W912HV-16-R-0008_Solicitation.pdf

PDF 934 KB Posted

Attached to
P903 Temporary Lodging Facility (TLF) & BU1419R APF Supporting Facilities, Camp Hansen, Okinawa, Japan
Solicitation number
W912HV-16-R-0008
Issued by

About this file

W912HV-16-R-0008 Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P903 Temporary Lodging Facility (TLF) & BU1419R Supporting Facilities, Camp Hansen, Okinaw a, Japan

SECTION 00 10 00, Proposal Schedule SECTION 00 21 00, Instructions SECTION 00 22 00, Supplementary Instructions SECTION 00 22 16, Supplementary Instructions to Proposer SECTION 00 45 00, Representations and Certif ications SECTION 00 70 00, Conditions of the Contract SECTION 00 73 00, Supplementary Conditions DIVISION 1, General Requirements DIVISION 2, Existing Conditions RFP Appendices A thru J

JIRO MIYAIRI 046-407-8837

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Jul-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________18 Aug 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE-JAPAN DISTRICT

RM 147, BLDG. 250

CAMP ZAMA

ZAMA-CITY, KANAGAWA 252-8511

JAPAN

W912HV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

046-253-8749FAX:TEL: 046-252-0994 TEL: FAX:

W912HV-16-R-0008 77

(See sec 01 01 50)

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

SECTION 00 10 00

SUPPLIES OR SERVICES AND PRICE/COSTS

PROPOSAL SCHEDULE

P903 Temporary Lodging Facility (TLF) & BU1419R Supporting Facilities, Camp Hansen, Okinawa, Japan

Item No.

Description

Quant

Unit

Amount

0001 BU1419R, Demolish Existing Structures

0001AA Design 1 JB ¥_______________

0001AB Construction 1 JB ¥_______________

0002 BU1419R, Provide Main Utility Lines

0002AA Design 1 JB ¥_______________

0002AB Construction 1 JB ¥_______________

0003 P903, Construct New Temporary Lodging Facility

0003AA Design 1 JB ¥_______________

0003AB Construction 1 JB ¥_______________

TOTAL PROPOSAL SCHEDULE (ITEM NO. 0001 THRU

0003)

Notes:

1. Failure of the Offeror to propose prices for all items in the Proposal Schedule may be cause for rejection of the proposal as unacceptable.

2. Any reference to "bid," "bidder," or "bidding schedule" shall be construed to mean "offer," "offeror," and "proposal schedule," respectively.

W912HV-16-R-0008

3. See Section 01 10 26.70 33, Subparagraph 3.3.2 for additional line item description.

4. Items Nos. 0001 and 0002 are subject to a combined cost limitation of ¥97,175,000 in accordance with FAR 36.205. This cost limitation does not represents the Government's estimate of the work. (See Section 00 21 00, Provision No.252.236-7006, Cost Limitation).

5. LEGEND: JB = Job

Section 00 21 00 - Instructions

INSTRUCTIONS

1. DELIVERY OF BIDS/OFFERS (MAR 2014).

a. Each bidder/offeror is solely responsible for ensuring that their bid/offer is received by the Government as specified in the solicitation. Please read the following statements to ensure timely submittal of your bid/offer:

(1) Closely coordinate the delivery of your bid/offer in sufficient time before the bid opening date/proposal due date.

(2) Bids/offers will not be accepted at the main gate of Government facilities.

(3) Valid picture identification is required for entry into Government facilities.

b. For Japanese visitors, Residential Registration Card, Passport, or Japanese Driver's License are considered valid picture Identification. Those individuals using a newly issued Japanese driver’s license with an Identity Code (IC) chip as a form of identification will be required to enter an 8 digit Personal Identification Number (PIN) into an IC Chip Reader.

Individuals are granted 3 attempts to input their PIN and will be denied access if they are unable to input the correct PIN. To obtain or reset the PIN code, individuals should go to their local Japanese police driver’s licensing center for assistance.

c. For non-Japanese visitors, Passport or Alien Registration Card are considered valid picture identification.

d. The Government will not escort or provide any base access to any door-to-door service company.

e. For bids/offers addressed to Camp Zama.

