Draft_PWS_-_CEFMS_Maintenance.pdf

PDF 130 KB Posted

Attached to
Corps of Engineers Financial Management System (CEFMS) Maintenance
Solicitation number
W912HQ-17-S-0001
Issued by

About this file

Draft Performance Work Statement (PWS)

View the file

Other files

File Type Posted
Sources_Sought_Notice.pdf PDF
Capabilities_Questionnaire.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Corps of Engineers Financial Management System (CEFMS) Maintenance for USACE Finance Center 06 December 2016

Table of Contents

1.0 Introduction

1.1 Background:

1.2 Scope:

2.0 General Requirements:

2.1 Contract Management

2.2 Contract Administration

2.3 Non-Personal Services

2.4 Hours of Work:

2.5 Non-Standard Operations:

2.6 Recognized Holidays:

2.7 Travel:

2.8 Contracting Officer Representative (COR):

2.9 Quality Control

2.10 Quality Assurance

2.11 Contractor Manpower Reporting:

2.12 Government Furnished Equipment

3.0 Specific Tasks:

3.1 Kickoff Meeting:

3.2 CEFMS Software Management and Development

4.0 Performance:

4.1 Period of Performance (POP):

4.2 Place of Performance:

5.0 Security and Privacy

6.0 Invoicing and Payments:

7.0 Deliverables:

1.0 Introduction

1.1 Background:

The U.S. Army Corps of Engineers Finance Center (UFC) supports the maintenance and enhancements for the Corps of Engineers Financial Management System (CEFMS) which is an enterprise financial management system supporting the business processes and mission of U.S. Army Corps of Engineers (USACE) worldwide. CEFMS provides integrated, end-to-end automated financial management services enabling full transparency of funds execution for USACE projects. CEFMS provides functionality for receipt of Civil Works and Military appropriated direct funding and reimbursable funding and execution of funds to include commitments, obligations, receiving, invoicing, disbursements, billing, collections and reporting. CEFMS provides automated pro forma transactions and general ledger updates in compliance with U.S.

Treasury Standard General Ledger (USSGL) policies. The UFC is responsible for performing research, analysis, design, development, testing and implementation of all systems maintenance and enhancements for the CEFMS.

CEFMS is critical to the day-to-day operations and carrying out the overall missions of USACE. CEFMS has enabled USACE to produce auditable financial statements and sustain audit readiness.

1.2 Scope:

CEFMS is the premier financial management system in the Department of Defense and the enterprise system for executing all financial management business processes and transactions within USACE. The purpose of this contract is to provide the UFC with system design, development, and management technical services sufficient to maintain CEFMS operations and perform updates and enhancements, as necessary, to meet the requirements of public laws, regulations, standards, stakeholders, and best business practices.

Enhancements include migrating selected CEFMS Oracle forms to a modern, HTML web application development framework using current technology and products as well as providing enhanced reporting capabilities, and modifying CEFMS architecture and application software to operate in USACE Cloud Environment.

2.0 General Requirements:

2.1 Contract Management:

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at UFC and the contractor's corporate offices.

2.2 Contract Administration:

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.3 Non-Personal Services:

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

2.4 Hours of Work:

Normal workdays are Monday through Friday except US Federal Holidays.

Workers typically work eight (8) hours per day, 40 hours per week. Flextime workers start not earlier than 0630 and not later than 0900. Core hours of work are from 0900 to 1500 daily. All contractor employees are expected to be available or accounted for during core hours.

2.5 Non-Standard Operations:

2.5.1 Upon determination by the Government that an emergency exists or quick response is necessary to meet mission requirements, the Contractor will be notified of the need for priority response by the most appropriate method including, but not limited to, telephone or “in person" (if possible).

Notification shall be followed up with an email.

2.5.2 The Contractor shall maintain an on-call service capable of responding to system failures within a one hour period after normal business hours and on weekends.

2.5.3 The Contractor shall be available to work extended hours on an ad hoc basis to develop software solutions necessary to satisfy emergent needs due to changes in public law, policy, or data requirements.

