Page 1
W912HV-21-B-0003 (AM-0003)
1.2.2.2 Unit of Measure
Unit of measure: job.
1.2.3 CLIN 0003, Building renovation within Phase III (BASE)
1.2.3.1 Payment
Payment will be made at Contract job price for CLIN 0003 "Building renovation within Phase III" for work completed including, but not limited to, renovation of thirty-nine(39) f our t een ( 14) D3-53 Housing Units, nine(9) G3-53 Housing Units, and nine(9) L3-53 Housing Units, in Phase III as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0003, complete.
1.2.3.2 Unit of Measure
Unit of measure: job.
1.2.4 CLIN 0004 Sitework within Phases I-III (OPTION 1)
1.2.4.1 Payment
Payment will be made at Contract job price for CLIN 0004 "Sitework within Phases I-III" for work completed, but not limited to all sitework in all phases I,II, and III as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0004, complete.
1.2.4.2 Unit of Measure
Unit of measure: job.
1.2.5 CLIN 0005 Renovate Buildings 2200, 2201, 2202, 2204, 2206 within Phase IV including sitework (OPTION 2)
1.2.5.1 Payment
Payment will be made at Contract job price for CLIN 0005 "Renovate Buildings 2200, 2201, 2202, 2204, 2206 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2200, 2201, 2202, 2204, and 2206, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0005, complete.
1.2.5.2 Unit of Measure
Unit of Measure: job.
1.2.6 CLIN 0006 Renovate Buildings 2120, 2122, 2124, 2126, 2128 within Phase IV including sitework(OPTION 3)
1.2.6.1 Payment
Payment will be made at Contract job price for CLIN 0008 "Renovate Buildings 2120, 2122, 2124, 2126, 2128 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2120, SECTION 01 22 00.00 10 Page 2
W912HV-21-B-0003 (AM-0003)
j2ee9gsg
2122, 2124, 2126, 2128, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0006, complete.
1.2.6.2 Unit of Measure
Unit of Measure: job.
1.2.7 CLIN 0007 Renovate Buildings 2112, 2114, 2116, 2118 within Phase IV including sitework (OPTION 4)
1.2.7.1 Payment
Payment will be made at Contract job price for CLIN 0007 "Renovate Buildings 2112, 2114, 2116, 2118 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2112, 2114, 2116, 2118, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0007, complete.
1.2.7.2 Unit of Measure
Unit of Meausre: job.
1.2.8 CLIN 0008 Renovate Buildings 2104, 2106, 2108, 2110 within Phase IV including sitework (OPTION 5)
1.2.8.1 Payment
Payment will be made at Contract job price for CLIN 0008 "Renovate Buildings 2104, 2106, 2108, 2110 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2104, 2106, 2108, 2110, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0008, complete.
1.2.8.2 Unit of Measure
Unit of Measure: job.
1.2.9 CLIN 0009 Renovate Buildings 1819, 1821, 1823, 1825, 1827, 1829 within Phase IV including sitework (OPTION 6)
1.2.9.1 Payment
Payment will be made at Contract job price for CLIN 0009 "Renovate Buildings 1819, 1821, 1823, 1825, 1827, 1829 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 1819,1821, 1823, 1825, 1827, 1829, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0009, complete.
1.2.9.2 Unit of Measure
Unit of Measure: job.
SECTION 01 22 00.00 10 Page 3
1.2.10 CLIN 0010 Renovate Buildings 1831, 1833, 1835, 1837, 1839, 1841, 1843 within Phase IV including sitework (OPTION 7)
1.2.10.1 Payment
Payment will be made at Contract job price for CLIN 0010 "Renovate Buildings 1831, 1833, 1835,1837, 1839, 1841, 1843 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 1831, 1833, 1835, 1837, 1839, 1841, 1843, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0010, complete
1.2.10.2 Unit of Measure
Unit of Measure: job.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PROGRESS PAYMENT INVOICE
Requests for payment shall be submitted in accordance with Federal Acquisition Regulations (FAR) Subpart 32.9, entitled "PROMPT PAYMENT", and Paragraphs 52.232-5 and 52.232-27, entitled "Payments Under Fixed-Price Construction Contracts", and "Prompt Payment for Construction Contracts", respectively. In addition each request shall be submitted in the number of copies and to the designated billing office as shown in the Contract.
