W912HV-20-R-0004 Tengan Boat Basin Dredging.pdf
PDF 2 MB Posted
- Solicitation number
- W912HV-20-R-0004
About this file
This solicitation requests proposals for dredging work at the Tengan Boat Basin located at Camp Courtney in Okinawa, Japan. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Japan. The solicitation seeks dredging services to maintain the harbor, including pre-dredging surveys, metal debris clearance, environmental protection measures, dredging, disposal of dredged materials, post-dredging surveys, and final cleanup. Pricing will be based on cubic meters of material removed. The response deadline is not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM-0001-Specifications.pdf | ||
| W912HV20R0004-0001.pdf | ||
| W912HV-20-R-0004 Tengan Boat Basin Dredging-Drawings.pdf | ||
| W912HV20R0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912HV-20-R-0004
US Army Corps of Engineers
Japan District
FY18 DLA DWCF Boat Basin Dredging Tengan
Camp Courtney
Okinawa, Japan
SPECIFICATIONS
RTA
07 APR 2020
FY18 DLA DWCF TENGAN BOAT BASIN DREDGING 19MC0009
Camp Courtney, Okinawa, Japan
W912HV-20-R-0004 PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 10 GENERAL CONTRACT REQUIREMENTS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 00-A ENG FORM 4025-R
01 33 00-B SUBMITTAL REGISTER
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 26-A USACE ACCIDENT PREVENTION PLAN CHECKLIST
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 USACE QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 50 00-A PROJECT SIGN
01 50 00-B TEMPORARY TOILET FACILITY
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 DREDGING
-- End of Project Table of Contents --
FY18 DLA DWCF TENGAN BOAT BASI N DREDGI NG 19MC0009
Camp Cour t ney, Oki nawa, Japan
SECTI ON 01 11 00. 00 10
GENERAL CONTRACT REQUI REMENTS
PART 1 GENERAL
1. 1 DEFINITIONS
The wor d " Gover nment " shal l be r ead as " Uni t ed St at es Gover nment " whenever t he wor d " Gover nment " appear s i n t hi s Cont r act , unl ess ot her wi se st at ed.
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 10 ( 2013) St andar d f or Por t abl e Fi r e Extinguishers
NFPA 241 ( 2013; Er r at a 2015) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Vi ew Locat i on Sket ch I ni t i al Si t e Condi t i ons Phot os;
Key Per sonnel Qual i f i cat i ons; G
SD- 07 Cer t i f i cat es
Mont hl y Pr ogr ess Phot os;
1. 4 ACCEPTABLE ALTERNATI VES JAPANESE STANDARDS
Wher e i ndi cat ed i n t he i ndi vdual t echni cal speci f i cat i ons REFERENCES par agr aph, accept abl e Japanese St andar ds ar e l i s t ed whi ch ar e consi der ed accept abl e al t er nat i ves t o t he US st andar ds wi t hi n t he Cont r act Speci f i cat i ons. Not e t he maj or i t y of speci f i cat i ons do not have any l i s t ed Japanese St andar ds. I ncor por at i on of accept abl e Japanese const r uct i on met hods, mat er i al s, and equi pment t hat ar e ot her wi se aut hor i zed by t he
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 1 cont r act , i s desi r ed t o ensur e t hat t he pr oj ect i s const r uct i bl e and t he f aci l i t y can be mai nt ai ned wi t h l ocal mat er i al s and suppl i es. Japanese st andar ds not r ef er enced i n t hese speci f i cat i ons as bei ng accept abl e al t er nat i ves t o US st andar ds ar e desi r ed and ar e t o be submi t t ed t o t he Cont r act i ng Of f i cer f or consi der at i on as accept abl e al t er nat i ves af t er awar d usi ng t he var i at i on r equest pr ocess set f or t h i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Pr i or t o t he use of such pr oposed addi t i onal al t er nat i ve Japanese st andar ds, wr i t t en appr oval by t he Cont r act i ng Of f i cer i s r equi r ed.
1. 5 KEY PERSONNEL QUALI FI CATI ONS
The Cont r act or ' s Pr oj ect Key per sonnel shal l not be assi gned dut i es t o any ot her Cont r act s ( excl udi ng t he pr oj ect manager ) wi t hout appr oval f r om t he Cont r act i ng Of f i cer . The Pr oj ect Super i nt endent may be assi gned ot her dut i es as t he Pr oj ect Manager , CQC Syst em Manager , or Si t e Saf et y Heal t h Of f i cer . Wi t hi n f i ve ( 5) wor ki ng days af t er r ecei pt of t he Not i ce t o Pr oceed, t he Cont r act or shal l submi t i n wr i t i ng t o t he Cont r act i ng Of f i cer an or gani zat i onal char t , t he qual i f i cat i ons and backgr ound hi st or y of t he pr oposed Key Per sonnel f or appr oval . The Cont r act i ng Of f i cer shal l have t he expl i c i t r i ght t o det er mi ne accept abi l i t y ( or r ej ect i on) of t he pr oposed i ndi v i dual s. I n addi t i on, t he Cont r act or shal l be r esponsi bl e t o r epl ace sai d i ndi v i dual s upon not i f i cat i on by t he Gover nment shoul d per f or mance become i nadequat e dur i ng t he Cont r act per i od. Key Per sonnel shal l at t end t he Pr econst r uct i on conf er ence.
1. 5. 1 Pr oj ect Manager
The Pr oj ect Manager shal l have a mi ni mum of f i ve ( 5) year s exper i ence as a Pr oj ect Manager on const r uct i on pr oj ect s cont ai ni ng dr edgi ng component s s i mi l ar i n s i ze and scope t o t hi s Cont r act . The Pr oj ect Manager shal l mai nt ai n over si ght of Cont r act pr oposal s pr epar ed by t he Cont r act or st af f and be aut hor i zed t o negot i at e Cont r act t er ms and si gn Cont r act document s on behal f of t he Cont r act or . The pr oj ect manager does not need t o be pr esent on t he s i t e dai l y, but shal l at t end weekl y pr ogr ess meet i ngs and be avai l abl e on s i t e wi t hi n 24 hour s upon r equest .
