boiler replacement RFQ post-site visit questions

1. I would like to know who your BACNET controls vendor is and can you provide their phone number?

A: ESI 703-471-6310

2. Can a dumpster be placed on site for the demolition portion of the boiler replacement work and be placed near the location of the boilers?

A: YES

3. Can the existing concrete equipment pads for the boilers be reused? Both equipment pads seem to be in good condition.

A: YES

4. The boiler in Bldg. 2584 has a pump located behind the boiler that Mr. Roberts said has been abandoned in place. Should we cap piping to pump and leave the pump in place as is?

A: Contractor shall cap at nearest shut-off valve. Pump remains.

5. What kind of expansion tank do you want used: the floor mounted bladder type or like the kind mounted in the ceiling?

A: Ceiling mounting unless floor type is small enough for required safety clearance.

6. Are we just replacing isolation valves for the boilers?

A: Contractor shall replace all valves as per manufacture spec. to the first isolation valve only.

7. Is there pump info for the 2- B&G pumps in Bldg. 2582?

8. Has line B.2 been deleted from the scope of work?

A:YES

9. Contractor BID shall include pot feeders in their installation and procurement proposal. Both building #2582 and #2584.

image1.JPG image2.JPG