(1) The Japan Post has access to Camp Zama.

(2) If you decide to hand-carry your bid/offer to Camp Zama, please allow sufficient time to have a Government personnel meet your representative(s) at the Camp Zama main gate, sign your representative(s) in, and be escorted to our office. We suggest arriving at the gate to Camp Zama at least 30 minutes before the closing time for bid/offer acceptance.

2. SOLICITATIONS FOR LOCAL SOURCES ONLY. This contract will be performed in its entirety in the country of Japan and is intended only for local sources. (See Federal Acquisition Regulation 5.202(a)(12) and Paragraph titled, ”Offeror Eligibility”.) (JED APR 2006)

3. SUBMISSIONS OF OFFERS IN JAPANESE YEN. Offers submitted in response to this solicitation shall be in terms of Japanese Yen, including any required bid guarantee. Offers received in other than Japanese Yen shall be rejected.

4. MAGNITUDE OF THE PROPOSED PROJECT. The estimated price range of this work is between ¥1,000,000,000 and ¥2,500,000,000,000 [FAR 36.204].

5. REQUEST FOR EXPLANATION OR INTEPRETATION. Request for explanation or interpretation of the solicitation, drawings, specifications, etc., must be submitted to the Government point of contact by August 1, 2016.

6. BONDING THRESHOLDS (MAR 2015).

a. Under the Federal Acquisition Streamlining Act of 1994, Public Law 103-355 (FASA), the Miller Act (40 U.S.C. 270a-270f) no longer applies to contracts that do not exceed the amount of $150,000. Therefore, the Government will not require the successful bidder to furnish a performance bond if it appears that award of a contract to the bidder will be in an amount of ¥17,250,000 or less.

b. The government requires a bid guarantee to accompany a bid when a performance bond will be required under the resulting contract. Therefore, under this solicitation, any bid that is in excess of ¥17,250,000 shall be accompanied by a bid guarantee, in the form and amount that is required by provision "52.228-1, BID GUARANTEE," and other pertinent provisions and clauses in this solicitation. Failure to submit a bid guarantee in such case may render the bid non-responsive to the solicitation.

c. A bid under this solicitation that does not exceed ¥17,250,000 shall not require a bid guarantee to be submitted with the bid. Absence of a bid guarantee in such case will not, in and of itself, render the bid non-responsive to the solicitation.

7. PERFORMANCE BOND (MAR 2015).

a. Applicable to contracts exceeding ¥17,250,000.

b. Within 10 calendar days after the date of receipt of the award letter, the bidder to whom award is made shall furnish the Government with a performance bond (Standard Form 25) with good and sufficient surety or sureties acceptable to the Government. The penal sum of the Performance Bond shall equal one hundred percent (100%) of the contract price.

c. Performance bond will be furnished by the Contractor to the Government prior to issuance by the Government of a Notice to Proceed. (FAR 28.102-3) [0000-4124]

8. SAFETY STANDARDS. The successful offeror will be required to comply with the Occupational Safety and Health Act (OSHA) standards as well as the Corps of Engineers Manual 385-1-1, Safety and Health Requirements Manual.

9. PERFORMANCE OF WORK BY THE CONTRACTOR – DEFINED. For the purpose of Clause entitled, "PERFORMANCE OF WORK BY THE CONTRACTOR", of Special Contract Requirements, work on the site with the Contractor's own organization means physical activities at the site other than work performed by subcontractors, procurement of materials for installation by subcontractors, or providing equipment to be used solely by subcontractors.

10. PRORATED COSTS. All costs pertaining to the performance of work under the contract over and above the direct costs for the work shall be prorated to and included in the price quoted for each item in the Bidding Schedule.

11. SPECIAL TREATMENT OF PACKAGING OF EQUIPMENT AND MATERIAL. Bidders are cautioned that equipment and material requiring ocean transportation may be subjected to inordinate dangers and special treatment or packaging may be necessary to assure arrival in a condition conforming to contract requirements.

