Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibit.xls | XLS spreadsheet | |
| Exhibit.xls | XLS spreadsheet | |
| Specifications.pdf | ||
| Evaluation_Orders.pdf | ||
| Sketches.pdf | ||
| A.07.23_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUBMITTAL REGISTER | ||||
| (ER 415 1-10) | CONTRACT NO. | |||
| TITLE AND LOCATION | CONTRACTOR | SPECIFICATION SECTION |
| ACTIVITY NO | TRANS- | ||||||||||||||||||||||||||
| MITTAL NO. | ITEM NO | SPECIFICATION PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | TYPE OF SUBMITTAL | CLASSI- | ||||||||||||||||||||||
| FICATION | REVIEWER | CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | GOVERNMENT ACTION | REMARKS | ||||||||||||||||||||||
| SD-01 Preconstruction Submittals | SD-02 Shop Drawings | SD-03 Product Data | SD-04 Samples | SD-05 Design Data | SD-06 Test Reports | SD-07 Certificates | SD-08 Manufacturer's Instructions | SD-10 O&M Data | SD-11 Closeout Submittals | INFORMATION ONLY | GOVERNMENT APPROVED | SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | CODE | DATE | SUBMIT TO GOVERN- MENT | CODE | DATE | ||||||||
| a. | b. | c. | d. | e. | f. | g. | h. | i. | j. | k. | l. | m. | n. | o. | p. | q. | r. | s. | t. | u. | v. | w. | x. | y. | z. | aa. | |
| 01 11 00 | 2.1 | Memorandum for Hazardous Material Use | x | A - Within 15 days after Basic Contract Award | |||||||||||||||||||||||
| 01 11 00 | 1.5.2 | Project Manager | x | x | A - Within 15 days after Basic Contract Award | ||||||||||||||||||||||
| 01 11 00 | 1.5.3 | Site Superintendent | x | x | A - Within 15 days after Basic Contract Award | ||||||||||||||||||||||
| 01 11 00 | 1.5.4 | English Speaking Representative | x | x | A - Within 15 days after Basic Contract Award | ||||||||||||||||||||||
| 01 11 00 | 1.7.3 | Planned Schedule of Road Closures | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 11 00 | 1.7.4 | Planned Schedule of Utility Outtages | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 11 00 | 1.7.5 | Fire Protection System Outtages | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 11 00 | 1.7.6 | Open Flame Work Permits | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 11 00 | 1.7.8 | Excavation Permit | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 11 00 | 1.7.9 | Temporary Protection Plan | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 11 00 | 1.8.2 | Employee and Vehicle Passes | x | x | As specified | ||||||||||||||||||||||
| 01 11 00 | 1.12 | Construction Schedule | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 11 00 | 1.19.1 | As-Built Drawing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 01 32 16 | 1.2 | Construction Schedule | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 32 16 | 1.4 | Monthly Updates | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 35 29 | 1.4, 1.7 | Accident Prevention Plan | x | A - Within 15 days after Basic Contract Award | * Safety Office Only | ||||||||||||||||||||||
| 01 35 29 | 1.4 | Competent Person | x | A - Within 15 days after Basic Contract Award | |||||||||||||||||||||||
| 01 35 29 | 3.1 | CSE Permits | x | A - Within 15 days after Basic Contract Award | * Safety Office Only | ||||||||||||||||||||||
| 01 45 01 | 3.2 | Quality Control Plan | x | x | A - Within 15 days after Basic Contract Award | ||||||||||||||||||||||
| 01 57 19 | 1.7 | Construction Indoor Air Quality (IAQ) Management Plan | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 57 19 | 1.7.2 | Air Contamination Testing | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 57 19 | 1.8 | Construction Indoor Air Quality (IAQ) Management Plan | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 01 74 19 | 1.6 | Waste Management Plan (LEED) | x | A - Within 15 days after Basic Contract Award | * Safety Office Only | ||||||||||||||||||||||
| 01 74 19 | 1.7 | Manifest | x | B - Within 15 days after TO | * Safety Office Only | ||||||||||||||||||||||
| 01 78 00 | 1.2 | As-Built Record of Equipment and Materials | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.2 | Warranty Management Plan | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.2 | Warranty Tags | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.2 | Final Cleaning | x | ||||||||||||||||||||||||
| 01 78 00 | 1.2 | Spare Parts Data | x | ||||||||||||||||||||||||
| 01 78 00 | 1.2 | Preventive Maintenance & Condition Monitoring | x | ||||||||||||||||||||||||
| 01 78 00 | 1.2 | Posted Instructions | x | ||||||||||||||||||||||||
| 01 78 00 | 1.2 | Operation and Maintenance Data | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.2 | Record Drawings | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.2 | Certification of EPA Designated Items | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.2 | Form DD1354 | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.2 | Checklist for Form DD1354 | x | x | |||||||||||||||||||||||
| 02 41 00 | 1.8 | Demolition/Decontamination Plan | x | x | A - Within 15 days after Basic Contract Award | ||||||||||||||||||||||
| 02 41 00 | 1.4.1 | Registration Certificate | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.7.1 | Asbestos Hazard Abatement Plan | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 13 | 1.4 | Detailed Drawings | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.1 | Weight Bills and Delivery Tickets | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.11 | Training Program | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.6.1 | Qualifications | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.7.1 | Respiratory Protection Plan | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.8.1 | Licenses, Permits and Notifications | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 3.11.2 | Encapsulants | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 3.11.2 | Cleanup and Disposal | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 3.11.3.1 | Asbestos Waste Shipment Records | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 3.11.3.2 | Asbestos Management Plan | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 3.9 | Exposure Assessment and Air Monitoring | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.7.3 | Local Exhaust System | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.9 | Medical Surveillance Requirements | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 2.1 | Encapsulants | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 13 | 1.7.3 | Local Exhaust System | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.2.2 | Lead Work Plan | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.6.1 | Respirators | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.6.4 | Vacuum Filters | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.2.3 | Occupational and Environmental Assessment Data Report | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 3.4.1 | Sampling Results | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.1.1 | Qualifications of IH/PQP | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.1.2 | Training Certification of Workers and Supervisors | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.1.3 | Testing Laboratory Qualifications | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.1.4 | Third Party Consultant Qualifications | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.2.2 | Lead Work Plan | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.2.6 | Respiratory Protection Program | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.2.7 | Hazard Communication Program | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 3.5.1.1 | Clearance Certification | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 3.5.2.1 | EPA, GOJ, or Local Prefecture-Approved Hazardous Waste, Treatment, Storage, or Disposal Facility for Lead Disposal | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 1.5.2.5 | Training Certification | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 3.5.2.1 | Hazardous Waste Manifest | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 83 13 | 3.5.2.1 | Weight Tickets for Non-Hazardous Waste | x | x | B - Within 15 days after TO | ||||||||||||||||||||||
| 02 82 33 | 1.4 | Occupant Protection Plan | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 1.6.2.2 | Lead-Based Paint Removal/Control Plan | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 1.7 | Materials and Equipment | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 2 | Lead Based Paint Encapsulate Coating | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 1.6.2.3 | Occupational and Environmental Sampling Results | x | C - Not a Submittal; to be included with QC Daily Reports | |||||||||||||||||||||||
| 02 82 33 | 3.4.1 | Test Reports | x | C - Not a Submittal; to be included with QC Daily Reports | |||||||||||||||||||||||
| 02 82 33 | 1.6.1.1 | Qualifications of CP | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 1.6.1.2 | Testing Laboratory | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 3.5.1.1 | Clearance Certification | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 3.6 | Abatement Report | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 82 33 | 3.5.2.1 | Hazardous Waste Manifest | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 02 84 16 | 1.8.1 | Qualifications of IH/PQP | x | x | |||||||||||||||||||||||
| 02 84 16 | 1.8.1 | Training Certifications | x | x | |||||||||||||||||||||||
| 02 84 16 | 1.8.2 | PCB and Lamp Removal Work Plan | x | x | |||||||||||||||||||||||
| 02 84 16 | 1.8.3 | PCB and Lamp Disposal Plan | x | ||||||||||||||||||||||||
| 02 84 16 | 3.5.2 | Transporter Certifications | x | x | |||||||||||||||||||||||
| 02 84 16 | 3.5.3 | Chain of Custody Form | x | ||||||||||||||||||||||||
| 03 15 14 | 2.1.1 | Premolded Expansion Joint Filler Strips | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 2.1 | Concrete Masonry Units (CMU) | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 1.4.2.1 | Reinforcing Steel | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 2.5 | Reinforcement | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 2.4.1 | Cement | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 2.4.4 | Admixtures | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 1.4.1.1 | Concrete Mix Design | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 2.3.1 | Mix Design | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 03 30 00 | 2.4.3 | Aggregates | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 04 20 00 | 2.1 | Concrete Masonry Units (CMU) | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 04 20 00 | 2.3 | Reinforcing Steel Bars and Rods | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 04 20 00 | 3.8.1 | Filling Concrete Testing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 04 20 00 | 3.2.1 | Reinforced Concrete Masonry Unit Walls | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 12 00 | 1.4.2.1 | Welding Procedures | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 12 00 | 1.4.1 | Fabrication Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 12 00 | 2.1 | Steel Member | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 12 00 | 2.2 | Bolts, Nuts and Washers | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 12 00 | 1.4.2.1 | Qualifications | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 30 00 | 1.3.2 | Fabrication Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 30 00 | 2.2 | Deck Units | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 30 00 | 2.3 | Eaves Gutter and Downspout | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 30 00 | 1.5 | Warranty | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.1.1 | Guard Rail Post | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.1.2 | Guard Rail for Vehicle Barriers | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.1.3 | Cable Barrier | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.1.1 | Guard Rail Post | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.1.2 | Guard Rail for Vehicle Barriers | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.1.3 | Cable Barrier | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.2.3.2 | Pretreatment, Priming and Painting | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 00 | 2.2.3.2 | Manufacturer's Instructions | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 03 | 1.3 | Detail Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 03 | 2.1.1 | Materials List | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 03 | 1.4 | Qualifications of Welders and Welding Operators | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 05 50 03 | 1.6 | Manufacturer's Material Safety Data Sheets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 10 00 | 2.2 | Plywood | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 10 00 | 2.3 | Preservative Treated Wood | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 10 00 | 2.4 | Cement Bonded Flake Board | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 10 00 | 2.5 | Fiber Reinforced Cement Boards | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 10 00 | 2.1 | Certificates of Grade | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 20 00 | 1.2 | Detail Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 20 00 | 2.1.2.1 | Wood Siding | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 06 20 00 | 2.1.1 | Certificates of Grade | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Roofing Panels | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Flashing and Accessories | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Gutter/Downspout Assembly | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 2.1 | Roof Panels | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 2.3 | Prefabricated Seam Roofing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 2.5 | Accessories | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Factory-Applied Color Finish | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Fasteners | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Gaskets and Sealant/Insulating Compounds | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 2.1 | Roof Panels | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 2.3 | Prefabricated Seam Roofing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Factory-Applied Color Finish | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 2.1 | Roof Panels | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.1 | Qualifications of Manufacturer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.4.4 | Installation Manual | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 41 13 | 1.8 | Warranties | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 2.5 | Trap | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 2.1.1 | Metal Wall Panel | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 2.2 | Accessories | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 2.3 | Fasteners | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 2.4 | Sealant | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 2.1.1 | Metal Wall Panel | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 3.1 | Installation | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 42 13 | 1.4 | Warranties | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 1.4.3 | Roof Plan | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 2.1 | Waterproofing Protective Curing Form | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 2.2 | Modified Bitumen Sheets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 2.5 | Primer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 2.6 | Cant and Tapered Edge Strips | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 2.7.3 | Vapor Pressure Relief Vents | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 3.2.7 | Waterproof Cement Mortar | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 1.4.1 | Qualification of Manufacturer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 1.4.2 | Qualification of Applicator | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 3.1.2.2 | Torches | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 3.2.5 | Modified Bitumen Membrane Application | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 3.2.6 | Flashing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 3.2.8.1 | Coating Application | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 52 00 | 1.9 | Manufacturer and Installer Warranty | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 72 00 | 2.2 | Roof Ridge Ventilators | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 72 00 | 2.3 | Stationary Roof Ventilators | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 72 00 | 2.2 | Roof Ridge Ventilators | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 72 00 | 2.3 | Stationary Roof Ventilators | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 72 00 | 1.7.1 | Warranty | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 92 00 | 2.1 | Sealants | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 92 00 | 2.2 | Primers | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 92 00 | 2.3 | Bond Breakers | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 92 00 | 2.4 | Backstops | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 07 92 00 | 2.1 | Sealants | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 11 13 | 2.1 | Steel Doors and Frame | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 11 13 | 2.2 | Aluminum Door and Frame | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 11 13 | 2.1 | Steel Doors and Frame | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 11 13 | 2.2 | Aluminum Door and Frame | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 11 13 | 2.3 | Hardware and Accessories | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 51 13 | 2.1 | Windows | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 