1. 5. 2 Pr oj ect Super i nt endent ( Super vi sor )
The Pr oj ect Super i nt endent shal l be on t he wor k s i t e when on- si t e wor k i s bei ng per f or med and shal l be avai l abl e t o t he Cont r act i ng Of f i cer or hi s r epr esent at i ves upon r equest . The Pr oj ect Super i nt endent shal l have over al l r esponsi bi l i t y f or al l oper at i ons at t he j ob s i t e and be aut hor i zed t o make deci s i ons, negot i at e Cont r act t er ms and si gn Cont r act document s on behal f of t he Cont r act or . The Pr oj ect Super i nt endent shal l have a mi ni mum of f i ve ( 5) year s exper i ence as a super i nt endent on const r uct i on pr oj ect s cont ai ni ng dr edgi ng component s s i mi l ar i n s i ze and scope t o t hi s Cont r act .
1. 5. 3 Engl i sh Speaki ng Repr esent at i ve ( I nt er pr et er )
At al l t i mes dur i ng t he Cont r act per i od t he Cont r act or shal l have an empl oyee capabl e of f l uent bi l i ngual speech i n t he Japanese and Engl i sh l anguages at t he j ob s i t e. The bi l i ngual i nt er pr et er shal l have t he capabi l i t y t o r ecei ve and i ssue conci se and t echni cal expl anat i on and i nst r uct i ons bet ween t he Gover nment r epr esent at i ve( s) and Cont r act or super vi sor y per sonnel concer ni ng al l aspect s of Cont r act admi ni st r at i on and const r uct i on. Wi t hi n f i f t een ( 15) days af t er not i ce of Cont r act awar d, t he Cont r act or shal l submi t i n wr i t i ng t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve t he qual i f i cat i ons and backgr ound hi st or y of t he pr oposed i nt er pr et er f or appr oval . The Cont r act i ng Of f i cer ' s Repr esent at i ve shal l
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 2 have t he expl i c i t r i ght t o det er mi ne accept abi l i t y or r ej ect i on of t he pr oposed i ndi v i dual . I n addi t i on, t he Cont r act or shal l be r esponsi bl e t o r epl ace sai d i ndi v i dual upon not i f i cat i on by t he Gover nment shoul d per f or mance become i nadequat e dur i ng t he Cont r act per i od. The i nt er pr et er shal l at t end t he pr econst r uct i on conf er ence.
1. 5. 4 Cont r act or Qual i t y Cont r ol Syst em Manager ( CQCSM)
See Sect i on 01 45 00 QUALI TY CONTROL.
1. 5. 5 Si t e Saf et y and Heal t h Of f i cer ( SSHO)
See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS.
1. 6 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER
a. Thi s par agr aph speci f i es t he pr ocedur e f or det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her i n accor dance wi t h t he Cont r act c l ause ent i t l ed " DEFAULT ( FI XED- PRI CE CONSTRUCTI ON) " . I n or der f or t he Cont r act i ng Of f i cer t o awar d a t i me ext ensi on under t hi s c l ause, t he f ol l owi ng condi t i ons must be sat i sf i ed:
( 1) The weat her exper i enced at t he pr oj ect s i t e dur i ng t he Cont r act per i od must be f ound t o be unusual l y sever e, t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng any gi ven mont h.
( 2) The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .
b. The l i s t i ng bel ow def i nes t he mont hl y ant i c i pat ed adver se weat her days f or t he Cont r act per i od and i s based upon 20t h Weat her Squadr on ( MAC) , U. S. Ai r For ce; I wakuni U. S. Mar i ne Cor ps Ai r St at i on, Weat her Ser v i ce;
Sasebo Naval Paci f i c Met eor ol ogy and Oceanogr aphy Det achment ; JASDF ( Japan Ai r Sel f Def ense For ce) , or s i mi l ar dat a f or t he geogr aphi c l ocat i on of t he pr oj ect . ( Mor e speci f i c i nf or mat i on may be obt ai ned as speci f i ed under Speci al Cont r act Requi r ement s Cl ause ent i t l ed " Physi cal Data.")
MONTHLY ANTI CI PATED ADVERSE WEATHER DELAYS
WORK DAYS BASED ON ( 5) DAY WORK WEEK
Mi sawa- ar ea Kant o Pl ai n I wakuni Oki nawa Sasebo Osaka
JAN 8 1 2 5 7 4
FEB 9 3 4 7 6 4
MAR 6 6 7 8 7 5
APR 3 6 6 6 7 4
MAY 4 4 6 6 6 4
JUN 5 9 8 6 12 5
JUL 6 6 6 6 9 4
AUG 6 6 5 9 9 3
SEP 6 7 6 7 9 4
OCT 4 5 4 4 8 4
NOV 6 4 4 4 5 3
DEC 7 1 3 5 5 3
The above schedul e of ant i c i pat ed adver se weat her days shal l const i t ut e t he
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 3 base l i ne f or mont hl y ( or por t i on t her eof ) weat her t i me eval uat i ons.
c. Upon acknowl edgment of t he Not i ce- t o- Pr oceed ( NTP) and cont i nui ng t hr oughout t he Cont r act , t he Cont r act or shal l r ecor d on t he dai l y CQC r epor t , t he occur r ence of adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day.
d. The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her ( even i f adver se weat her occur r ed i n pr evi ous mont h) , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days. I f t he number of act ual adver se weat her del ay days exceeds t he number of days ant i c i pat ed i n par agr aph ( b) , above, t he Cont r act i ng Of f i cer shal l conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her wor k days, and i ssue a modi f i cat i on i n accor dance wi t h t he Cont r act c l ause ent i t l ed " DEFAULT
( FI XED PRI CE CONSTRUCTI ON) " .
e. For al l wor k under t hi s Cont r act , adver se weat her i s def i ned as:
( 1) Rai nf al l - Number of occur r ences of pr eci pi t at i on gr eat er t han or equal t o 0. 10 i nches ( 2. 54mm) .