2.6 Recognized Holidays: The Contractor is not required to perform services on the holidays listed below:

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

2.7 Travel:

2.7.1 The Contractor shall ensure that all travel is in accordance with (IAW) the Department of Defense (DOD) Joint Travel Regulation (JTR) and Federal Travel Regulation (FTR), FAR 31.205-46. All travel requires Government approval/authorization by the Contracting Officer (KO) or designated Contracting Officer’s Representative (COR) prior to departing on travel. Travel arrangements for Contractor personnel shall be provided to and approved by the KO or COR in advance of travel using established guidelines to request approval. All invoices for travel shall be accompanied by supporting receipts.

2.7.2 The Contractor shall submit trip reports within seven (7) days after completion of travel. If a trip extends more than two weeks, the Contractor shall submit interim reports every two weeks throughout the duration of the trip. Trip reports will summarize the reason for the trip, Government Official authorizing the trip, results of the trip, action items, and any other relevant information about the trip. The Contractor shall provide a Trip Report to the COR and the Government’s Project Manager within five (5) business days from the completion of the trip IAW DI-MISC-80508B, Data Item No. C001.

2.8 Contracting Officer Representative (COR):

The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

2.9 Quality Control:

The Contractor shall develop, maintain and execute an approved quality control plan (QCP). This quality control plan shall define processes to monitor

Contractor performance at applicable PWS locations and ensure compliance with the requirements of this contract and applicable regulatory guidance. The Contractor’s QCP shall delineate procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall electronically submit a comprehensive, written QCP to the COR within 30 days of contract award.

The QCP shall be reviewed by the Government before acceptance. After review of the quality control plan, the KO will provide the Contractor with written acceptance or rejection of the QCP along with any proposed changes.

2.10 Quality Assurance:

The government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

2.11 Government Furnished Equipment:

The government shall provide a laptop with docking station for contractors assigned to this requirement.

2.12 Data Rights:

The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source code of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

2.13 Copyright:

The CEFMS source code, technical data, and user manuals are copyrighted materials owned by the Government. Any information provided under this contract pertaining to the CEFMS application is restricted to Government use only and not available for redistribution. The contractor agrees to assign all copyrights to the Government for any new materials or modifications to existing materials that are produced by the contractor during the term and in the scope of this contract.

3.0 Specific Tasks:

3.1 Kickoff Meeting:

Within 10 days of execution of the contract, the Contractor shall schedule a kickoff meeting to be hosted at the delivery address. The meeting must occur within 20 days of contract execution and must be attended in person.

3.2 CEFMS Software Management and Development:

The contractor shall provide IT Oracle Database Administration, Design, and System Engineering Services for the CEFMS application. These services will be made available to the HQUSACE Finance Center (CEFC-S) in Huntsville, Alabama and to HQUSACE Finance Center (CEFC) in Millington, Tennessee.

This work is variable in nature. It can be completed on a daily, weekly, or monthly basis depending upon changes in business processes and regulatory requirements. All specific work assignments associated with the tasks will be managed by work requests utilizing a trouble ticket reporting system and will serve as the delivery tool for these tasks.

3.2.1 Financial System Application Development, Operations and Maintenance:

Utilizing the current Oracle product releases, the contractor shall assist in the maintenance, system requirements analysis, design, coding, testing, and implementation of changes and enhancements of the software required for the operations of CEFMS. The contractor will maintain the Oracle Forms applications while leveraging the opportunities provided by complementing technologies. The contractor shall provide design of software that supports a service-oriented architecture to ensure seamless integration between applications. The contractor shall provide analysis, design and development in integrating modern HTML web application development frameworks as a user interface to existing CEFMS business process applications.

The contractor shall provide continuous assistance in identification and correction of programming deficiencies, programming modifications based on regulatory requirements and/or modifications, data elements needed to enhance and produce forms and reports, and/or changes to improve functional operations of screens.