51 13 | 2.2.2 | Blast Resistant Window | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 51 13 | 2.1 | Windows | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 51 13 | 2.2.2 | Blast Resistant Window | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 51 13 | 2.2.2 | Structural Blast Calculations | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 62 00 | 3.2 | Shop Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 62 00 | 1.5 | Warranty | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 62 00 | 2.3.1.1 | Skylights | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 08 62 00 | 1.3 | Qualifications | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 22 00 | 2.1 | Metal Support Systems | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 22 00 | 2.2 | Access Panels | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 00 | 2.1.1 | Gypsum Board | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 00 | 2.1.2 | Gypsum Sheathing Board | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 00 | 2.1.3 | Joint Treatment Materials | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 00 | 2.1.6 | Cornerbead and Edge Trim | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 00 | 2.1.5 | MSDS | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 01 | 2.1.1 | Silicate Calcium Board | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 01 | 2.1.2 | Glass Coated Silicate Calcium | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 01 | 2.1.4.1 | Screws | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 01 | 2.1.5 | Adhesives | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 29 01 | 2.1.6 | Cornerbead and Edge Trim | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 30 00 | 1.5 | Detail Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 30 00 | 2.1 | Tile | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 30 00 | 2.2 | Setting-Bed | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 30 00 | 2.4 | Mortar, Grout, and Adhesive | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 30 00 | 2.1 | Tile | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 51 00 | 1.3 | Detail Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 51 00 | 2.3 | Aluminum Spandrel Ceiling | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 51 00 | 2.1.1 | Acoustic Ceiling Tiles | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 51 00 | 2.1.1 | Adhesive | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 51 00 | 2.1.1 | Aluminum Corner Edges | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 51 00 | 2.1.1 | Acoustic Ceiling Tiles | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 2.1 | Vinyl Composition Tile | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 2.2 | Sheet Vinyl Flooring | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 2.3 | Moulding | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 2.4 | Wall Base | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 2.5 | Adhesives | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 2.1 | Vinyl Composition Tile | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 3.3 | Moisture, Alkalinity and Bond Tests | x | C - Not a Submittal; to be included with QC Daily Reports | |||||||||||||||||||||||
| 09 65 00 | 3.2 | Surface Preparation | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 65 00 | 3.4 | Installation Instructions | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 2.1 | Flooring | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 2.4 | Crackseal | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 3.2 | Mixing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 3.3.2 | Floor Surfacing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 1.3 | Qualifications of Installer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 3.3 | Application | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 3.1.2 | Manufacture Repair Instructions | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 67 23 | 2.2 | Flooring Systems | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 68 00 | 2.1 | Carpet | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 68 00 | 2.3 | Carpet Moldings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 68 00 | 2.5 | Adhesives and Concrete Primer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 68 00 | 2.1 | Carpet | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 72 00 | 2.2 | Primer and Adhesive | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 72 00 | 2.1.1 | Vinyl Wall Covering | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 72 00 | 2.1.1 | Vinyl Wall Covering | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 72 00 | 2.2 | MSDS | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 90 00 | 3.2 | Surface Preparation Plan | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 90 00 | 2.1 | Surface Preparation Materials for Finishing | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 90 00 | 2.2 | Coating Application | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 90 00 | 1.8 | Color and Texture | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 90 00 | 1.4 | MSDS | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 09 90 00 | 2.4 | High Pressure Water Wash Cleaning | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 12 21 00 | 3.2 | Installation | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 12 21 00 | 2.1 | Window Blinds | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 12 21 00 | 3.2 | Installation | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 22 00 00 | 2.3 | Termination Sets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 22 00 00 | 2.1.1 | Plug | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 23 07 00 | 2.2 | Pipe Insulation | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 23 07 00 | 2.1.1 | Supports | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 23 07 00 | 2.1.2 | Sealants | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 12 19 | 2.2 | Transformers | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 12 19 | 3.5.1 | Acceptance Checks and Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 12 19 | 1.4.1 | Transformer(s) Operation and Maintenance Data | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 1.4 | Fabrication Drawings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.6 | Panelboards | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.7 | Cubicle | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.1 | Conduit and Fittings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.11 | Precast Concrete Poles | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.12 | Warning Marks | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.13 | Manhole and Handhole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.2 | Wire and Cable | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.3 | Hardware, Pins, and Racks | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.4 | Boxes and Fittings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.9 | Grounding and Lightening Protection System | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.2.2 | Insulators | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.5.1 | Indoor Use Switches | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.6.3 | Step-Down Transformer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.6.4 | Voltage Transformer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.6.5 | Current Transformer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 2.6.6 | Multi-Digital Meter | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 3.8 | Continuity Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 3.8 | Grounding System Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 27 26 | 1.5 | Manufacturer's Material Safety Data Sheets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 56 00 | 2.2 | Luminaries | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 56 00 | 2.3 | Poles | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 26 56 00 | 3.2 | Operating Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 31 23 00 | 1.5.1 | Shoring and Sheeting Plan | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 31 23 00 | 3.8.1.1 | Density Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 01 19 | 2 | Manufacturer's Recommendations | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 11 23 | 1.6 | Plant, Equipment and Tools | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 11 23 | 1.4.1.1 | Sieve Analysis | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 11 23 | 1.4.1.2 | Liquid Limit and Plasticity Index | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 11 23 | 1.4.1.3 | Wear Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 11 23 | 1.4.1.4 | Compaction Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 11 23 | 1.4.1.5 | Thickness Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 16 | 2.3 | Mix Design | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 16 | 1.6 | Calibration | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 16 | 2.1 | Aggregates | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 16 | 2.2 | Asphalt Cement Binder | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 2.2 | Asphalt Cement Binder | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 2.3 | Mix Design | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 1.3.1 | Job-mix Formula | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 2.4.1 | Specific Gravity Test of Asphalt | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 2.4.1 | Coarse Aggregate Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 2.4.1 | Weight of Slag Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 2.4.1 | Fine Aggregate Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 17 | 3.5.1.1 | Aggregates Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 3.15 | Contractor Quality Control | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 2.4.1 | Open Graded Asphalt Job Mix Formula | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 2.4.2 | Job Mix Formula for Slurry Grout | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 2.1 | Coarse and Fine Aggregates | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 2.2 | Bituminous Material | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 2.1.1 | Coarse Aggregate | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 2.1.3 | Open-Graded Mix Aggregate | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 12 18 | 2.1.4 | Slurry Grout Sand | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 2.1.1 | Cementitious Materials | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 2.1.3 | Aggregate | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 2.1.4 | Admixtures | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 2.1.6 | Curing Materials | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 2.3 | Mix Design | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 2.1.3 | Aggregate Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 3.6.2 | Concrete Slump Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 3.6.3 | Compressive Strength Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 3.6.4 | Air Content Tests | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 1.4.1 | Ready-mixed Concrete Plant | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 13 13 | 1.4.3 | Batch Tickets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 16 13 | 1.2 | Copies of Certified Delivery Tickets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 16 13 | 2.1 | Precast Concrete Curb and Gutter | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 16 13 | 2.2 | Precast Reinforced Concrete Gutter and U-type Ditch | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 16 13 | 2.3 | Concrete | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 16 13 | 3.8 | Field Quality Control | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 16 13 | 3.8.2 | Copies of All Test Reports | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 17 23 | 2.1.1 | Paints for Roads and Streets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 17 23 | 2.1.2 | Paints for Heliport | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 17 23 | 2.1.3 | Reflective Media for Heliport, Road and Street | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 17 23 | 2.1 | Manufacturer's Material Safety Data Sheets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 17 23 | 2.1.1 | Paints for Roads and Streets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 17 23 | 2.1.2 | Paints for Heliport | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 17 23 | 2.1.3 | Reflective Media for Heliport, Road and Street | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.1 | Fence Assembly | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.10 | Reinforced Chain Link Security Fence | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.12 | Inner Fence and Gate | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.9 | Gate Assembly | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 3.6 | Grounding | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.11.1 | Temporary Enclosure | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.1 | Fence Assembly | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.10 | Reinforced Chain Link Security Fence | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.12 | Inner Fence and Gate | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.13 | Concrete | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.14 | High Zinc Dust Content Paint | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 3.5 | Hardware Assembly | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 3.6 | Grounding | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 2.11.2 | Gate Hardware and Accessories | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 3.1 | Fence Installation | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 31 13 | 3.7 | Material Safety Data Sheets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 92 23 | 2.4 | Fertilizer | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 92 23 | 2.1 | Sods | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 96 01 | 1.3.1 | Work Plan | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 32 96 01 | 1.3.5 | Photographs | x | D - Not a Submittal; to be included in Progress Payment package | |||||||||||||||||||||||
| 32 96 01 | 3.2.1 | Tree-Wound Paint | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.1 | Precast Concrete Pole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.2 | Polyethylene Golf Nets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.1 | Precast Concrete Pole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.2 | Polyethylene Golf Nets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.3 | Other Accessories | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.4 | Painting of Steel Pile and Concrete Pole Joint | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.1 | Concrete Pole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.2 | Golf Net | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 3.2 | Material Safety Data Sheets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 05 16 | 2.3.8 | Winch | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.1 | Piping Materials | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2 | Valves | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2.2 | Miscellaneous Piping Materials | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2.3 | Pressure Gauge | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2.4 | Measuring Devices | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2.5 | Hydrants | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2.6 | Valve Boxes | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2.7 | Valve Pits/Manhole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.1.2.8 | Manhole Cover | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 2.2.3 | Marker | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 3.2 | Field Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 11 00 | 1.4 | Material Safety Data Sheets | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 30 00 | 2.1 | Pipeline Materials | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 30 00 | 2.3 | Gaskets and Sealant/Insulating Compounds | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 30 00 | 2.3.1 | Precast Concrete Manhole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 30 00 | 2.3.4 | Frames, Covers, and Gratings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 30 00 | 3.2 | Reports | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.1 | Pipes for Storm Drains | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.3.1 | Prefabricated Reinforced Concrete Manhole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.3.2 | Precast Concrete Gutter Inlet | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.3.3 | Frame and Cover for Gratings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.1 | Pipes for Storm Drains | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.3.1 | Prefabricated Reinforced Concrete Manhole | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.3.2 | Precast Concrete Gutter Inlet | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 2.3.3 | Frame and Cover for Gratings | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 40 00 | 3.9.2 | Operational Test | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 63 23 | 2.1 | Piping Materials | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 63 23 | 2.2 | Valves | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 63 23 | 2.3 | Piping Accessories | x | B - Within 15 days after TO | |||||||||||||||||||||||
| 33 63 23 | 1.3.1 | Welder's Qualifications | x | B - Within 15 days after TO |