AM-0003 Stearley Heights Specs 1DEC21.pdf

PDF 2 MB Posted

Attached to
FY19 LXEZ 194643 Improve Military Family Housing, Stearley Heights, Kadena Air Base, Okinawa, Japan
Solicitation number
W912HV21B0003
Issued by

About this file

This solicitation provides the specifications and drawings for the FY19 LXEZ 194643 project to improve military family housing at Stearley Heights in Kadena Air Base, Okinawa, Japan. The project scope includes whole-house interior and exterior modernization, renovation, and repair of 130 single family dwelling units, including restoration of unit lots, building systems, and spaces. Work comprises management, design, supplies, equipment, labor and services to improve utilities, pavements, structures, mechanical and electrical systems, plumbing, fire and life safety, and environmental aspects. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Japan for construction with a magnitude between YEN2,500,000,000 and YEN10,000,000,000.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consolidated GFP Attachment V.M.1.1

Government Furnished Property

Attachment Number

Attachment File of

Attachment Date

Government Contracting Officer

Name Email Phone

Contract Award Contract Modification Solicitation AmendmentOR

Modification Number Amendment Number

Reference Procurement Instrument Number

Custodial Procurement Instrument Identification

Solicitation, Contract or Uniform PIID Number Issuing Office

DoDAAC Issue Year

(YY)

Contract

Type Sequence Number

Order Number (PIID Format FY16+) Issuing Office

DoDAAC Issue Year

(YY)

Contract

Type Sequence Number OR

Old Order Format

Reset Form Validate

01 11 00.00 10-A (AM-0003)

Government Furnished Property

ADD SERIALLY MANAGED ITEMS LIST

Line Number Item Name Item Description NSN CAGE Part

Number Model

Number Serial

Number UII QTY Unit of Measure Unit Cost Use As Is

Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes

ADD NON-SERIALLY MANAGED ITEMS LIST

Line Number Item Name Item Description NSN CAGE Part

Number Model

Number QTY Unit of Measure Unit Cost Use As Is

Refrigerator 509L Top Freezer Refrigerator WRT138FZDM

Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes

Line Number Item Name Item Description NSN CAGE Part

Number Model

Number QTY Unit of Measure Unit Cost Use As Is

Refrigerator 594L Top Freezer Refrigerator WRT311SFY

Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes

Line Number Item Name Item Description NSN CAGE Part

Number Model

Number QTY Unit of Measure Unit Cost Use As Is

Range 762mm Freestanding Electric Range WFC150M0JB

Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes

Line Number Item Name Item Description NSN CAGE Part

Number Model

Number QTY Unit of Measure Unit Cost Use As Is

Dishwasher Undercounter Dishwasher WDT750SAHZ

Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes

Line Number Item Name Item Description NSN CAGE Part

Number Model

Number QTY Unit of Measure Unit Cost Use As Is

Washer Top Loading Washer WTW7000DW

Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes

Line Number Item Name Item Description NSN CAGE Part

Number Model

Number QTY Unit of Measure Unit Cost Use As Is

Dryer Electric & Gas Dryer WED7000DW

Remove Delivery Date (On or Before) Duration Time Unit Delivery Event Notes

Items Authorized to be Requisitioned by the Contractor and Paid for by DoD

ADD Line Number Item Name Item Description NSN CAGE Part

Number QTY Unit of Measure Unit Cost Use As Is

Remove

FY21 Improve Family Housing Stearley Heights 19AF0002 Kadena, Okinawa, Japan

SECTION 01 22 00.00 10

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 GENERAL

Payment items for the work of this Contract for which payments shall be made are listed in the CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, topographic surveys, cost of bond premiums, and for performing all work required by drawings and specifications for which separate payment is not otherwise provided. Work paid for under one item shall not be paid for under any other item. No separate payment shall be made for the work, services, or operations required by the Contractor, as specified in DIVISION 01, GENERAL REQUIREMENTS, to complete the project in accordance with these specifications; all costs thereof shall be considered as incidental to the work.

