AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P903 Temporary Lodging Facility (TLF) & BU1419R Supporting Facilities, Camp Hansen, Okinaw a, Japan

The purpose of this amendment is to revise spec pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HV-16-R-0008

X 9B. DATED (SEE ITEM 11)

07-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Aug-2016

CODE

CONTRACTING DIVISION

USACE-JAPAN DISTRICT

RM 147, BLDG. 250

CAMP ZAMA

ZAMA-CITY, KANAGAWA 252-8511

JAPAN

W912HV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HV-16-R-0008

14. DESCRIPTION OF AMENDMENT (continued)

A. CHANGES TO SPECIFICATIONS – The amendment mark “(Am-0004)” is shown on each page of the amended specification section(s).

Revised Page(s) to Project Specifications. Attached hereto are the following revised page(s) to specifications. Revised page(s) will replace like-numbered page(s) in the subject specifications. Changes are indicated by an asterisk (*) in the left margin opposite the beginning of the revision and an asterisk in the right margin opposite the end of the revision.

Section Page No(s).

00 22 16 Page 33 & 34 of the solicitation

C. Proposal due date and time of September 2, 2016 (02:00 PM), Japan Standard Time, is remain unchanged.

SECTION 00 22 16

SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS

EVALUATION FACTORS FOR AWARD

1.0 AWARD OF CONTRACT

1.1 Award will be made to the Lowest Price Technically Acceptable offeror. To be eligible for award, an offeror must be evaluated as “acceptable” for Factors 1, 2 and 3. Price will be evaluated for fairness and reasonableness. The Government intends to evaluate proposals and award a contract without discussions with offerors. However, the Government reserves the right to conduct discussions if the contracting officer determines them to be necessary.

2.0 EVALUATION FACTORS for AWARD

A. Volume I – Technical Proposal

2.1 FACTOR 1 Construction Experience

2.1.1 Rationale for Evaluation of Construction Experience

a. The Government will evaluate demonstrated experience in completing relevant projects to assess the offeror’s ability to complete the requirements under this contract.

Government evaluators may contact the points of contact you list in Section 00 22 00, Attachment A, Construction Project Information Sheet to verify information that you provide for the projects submitted.

b. The Government will evaluate DESIGN-BID-BUILD and/or DESIGN-BUILD construction project(s) submitted in accordance with Section 00 22 00, PROPOSAL

SUBMISSION REQUIREMENTS.

c. The Government will evaluate the experience demonstrated by the offeror, as a Prime Contractor. The minimum requirement for this evaluation factor has been met when the offeror demonstrates experience, as a Prime Contractor (see note below), on three (3) construction projects, which each meets all the below criteria for minimum acceptability:

1) Had a contract value of ¥1,000,000,000 or more, and are currently well underway (at least 50% construction progress completed) or was completed and turned over no longer than six (6) years preceding the issuance date of this Solicitation,

2) Demonstrate experience in in the construction of Government or comparable commercial projects of lodging facilities including barracks, hotels, or essentially any type of multi-level facility that involved the construction of multi-functional areas consisting of, but not limited to, guest rooms, lobby/atrium reception area, lounge areas, business center, elevator, administrative offices, storage rooms, laundry/maintenance areas, men's/women's toilet rooms, mechanical/electrical room, W912HV-16-R-0008

(Am-0004) paved exterior areas and landscaping; that involved multiple disciplines and trades of the same, and.

3) Were completed by the Offeror or Joint Venture Teaming Member (shown in a signed Joint Venture Agreement) as the Prime Contractor.

Note: For purposes of evaluating construction experience as a prime contractor, the offeror and prime contractor are defined as the contractor identified in Block 14 of SF 1442. If a Joint Venture (JV) joint venture is identified in Block 14 of the SF 1442, then a signed joint venture agreement must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM) by the submittal date of offer. Under JV agreements, the Government will evaluate construction experience for the JV as a singular entity whereby the JV is considered the prime contractor (inclusive of all affiliates comprising the agreement).

Construction Experience will be rated on an “Acceptable” or “Unacceptable” basis using the ratings and descriptions shown below.

Acceptable – Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable – Proposal does not clearly meet the minimum requirements of the solicitation.

2.2 FACTOR 2 Design Experience

2.2.1 Rationale for Evaluation of Design Experience

a. The Government will evaluate demonstrated experience in completing relevant projects to assess the offeror’s ability to complete the requirements under this contract. Government evaluators may contact the points of contact you list in Section 00 22 00, Attachment B, Design Project Information Sheet to verify information that you provide for the projects submitted.

b. The Government will evaluate design project(s) submitted in accordance with Section 00 22 00, PROPOSAL SUBMISSION REQUIREMENTS. Experience may be submitted for either DESIGN- BID-BUILD design projects (stand-alone design projects) and/or DESIGN-BUILD design projects (design completed as part of a Design Build project).

c. The minimum requirement for this evaluation factor has been met when the offeror demonstrates experience on three projects, which each meets all the below criteria for minimum acceptability:

1) Were for design of construction projects, in which the construction cost was estimated to exceed ¥1,000,000,000, and are currently well underway (at least