12. SIGNATURE ON OFFERS. Offers must be signed by an officer of the company or an individual who is authorized to sign offers for and on behalf of the company. An individual, other than an officer of the company, who signs an offer must submit evidence of his authority to sign such offer. This evidence must accompany the offer. Failure to comply with this requirement may be cause for rejection of the offer.

13. JOINT VENTURE. In the event the offeror is a joint venture, the offer must be signed by an authorized representative of each participant in the joint venture. Failure to comply with this requirement may be cause for rejection of the offer.

14. OFFEROR ELIGIBILITY. Only local sources will be considered under this solicitation.

Local sources are sources (e.g. corporations, partnerships, or Joint Ventures [For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements]) that are physically located in Japan and authorized (i.e. licensed and registered) to perform in Japan, the type of construction work specific in this solicitation. Specifically, a prospective offeror must be duly authorized to operate and conduct business in Japan and must fully comply with all laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts. In addition, prior to award of the contracts, offerors must be registered with the Government of Japan to do construction work in Japan and possess necessary construction licenses and permits to perform work required under this solicitation.

The U.S. Government will not offer “United States Official Contractor” status under Article XIV of the US-Japan Status of Forces Agreement (SOFA) to U.S. contractors normally resident in the United States; nor will the U.S. Government certify employees of such contractors as “Members of the Civilian Component” under Article I(b) of the SOFA.

15. JAPANESE CONSUMPTION TAX (APR 2014). Effective April 1, 2014, the Government of Japan increased the rate of Japanese Consumption Tax from 5% to 8%. By virtue of Article XII of the Status of Forces Agreement (SOFA), materials, supplies, equipment and services procured for official purposes in Japan by the United States armed forces, or its authorized procurement agencies are EXEMPT from various Japanese Taxes, including Consumption Tax.

The exemption from the Japanese Consumption Tax applies not only to Japanese prime contractors, but also to Japanese subcontractors or suppliers at every level regardless of the nationality of the prime contractor whether a Japanese or a Foreign firm. The instruments listed hereinafter have been agreed to by both governments of Japan and the U.S. as "Proof of Purchase by U.S. Forces in Japan.”

Standard Form 1034 Public Voucher for Purchases and Services other than Personal

DD Form 1155 Order for Supplies or Services

Standard Form 44 Purchase Order-Invoice-Voucher

ENG Form 93 Payment Estimate

Therefore, Japanese Consumption Tax shall NOT be included in your bid, proposal or quote.

16. DEFINITION OF THE WORDS ITEM/ITEMS.

a. This solicitation contains a single schedule for award to a single bidder.

b. For the purpose of this solicitation, the words "ITEM" and "ITEMS" as used in provision(s) of this section shall be construed to mean "SCHEDULE" and "SCHEDULES", respectively.

17. ACCEPTABLE SURETIES (MAR 2013). Notwithstanding the statement contained in paragraph (d) of the clause, FAR 52.228-15, "Performance and Payment Bonds - Construction (OCT 2010)", concerning the acceptable corporate sureties appearing on the Treasury Department Circular 570, a corporate surety that has received official approval to execute bid bonds (Standard Form 24) and performance bonds (Standard Form 25) on United States Forces Japan construction projects from the Government of Japan will be considered an acceptable surety. Banks are not acceptable sureties; bid bonds and performance bonds executed by banks will be rejected.

18. FUNDING. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available from which payment for contract purposes can be made.

19. METHOD OF PROCUREMENT. The US Army Corps of Engineers, Japan District, intends to solicit this requirement using the source selection procedures in accordance with the provisions set forth in this Request For Proposal (RFP). A Firm-Fixed Price construction contract will be awarded to the offeror who submits a proposal determined to be the lowest priced, technically acceptable proposal by the Government (see Section 00 22 16).

20. PRE-AWARD SURVEYS. The Government reserves the right to conduct a pre-award survey of any firm under consideration to confirm any part of the information furnished by the offeror, or to require other evidence of managerial, financial, technical, and other capabilities, the positive establishment of which is determined by the Government to be necessary for the successful performance of the contract.