1.2 LINE ITEMS

1.2.1 CLIN 0001, Building Renovation within Phase I(BASE)

1.2.1.1 Payment

Payment shall be made at the Contract job price for CLIN 0001 "Building Renovation within Phase I" for work completed including, but not limited to renovation of thirteen(13) D3-53 Housing Units, nine(9) G3-53 Housing Units, one(1) H4-53 Housing Unit, nine(9) L3-53 Housing Units, and one(1) N3-53 Housing unit, in Phase I as shown on Sheet G-007 and Sheet G-008.

Payment for work completed shall constitute full compensation of CLIN 0001, complete.

1.2.1.2 Unit of Measure

Unit of measure: job.

1.2.2 CLIN 0002, Building Renovation within Phase II (BASE)

1.2.2.1 Payment

Payment shall be made at the Contract job price for CLIN 0002 "Building Renovation within Phase II" for work completed including, but not limited to, renovation of twelve(12) D3-53 Housing Units, nine(9) G3-53 Housing Units, nine(9) L3-53 Housing Units, and four(4) N3-53 Housing Units, in Phase II as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0002, complete.

SECTION 01 22 00.00 10 Page 1

W912HV-21-B-0003 (AM-0003)

1.2.2.2 Unit of Measure

Unit of measure: job.

1.2.3 CLIN 0003, Building renovation within Phase III (BASE)

1.2.3.1 Payment

Payment will be made at Contract job price for CLIN 0003 "Building renovation within Phase III" for work completed including, but not limited to, renovation of thirty-nine(39) f our t een ( 14) D3-53 Housing Units, nine(9) G3-53 Housing Units, and nine(9) L3-53 Housing Units, in Phase III as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0003, complete.

1.2.3.2 Unit of Measure

Unit of measure: job.

1.2.4 CLIN 0004 Sitework within Phases I-III (OPTION 1)

1.2.4.1 Payment

Payment will be made at Contract job price for CLIN 0004 "Sitework within Phases I-III" for work completed, but not limited to all sitework in all phases I,II, and III as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0004, complete.

1.2.4.2 Unit of Measure

Unit of measure: job.

1.2.5 CLIN 0005 Renovate Buildings 2200, 2201, 2202, 2204, 2206 within Phase IV including sitework (OPTION 2)

1.2.5.1 Payment

Payment will be made at Contract job price for CLIN 0005 "Renovate Buildings 2200, 2201, 2202, 2204, 2206 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2200, 2201, 2202, 2204, and 2206, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0005, complete.

1.2.5.2 Unit of Measure

Unit of Measure: job.

1.2.6 CLIN 0006 Renovate Buildings 2120, 2122, 2124, 2126, 2128 within Phase IV including sitework(OPTION 3)

1.2.6.1 Payment

Payment will be made at Contract job price for CLIN 0008 "Renovate Buildings 2120, 2122, 2124, 2126, 2128 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2120, SECTION 01 22 00.00 10 Page 2

W912HV-21-B-0003 (AM-0003)

j2ee9gsg

2122, 2124, 2126, 2128, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0006, complete.

1.2.6.2 Unit of Measure

Unit of Measure: job.

1.2.7 CLIN 0007 Renovate Buildings 2112, 2114, 2116, 2118 within Phase IV including sitework (OPTION 4)

1.2.7.1 Payment

Payment will be made at Contract job price for CLIN 0007 "Renovate Buildings 2112, 2114, 2116, 2118 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2112, 2114, 2116, 2118, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0007, complete.

1.2.7.2 Unit of Measure

Unit of Meausre: job.

1.2.8 CLIN 0008 Renovate Buildings 2104, 2106, 2108, 2110 within Phase IV including sitework (OPTION 5)

1.2.8.1 Payment

Payment will be made at Contract job price for CLIN 0008 "Renovate Buildings 2104, 2106, 2108, 2110 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 2104, 2106, 2108, 2110, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0008, complete.

1.2.8.2 Unit of Measure

Unit of Measure: job.

1.2.9 CLIN 0009 Renovate Buildings 1819, 1821, 1823, 1825, 1827, 1829 within Phase IV including sitework (OPTION 6)

1.2.9.1 Payment

Payment will be made at Contract job price for CLIN 0009 "Renovate Buildings 1819, 1821, 1823, 1825, 1827, 1829 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 1819,1821, 1823, 1825, 1827, 1829, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0009, complete.