When submitting payment requests, the Contractor shall complete Blocks 1 through 12 of the "PROGRESS PAYMENT INVOICE" Form as directed by the Contracting Officer (provided in RMS CM). The completed form shall then become the cover document to which all other support data shall be attached.
One additional copy of the entire request for payment, to include the "PROGRESS PAYMENT INVOICE" cover document, shall be forwarded to a separate address as designated by the Contracting Officer.
The Contractor shall submit with each pay request, a list of subcontractors that have worked during that pay period. The listing shall be broken down into weeks, identifying each subcontractor that has worked during a particular week, and indicate the total number of employees that have worked on site for each subcontractor for each week. The prime Contractor shall also indicate the total number of employees for its on site staff for each week.
3.2 CONTRACT COST BREAKDOWN
The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.
SECTION 01 22 00.00 10 Page 4
3.3 CONTRACT ADMINISTRATION
3.3.1 Contracting Officer (KO)
This Contract shall be administered by a Contracting Officer (KO) assigned to the U.S. Army Corps of Engineers, Japan Engineer District, APO AP 96338-5010.
3.3.2 Administrative Contracting Officer (ACO)
In accordance with the USACE Acquisition Instruction (UAI) Section 1.602-1-100, Administrative Contracting Officer(s) (ACO's) may be delegated a part of the Contracting Officer's authority to modify this Contract and perform Contract administration functions under Federal Acquisition Regulation (FAR) Section 42.302, subject to the authority and limitations set forth in the appointment and delegation letter.
3.3.3 Contracting Officer's Representative (COR)
The Contracting Officer may designate one or more individuals as his/her authorized representatives in administering this Contract. Refer to the clause in Section 00 70 00 CONDITIONS OF THE CONTRACT entitled CONTRACTING OFFICER'S REPRESENTATIVE (DFARS 252.201-7000) for the definition and limited authority of CORs.
3.4 DESIGNATED BILLING OFFICE
The designated billing office for this Contract is:
Resident Engineer, Zukeran Resident Office U.S. Army Corps of Engineers, Japan Engineer District Unit 35132
APO AP 96376-5132
-- End of Section --
SECTION 01 22 00.00 10 Page 5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 44 PAGES
W912HV-21-B-0003
FY21 Improve Family Housing Stearley Heights
01 11 00.00 10 SD-01 Preconstruction Submittals
1.11Initial Site Conditions Photos
1.7 GKey Personnel Qualifications
1.10.2Conformed Drawings Submittal
SD-07 Certificates
1.11Monthly Progress Photos
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update
01 35 26 SD-01 Preconstruction Submittals
1.7.2.2 GStandard Lift Plan
1.7 GAccident Prevention Plan (APP)
1.7.2.3 GCritical Lift Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
01 35 26 1.9.1Hot Work Permit
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
1.4 GIndoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
1.5.5.1 GICC-ESR Evaluation Report for
Adhesive Anchors
SD-06 Test Reports
3.1.2 GDaily Reports
3.1.1 GBiweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1 GCertificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
3.3.2 GTemporary Utility Connections
Plan
1.3.1 GPhasing Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
01 57 19.01 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.9.12.1 GSolid Waste Management Permit
1.8.2Regulatory Notifications
1.9 GEnvironmental Protection Plan
1.9.8.2 GDirt and Dust Control Plan
1.8.5 GEmployee Training Records
1.8.4 GEnvironmental Manager
Qualifications
3.15.3 GTemporary Fuel Storage Tank
Approval Request
3.15.5 GUnderground Fuel Storage Tank
Approval Request
1.9.4 GDig Permit
3.8.1 GWaste Determination
Documentation
1.8.3 GLicenses/Permits/Notifications
1.9.9.1 GStormwater Pollution Prevention
Plan
1.9.9.1 GStormwater Pollution Prevention
Plan
SD-06 Test Reports
3.8.1.1.2Laboratory Analysis
3.2.2Inspection Reports
3.8.2.1 GSolid Waste Management Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
01 57 19.01 3.7.2Nonhazardous Solid Waste
Diversion Report
1.9.11.2Hazardous Waste Analysis
Report
SD-07 Certificates
1.8.5 GEmployee Training Records
1.9.12.1Solid Waste Management