( 2) Snowf al l - Number of occur r ences of pr eci pi t at i on gr eat er t han or equal t o 1. 00 i nches ( 25. 4mm) . ( Not appl i cabl e t o Oki nawa Ar ea)
( 3) Col d Temper at ur e - Number of occur r ences when dai l y maxi mum t emper at ur e does not exceed t he mont hl y mean l ow t emper at ur e or 32 degr ees Fahr enhei t ( 0 degr ees Cel s i us) , whi chever i s l ower . ( Not appl i cabl e t o Oki nawa Ar ea)
( 4) Concur r ence bet ween snowf al l and col d t emper at ur e i s 80 per cent , i . e. 80 per cent of t he t i me snow f al l s , t he t emper at ur e i s " col d" .
( 5) Wi nd - Number of occur r ences when t he wi nd i s gust i ng 30 knot s ( 56 k i l omet er s/ hour ) or gr eat er .
f . The Cont r act or ' s schedul e must r ef l ect t he above ant i c i pat ed adver se weat her del ays on al l weat her - dependent act i v i t i es.
1. 7 PERMI TS AND RESPONSI BI LI TI ES
The Cont r act or shal l , wi t hout addi t i onal expense t o t he Gover nment , be r esponsi bl e f or obt ai ni ng any necessar y l i censes and per mi t s, and f or compl yi ng wi t h any l aws, codes, and r egul at i ons ( i ncl udi ng t he r equi r ement s of mat er i al , pr ef ect ur al , and l ocal Gover nment of Japan, and associ at ed mi l i t ar y i nst al l at i on) appl i cabl e t o t he per f or mance of wor k. The Cont r act or shal l al so be r esponsi bl e f or al l damages t o per sons or pr oper t y t hat occur as a r esul t of t he Cont r act or ' s f aul t or negl i gence. These damages shal l be r epai r ed or r epl aced by t he Cont r act or at no cost t o t he Gover nment . The Cont r act or shal l t ake pr oper saf et y and heal t h pr ecaut i ons t o pr ot ect al l wor k and wor ker s.
Submi t a schedul e of pl anned r oad cl osur es t o t he Cont r act i ng Of f i cer wi t h t he i ni t i al pr oj ect schedul e. Not i f i cat i on of speci f i c r oad cl osur es shal l be i n wr i t i ng t o t he Cont r act i ng Of f i cer not l ess t han t hi r t y ( 30) cal endar days i n advance of t he i nt ended c l osur e. The r oad cl osur e r equest shal l
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 4 i ncl ude t he pl anned t r af f i c cont r ol measur es as wel l as t he gener al i nf or mat i on about t he c l osur e. Al l r oad c l osur es shal l be coor di nat ed wi t h base of f i c i al s and ar e subj ect t o base r equi r ement s. No r oad cl osur e shal l be per mi t t ed unt i l t he Cont r act or r ecei ves wr i t t en appr oval f r om t he Cont r act i ng Of f i cer . Ful l r oad c l osur es i s gener al l y not per mi t t ed ( at l east one way t r af f i c shal l al ways be pr ovi ded) .
1. 8 SPECI AL CONTRACT REQUI REMENTS
1. 8. 1 Meetings
b. Weekl y Pr ogr ess Meet i ngs. A weekl y pr ogr ess meet i ng shal l be conduct ed, wi t h t he day, t i me, and l ocat i on t o be det er mi ned at t he Pr econst r uct i on Conf er ence. The Cont r act or ' s Pr oj ect Manager , Super i nt endent , I nt er pr et er , and Qual i t y Cont r ol Manager shal l at t end.
Repr esent at i ves f r om t he Gover nment may i ncl ude, but ar e not l i mi t ed t o, Di r ect or of Publ i c Wor ks/ Faci l i t i es Engi neer i ng per sonnel , Pr oj ect ' s Resi dent Of f i ce per sonnel , and Pr oj ect Manager . The Cont r act or shal l be pr epar ed t o di scuss wor k compl et ed dur i ng t he pr evi ous week, wor k cur r ent l y i n pr ogr ess, and wor k f or ecast ed f or t he f ol l owi ng week, as wel l as t he st at us of any const r uct i on i ssues and open act i on i t ems. Pr ovi de t he meet i ng agenda f or r evi ew 24 hour s pr i or t o t he meet i ng, t ake not es dur i ng t he meet i ng, and pr ovi de el ect r oni c copi es of t he meet i ng mi nut es i n Engl i sh wi t hi n 24 hour s of t he pr ogr ess meet i ng f or r evi ew.
c. Red Zone Meet i ng. A Red Zone meet i ng shal l be conduct ed f or Cont r act s wi t h a val ue i n excess of 55, 000, 000 JPY or t hose deemed suf f i c i ent l y compl ex by t he Cont r act i ng Of f i cer t o war r ant one. The pur pose of t he Red Zone meet i ng i s t o di scuss c l oseout r equi r ement s f or t he cont r act and t o est abl i sh a t i mel i ne t o get t hose i t ems compl et ed ( see Sect i on 01 78 00 CLOSEOUT SUBMI TTALS f or t ypi cal c l oseout r equi r ement s) . The meet i ng i s a good t i me f or t he Cont r act or t o gai n appr oval on f or mat f or i t ems such as Oper at i ons and Mai nt enance manual s, t he equi pment - i n- pl ace l i s t , t he war r ant y pl an, and any ot her i t ems. The I ni t i t al Red Zone i s t ypi cal l y schedul ed when pr oj ect r eached 75 per cent compl et i on mi l est one. Pr ovi de t he meet i ng agenda f or r evi ew 24 hour s pr i or t o t he meet i ng, t ake not es dur i ng t he meet i ng, and pr ovi de el ect r oni c copi es of t he meet i ng mi nut es i n Engl i sh wi t hi n 24 hour s of t he Red Zone meet i ng.
d. Saf et y and Qual i t y Cont r ol Meet i ngs. Saf et y and qual i t y cont r ol meet i ngs shal l be hel d as needed and det er mi ned by t he Cont r act or . See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and Sect i on 01 45 00 USACE QUALI TY CONTROL f or speci f i c r equi r ement s.