21. PRE-PROPOSAL CONFERENCE.

a. Offerors are strongly urged and expected to attend and participate in the pre-proposal conference. The purpose of this conference is to promote uniform interpretation of the solicitation documents and work requirements and can include discussions of any problems with interpretations of the solicitation documents and work execution identified by potential offerors through written questions. In no event will a failure to attend the pre-proposal conference constitute grounds for a claim after award of the contract.

b. Offerors are encouraged to ask questions at the conference. Any questions made at the conference may or may not be addressed at the conference, but will be addressed in the minutes of the conference.

c. The Pre-Proposal Conference will be conducted concurrently with the Pre-Proposal Site Investigation. Please see Section 00 21 00, Provision No. 52.236-27 Alt I, Site Visit for information regarding the meeting.

22. ORGANIZATIONAL CONFLICTS OF INTEREST (DEC 2015)

In order to prevent a potential conflict of interest under FAR subpart 9.5, firms that prepared or assisted in preparing a statement of work, specifications, or plans for this project in any capacity (to include as a prime contractor, partner, subcontractor, or consultant) under any prior contract shall not be a bidder/offeror under this solicitation and shall not be a part of the bidder's/offeror's team in any capacity (to include as a prime contractor, partner, subcontractor, or consultant).

Failure to comply with this provision may result in termination for default.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.204-16 Commercial and Government Entity Code

Reporting

JUL 2015

52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)

APR 2014

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.222-56 Certification Regarding Trafficking in Persons

Compliance Plan.

MAR 2015

52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7004 Alt A

System for Award Management Alternate A FEB 2014

252.204-7008 Compliance With Safeguarding Covered Defense Information Controls

DEC 2015

252.215-7008 Only One Offer OCT 2013 252.236-7006 Cost Limitation JAN 1997

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed-price contract resulting from this solicitation.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or ¥345,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government

Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

CONTRACTING DIVISION-Contracting Officer

USACE-JAPAN DISTRICT

RM 147, BLDG 250

CAMP ZAMA

ZAMA-CITY, KANAGAWA 252-8511

JAPAN

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site investigation will be conducted with the following schedule:

Date: July 25, 2016 Time: 1400 hrs Location of Meeting: East side of baseball field behind Base Exchange.

COE POC/phone number/email:

Mr. Frank Cook, 080-2160-7244, Frank.H.Cook.civ@usace.army.mil or Ms. Victoria Okudera, 080-2160-7500, Victoria.V.Okudera.ln@usace.army.mil

(i) Camp Hansen base access is required. A maximum of five (5) personnel per company (prospective offeror) will be permitted to attend the site investigation.

(ii) If the prospective offeror requires a day base access pass (personnel and/or Vehicle), the offeror shall provide a roster of attendees to the aforementioned POC, ten (10) days prior to the site investigation date. Roster shall contain the Company Name, Individual(s) Name, and a copy (front and back) of the individual’s photo identification (ID). On the day of the site investigation pre-approved personnel shall require a Photo ID to enter the base.

(iii) For vehicle base access provide a copy of the vehicle registration and proof of insurance (JCI) ten (10) days prior to the site investigation date.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Subparagraph (c)(5) of FAR clause 52.215-1 -- Instructions to Offerors -- Competitive Acquisition, is revised to read as follows. “Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in Japanese yen.”

SECTION 00 22 00

SUPPLEMENTARY INSTRUCTIONS

PROPOSAL SUBMISSION REQUIREMENTS

1.0 GENERAL INSTRUCTIONS

This acquisition is being conducted using a “One-Phase” design build procurement process.

1.1 Offerors shall strictly adhere to the requirements in this Section when preparing the proposal to be submitted in response to this Request for Proposal (RFP). All proposals shall be in English. The Government will not reimburse any Offeror any cost incurred in response to this RFP. Proposals that fail to comply with the proposal submittal requirements addressed in this section of the solicitation may be deemed unacceptable. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) solicitation at or before the exact time specified.