License
1.7.1Asbestos Certification
1.7.2Lead Certification
3.11 GWritten Assessment Of Friable
Asbestos Disturbance
SD-11 Closeout Submittals
3.8.1 GWaste Determination
Documentation
3.8.3.5 GDisposal Documentation for
Hazardous and Regulated Waste
1.8.5 GAssembled Employee Training
Records
1.9.12.1 GSolid Waste Management Permit
3.8.2.1 GSolid Waste Management Report
3.8.3.1 GHazardous Waste/Debris
Management
1.9.13.2 GFuel Storage Tank
Installation/Removal Report
1.8.2 GRegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
01 57 19.01 3.8.2.1Sales Documentation
1.11Environmental Records Binder
3.8.2.1Contractor Certification
3.8.2.1Contractor Certification
1.10General Use Permitted
Equipment
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags
3.8Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.7.1 GAs-Built Record of Equipment
and Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
01 78 00 3.6 GAs-Built Record of Equipment and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
02 82 13.00 10 SD-01 Preconstruction Submittals
1.4 GAsbestos Hazard Abatement Plan
SD-02 Shop Drawings
1.7.1 GDetailed Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
02 82 13.00 10 3.11.3.1 GAsbestos Waste Shipment
Records
1.1Weight Bills and Delivery Tickets
2.1 GEncapsulants
1.9.1 GRespiratory Protection Program
3.11 GCleanup and Disposal
1.6.1 GQualifications
1.11Training Program
1.8.1Licenses, Permits and
Notifications
3.11.3.2 GAsbestos Management Plan
SD-06 Test Reports
3.9Exposure Assessment and Air
Monitoring
1.7.3Local Exhaust System
SD-07 Certificates
1.7.3Local Exhaust System
2.1 GEncapsulants
1.9Medical Surveillance
Requirements
SD-10 Operation and Maintenance
Data
2.3Recyclable Materials
02 82 13.00 30 SD-01 Preconstruction Submittals
1.5.2.5 GMedical Examinations
3.3 GSampling Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
02 82 13.00 30 3.3.2 GAsbestos Sampling Plan
SD-04 Samples
3.4.4 GAsbestos Sampling/Assessment
Record
SD-06 Test Reports
3.4 GAsbestos Sampling And Analysis
Report
3.2.3 GLaboratory Analysis
3.2.1 GLaboratory Analysis Reports
SD-07 Certificates
1.5.2.11 GCertificate Of Workers
Acknowledgment
3.1 GAsbestos Hazard Abatement Plan
SD-11 Closeout Submittals
1.4.3 GHazardous Waste Manifest
1.5.2.12 GHazardous Waste Manifest
3.2.5 GHazardous Waste Manifest
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.2 GLead Work Plan
1.2.7 GIndustrial Hygienist/Private
Qualified Person (IH/PQP)
1.5.1.1 GIndustrial Hygienist/Private
Qualified Person (IH/PQP)
1.5.1.2 GTraining Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
02 83 13.00 20 1.5.2.8 Glead waste management plan
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 Gsampling results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.3 GTesting laboratory
1.5.1.4 GThird party consultant
qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GDisposal Documentation
02 83 19.00 30 SD-01 Preconstruction Submittals
1.4.1.1 GLead Hazard Abatement Plan
SD-06 Test Reports
1.4.1.2.1 GLaboratory Results
1.4.1.2.1 GToxicity Analysis
SD-11 Closeout Submittals
1.4.1.3 GHazardous Waste Manifest
02 84 16 SD-01 Preconstruction Submittals
1.4.3Pcb And Lamp Removal And
Disposal Work Plan
1.8.2Pcb And Lamp Removal And
Disposal Work Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
02 84 16 3.5.1 GJapan Specially Controlled
Hazardous Waste Disposal Permit
3.5.5Transporter Certification
3.5.6.2Disposal Request Form
SD-07 Certificates
1.4.3 GPCB and Lamp Removal and
Disposal Work Plan
1.8.2 GPCB and Lamp Removal and
Disposal Work Plan
1.8.1 GQualifications of IH/PQP
1.8.1 GTraining Certification
1.8.3 GPCB and Lamp Disposal Plan
3.5.2 GJapan Industrial Waste Collection
And Transport Permit
SD-11 Closeout Submittals
3.5.3Copy E of the Japanese
Hazardous Waste Manifest
3.3.1Signed Ballast Turn-in (at Bldg
3625) Sheet
3.2.4Certification Of Decontamination
03 30 00 SD-01 Preconstruction Submittals
1.6.4 GQuality Control Plan
1.6.7 GLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
03 30 00 2.1Formwork Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.6.2Mechanical Reinforcing Bar
Connectors
2.4.7 GEpoxy Mortar Patching Material
for Spall Repair
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.3.1Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.5.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
SD-05 Design Data
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
SD-07 Certificates
1.3MLIT Structural Steel Fabricator
Quality Certification
1.3MLIT Structural Steel Erector
Quality Certification
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
05 30 00 SD-04 Samples
2.1.1Metal Roof Deck Units
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Welder Qualifications
1.3.2Welding Procedures
1.3.3.1Fire Safety
1.3.1Manufacturer's Certificate
2.2.11Stud Manufacture's Certification
2.2.11Stud Manufacture's Test Reports
05 50 13 SD-02 Shop Drawings
2.3 GAngles and Plates
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 GWood Products
2.4 GCountertops
1.4 GTreated Wood Products
2.2 GSoffits
2.3 GFascias and Trim
2.8 GHardware and Accessories
2.1.7Recycled Content for
MDF/Particleboard
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
06 20 00 1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
2.1.6Indoor Air Quality for Hardwood
Plywood
2.1.7Indoor Air Quality for MDF and
Particleboard
2.9.1.2Indoor Air Quality for Non-aerosol
Adhesives
2.9.1.2Indoor Air Quality for Aerosol
Adhesives
06 61 16 SD-02 Shop Drawings
1.5.2 GDetail Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.5.1Qualifications
2.3Fabrications
2.2.4Indoor air quality for solid surface seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.3 GCounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
06 61 16 2.3Fabrications
1.5.1Qualifications
2.1Indoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
1.6.4 GAir Leakage Test Report
3.5.7 GAir Leakage Test Report
1.6.4 GDiagnostic Test Report
3.6.5 GDiagnostic Test Report
07 21 13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
07 21 13 1.3 GManufacturer's Standard Details
2.2 GBlock or Board Insulation
2.3 GVapor Retarder
2.4 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
2.6 GAccessories
2.1.2Recycled Content for Block or
Board Insulation
2.2.5Recycled Content for Block or
Board Insulation
SD-07 Certificates
2.2 GBlock or Board Insulation
2.3 GVapor Retarder
2.5 GProtection Board or Coating
1.8 GSpecial Warranties
1.8 GSpecial Warranties
2.2.6Indoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
2.2Block or Board Insulation
2.6.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2Recycled Content for Insulation
Materials
2.3Pressure Sensitive Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
07 21 16 2.4Accessories
SD-07 Certificates
2.4.1Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-04 Samples
3.1.2 GMock-Up
2.1 GMaterial Samples For Air Barrier
System
SD-05 Design Data
1.8 GDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
07 27 26 1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
07 27 26 1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
07 56 00.00 23 SD-02 Shop Drawings
1.10 GFluid-Applied Roofing Membrane
SD-03 Product Data
1.10 GFluid-Applied Roofing Membrane
1.10.2 GSafety Data Sheets
2.4 GReinforcement
2.2 GPrimers, Adhesives, And Mastics
1.11 GWarranty
SD-04 Samples
1.10.3 GMockup
2.4 GReinforcement
SD-05 Design Data
1.2.2 GWind Uplift Calculations
SD-06 Test Reports
1.10.4Field Peel Adhesion Test
1.6 GCapillary Moisture Test
3.6.1 GSite Inspections
SD-07 Certificates
1.4.1Material and Equipment
1.4.1Material and Equipment
1.4.2Manufacturer Qualifications
1.4.3 GQualification Of Applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
07 56 00.00 23 1.10 GFluid-Applied Roofing Membrane
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.16 GExpansion Joints
3.1.9 GBase Flashing
3.1.10 GCounterflashing
3.1.17 GFlashing at Roof Penetrations
and Equipment Supports
3.1.11 GReglets
3.1.11.1 GReglets
3.1.13 GDrip Edges
3.1.14 GEave Flashing
2.1Recycled Content
SD-03 Product Data
2.2.6 GCool Roof
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
07 84 00 2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
Indoor Air Quality For Interior
Sealants
2.1.3Indoor Air Quality For Interior
Acoustical Sealants
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-03 Product Data
1.5.1 GDoor and Frame Assembly
2.2.3Recycled Content of Aluminum
Material
SD-04 Samples
1.5.2 GFinish Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
08 11 16 SD-05 Design Data
1.2.1 GCalculations
1.2.2 GAir Infiltration
1.2.3 GWater Penetration
1.2.4 GNFRC Project Label Certificates
for Fenestration
SD-08 Manufacturer’s Instructions
1.5.1 GDoor and Frame Assembly
1.5.4 GAdjustments, Cleaning, and
Maintenance
1.2.4 GNFRC Project Label Certificates
for Fenestration
08 11 69 SD-02 Shop Drawings
2.1.4Storm doors
SD-03 Product Data
2.1.4Storm doors
2.1.4.1Hardware
SD-04 Samples
2.3 Gfinishes
SD-06 Test Reports
2.1.4Storm doors
SD-10 Operation and Maintenance
Data
2.1.4 GStorm doors
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
08 14 00 SD-03 Product Data
2.1 GDoors
2.2Accessories
2.3.7Water-resistant Sealer
1.5Warranty
2.1.2 GSound Transmission Class
Rating
SD-04 Samples
2.1Doors
2.3.6.3 GDoor Finish Colors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.8 GAccessories
2.1Recycled Content
SD-04 Samples
2.5 GFinishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
08 31 00 SD-06 Test Reports
1.3.1 GAcoustical Ratings of Assemblies
08 32 13 SD-02 Shop Drawings
2.1Aluminum sliding glass doors
SD-03 Product Data
2.1Aluminum sliding glass doors
2.1.1Hardware
2.1.2Glazing
2.1.3Weatherstripping
2.1.4Screens
2.1.5Finish
SD-04 Samples
2.1.5Finish
SD-10 Operation and Maintenance
Data
2.1 GAluminum sliding glass doors
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.6Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.4.7.1 GHardware
2.4.2 GFasteners
1.7 GWindow Performance
2.5 GThermal-Barrier Windows
2.6 GMullions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
08 51 13 2.4.9 GScreens
2.1.6 GWeatherstripping
2.4.7 GAccessories
2.4.3Adhesives
1.7.4 GThermal Performance
SD-04 Samples
1.3.3.1Finish Sample
1.3.3.2Window Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
1.3.4 GDesign Analysis
SD-06 Test Reports
1.3.5Minimum Condensation
Resistance Factor
1.7.6Windborne-Debris-Impact
Performance
SD-10 Operation and Maintenance
Data
2.1 GWindows
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.2.4 GKeying System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
08 71 00 2.2 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3Insulating Glass
1.3Glazing Accessories
2.4.3.1Sealants
2.4.4Joint Backer
SD-04 Samples
2.3Insulating Glass
2.4.2Glazing Compound
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.6.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
08 91 00 SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
1.5 GDoor louvers
2.3 GDoor louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1Recycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.6Cementitious Backer Units
2.1.4Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.3Water-Resistant Gypsum Backing
Board
2.1.11Accessories
2.1.1Gypsum Board
2.1.1Recycled Content for Gypsum
Board
2.1.7VOC Content of Joint Compound
SD-04 Samples
2.1.5 GPredecorated Gypsum Board
SD-07 Certificates
2.1 GAsbestos Free Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
09 29 00 2.1.1Indoor Air Quality for Gypsum
Board
2.1.9Indoor Air Quality for Non-aerosol
Adhesives
2.1.9Indoor Air Quality for Aerosol
Adhesives
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GPorcelain Tile
2.1.1Recycled Content for Porcelain
Tile
2.1.2 GMosaic Tile
2.1.2Recycled Content for Mosaic Tile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
09 30 10 2.6 GTransition Strips
2.4.3 GGrout
SD-07 Certificates
2.4.7Indoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 65 00 SD-02 Shop Drawings
Part 2 GResilient Flooring and
Accessories
2.8 GResilient Flooring and
Accessories
SD-03 Product Data
Part 2 GResilient Flooring and
Accessories
2.8 GResilient Flooring and
Accessories
2.4Adhesives
SD-04 Samples
Part 2 GResilient Flooring and
Accessories
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 44 PAGES
FY21 Improve Family Housing Stearley Heights
09 65 00 3.3 GMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1Indoor Air Quality for Luxury Vinyl
Tile
2.4Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
Part 2 GResilient Flooring and
Accessories
2.8 GResilient Flooring and
Accessories
09 90 00 SD-02 Shop Drawings
3.12Piping Identification
SD-03 Product Data
2.1 GCoating
3.3.5Sealant
SD-04 Samples
1.11 GColor
1.5.2 GTextured Wall Coating System
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2 GQualification Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SC…