1. 9 PROGRESS AND COMPLETI ON PHOTOGRAPHS
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600 by 1200 by 24 bi t t r ue col or 300 DPI mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 10 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect . Submi t t he I ni t i al Si t e Condi t i ons Phot os, Mont hl y Pr ogr ess Phot os. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es. Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he v i ew l ocat i on sket ch. I ncl ude a dat e desi gnat or i n f i l e names. Cr oss r ef er ence submi t t al s i n t he appr opr i at e dai l y r epor t . Phot ogr aphs pr ovi ded ar e f or
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 5 unr est r i ct ed use by t he Gover nment .
1. 10 BASE REGULATI ONS
The Cont r act or and Subcont r act or ( s) shal l become f ami l i ar wi t h and obey al l base r egul at i ons, i ncl udi ng f i r e, t r af f i c , saf et y, and secur i t y r egul at i ons. Al l Cont r act or s shal l keep wi t hi n t he l i mi t s of t he wor k ( and avenues of i ngr ess and egr ess) , and shal l not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and ar e c l ear ed f or such ent r y. The Cont r act or ' s equi pment shal l be conspi cuousl y mar ked f or i dent i f i cat i on.
1. 10. 1 Request f or Cont r act or ' s Empl oyee Passes and Vehi c l e Passes
No empl oyee or r epr esent at i ve of t he Cont r act or shal l be admi t t ed t o t he wor k s i t e wi t hout a Cont r act i ng Of f i cer ' s f ur ni shed aut hor i zed admi t t ance.
Pr i or t o t he st ar t of on- si t e wor k, submi t appl i cat i ons f or base passes t o t he Cont r act i ng Of f i cer f or key empl oyees ( pr oj ect manager , s i t e super vi sor , i nt er pr et er , et c. ) f or l ong t er m DBI DS passes. The Cont r act or , wi t h assi st ance f r om t he Resi dent Of f i ce, i s r esponsi bl e f or secur i ng suf f i c i ent passes f or ot her wor ker s, i ncl udi ng subcont r act or ' s empl oyees and vehi c l es, r equi r ed t o access t he base f or t he pr oj ect dur at i on. Addi t i onal per sonnel dat a shal l al so be f ur ni shed.
Pr ovi de al l i nf or mat i on r equi r ed f or backgr ound checks t o meet base access r equi r ement s t o be accompl i shed by Base Pr ovost Mar shal Of f i ce, Di r ect or of Emer gency Ser vi ces or Secur i t y Of f i ce. Cont r act or wor kf or ce must compl y wi t h al l per sonal i dent i t y ver i f i cat i on r equi r ement s as di r ect ed by DOD, HQDA and/ or l ocal pol i cy. The Gover nment r eser ves t he r i ght t o make changes t o t he Cont r act or secur i t y r equi r ement s or pr ocesses due t o a change i n t he For ce Pr ot ect i on Condi t i on ( FPCON) .
Upon compl et i on of t hi s Cont r act , r et ur n al l empl oyee and vehi c l e passes t o t he base, and obt ai n a cer t i f i cat i on of r ecei pt . Fi nal payment shal l be wi t hhel d unt i l al l passes have been r et ur ned.
1. 10. 2 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed on i nst al l at i ons except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on, and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer shal l i dent i f y desi gnat ed smoki ng ar eas.
1. 10. 3 Muni t i ons and Expl osi ves of Concer n ( MEC)
Muni t i ons and Expl osi ves of Concer n ( MEC) : Unexpl oded Or dnance ( UXO) , Mat er i al Pr esent i ng a Pot ent i al Expl osi ve Hazar d ( MPPEH) , Chemi cal Agent s ( CA) , or Di scar ded Mi l i t ar y Muni t i ons ( DMM) on j obsi t es shal l be t r eat ed as ext r emel y danger ous and must be r epor t ed i mmedi at el y. Fol l ow t he 3Rs:
RECOGNI ZE, RETREAT, and REPORT. I n t he event MEC ar e di scover ed or uncover ed, i mmedi at el y st op wor k i n t hat ar ea and i mmedi at el y i nf or m t he Cont r act i ng Of f i cer ' s Repr esent at i ve. Cont r act or shal l pr ovi de di spat ch and Cont r act i ng Of f i cer ' s Repr esent at i ve wi t h speci f i c l ocat i on of t he i t em. Cont r act or per sonnel shal l s t op wor k i n t he i mmedi at e v i c i ni t y of t he di scover y and mai nt ai n a mi ni mum di st ance of 300 met er s f r om t he i t em.
Cont r act or shal l mai nt ai n f l exi bi l i t y i n r edi r ect i ng per sonnel and wor k ef f or t i n t he event t hat i t ems possessi ng an expl osi ve hazar d ar e di scover ed and const r uct i on per sonnel ar e excl uded f r om ar eas dur i ng t he dest r uct i on/ r emoval pr ocess.
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 6
1. 11 ORDER OF WORK
1. 11. 1 Schedule
Schedul e al l wor k t o cause t he l east amount of i nt er f er ence wi t h act i v i t y oper at i ons. Per mi ssi on t o i nt er r upt any act i v i t y, r oads, or ut i l i t y ser vi ces shal l be r equest ed i n wr i t i ng a mi ni mum of 30 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on. I nt er r upt i ons of act i v i t i es, r oads, and ut i l i t y ser v i ces shal l be al l owed onl y when t hey wi l l not cause i nt er f er ence wi t h t he oper at i ons of t he act i v i t y. The Cont r act or shal l r emove and di spose of f Gover nment pr oper t y al l Cont r act or gener at ed debr i s at t he end of each shi f t , or mor e f r equent l y i f r equi r ed, t o keep t he space usabl e. Upon awar d of t hi s Cont r act , t he Cont r act or shal l begi n and compl et e al l r equi r ed wor k; r eady f or use and i ncl udi ng c l eanup, wi t hi n t he t i me per i od speci f i ed on t hi s Cont r act . Al l wor k schedul ed i n occupi ed ar eas shal l be accompl i shed i n such a manner as t o cause t he l east possi bl e i nconveni ence t o t he occupant s.