The contractor shall provide maintenance, support, modification, and enhancements to areas of functionality that include but is not limited to the below list:

Access Request Management System (ARMS) Module Accounts Payable Module Accounts Receivable Module Accrual Module Appropriation Expenditure Authority Appropriation Refund Asset Life Cycle Management Module

Asset/Facilities Management Module Audit Universe of Transactions Billing and Collections Module Budget Module Building & Structures Module Capital Property Recon Reporting Module Civil Automated Budget Module Civil Work Allowance Module Collections & Deposits Common Access Card (CAC) Authentication Consolidated Departmental Overhead Module Construction in Progress Corporate Reporting Module Cost of Doing Business Module Cost Share Module Cost Transfer Module Credit Card Module Cross Charge Distributable Billings Customer Order Advance Accounts Module Customer Order-Government Order Module Data Management Depreciation, Plant Increment and Insurance Accounting Module Distributions Module Expend and Disburse Module Facility Management Foreign Currency Module Funding Module Funds Distribution Module (FDM) General Journals General Ledger Chart of Accounts Government Order / Customer Order (GO/CO) Integration Homeowners Assistance Program (HAP) Inventory Management Module Intra-Government Payment and Collection (IPAC) IRS Form 1099 Miscellaneous Module Long-Term Receivables Module Manpower Module Obligations Module Oracle Toolset Support Payroll Module Personal Property Management Module

Problem Reporting Module Purchase Request Module Reconciliations/Data Integrity Real Estate Property Maintenance Module Reoccurring Payments Module Reorganization Module Reporting Module Resource Plans Module Revenue Generating Agreements Module Revolving Fund Small Purchases Module Specific Expenditure Authority Standard Resource Code Module Standard Revolving Fund Work Item Module Supervision and Administration (S&A) Module for Flat Rate Military Construction System Print Programming and Support Time and Attendance Module Training Module Transfers Module Travel Module Unliquidated Obligations Review Module Multiple Interfaces with both internal and external systems Warehouse and Inventory Module Work Management Module Year-End Processing Module

3.2.2 Oracle Database and Application Design and Administration:

The contractor shall assist in continued support of the Oracle Database and Application Server Administration, Design, and System Engineering Services required for the operations of the CEFMS. The contractor shall leverage latest technology capabilities to meet customer needs with timely and seamless access to the cloud-based infrastructure, business applications, and data. This includes staying abreast of new feature offerings and new and innovative ways to provide technology value to USACE customers.

Contractor shall keep management informed on incorporating all latest features and technology advances in CEFMS to improve user interfaces, effectiveness, efficiency and performance of the system.

The contractor shall take advantage of features of the Oracle products listed below to meet the requirements of the CEFMS system architecture plans to be located in a commercial or government cloud with real-time failover and high availability solutions:

Oracle Multitenant Database Oracle Real Application Clusters Oracle Golden Gate Oracle Advanced Security Oracle Advanced Compression Oracle Access Manager Oracle DataGuard

The contractor shall provide continuous assistance for identification, correction, and configuration of all Oracle Databases to include the development and production environments, configuration modifications based on regulatory requirements, database and system certification and accreditation policies, upgrades, and overall design and operations of the architecture. The contractor shall provide 24x7 Oracle Certified DBA Support.

3.2.3 Interface Support:

The contractor shall assist in the continued support of the hardware and software architecture of interface support between CEFMS and other Corps automated information systems (AIS) as well as external agency systems including DOD and US Treasury systems. Other system interfaces may be added in the future due to agency requirements, directives, policy and procedures.

3.2.4 UNIX and Systems Administration:

The contractor shall assist with principal support to CEFMS to include knowledge of UNIX, Solaris, Sun Microsystems, and Oracle SQL/PL*SQL software tuning techniques. To achieve CEFMS user support objectives, assistance will include optimization of platform specific hardware and software tuning considerations to maximize the performance of the CEFMS activity across the Army Corps of Engineers Information Technology (ACE- IT) architecture. The contractor shall also assist the processing center personnel configuring and tuning the production operating environment. The contractor shall assist the processing center personnel in configuring and tuning the CEFMS Oracle database and application servers. The contractor shall also maintain a development and test environment, including configuration modifications based on regulatory requirements, system certification and accreditation policies, upgrades, and overall design and operations of the architecture.