There will be no public opening of the proposals received as a result of this RFP. Failure to meet a requirement may result in an offer being ineligible for award. Copies of the RFP are available by INTERNET ACCESS ONLY. All RFP documents will be posted to and made available for viewing in Federal Business Opportunities (http://www.fbo.gov). All amendments will be posted to and made available for viewing in FedBizOpps. It shall be the Offeror’s responsibility to check the website for any amendments.

1.2 The Government seeks award of one contract to the responsible offeror whose proposal represents the best value to the Government using the Lowest Priced Technically Acceptable (LPTA) process.

1.2.1 The Government will determine which offeror demonstrates the required competence for performing the requirement described herein and offers the lowest priced technically acceptable proposal to the Government. Offerors are advised the Government intends to make an award on the basis of initial proposals without conducting discussions with the offerors (other than communications conducted for the purpose of clarification). However, the Government reserves the right to conduct discussions if the Contracting Officer determines it necessary.

1.2.2 The Government reserves the right to discuss aspects of proposals with Offerors in the competitive range, if one is determined to be necessary, upon completion of the evaluation.

Offerors are advised that the Government may make award without discussions, clarifications, or any contact concerning the proposals received. Therefore, proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Offerors shall not assume that they will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

1.3 Proposals received by the Government after the date and time set for receipt of proposals will be handled in accordance with the requirements of Provision “52.215-1, Instructions to Offerors – Competitive Acquisition”.

1.4 Offerors are required to provide information addressing all stated factors in a clear and understandable format. If an offeror does not have information relating to a specific factor, the offeror shall clearly state so in the proposal. Proposals that do not clearly address all factors may be considered unacceptable and may not receive further consideration.

2.0 PROPOSAL SUBMISSION INSTRUCTIONS

2.1 General Requirements: The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet the requirements. Offerors shall assume that the Government has no prior knowledge of their facilities or experience, and will base its evaluation on the information presented in the offeror’s proposal.

2.1.1 Proposals shall be submitted in two (2) separate envelopes as follows:

2.1.1.1 Volume I shall contain the Technical Proposal and shall be clearly marked Volume I – Technical Proposal. In addition, follow instructions in Paragraph (c)(1) of Section 00 21 00, 52.215-1, INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION.

2.1.1.2 Volume II shall contain the Price Proposal and shall be clearly marked Volume II – Price Proposal. In addition, follow instructions in Paragraph (c)(1) of Section 00 21 00, 52.215-1, INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION.

2.1.2 Each volume shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. It is recommended that the pages be standard 8-1/2” x 11” or A4 white bond paper using 12 characters per linear inch or equivalent as the minimum size standard for text.

2.1.3 The Government recognizes that offerors go to considerable expense to prepare proposals for this solicitation, so the Government prefers that proposals be practical. Elaborate format, special binders, special reproduction techniques, and the like are not necessary or desired. In short, the proposal shall completely and adequately address the requirements stated in solicitation. Proposal legibility, clarity, coherence, and contents are important.

2.1.4 Revised Proposal. Revised proposals will not be accepted unless specifically requested by the Contracting Officer. If the Contracting Officer decides to conduct discussions and requests revised proposals from the offerors; offerors shall ensure that all replacement pages are clearly marked “REVISED”, shall show the date of revision, shall be submitted in the appropriate number of copies (e.g., if two copies of the original page was required, then two copies of the revised page will also be required). All proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g. bold face print or underlining.

2.2 Proposal Format

2.2.1 Size of Proposal Pages: Proposal pages should be standard letter size (8-1/2” x 11” or A4);

however, if drawings or other graphics are submitted, offerors should reduce them only to the extent that legibility is not lost. Font size 12 or larger is preferred. Each page should be numbered. Any pages over the prescribed limit will not be considered for evaluation.

2.3 Proposal Content

2.3.1. Volume I – Technical Proposal

2.3.1.1. Submit one (1) original and five (5) paper copies of the documents shown in the table below. The volume shall be bound and tabbed and in the order as shown in the table below.

The Technical Proposal shall not contain any reference to cost for this project. The total pages submitted for the Technical Proposal shall not exceed seventy (70) pages. Each page should be numbered. Any pages over the prescribed limit will not be considered for evaluation. Do not include the front and back cover of the technical proposal in the seventy (70) sheet count.