1. 11. 2 Wor ki ng Hour s
Nor mal Wor ki ng Hour s and Days ar e Monday t hr ough Sat ur day, 0800 hour s t hr ough 1700 hour s.
1. 11. 3 Noi se and Vi br at i on
Noi se gr eat er t han 70 deci bel s and vi br at i on pr oduci ng wor k i n occupi ed bui l di ngs shal l be conduct ed out s i de cor e school / busi ness hour s ( 0700 - 1430) unl ess wr i t t en per mi ssi on i s gi ven by t he Cont r act i ng Of f i cer .
1. 11. 4 Wor k Out si de of Regul ar Hour s
I f t he Cont r act or desi r es t o car r y on wor k out s i de t he r egul ar hour s, on Sundays, or hol i days, a wr i t t en appl i cat i on shal l be submi t t ed t o t he Cont r act i ng Of f i cer or hi s r epr esent at i ve f or appr oval . The Cont r act or shal l al l ow t hr ee wor ki ng days not i ce t o enabl e sat i sf act or y ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess. I f wor k i s t o be accompl i shed af t er dayl i ght hour s, t he Cont r act or shal l i l l umi nat e t he ar ea i n a manner appr oved by t he Cont r act i ng Of f i cer or t hei r r epr esent at i ve and i n accor dance wi t h EM 385- 1- 1. Unl ess di r ect ed by a Cont r act i ng Of f i cer , wor k accompl i shed out s i de r egul ar wor ki ng hour s shal l be at no addi t i onal cost t o t he Gover nment .
1. 12 FI RE PREVENTI ON DURI NG CONSTRUCTI ON
1. 12. 1 General
Compl y wi t h al l per t i nent f i r e pr event i on pr ovi s i ons of t he US Ar my Cor ps of Engi neer s Manual EM 385- 1- 1, NFPA 241 and shal l f ol l ow t he I nst al l at i on f i r e r egul at i ons. Pr i or t o commencement of wel di ng or ot her hot wor k oper at i ons, obt ai n appr oval f r om t he I nst al l at i on Fi r e Chi ef .
1. 12. 2 Supply
No mor e t han one day' s suppl y of pai nt , pai nt mat er i al s, or compounds shal l be al l owed wi t hi n t he ar ea of t he bui l di ng, and shal l be r emoved f r om t he j ob s i t e af t er each wor ki ng day. No gasol i ne or s i mi l ar l ow f l ash poi nt f l ammabl e l i qui d shal l be al l owed wi t hi n t he bui l di ng ar ea. Af t er pr oper coor di nat i on wi t h t he Faci l i t y ' s Emer gency Ser vi ces ( t o conf i r m t he maxi mum
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 7 al l owabl e quant i t i es and l ocat i on of st or age) , st or age of addi t i onal pr oduct may be aut hor i zed.
1. 12. 3 Fi r e Ext i ngui sher s
Pr ovi de, as a mi ni mum, t he number , s i ze, and t ype of f i r e ext i ngui sher s i n accor dance wi t h t he l at est NFPA 10. The Cont r act or shal l compl y wi t h t he I nst al l at i on Fi r e Chi ef ' s pol i c i es i f t hey ar e mor e st r i ngent t han NFPA 10.
Fi r e ext i ngui sher s shal l r emai n t he pr oper t y of t he Cont r act or and shal l be r emoved upon compl et i on of t he pr oj ect .
1. 12. 4 Housekeeping
Accumul at i ons of combust i bl e mat er i al shal l be r emoved f r om t he bui l di ng ar ea on a dai l y basi s.
1. 12. 5 Handl i ng of Gasol i ne
Gasol i ne shal l be st or ed i n i ndust r y st andar d appr oved saf et y cont ai ner s.
Adequat e vent i l at i on shal l be pr ovi ded t o saf el y di spose of f l ammabl e vapor s wher e f l ammabl e l i qui ds ar e ut i l i zed. Gasol i ne power ed equi pment shal l be r ef uel ed a mi ni mum 20 f eet away f r om t he bui l di ng ar ea.
1. 12. 6 Not i f i cat i on of Fi r e
Be f ami l i ar wi t h met hods f or not i f y i ng t he I nst al l at i on Fi r e Depar t ment .
The I nst al l at i on' s f i r e post er shal l be post ed i n conspi cuous l ocat i ons and at t el ephones i n const r uct i on shacks.
1. 13 CONTRACTOR FURNI SHED MATERI AL AND WORKMANSHI P
The Cont r act or shal l f ur ni sh al l mat er i al s necessar y f or per f or mance of t he wor k of t hi s cont r act unl ess ot her wi se speci f i ed. Mat er i al s pr ocur ed shal l be new and shal l meet any speci f i cat i ons and st andar ds l i s t ed i n t hese speci f i cat i ons. I f no speci f i cat i on f or a mat er i al needed t o per f or m t hi s cont r act ar e st at ed, t he mat er i al shal l be new, of accept abl e i ndust r i al gr ade and qual i t y , equal t o or bet t er t han t he manuf act ur er ' s or i gi nal equi pment f or equi pment bei ng r epai r ed or r epl aced, and wi l l be compat i bl e wi t h exi st i ng mat er i al s and syst ems. Al l mat er i al s pr ovi ded under t hi s cont r act shal l be f r ee of asbest os, l ead i n pai nt , and PCB. The Cont r act i ng Of f i cer r eser ves t he r i ght t o r equest submi t t al of any mat er i al bei ng pr ovi ded under t hi s cont r act . The Cont r act i ng Of f i cer shal l make t he f i nal det er mi nat i on of t he accept abi l i t y of any mat er i al used on t hi s contract.