3.2.5 CEFMS Documentation:

The contractor shall maintain the following document libraries:

System Design Documentation – The contractor shall develop and maintain design documentation for all forms, modules, and interfaces. The contractor shall update existing or current design documentation for all existing forms, modules and interfaces that are modified or enhanced.

Database Architectural Documentation – The Contractor shall develop and maintain database logic documentation and disaster recovery for all databases comprising the CEFMS application.

User Documentation – The Contractor shall maintain and update the CEFMS User manuals in Word format.

Information Assurance (IA) Documentation – The Contractor shall prepare, manage and maintain all Risk Management Framework (RMF) documentation, artifacts, and Standard Operation Procedures (SOPs) required for System Certification and Accreditation (C&A).

Source Code – Contractor shall maintain source code in the PVCS Version Manager system.

3.2.6 Electronic signature software– CAC/PKI:

The contractor shall assist in continued support of all electronic signature software required for the operations of CEFMS and shall provide maintenance, troubleshooting, and new development in both the production and testing environments. This includes, but is not limited to, the following:

Windows-based software (WinEFT, WinChecks, WinStubs, Foreign Currency and European Electronic File Transfers) Unix-based PKI electronic signature libraries Oracle database interface for electronic signatures DBSign server-based signature software

3.2.7 Training, Testing and User Support:

The contractor shall provide other support functions to include training, testing, and user support of CEFMS Database Design, programming modifications and standards, CAC/PKI functionality, regulatory requirements, and related functions as deemed required.

3.2.8 Reports:

The contractor shall migrate all identified SQR and Oracle reports using Oracle Business Intelligence Enterprise Edition (OBIEE). This migration must ensure data integrity and a seamless transition from the SQR and Oracle reports to the new reports. Migration should take full advantage of OBIEE tools provided for reports, data analysis and dashboards.

The contractor shall maintain all existing CEFMS SQR and Oracle reports as requested until they are converted to Oracle Business Intelligence.

The contractor shall provide maintenance and development of all report requirements using OBIEE and BI Publisher.

3.2.9 Mobile applications – The contractor shall provide requirements analysis, recommended design solutions and development of financial and business mobile applications that are accessible by smart phone or tablet that update, at the transactional level, CEFMS data located on a secure network/cloud.

4.0 Performance:

4.1 Period of Performance (POP):

The period of performance (POP) for this requirement is a base period beginning from the Date of Award (DOA) and continuing for 12 months. This requirement includes four 12-month option periods.

Table 1 – Period of Performance

Period of Performance

Base Period From Date of Award for12 Months

Option Period 1 Anniversary of Base Period for 12 Months

Option Period 2 Anniversary of Option 1 for12 Months

Option Period 3 Anniversary of Option 2 for 12 Months

4.2 Primary Place of Performance:

4.2.1 Government requires that at least 40% of contractor’s staff be located on-site at USACE Finance Center, Millington, TN. Other contractor staff shall perform work at the Contractor’s Facility. Contractor facility must be available for Government inspection within 24 hours’ notice.

5.0 Security and Privacy.

5.1 Antiterrorism (AT) Level I Training. All contractor employees, including subcontractor employees, requiring access to Army installation, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I training is available at https://atlevel1.dtic.mil/at.

5.2 Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractors’ employees shall comply with applicable installation, access and local security policies and procedures. The local Security Office will provide policies and procedures. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA and local policies. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

5.3 Common Access Card (CAC). A Common Access Card (CAC) is required for access to government IT Systems. All Contractor employees working under this contract require access to Information Technology (IT) Systems (stand-alone computers, network computers/systems, e-mail etc.) and shall, at a minimum, be designated into an IT I or II position in accordance with AR 25-2, Information Assurance. The investigative requirement for an IT I position is a favorable Single Scope Background Investigation (SSBI), and IT II positions require a favorable National Agency Check with Law and Credit (NACLC).

5.4 iWATCH Training. The contractor and all associated subcontractors shall brief all employees on the USACE iWATCH program. This locally developed training will be used to inform employees of the type of behavior to watch for and instruct employees to report suspicious activity to the COR. The training shall be completed within 30 calendar days of contract award and within 30 days of new employees commencing performance on the contract. The contractor shall provide certification of completion to the COR within 10 days of training completion. The Security Office will provide training documents.

