This is a Questions and Answers document (Amendment 01) for federal solicitation W912HQ26QA029 issued by the U.S. Army Corps of Engineers at Fort Belvoir.

The solicitation involves painting services for a wall approximately 50 feet at the base and 25 to 30 feet in height. The contractor must complete the work within 30 days from contract issuance. Working hours are approximately 0700-1800, with no lift or scaffold requirements needed. The Government will provide water and electricity access, as well as restroom facilities. Contractors must comply with Fort Belvoir base access requirements, including background checks and badging procedures per Installation Access Policy. Site visits are not required but recommended, with registration through the Fort Belvoir Visitor Center. The contractor should use the best available UV paint with a clear coat finish to maximize durability and warranty protection. The document does not specify insurance limits, bond amounts, permit requirements, or specific warranty terms, indicating these details remain in the base solicitation documents.

View the file

Other files

File Type Posted
Amendment 3.pdf PDF
Solicitation Amendment 2.pdf PDF
Service Contract Act WD 2015 4281.pdf PDF
Solicitation - W912HQ26QA029.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # W912HQ26QA029

Amendment 01

The purpose of Amendment 01 to solicitation W912HQ26QA029 is to provide answers to questions received.

1.Please provide the Government-approved artwork, exact wall dimensions/square footage, elevation/height, and the referenced Proposal 175813-1, Page 2.

Answer: Approximate area to be painted is 50’ at the base roughly 25 to 30’ high.

2. Is a site visit required or available? If so, please provide date, time, registration, access, and badging procedures.

Answer: Site visit is not required but recommended. Pending the week will determine the availability for a visit. Registration will need to be completed through the Fort Belvoir Visitor Center.

3. Please confirm insurance limits, bonds, permits, background-check/badging requirements, working hours, lift/scaffold requirements, clear-coat/warranty requirements, and whether the 15 Sep-14 Oct dates control or the 30 days from NTP controls.

Answer: Background and badging requirements IAW base access. Working hours would be roughly 0700-1800. There are not lift or scaffold requirements. Best UV paint and Clear Coat available would be great. 30 Days from contract issue to completion.

4. Is there Water & Electricity available for Contractor?

Answer: Yes.

5. Is there a Restroom Available to Contractor?

Answer: Yes.