1. 14 CORRESPONDENCE
Al l cor r espondence addr essed t o t he Gover nment shal l be made t hr ough ser i al i zed l et t er s f ur ni shed wi t h one or i gi nal and t wo copi es. Ser i al i zed l et t er s shal l begi n wi t h t he number S- 0001 and shal l be cont i nuous wi t hout a br eak i n number i ng. Ser i al i zed l et t er s shal l i ncl ude t he cont r act t i t l e and number , dat e, subj ect , and shal l be s i gned by an aut hor i zed r epr esent at i ve of t he Cont r act or .
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON ( NOT USED)
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 8
- - End of Sect i on - -
W912HV-20-R-0004 SECTI ON 01 11 00. 00 10 Page 9
SECTI ON 01 22 00. 00 10
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 GENERAL
Payment i t ems f or t he wor k of t hi s Cont r act f or whi ch payment s shal l be made ar e l i s t ed i n t he CONTRACT LI NE I TEM NUMBER ( CLI N) SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, t opogr aphi c sur veys, cost of bond pr emi ums, and f or per f or mi ng al l wor k r equi r ed by dr awi ngs and speci f i cat i ons f or whi ch separ at e payment i s not ot her wi se pr ovi ded. Wor k pai d f or under one i t em shal l not be pai d f or under any ot her i t em. No separ at e payment shal l be made f or t he wor k, ser vi ces, or oper at i ons r equi r ed by t he Cont r act or , as speci f i ed i n DI VI SI ON 01, GENERAL REQUI REMENTS, t o compl et e t he pr oj ect i n accor dance wi t h t hese speci f i cat i ons; al l cost s t her eof shal l be consi der ed as i nci dent al t o t he work.
1. 2 LI NE I TEMS
1. 2. 1 CLI N 0001, Per mi t s, Mobi l i zat i on, and Demobi l i zat i on
1. 2. 1. 1 Payment
Payment shal l be made at t he Cont r act j ob pr i ce f or CLI N 0001 " Per mi t s, Mobi l i zat i on, and Demobi l i zat i on" f or wor k compl et ed i ncl udi ng, but not l i mi t ed t o al l wor k associ at ed wi t h per mi t s and pr e- const r uct i on submi t t al s, mobi l i zat i on and demobi l i zat i on of al l t he Cont r act or ' s pl ant and equi pment , i ncl udi ng mi scel l aneous i t ems, set t i ng up, pr ot ect i on of t he envi r onment , c l eanup, and al l i nc i dent al i t ems necessar y t o compl et e t he wor k. The Cont r act or shal l be el i gi bl e f or payment of 60 per cent of t hi s CLI N l ump sum pr i ce upon compl et i on of mobi l i zat i on at t he wor k s i t e. The r emai ni ng 40 per cent of t hi s CLI N l ump sum pr i ce shal l be pai d upon compl et i on of demobi l i zat i on. . Payment f or wor k compl et ed shal l const i t ut e f ul l compensat i on of CLI N 0001, compl et e.
1. 2. 1. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 2. 2 CLI N 0002, Dr edgi ng
1. 2. 2. 1 Payment
Payment shal l be made f or al l wor k associ at ed wi t h mai nt enance dr edgi ng of Tengan Har bor i n accor dance wi t h t he pl ans and speci f i cat i ons. Wor k i ncl udes pr e- dr edgi ng sur vey, magnet omet er sur vey, met al debr i s c l ear ance, envi r onment al pr ot ect i on, dr edgi ng, payment sur veys, di sposal of dr edged mat er i al , post - dr edgi ng sur vey, f i nal c l eanup and al l i nci dent al wor k f or a
W912HV-20-R-0004 SECTI ON 01 22 00. 00 10 Page 1 compl et e wor ki ng f aci l i t y .
1. 2. 2. 2 Uni t of Measur e
Uni t of measur e: cubi c met er .
1. 2. 2. 3 Measurement
Dr edgi ng wi l l be measur ed by t he i n- s i t u vol ume of mat er i al r emoved f r om wi t hi n t he dr edgi ng pr i sm def i ned on t he pl an dr awi ngs. Payment wi l l i nc l ude mat er i al r emoved wi t hi n 0. 5 met er s bel ow t he r equi r ed dr edge el evat i on ( over dept h dr edgi ng) . No payment wi l l be made f or ant i c i pat ed s l oughi ng of s i de s l opes i nt o t he dr edge ar ea. Measur ement wi l l be based on pr e- and post - dr edgi ng sur veys as def i ned i n Sect i on 35 20 23 DREDGI NG.
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON
3. 1 PROGRESS PAYMENT I NVOI CE
Request s f or payment shal l be submi t t ed i n accor dance wi t h Feder al Acqui s i t i on Regul at i ons ( FAR) Subpar t 32. 9, ent i t l ed " PROMPT PAYMENT" , and Par agr aphs 52. 232- 5 and 52. 232- 27, ent i t l ed " Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s" , and " Pr ompt Payment f or Const r uct i on Cont r act s" , r espect i vel y. I n addi t i on each r equest shal l be submi t t ed i n t he number of copi es and t o t he desi gnat ed bi l l i ng of f i ce as shown i n t he Cont r act .
When submi t t i ng payment r equest s, t he Cont r act or shal l compl et e Bl ocks 1 t hr ough 12 of t he " PROGRESS PAYMENT I NVOI CE" For m as di r ect ed by t he Cont r act i ng Of f i cer ( pr ovi ded i n QCS) . The compl et ed f or m shal l t hen become t he cover document t o whi ch al l ot her suppor t dat a shal l be at t ached.
One addi t i onal copy of t he ent i r e r equest f or payment , t o i ncl ude t he " PROGRESS PAYMENT I NVOI CE" cover document , shal l be f or war ded t o a separ at e addr ess as desi gnat ed by t he Cont r act i ng Of f i cer .