5.5 Access to Government Information Systems. All contractor employees with access to a government information system must successfully complete the DoD Information Assurance Awareness training prior to access to the information system and then annually thereafter.

5.6 Operations Security (OPSEC) Training. All new contractor employees will complete Level I OPSEC training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training.

5.7 Information Assurance (IA)/Information Technology (IT) Training. All contractor employees and associated subcontractors’ employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoD 8570.01, DoD 8570.01-M and AR 25-2 within 6 months of employment.

5.8 Information Assurance (IA)/Information Technology (IT) Training Certification. All contractor employees supporting IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01-M, DFARS 252.239- 7001 and AR 25-2. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

5.9 Contract employees will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas: All contractor employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive or restricted areas. The contractor will coordinate with the COR and/or facility security office for access when required.

5.10 Specific Security Requirements. This project has been determined to be “Sensitive Unclassified”. All documentation (i.e. OPM SF85P) required for security certification will be the responsibility of the contractor and the government organization. Army Regulation AR 25-2 identifies three levels of background investigations for IT positions. The contractor positions required for this contract are in two of the three possible classifications. The classifications are:

5.11.1 IT-I - Example: Personnel in positions (SAs/NAs for infrastructure devices, IDSs, routers; SAs/NAs for classified systems and devices) with privileged level access to control, manage, or configure IA tools or devices, individual ISs, networks, devices, and enclaves.

5.11.1.1 Background Investigation is labeled an SSBI (Single Source Background Investigation - top secret investigation- no clearance will be issued).

5.11.2 IT-II - Example: Personnel in positions (operating system administration of common applications or enclaves, back-up operators) with limited privileged level access to control, manage, or configure ISs and devices.

5.11.2.1 (Background Investigation is labeled a NACLc. The NACLC will be used as the initial investigation for contractors at the Confidential, Secret, and L access levels. It will also be used as the reinvestigation product for both contractors and Federal employees at the same access levels. Secret clearance will not be issued)

5.11.3 IT-III - General User. Background Investigation is labeled a NAC (National Agency Check without Clearance).

5.11 Each individual employed on this contract shall have a minimum IT-II current background investigation or have one initiated at the start of employment. The COR will determine the required level of investigation based on responsibilities.

5.12 The contractor shall provide physical security for all material, equipment, data and information handled during contract performance, in accordance with AR 190-13, The Army Physical Security Program, AR 190-51, Security of Unclassified Army Property (Sensitive and Non-sensitive), and command policies, procedures and regulations.

6.0 Invoicing and Payments:

6.1 Payment Schedule: Payments will be made on a monthly basis.

6.2 The Contractor shall provide invoices in accordance with FAR 32.905(b).

Electronic invoice submissions must be created in black and white and in Adobe’s Portable Document Format (PDF) and comply with the requirements specified within this contract. At a minimum, invoices will contain the following elements:

Name and address of the Contractor (Note: Differences between the remittance address on the invoice and the data on record in the System for Award Management (SAM) can potentially cause delays in payment. Please verify these data agree exactly.)

Invoice date and number Entire Contract number, contract line item number, the order number and modification number as applicable.

Description, quantity, unit of measure, unit price and extended price of the item delivered. Item description must match those contained in the purchase order/contract description.

Delivery tracking information to include tracking number and name of the person accepting delivery.

In cases where there is no physical delivery, please include all email correspondence to the electronic delivery POC (the customer) when the product becomes available for download or is renewed in accordance with the statement of work. Read receipts may help substantiate electronic delivery.

Name and address of official to whom payment will be sent Period of performance covered by the invoice

6.3 All invoices for this contract action shall be emailed to the following locations for processing:

CEFC-T0invoices@usace.army.mil

6.4 Final invoices with respect to a specific contract/delivery order/task order shall be clearly marked “FINAL” and submitted within 45 days after period of performance end date specified in contract. NOTE – In some cases the first invoice may also be the final invoice.

6.5 Release of Claims: A Release of Claims shall accompany a final invoice.

The Release of Claims shall be signed, include the final Purchase Order/Contract/Task Order amount. The Release of Claims template is attached and is available upon request from the COR.

6.6 Payment Processing will begin: 1) after the Government accepts delivery of the supplies and/or services being billed, 2) receipt of invoice in accordance with these instructions and 3) a release of claims (with the final invoice).

6.7 NOTE - The COR is responsible for determining the acceptability of the invoice and annotating the Government’s official “received” date. The received date is used on occasions where interest must be calculated for late payment.

Deficient invoice submissions will be rejected.

7.0 Deliverables:

7.1 All deliverables are identified in the PWS paragraphs above and further identified in the Table 1 below. Deliverables shall be submitted to the designated COR. Additional copies may be required for delivery to other stakeholders as listed in the delivery schedule below.

7.2 The Contractor shall ensure that the work products are professional in nature without typographical and grammatical errors. They shall also ensure that documents are formatted according to USACE standards and best business practices.

7.3 Government Acceptance Period. The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection.

7.4 The Contractor shall re-perform or resubmit, at no additional cost to the government, any activity, software product or deliverable that is determined to be insufficient to meet the requirements.

7.5 The Contractor shall prepare a Task Management Plan (TMP) describing the technical approach, organizational resources, and management controls to be employed to meet the cost, performance, and schedule requirements throughout the PWS execution. The TMP is subject to review and final approval by the government. The TMP should be submitted within one week (5 business days) of contract award. The contractor shall notify the government in any instance when they will be late submitting any deliverable articulated on the Task Management Plan.

7.6 The Contractor shall provide a monthly activity report to the COR, no later than five (5) working days after the end of the month. At a minimum, the report shall contain a description of all major activities completed during the month, any problems encountered including follow-on mitigation or escalation actions taken, products and services delivered during the month, a brief synopsis of the projects to be worked in the upcoming month, and lessons learned.

7.7 The Contractor shall provide a Monthly Financial Status Report to the COR, no later than five (5) working days after the end of the month. At a minimum, the report shall include:

For each employee: name, skill level, regular and overtime hours worked (denoting on or off site), and cumulative regular and overtime hours worked

An itemized list of the reporting period detail costs The summary of the current reporting period costs, adjusted by composite performance assessment value (0 to 100%) The cumulative to-date costs, The current award value The remaining unbilled amount.

Table 2. Deliverables

PWS

Reference

Deliverable Frequenc y

Description/Timing Medium/Format

PWS 3.1

Kick Off Meeting

Within 10 days of Contract Award

Initial contract meeting review of contract, expectations, Points of Contact

Face to face pre-scheduled meeting hosted by Government

PWS 7.5

Task Management Plan

Within 5 days of Period of Performan ce start

Describes the technical approach, organizational resources, and management controls

Microsoft Word submitted electronically to

COR

PWS 7.6 Activity Report Monthly Description of all major activities completed during the month

PDF format submitted electronically to

COR

PWS 7.7

Monthly Financial Status Report

Monthly Description of detail costs

PDF format submitted electronically to

COR

PWS 2.9

Quality Control Plan

Within 30 Days after Contract Award

Updated Quarterly

Microsoft Word submitted electronically to

COR

PWS 6.0 Invoices Monthly In accordance with Invoicing Instructions

PDF format submitted electronically to identified points of contact

PWS

Reference

Deliverable Frequenc y

Description/Timing Medium/Format

PWS 3.2.5

System Design Documentation

When Complete

System Design Documentation for each new module and updated for existing modules

Microsoft Word format submitted electronically to

COR

PWS 3.2.5

Database Architectural Documentation

When Complete

Describes the physical data model

Microsoft Word format submitted electronically to

COR

PWS 3.2.5

User Documentation

When Complete

User manuals for each CEFMS module

Microsoft Word format submitted electronically to

COR

PWS 3.2.5

Information Assurance (IA) Documentation

When Complete

All IA documentation required for Certification and Accreditation

Microsoft Word format submitted electronically to

COR

PWS 3.2.5 Source Code When Complete

All CEFMS Source code Text in PVCS Version Manager system

File details come from the government source that posted it. Updated .