Fire Alarm questions and answers.pdf

PDF 99 KB Posted

Attached to
Fire Alarm Upgrade
Solicitation number
W912HQ26S0075
Issued by

About this file

This is a Questions and Answers (Q&A) document related to a fire alarm installation or upgrade project at a government facility involving multiple buildings and the main building 2593.

The government will provide existing fire alarm drawings but will not supply current floor plans reflecting renovations in CAD format. Existing conduit is not required to be replaced. The contractor's responsibility for running communication wiring from five buildings to the main Kingman building is not explicitly answered in the provided excerpt. Humphry's Engineering Center will not be supplying drawings of each building with device locations, test reports, or device lists for each building. Question 6 references an attached diagram showing existing paths back to the main building 2593 but the diagram is not included in this document excerpt. These responses indicate that contractors will need to conduct site surveys and develop their own documentation and installation plans with minimal government-provided technical support materials.

View the file

Other files

File Type Posted
More answers for fire alarm upgrade.pdf PDF
Bldg. Fiber Conections.pdf PDF
Bldg. 2584 and 2585 (not current).pdf PDF
Solicitation-W912HQ26RA018.pdf PDF
Solicitation-W912HQ26RA018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Can the government provide existing fire alarm drawings?

YES

2. Can the government please provide current floor plans reflecting any renovations preferably in CAD format? NO

3. Is the existing conduit required to be replaced? NO

4. Is the contractor responsible for running communication wiring from the 5 buildings to a main building (i.e., running fiberoptic cable from buildings to the Kingman building)?

5. Will the Humphry’s Engineering Center be supplying the following :

A. Drawings of each building with location of devices. NO B. Test Reports. NO C. Devise list for each building. NO

6. Does each building have an existing path back to the main building 2593. See attached