The Cont r act or shal l submi t wi t h each pay r equest , a l i s t of subcont r act or s t hat have wor ked dur i ng t hat pay per i od. The l i s t i ng shal l be br oken down i nt o weeks, i dent i f y i ng each subcont r act or t hat has wor ked dur i ng a par t i cul ar week, and i ndi cat e t he t ot al number of empl oyees t hat have wor ked on s i t e f or each subcont r act or f or each week. The pr i me Cont r act or shal l al so i ndi cat e t he t ot al number of empl oyees f or i t s on s i t e st af f f or each week.
3. 2 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
W912HV-20-R-0004 SECTI ON 01 22 00. 00 10 Page 2
3. 3 CONTRACT ADMI NI STRATI ON
3. 3. 1 Cont r act i ng Of f i cer ( KO)
Thi s Cont r act shal l be admi ni st er ed by a Cont r act i ng Of f i cer ( KO) assi gned t o t he U. S. Ar my Cor ps of Engi neer s, Japan Engi neer Di st r i c t , APO AP 96338-5010.
3. 3. 2 Admi ni st r at i ve Cont r act i ng Of f i cer ( ACO)
I n accor dance wi t h t he USACE Acqui s i t i on I nst r uct i on ( UAI ) Sect i on
1. 602- 1- 100, Admi ni st r at i ve Cont r act i ng Of f i cer ( s) ( ACO' s) may be del egat ed a par t of t he Cont r act i ng Of f i cer ' s aut hor i t y t o modi f y t hi s Cont r act and per f or m Cont r act admi ni st r at i on f unct i ons under Feder al Acqui s i t i on Regul at i on ( FAR) Sect i on 42. 302, subj ect t o t he aut hor i t y and l i mi t at i ons set f or t h i n t he appoi nt ment and del egat i on l et t er .
3. 3. 3 Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR)
The Cont r act i ng Of f i cer may desi gnat e one or mor e i ndi v i dual s as hi s/ her aut hor i zed r epr esent at i ves i n admi ni st er i ng t hi s Cont r act . Ref er t o t he c l ause i n Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT ent i t l ed CONTRACTI NG OFFI CER' S REPRESENTATI VE ( DFARS 252. 201- 7000) f or t he def i ni t i on and l i mi t ed aut hor i t y of CORs.
3. 4 DESI GNATED BI LLI NG OFFI CE
The desi gnat ed bi l l i ng of f i ce f or t hi s Cont r act i s :
Resi dent Engi neer , Zuker an Resi dent Of f i ce U. S. Ar my Cor ps of Engi neer s, Japan Engi neer Di st r i c t Uni t 35132
APO AP 96376- 5132
- - End of Sect i on - -
W912HV-20-R-0004 SECTI ON 01 22 00. 00 10 Page 3
SECTI ON 01 32 01. 00 10
PROJECT SCHEDULE
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AACE I NTERNATI ONAL ( AACE)
AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s
AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
ER 1- 1- 11 ( 1995) Admi ni st r at i on - - Pr ogr ess, Schedul es, and Net wor k Anal ysi s Syst ems
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul er Qual i f i cat i ons; G, RO Pr el i mi nar y Pr oj ect Schedul e; G, RO I ni t i al Pr oj ect Schedul e; G, RO Per i odi c Schedul e Updat e; G, RO
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2 year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nc i pl es and appl i cat i on.
PART 2 PRODUCTS
2. 1 SOFTWARE
The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s specification.
W912HV-20-R-0004 SECTI ON 01 32 01. 00 10 Page 1
2. 1. 1 Gover nment Def aul t Sof t war e
The Gover nment i nt ends t o use Pr i maver a P6.
2. 1. 2 Cont r act or Sof t war e
Schedul i ng sof t war e used by t he Cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .
2. 1. 2. 1 Primavera
I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em.
2. 1. 2. 2 Ot her Than Pr i maver a
I f t he Cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s shal l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes shal l be r et ur ned at pr oj ect compl et i on.
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15 SCHEDULE FOR CONSTRUCTI ON CONTRACTS. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of construction i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.
Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
The schedul e i s t he basi s f or det er mi ni ng Cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a Cont r act CLI N must equal t he val ue of t he CLI N. Pr ovi de Cont r act Cost Br eakdown i n accor dance wi t h Sect i on 01 22 00. 00 10 PRI CE AND PAYMENT PROCEDURES. Lack of an accur at e and appr oved schedul e updat e wi l l r esul t i n t he i nabi l i t y of t he Cont r act i ng Of f i cer t o eval uat e cont r act ear ned val ue f or t he pur poses of payment.
3. 2. 1 Act i v i t y Cost Loadi ng
Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.
Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .
W912HV-20-R-0004 SECTI ON 01 32 01. 00 10 Page 2
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he di sappr oval of t he pr el i mi nar y, i ni t i al , or per i odi c schedul e updat es and subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .
I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i nc l uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l shal l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer shal l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :
3. 3. 2 Act i v i t y Dur at i ons
Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.
Less t han 2 per cent of al l non- pr ocur ement act i v i t i es shal l have Or i gi nal Dur at i ons ( OD) gr eat er t han 20 wor k days or 30 cal endar days.
3. 3. 3 Pr ocur ement Act i v i t i es
I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.
3. 3. 4 Mandat or y Tasks
I ncl ude onl y t he f ol l owi ng appl i cabl e act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es:
a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .
b. Submi ssi on, r evi ew, and accept ance of f eat ur es r equi r i ng desi gn completion.
c. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout dr awi ngs.
d. Long pr ocur ement act i v i t i es.
e. Submi ssi on and appr oval of O & M manual s.
f . Submi ssi on and appr oval of r ecor d dr awi ngs.
g. Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.