1.2.9.2 Unit of Measure

Unit of Measure: job.

SECTION 01 22 00.00 10 Page 3

1.2.10 CLIN 0010 Renovate Buildings 1831, 1833, 1835, 1837, 1839, 1841, 1843 within Phase IV including sitework (OPTION 7)

1.2.10.1 Payment

Payment will be made at Contract job price for CLIN 0010 "Renovate Buildings 1831, 1833, 1835,1837, 1839, 1841, 1843 within Phase IV including sitework" for work completed, but not limited to, renovation of Buildings 1831, 1833, 1835, 1837, 1839, 1841, 1843, and sitework of housing units as shown on Sheet G-007 and Sheet G-008. Payment for work completed shall constitute full compensation of CLIN 0010, complete

1.2.10.2 Unit of Measure

Unit of Measure: job.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 PROGRESS PAYMENT INVOICE

Requests for payment shall be submitted in accordance with Federal Acquisition Regulations (FAR) Subpart 32.9, entitled "PROMPT PAYMENT", and Paragraphs 52.232-5 and 52.232-27, entitled "Payments Under Fixed-Price Construction Contracts", and "Prompt Payment for Construction Contracts", respectively. In addition each request shall be submitted in the number of copies and to the designated billing office as shown in the Contract.

When submitting payment requests, the Contractor shall complete Blocks 1 through 12 of the "PROGRESS PAYMENT INVOICE" Form as directed by the Contracting Officer (provided in RMS CM). The completed form shall then become the cover document to which all other support data shall be attached.

One additional copy of the entire request for payment, to include the "PROGRESS PAYMENT INVOICE" cover document, shall be forwarded to a separate address as designated by the Contracting Officer.

The Contractor shall submit with each pay request, a list of subcontractors that have worked during that pay period. The listing shall be broken down into weeks, identifying each subcontractor that has worked during a particular week, and indicate the total number of employees that have worked on site for each subcontractor for each week. The prime Contractor shall also indicate the total number of employees for its on site staff for each week.

3.2 CONTRACT COST BREAKDOWN

The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.

SECTION 01 22 00.00 10 Page 4

3.3 CONTRACT ADMINISTRATION

3.3.1 Contracting Officer (KO)

This Contract shall be administered by a Contracting Officer (KO) assigned to the U.S. Army Corps of Engineers, Japan Engineer District, APO AP 96338-5010.

3.3.2 Administrative Contracting Officer (ACO)

In accordance with the USACE Acquisition Instruction (UAI) Section 1.602-1-100, Administrative Contracting Officer(s) (ACO's) may be delegated a part of the Contracting Officer's authority to modify this Contract and perform Contract administration functions under Federal Acquisition Regulation (FAR) Section 42.302, subject to the authority and limitations set forth in the appointment and delegation letter.

3.3.3 Contracting Officer's Representative (COR)

The Contracting Officer may designate one or more individuals as his/her authorized representatives in administering this Contract. Refer to the clause in Section 00 70 00 CONDITIONS OF THE CONTRACT entitled CONTRACTING OFFICER'S REPRESENTATIVE (DFARS 252.201-7000) for the definition and limited authority of CORs.

3.4 DESIGNATED BILLING OFFICE

The designated billing office for this Contract is:

Resident Engineer, Zukeran Resident Office U.S. Army Corps of Engineers, Japan Engineer District Unit 35132

APO AP 96376-5132

-- End of Section --

SECTION 01 22 00.00 10 Page 5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 44 PAGES