2.3.1.2. In addition, provide the complete Volume I – Technical Proposal submittal, including text, renderings, drawings, photographs, etc. as PDF files and on CD (one copy). The CD should be marked with the offeror’s name, the solicitation number, and should be identified as the electronic copy of the Volume I Technical Proposal. If the electronic files are of a size at which they must be compressed (zipped), they shall be compressed into one file using WinZip version 6.2 or later. Self extracting exe files will not be accepted. Electronic files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text.

2.3.1.3. In the event of any conflicts or differences between the original sealed offer and any paper copy or electronic (PDF) copy of the proposal, the sealed original offer shall control.

The offeror is responsible for ensuring that all copies of the proposal, whether a paper copy or an electronic copy, is consistent with the original sealed offer.

2.3.1.4. The submittals should be formatted as follows:

Volume I – Technical Tab Documents to be

1 Cover Sheet. See Paragraph 2.3.1.5.1.

2 SF 1442 (front and back page)

3 Section 00 45 00, Representations and Certifications

4 Joint Venture Agreement (if Joint Venture)

5 Attachment A “Construction Project Information Sheet.” Submit one information sheet per project. See Paragraph 2.3.1.5.2

6 Attachment B “Design Project Information Sheet.” Submit one information sheet per project. See Paragraph 2.3.1.5.3

7 Attachment C – Past Performance Questionnaire. Submit one sheet for each project submitted under Factor 1 Construction Experience and submit one sheet for each project submitted under Factor 2 Design Experience. See Paragraph 2.3.1.5.4

2.3.1.5 Additional Submittal Instructions

2.3.1.5.1 Cover Sheet. Follow instructions in Paragraph (c)(2) in Section 00 21 00, 52.215-1, INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION.

2.3.1.5.2 Construction Project Information Sheet (Attachment A) included in this solicitation is provided for the offeror to submit for each project included for Factor 1, Construction Experience.

2.3.1.5.3 Design Project Information Sheet (Attachment B) included in this solicitation is provided for the offeror to submit for each project included For Factor 2, Design Experience.

Ensure correct phone numbers and e-mail addresses are provided for the client point of contact.

2.3.1.5.4 Past Performance Questionnaire (Attachment C) included in this solicitation is provided for the offeror to submit information for Factor 3, Past Performance. See paragraph

2.4.3 below for more information regarding Past Performance.

2.3.2 Volume II – Price Proposal

2.3.2.1. Submit one (1) original and two (2) paper copies of the documents shown in the table below. The volume shall be bound and tabbed and in the order as shown in the table below.

2.3.2.2. In addition, provide the complete Volume II – Price Proposal submittal, as PDF files and on CD (one copy). The CD should be marked with the offeror’s name, the solicitation number, and be identified as the electronic copy of the Volume II Price Proposal.

2.3.2.3. In the event of any conflicts or differences between the original sealed offer and any paper copy or electronic (PDF) copy of the proposal, the sealed original offer shall control.

The offeror is responsible for ensuring that all copies of the proposal, whether a paper copy or an electronic copy, is consistent with the original sealed offer.

Volume II – Price

Tab Documents to be 1 Cover Sheet. See Paragraph 2.3.2.4.1.

2 Standard Form (SF) 1442. Front and back page.

3 Section 00 10 00.

4 Section 00 45 00.

5 Joint Venture Agreement (if a Joint Venture)

2.3.2.4. Additional Submittal Instructions

2.3.2.4.1. Cover Sheet. Follow instructions in Paragraph (c)(2) in Section 00 21 00, 52.215-1, INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION.

2.4 EVALUATION FACTORS AND SUBMISSION REQUIREMENTS

Non-price factors are Construction Experience, Design Experience and Past Performance. The evaluation factors and submission requirements for each factor are as follows:

2.4.1 Factor 1 Construction Experience

2.4.1.1 Only relevant construction projects will be considered for evaluation. Relevant projects are projects that include EACH OF THE FOLLOWING:

(1) Had a contract value of ¥1,000,000,000 or more, and are currently well underway (at least 50% construction progress completed) or was completed and turned over no longer than six (6) years preceding the issuance date of this Solicitation,

(2) Demonstrate experience in in the construction of Government or comparable commercial projects of lodging facilities including barracks, hotels, or essentially any type of multi-level facility that involved the construction of multi-functional areas consisting of, but not limited to, guest rooms, lobby/atrium reception area, lounge areas, business center, elevator, administrative offices, storage rooms, laundry/maintenance areas, men's/women's toilet rooms, mechanical/electrical room, paved exterior areas and landscaping; that involved multiple disciplines and trades of the same, and.

(3) Were completed by the Offeror or Joint Venture Teaming Member (shown in a signed Joint Venture Agreement) as the Prime Contractor.

Note: For purposes of evaluating construction experience as a prime contractor, the offeror and prime contractor are defined as the contractor identified in Block 14 of SF

1442. If a Joint Venture (JV) joint venture is identified in Block 14 of the SF 1442, then a signed joint venture agreement must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM) by the submittal date of offer. Under JV agreements, the Government will evaluate construction experience for the JV as a singular entity whereby the JV is considered the prime contractor (inclusive of all affiliates comprising the agreement).

2.4.1.2 Use Attachment A, Construction Project Information Sheet, attached to this Section to submit three (3) relevant Construction projects. If more than three (3) projects are submitted, only the first three (3) projects will be considered for evaluation. The fourth (4th) and any additional project will not be considered for evaluation. This is regardless whether or not the first three (3) projects are classified as “relevant” or “not relevant” by Government evaluators.

2.4.2 Factor 2 Design Experience

2.4.2.1 Only relevant design projects will be considered for evaluation. Relevant projects are projects that include EACH OF THE FOLLOWING:

1) Were for design of construction projects, in which the construction cost was estimated to exceed ¥1,000,000,000, and are currently well underway (at least 50% design progress completed) or completed no longer than six (6) years preceding the issuance date of this Solicitation,

2) Demonstrates experience in the design of Government or comparable commercial projects of lodging facilities including barracks, hotels, or essentially any type of multi-level facility that involved the design of multi-functional areas consisting of, but not limited to, guest rooms, lobby/atrium reception area, lounge areas, business center, elevator, administrative offices, storage rooms, laundry/maintenance areas, men's/women's toilet rooms, mechanical/electrical room, paved exterior areas and landscaping; that involved multiple disciplines and trades of the same, and

3) Were completed by the Offeror, Joint Venture Teaming Member (shown in a signed Joint Venture Agreement), or by the Offeror’s proposed subcontractor, as the Designer of Record (DOR).

2.4.2.2 Use Attachment B, Design Project Information Sheet, attached to this Section to submit three (3) relevant design projects. If more than three (3) projects are submitted, only the first three (3) projects will be considered for evaluation. The fourth (4th) and any additional project will not be considered for evaluation. This is regardless whether or not the first three (3) projects are classified as “relevant” or “not relevant” by Government evaluators.

2.4.2.3 The Offeror acknowledges that the proposed subcontractors under this factor shall become contractually binding in accordance with clause 52.236-5001.

2.4.2.4 How to submit for relevant Design-Build projects: If the Offeror accomplished BOTH design AND construction for a Design-Build project which meets both the relevancy criteria for

Factor 1, Construction Experience and Factor 2, Design Experience, the offeror may submit both Attachment A and B for the same project. It is understood that the data in both sheets may be identical or very similar to each other.

2.4.3 Factor 3 Past Performance

2.4.3.1 Completed Past Performance Questionnaires should be submitted with your proposal for each project the offeror submits for Factors 1, Construction Experience) and Factor 2, Design Experience. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment C), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contacts listed below via email prior to proposal closing date and time.

Jiro Miyairi, E-mail: jiro.miyairi@usace.army.mil Theodore T. Turney, E-mail: theodore.t.turney@usace.army.mil

2.4.3.2 Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

2.4.3.3 The offeror may include performance recognition documents received for each project the offeror includes in its proposal for Factors 1 and 2, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

2.4.3.4 In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

2.4.3.5 While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

--End of Section--

SECTION 00 22 00 ATTACHMENT A

CONSTRUCTION PROJECT INFORMATION SHEET

Name of Offeror: ________________________________________________

Provide information for relevant projects to be used for CONSTRUCTION EXPERIENCE evaluation purposes. For each project, provide the following information (use additional sheets as necessary):

a. Type of project (Check One):

___ Design-Bid-Build ___ Design-Build

b. Contract or Task Order Number/Project Title:

c. Location/Site (Include Country, Prefecture, and City where the project was constructed):

d. Name of Company/Firm Involved in this project (if other than the Offeror or if Offeror is a Joint Venture):

e. Nature of Involvement in this project, i.e. Prime Contractor:

f. Cost of Project:

Total Contract Value ¥___________

Construction only (if Design-Build project) ¥___________

Design only (if Design-Build project) ¥___________

g. General Scope of Project (be sure to describe how this project meets each and every minimum acceptability criteria listed in RFP Section 00 22 16, Factor 1):

h. Identify key work disciplines your company/firm employed on this project:

i. Period of Performance

Start Date: ________________

Date Physically Completed: _____________

If not Completed, percentage of construction progress currently completed:

Provide two Points of Contact for Client/Agency (if client is the U.S. Government, provide name and address of contracting office, contract number, name and telephone number of Contracting Officer):

(1)

Name: ______________________________________________________________

Telephone No.________________________

Fax No.________________________

E-mail: _____________________________________________________________

Address: ____________________________________________________________

(2)

Fax No.________________________

j. Extent and Type of Work Subcontracted: ( ____ % of direct effort)

SECTION 00 22 00 ATTACHMENT B

DESIGN PROJECT INFORMATION SHEET

Name of Offeror (offeror on this RFP):

Name of Designer (firm that did the design work for this project):

Indicate if the design on this project was completed by the Offeror, Joint Venture Teaming Member (shown in a signed Joint Venture Agreement), or by the Offeror’s proposed subcontractor, as the Designer of Record (DOR).

Provide information for relevant projects to be used for DESIGN EXPERIENCE evaluation purposes. For each project, provide the following information (use additional sheets as necessary):

a. Type of project (Check One):

___ Design-Bid-Build ___ Design-Build

b. Contract or Task Order Number/Project Title:

c. Location/Site of Project (Include Country and City where the project was or will be constructed):

d. Identify the Designer of Record for the project. Identify the nature and level of direct effort as a percentage of the offeror’s involvement in the project:

e. Cost of Project:

Design amount ¥___________ Estimated construction cost ¥___________

f. General Scope of Project (be sure to describe how this project meets each and every minimum acceptability criteria listed in RFP Section 00 22 16, Factor 2):

g. Identify key work disciplines the design company/firm employed on this project:

h. Period of Performance

Start Date: ________________

Date Completed: _____________

i. Provide two Points of Contact for Client/Agency (if client is the U.S. Government, provide name and address of contracting office, contract number, name and telephone number of Contracting Officer):

(3)

Fax No.________________________

(4)

Fax No.________________________

E-mail: _____________________________________________________________

Address: ____________________________________________________________

Section 00 22 00 Attachment C Past Performance Questionnaire

Form PPQ-0 (9/30/11)

USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

Form PPQ-0 (9/30/11)

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

業者の評価の為の評価基準と定義

RATING DEFINITION NOTE

(E) Exceptional 特に優れている

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

仕事が契約内容と合致しており、顧客の希望

を上回る点が多い。修正可能な範囲の軽微な

不具合を含め、契約通りの内容である。修正

箇所は非常に満足な結果である。

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good 優れている

Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

仕事が契約内容と合致しており、顧客の希望

を多少上回る。修正可能な範囲の若干の不具

合を含め、契約通りの内容である。修正箇所

は満足な結果である。

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory 満足

Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

仕事が最低限の契約内容と合致している。修

正可能な若干の不具合を含め、契約通りの内

容である。修正箇所は特に問題ない結果であ

る。

A…