W912HV-20-R-0004 SECTI ON 01 32 01. 00 10 Page 3
h. Submi ssi on and appr oval of t est i ng and ai r bal ance ( TAB) .
i . Submi ssi on of TAB speci al i s t desi gn r evi ew r epor t .
j . Submi ssi on and appr oval of f i r e pr ot ect i on speci al i s t .
k. Submi ssi on and appr oval of Bui l di ng Commi ssi oni ng Pl an, t est dat a, and r epor t s. Devel op t he schedul e l ogi c associ at ed wi t h t est i ng and commi ssi oni ng of mechani cal syst ems t o a l evel of det ai l consi st ent wi t h t he Cont r act commi ssi oni ng r equi r ement s. Al l t asks associ at ed wi t h bui l di ng t est i ng and commi ssi oni ng shal l be compl et ed pr i or t o submi ssi on of bui l di ng commi ssi oni ng r epor t and subsequent Cont r act completion.
l . Ai r and wat er bal anci ng.
m. Bui l di ng commi ssi oni ng - Funct i onal Per f or mance Test i ng.
n. Cont r ol s t est i ng pl an submi ssi on.
o. Cont r ol s t est i ng.
p. Per f or mance Ver i f i cat i on t est i ng.
q. Ot her syst ems t est i ng, i f r equi r ed.
r . Cont r act or ' s pr e- f i nal i nspect i on.
s. Cor r ect i on of punch l i s t f r om Cont r act or ' s pr e- f i nal i nspect i on.
t . Gover nment ' s pr e- f i nal i nspect i on.
u. Cor r ect i on of punch l i s t f r om Gover nment ' s pr e- f i nal i nspect i on.
v. Fi nal i nspect i on.
w. Pl anned Ut i l i t y Out ages ( el ect r i cal and wat er )
3. 3. 5 Gover nment Act i v i t i es
Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess.
These act i v i t i es i ncl ude, but ar e not l i mi t ed t o: approvals, envi r onment al per mi t appr oval s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.
3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y
Use t he act i v i t y codi ng st r uct ur e def i ned i n t he St andar d Dat a Exchange For mat ( SDEF) i n ER 1- 1- 11. Thi s exact st r uct ur e i s mandat or y. Devel op and assi gn al l Act i v i t y Codes t o act i v i t i es as det ai l ed her ei n. A t empl at e SDEF compat i bl e schedul e backup f i l e i s avai l abl e on t he RMS web si t e:
http://rms.usace.army.mil .
The SDEF f or mat i s as f ol l ows:
Fi el d Act i v i t y Code Lengt h Descr i pt i on
1 WRKP 3 Wor ker s per day
W912HV-20-R-0004 SECTI ON 01 32 01. 00 10 Page 4
2 RESP 4 Responsi bl e par t y
3 AREA 4 Ar ea of wor k
4 MODF 6 Modi f i cat i on Number
5 BI DI 6 Bi d I t em ( CLI N)
6 PHAS 2 Phase of wor k
7 CATW 1 Cat egor y of wor k
8 FOW 20 Feat ur e of wor k*
* Some syst ems r equi r e t hat FEATURE OF WORK val ues be pl aced i n sever al act i v i t y code f i el ds. The not at i on shown i s f or Pr i maver a P6. Ref er t o t he speci f i c sof t war e gui del i nes wi t h r espect t o t he FEATURE OF WORK f i el d requirements.
3. 3. 6. 1 Wor ker s Per Day ( WRKP)
Assi gn Wor ker s per Day f or al l f i el d const r uct i on or di r ect wor k act i v i t i es, i f di r ect ed by t he Cont r act i ng Of f i cer . Wor ker s per day i s based on t he aver age number of wor ker s expect ed each day t o per f or m a t ask f or t he dur at i on of t hat act i v i t y .
3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)
Assi gn r esponsi bi l i t y code f or al l act i v i t i es t o t he Pr i me Cont r act or , Subcont r act or ( s) or Gover nment agency( i es) r esponsi bl e f or per f or mi ng t he activity.
a. Act i v i t i es coded wi t h a Gover nment Responsi bi l i t y code i ncl ude, but ar e not l i mi t ed t o: Gover nment appr oval s, Gover nment desi gn r evi ews, envi r onment al per mi t appr oval s, Gover nment Fur ni shed Pr oper t y/ Equi pment ( GFP) , and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.
b. Act i v i t i es cannot have mor e t han one Responsi bi l i t y Code. Exampl es of accept abl e act i v i t y code val ues ar e: KO ( f or Cont r act i ng Of f i cer ) , DOR ( f or t he desi gner of r ecor d) , ELEC ( f or t he el ect r i cal Subcont r act or ) , MECH ( f or t he mechani cal Subcont r act or ) , and GOVT ( f or USACE) .
3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)
Assi gn Wor k Ar ea code t o act i v i t i es based upon t he wor k ar ea i n whi ch t he act i v i t y occur s. Def i ne wor k ar eas based on r esour ce const r ai nt s or space const r ai nt s t hat woul d pr ecl ude a r esour ce, such as a par t i cul ar t r ade or cr af t wor k cr ew f r om wor ki ng i n mor e t han one wor k ar ea at a t i me due t o r est r ai nt s on r esour ces or space. Exampl es of Wor k Ar ea Codi ng i nc l ude di f f er ent ar eas wi t hi n a f l oor of a bui l di ng, di f f er ent f l oor s wi t hi n a bui l di ng, and di f f er ent bui l di ngs wi t hi n a compl ex of bui l di ngs.
Act i v i t i es cannot have mor e t han one Wor k Ar ea Code.
Not al l act i v i t i es ar e r equi r ed t o be Wor k Ar ea coded. A l ack of Wor k Ar ea codi ng i ndi cat es t he act i v i t y i s not r esour ce or space const r ai ned.
W912HV-20-R-0004 SECTI ON 01 32 01. 00 10 Page 5
3. 3. 6. 4 Modi f i cat i on Number ( MODF)
Assi gn a Modi f i cat i on Number Code t o any act i v i t y or sequence of act i v i t i es added t o t he schedul e as a r esul t of a Cont r act Modi f i cat i on, when appr oved by Cont r act i ng Of f i cer . Key al l Code val ues t o t he Gover nment ' s modi f i cat i on number i ng syst em. An act i v i t y can have onl y one Modi f i cat i on Number Code.
3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )
Assi gn a Bi d I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .