Contractor Question Responses.pdf

PDF 30 KB Posted

Attached to
UMSB Cages Installation
Solicitation number
W912HQ26S0072
Issued by

About this file

This is a Questions and Answers document providing clarification on electrical power requirements for a cage installation project. The document addresses two specific inquiries regarding optional power pricing specifications.

The first clarification confirms that overhead lighting and switches are not required as part of the optional power pricing. The second clarification specifies that each cage will be equipped with one duplex outlet, with a maximum of six cages connected to each electrical circuit. These specifications establish the electrical infrastructure parameters for the cage installation, ensuring contractors understand the power delivery configuration and outlet requirements for their proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Should the optional pricing for the power include an overhead light and switch.

Answer: No overhead Lighting and Switch required.

2. Power per cage will be a single outlet and no more than 6 per circuit.

Answer: Each cage will have 1 duplex outlet and tie in 6 cages to each circuit.