W912HV-21-B-0003

FY21 Improve Family Housing Stearley Heights

01 11 00.00 10 SD-01 Preconstruction Submittals

1.11Initial Site Conditions Photos

1.7 GKey Personnel Qualifications

1.10.2Conformed Drawings Submittal

SD-07 Certificates

1.11Monthly Progress Photos

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

1.8.1 GSubmittal Register Monthly

Update

01 35 26 SD-01 Preconstruction Submittals

1.7.2.2 GStandard Lift Plan

1.7 GAccident Prevention Plan (APP)

1.7.2.3 GCritical Lift Plan

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

01 35 26 1.9.1Hot Work Permit

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

1.4 GIndoor Air Quality (IAQ)

Management Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

1.5.5.1 GICC-ESR Evaluation Report for

Adhesive Anchors

SD-06 Test Reports

3.1.2 GDaily Reports

3.1.1 GBiweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1 GCertificate of Compliance

1.5 GSpecial Inspector

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

3.3.2 GTemporary Utility Connections

Plan

1.3.1 GPhasing Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

01 57 19.01 SD-01 Preconstruction Submittals

1.8.1Preconstruction Survey

1.9.12.1 GSolid Waste Management Permit

1.8.2Regulatory Notifications

1.9 GEnvironmental Protection Plan

1.9.8.2 GDirt and Dust Control Plan

1.8.5 GEmployee Training Records

1.8.4 GEnvironmental Manager

Qualifications

3.15.3 GTemporary Fuel Storage Tank

Approval Request

3.15.5 GUnderground Fuel Storage Tank

Approval Request

1.9.4 GDig Permit

3.8.1 GWaste Determination

Documentation

1.8.3 GLicenses/Permits/Notifications

1.9.9.1 GStormwater Pollution Prevention

Plan

1.9.9.1 GStormwater Pollution Prevention

Plan

SD-06 Test Reports

3.8.1.1.2Laboratory Analysis

3.2.2Inspection Reports

3.8.2.1 GSolid Waste Management Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

01 57 19.01 3.7.2Nonhazardous Solid Waste

Diversion Report

1.9.11.2Hazardous Waste Analysis

Report

SD-07 Certificates

1.8.5 GEmployee Training Records

1.9.12.1Solid Waste Management

License

1.7.1Asbestos Certification

1.7.2Lead Certification

3.11 GWritten Assessment Of Friable

Asbestos Disturbance

SD-11 Closeout Submittals

3.8.1 GWaste Determination

Documentation

3.8.3.5 GDisposal Documentation for

Hazardous and Regulated Waste

1.8.5 GAssembled Employee Training

Records

1.9.12.1 GSolid Waste Management Permit

3.8.2.1 GSolid Waste Management Report

3.8.3.1 GHazardous Waste/Debris

Management

1.9.13.2 GFuel Storage Tank

Installation/Removal Report

1.8.2 GRegulatory Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

01 57 19.01 3.8.2.1Sales Documentation

1.11Environmental Records Binder

3.8.2.1Contractor Certification

3.8.2.1Contractor Certification

1.10General Use Permitted

Equipment

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-03 Product Data

1.7.1 GWarranty Management Plan

1.7.5Warranty Tags

3.8Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.7.1 GAs-Built Record of Equipment

and Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

01 78 00 3.6 GAs-Built Record of Equipment and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

3.9 GInterim DD FORM 1354

3.9 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

02 82 13.00 10 SD-01 Preconstruction Submittals

1.4 GAsbestos Hazard Abatement Plan

SD-02 Shop Drawings

1.7.1 GDetailed Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

02 82 13.00 10 3.11.3.1 GAsbestos Waste Shipment

Records

1.1Weight Bills and Delivery Tickets

2.1 GEncapsulants

1.9.1 GRespiratory Protection Program

3.11 GCleanup and Disposal

1.6.1 GQualifications

1.11Training Program

1.8.1Licenses, Permits and

Notifications

3.11.3.2 GAsbestos Management Plan

SD-06 Test Reports

3.9Exposure Assessment and Air

Monitoring

1.7.3Local Exhaust System

SD-07 Certificates

1.7.3Local Exhaust System

2.1 GEncapsulants

1.9Medical Surveillance

Requirements

SD-10 Operation and Maintenance

Data

2.3Recyclable Materials

02 82 13.00 30 SD-01 Preconstruction Submittals

1.5.2.5 GMedical Examinations

3.3 GSampling Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

02 82 13.00 30 3.3.2 GAsbestos Sampling Plan

SD-04 Samples

3.4.4 GAsbestos Sampling/Assessment

Record

SD-06 Test Reports

3.4 GAsbestos Sampling And Analysis

Report

3.2.3 GLaboratory Analysis

3.2.1 GLaboratory Analysis Reports

SD-07 Certificates

1.5.2.11 GCertificate Of Workers

Acknowledgment

3.1 GAsbestos Hazard Abatement Plan

SD-11 Closeout Submittals

1.4.3 GHazardous Waste Manifest

1.5.2.12 GHazardous Waste Manifest

3.2.5 GHazardous Waste Manifest

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.2 GLead Work Plan

1.2.7 GIndustrial Hygienist/Private

Qualified Person (IH/PQP)

1.5.1.1 GIndustrial Hygienist/Private

Qualified Person (IH/PQP)

1.5.1.2 GTraining Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

02 83 13.00 20 1.5.2.8 Glead waste management plan

1.5.2.4 GMedical Examinations

SD-06 Test Reports

1.5.2.3 Gsampling results

1.5.2.3 GOccupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.3 GTesting laboratory

1.5.1.4 GThird party consultant

qualifications

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GDisposal Documentation

02 83 19.00 30 SD-01 Preconstruction Submittals

1.4.1.1 GLead Hazard Abatement Plan

SD-06 Test Reports

1.4.1.2.1 GLaboratory Results

1.4.1.2.1 GToxicity Analysis

SD-11 Closeout Submittals

1.4.1.3 GHazardous Waste Manifest

02 84 16 SD-01 Preconstruction Submittals

1.4.3Pcb And Lamp Removal And

Disposal Work Plan

1.8.2Pcb And Lamp Removal And

Disposal Work Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

02 84 16 3.5.1 GJapan Specially Controlled

Hazardous Waste Disposal Permit

3.5.5Transporter Certification

3.5.6.2Disposal Request Form

SD-07 Certificates

1.4.3 GPCB and Lamp Removal and

Disposal Work Plan

1.8.2 GPCB and Lamp Removal and

Disposal Work Plan

1.8.1 GQualifications of IH/PQP

1.8.1 GTraining Certification

1.8.3 GPCB and Lamp Disposal Plan

3.5.2 GJapan Industrial Waste Collection

And Transport Permit

SD-11 Closeout Submittals

3.5.3Copy E of the Japanese

Hazardous Waste Manifest

3.3.1Signed Ballast Turn-in (at Bldg

3625) Sheet

3.2.4Certification Of Decontamination

03 30 00 SD-01 Preconstruction Submittals

1.6.4 GQuality Control Plan

1.6.7 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

03 30 00 2.1Formwork Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.6.2Mechanical Reinforcing Bar

Connectors

2.4.7 GEpoxy Mortar Patching Material

for Spall Repair

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.3.1Aggregates

3.13.2.3 GCompressive Strength Tests

3.13.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

1.6.5.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

SD-05 Design Data

1.4.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

SD-07 Certificates

1.3MLIT Structural Steel Fabricator

Quality Certification

1.3MLIT Structural Steel Erector

Quality Certification

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.4 GFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

05 30 00 SD-04 Samples

2.1.1Metal Roof Deck Units

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Welder Qualifications

1.3.2Welding Procedures

1.3.3.1Fire Safety

1.3.1Manufacturer's Certificate

2.2.11Stud Manufacture's Certification

2.2.11Stud Manufacture's Test Reports

05 50 13 SD-02 Shop Drawings

2.3 GAngles and Plates

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 GWood Products

2.4 GCountertops

1.4 GTreated Wood Products

2.2 GSoffits

2.3 GFascias and Trim

2.8 GHardware and Accessories

2.1.7Recycled Content for

MDF/Particleboard

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

06 20 00 1.5 GSamples

SD-07 Certificates

1.7.1.1 GCertificates of Grade

2.1.6Indoor Air Quality for Hardwood

Plywood

2.1.7Indoor Air Quality for MDF and

Particleboard

2.9.1.2Indoor Air Quality for Non-aerosol

Adhesives

2.9.1.2Indoor Air Quality for Aerosol

Adhesives

06 61 16 SD-02 Shop Drawings

1.5.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.5.1Qualifications

2.3Fabrications

2.2.4Indoor air quality for solid surface seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.3 GCounter and Vanity Tops

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

06 61 16 2.3Fabrications

1.5.1Qualifications

2.1Indoor Air Quality for solid surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

1.6.4 GAir Leakage Test Report

3.5.7 GAir Leakage Test Report

1.6.4 GDiagnostic Test Report

3.6.5 GDiagnostic Test Report

07 21 13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

07 21 13 1.3 GManufacturer's Standard Details

2.2 GBlock or Board Insulation

2.3 GVapor Retarder

2.4 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

2.6 GAccessories

2.1.2Recycled Content for Block or

Board Insulation

2.2.5Recycled Content for Block or

Board Insulation

SD-07 Certificates

2.2 GBlock or Board Insulation

2.3 GVapor Retarder

2.5 GProtection Board or Coating

1.8 GSpecial Warranties

1.8 GSpecial Warranties

2.2.6Indoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.2Block or Board Insulation

2.6.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2Recycled Content for Insulation

Materials

2.3Pressure Sensitive Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

07 21 16 2.4Accessories

SD-07 Certificates

2.4.1Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 27 10.00 10 SD-02 Shop Drawings

2.1 GAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 GAir Barrier System Product Data

SD-04 Samples

3.1.2 GMock-Up

2.1 GMaterial Samples For Air Barrier

System

SD-05 Design Data

1.8 GDesign Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.7 GAir Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals

1.9.1 GQualifications of Manufacturer

1.9.2 GQualifications of Installer

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

07 27 26 1.4 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

2.6 GReinforcement

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4.3 GMockup

SD-06 Test Reports

1.6 GCapillary Moisture Test

1.4.4 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

1.4.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

1.9.1 GQualifications of Manufacturer

1.9.2 GQualifications of Installer

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

07 27 26 1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

07 56 00.00 23 SD-02 Shop Drawings

1.10 GFluid-Applied Roofing Membrane

SD-03 Product Data

1.10 GFluid-Applied Roofing Membrane

1.10.2 GSafety Data Sheets

2.4 GReinforcement

2.2 GPrimers, Adhesives, And Mastics

1.11 GWarranty

SD-04 Samples

1.10.3 GMockup

2.4 GReinforcement

SD-05 Design Data

1.2.2 GWind Uplift Calculations

SD-06 Test Reports

1.10.4Field Peel Adhesion Test

1.6 GCapillary Moisture Test

3.6.1 GSite Inspections

SD-07 Certificates

1.4.1Material and Equipment

1.4.1Material and Equipment

1.4.2Manufacturer Qualifications

1.4.3 GQualification Of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

07 56 00.00 23 1.10 GFluid-Applied Roofing Membrane

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.16 GExpansion Joints

3.1.9 GBase Flashing

3.1.10 GCounterflashing

3.1.17 GFlashing at Roof Penetrations

and Equipment Supports

3.1.11 GReglets

3.1.11.1 GReglets

3.1.13 GDrip Edges

3.1.14 GEave Flashing

2.1Recycled Content

SD-03 Product Data

2.2.6 GCool Roof

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

07 84 00 2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

SD-07 Certificates

Indoor Air Quality For Interior

Sealants

2.1.3Indoor Air Quality For Interior

Acoustical Sealants

08 11 16 SD-02 Shop Drawings

1.5.1 GDoor and Frame Assembly

SD-03 Product Data

1.5.1 GDoor and Frame Assembly

2.2.3Recycled Content of Aluminum

Material

SD-04 Samples

1.5.2 GFinish Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

08 11 16 SD-05 Design Data

1.2.1 GCalculations

1.2.2 GAir Infiltration

1.2.3 GWater Penetration

1.2.4 GNFRC Project Label Certificates

for Fenestration

SD-08 Manufacturer’s Instructions

1.5.1 GDoor and Frame Assembly

1.5.4 GAdjustments, Cleaning, and

Maintenance

1.2.4 GNFRC Project Label Certificates

for Fenestration

08 11 69 SD-02 Shop Drawings

2.1.4Storm doors

SD-03 Product Data

2.1.4Storm doors

2.1.4.1Hardware

SD-04 Samples

2.3 Gfinishes

SD-06 Test Reports

2.1.4Storm doors

SD-10 Operation and Maintenance

Data

2.1.4 GStorm doors

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

j2ee9gsg Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

08 14 00 SD-03 Product Data

2.1 GDoors

2.2Accessories

2.3.7Water-resistant Sealer

1.5Warranty

2.1.2 GSound Transmission Class

Rating

SD-04 Samples

2.1Doors

2.3.6.3 GDoor Finish Colors

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.2.8 GAccessories

2.1Recycled Content

SD-04 Samples

2.5 GFinishes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

08 31 00 SD-06 Test Reports

1.3.1 GAcoustical Ratings of Assemblies

08 32 13 SD-02 Shop Drawings

2.1Aluminum sliding glass doors

SD-03 Product Data

2.1Aluminum sliding glass doors

2.1.1Hardware

2.1.2Glazing

2.1.3Weatherstripping

2.1.4Screens

2.1.5Finish

SD-04 Samples

2.1.5Finish

SD-10 Operation and Maintenance

Data

2.1 GAluminum sliding glass doors

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.4.7.1 GHardware

2.4.2 GFasteners

1.7 GWindow Performance

2.5 GThermal-Barrier Windows

2.6 GMullions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

08 51 13 2.4.9 GScreens

2.1.6 GWeatherstripping

2.4.7 GAccessories

2.4.3Adhesives

1.7.4 GThermal Performance

SD-04 Samples

1.3.3.1Finish Sample

1.3.3.2Window Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.4 GDesign Analysis

SD-06 Test Reports

1.3.5Minimum Condensation

Resistance Factor

1.7.6Windborne-Debris-Impact

Performance

SD-10 Operation and Maintenance

Data

2.1 GWindows

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.2.4 GKeying System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

08 71 00 2.2 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.3Insulating Glass

1.3Glazing Accessories

2.4.3.1Sealants

2.4.4Joint Backer

SD-04 Samples

2.3Insulating Glass

2.4.2Glazing Compound

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.6.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall louvers

1.5Wall louvers

SD-03 Product Data

2.2Metal Wall Louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

08 91 00 SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

1.5 GDoor louvers

2.3 GDoor louvers

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1Recycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.6Cementitious Backer Units

2.1.4Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.3Water-Resistant Gypsum Backing

Board

2.1.11Accessories

2.1.1Gypsum Board

2.1.1Recycled Content for Gypsum

Board

2.1.7VOC Content of Joint Compound

SD-04 Samples

2.1.5 GPredecorated Gypsum Board

SD-07 Certificates

2.1 GAsbestos Free Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

09 29 00 2.1.1Indoor Air Quality for Gypsum

Board

2.1.9Indoor Air Quality for Non-aerosol

Adhesives

2.1.9Indoor Air Quality for Aerosol

Adhesives

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.1.1Recycled Content for Porcelain

Tile

2.1.2 GMosaic Tile

2.1.2Recycled Content for Mosaic Tile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

09 30 10 2.6 GTransition Strips

2.4.3 GGrout

SD-07 Certificates

2.4.7Indoor Air Quality for Sealants

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 GInstallation

09 65 00 SD-02 Shop Drawings

Part 2 GResilient Flooring and

Accessories

2.8 GResilient Flooring and

Accessories

SD-03 Product Data

Part 2 GResilient Flooring and

Accessories

2.8 GResilient Flooring and

Accessories

2.4Adhesives

SD-04 Samples

Part 2 GResilient Flooring and

Accessories

2.8 GResilient Flooring and

Accessories

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 44 PAGES

FY21 Improve Family Housing Stearley Heights

09 65 00 3.3 GMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1Indoor Air Quality for Luxury Vinyl

Tile

2.4Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

Part 2 GResilient Flooring and

Accessories

2.8 GResilient Flooring and

Accessories

09 90 00 SD-02 Shop Drawings

3.12Piping Identification

SD-03 Product Data

2.1 GCoating

3.3.5Sealant

SD-04 Samples

1.11 GColor

1.5.2 GTextured Wall Coating System

SD-07 Certificates

1.4Applicator's Qualifications

1.5.1.2 GQualification Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SC…

This is the start of the file's text. The full file is on GovTribe.