US Army Corps of Engineers Charleston District 69A Hagood Avenue
Charleston, SC 29403 __________
Charleston Flood Material
Storage Yard W912HP-1 -R-50 3
March 1, 201
TECHNICAL PROVISIONS
TABLE OF CONTENTS
SECTION TITLE
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 GENERAL
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM
01 55 00.00 SURVEY REQUIREMENTS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 05 21 GEOGRID SOIL REINFORCEMENT
ATTACHMENTS
DOCUMENT 00 01 15 Page 1
CHARLESTON FLOOD MATERIAL STORAGE YARD W912HP-19-R-5003
BERKELEY COUNTY SOUTH CAROLINA
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 2
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET NO. SHEET NO. TITLE
1 X-001 INDEX OF DRAWINGS, VICINITY AND LOCATION MAPS
2 C-001 EXISTING CONDITIONS
3 C-002 LAYOUT PLAN
4 C-003 GRADING PLAN
-- End of Document --
SECTION 01100 PAGE 1
01 - GENERAL REQUIREMENTS
SECTION 01 11 00
GENERAL
1.1 PRECONSTRUCTION CONFERENCE
1.1.1 Conference
1.1.2 Submittals
1.1.3 Letter of Record
1.2 PROGRESS CHARTS
1.2.1 Periodic Progress Charts
1.2.2 Submittal of Progress Chart (ENG Form 2454)
1.2.3 Preparation of Progress Chart
1.2.4 Modifications
1.3 CERTIFICATES OF COMPLIANCE
1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS
1.4.1 Environmental Protection
1.4.2 Environmental Litigation
1.4.3 Work in Quarantined Areas
1.5 DAMAGE TO WORK
1.6 PHYSICAL CONDITIONS AND DATA
1.6.1 General
1.6.2 Physical Conditions
1.6.3 Weather Conditions
1.6.4 Transportation Facilities
1.6.5 Tides
1.6.6 Navigation Traffic
1.6.7 Obstruction of Navigation
1.6.8 Condition of Site
1.6.9 Records
1.6.10 Weather Conditions
1.6.11 Time Extensions For Unusually Severe Weather
1.7 CONTRACTOR’S USE OF PROJECT SITE FACILITIES
1.8 TESTING
1.9 CONSTRUCTION SCHEDULE CONSTRAINTS
1.9.1 Occupancy
1.9.2 Coordination With Other Contractors
1.9.3 Continuity
1.10 AS-BUILT DRAWINGS
1.10.1 As-Built Contract Drawings
1.11 ACCESS ROUTES
SECTION 01100 PAGE 2
1.12 DATUM AND BENCH MARKS
1.13 WORK PLAN
1.14 SUNDAYS, HOLIDAYS, AND NIGHT WORK
1.15 CONTRACTOR FURNISHED DISPOSAL AREAS
1.16 STORAGE AREAS
1.17 PUBLIC ACCESS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
SECTION 01100 PAGE 3
SECTION 01100
GENERAL
1.1 PRECONSTRUCTION CONFERENCE
1.1.1 Conference
The Contracting Officer’s Representative will arrange a Preconstruction Conference after award of contract and before commencement of work. The Contracting Officer's Representative will notify the Contractor of the time and date set for the meeting. At this conference, the Contractor shall be oriented with respect to Government procedures and line of authority, contractual, administrative, and construction matters. Additionally, a schedule of required submittals will be discussed.
1.1.2 Submittals
The Contractor shall bring to this conference the following items in completed form:
(a) Minimum Basic Outline for Accident Prevention Program (See ATTACHMENTS)
(b) Emergency Response Procedures including employee certificates for current First
Aid and CPR training
(c) Letter appointing Contractor Quality Control System Manager
(d) Quality Control Plan
(e) Environmental Protection Plan
(f) Hazard Analysis Plan, as specified in Section 01 35 26 GOVERNMENT SAFETY
REQUIREMENTS
(g) List of Subcontractors including written statement that no first tier subs are presently debarred or suspended from Government work
(h) Work Plan or Draft Work Plan
(i) List of proposed employees with social security numbers, place of birth, and birthday for Contracting Officer’s approval. Foreign nationals shall not be permitted to work at the site.
1.1.3 Letter of Record
A Letter of Record will be written documenting all items discussed at the conference and a copy will be furnished by the Contracting Officer's Representative to all in attendance.
1.2 PROGRESS CHARTS
1.2.1 Periodic Progress Charts
SECTION 01100 PAGE 4
In consonance with the Contract Clause, SCHEDULES FOR CONSTRUCTION CONTRACTS, the Contractor shall be guided by the following requirements and procedures as pertain to submission of an initial and subsequent periodic construction progress charts. These charts as approved and updated shall provide the basis for determination of the amounts of partial payments.
1.2.2 Submittal of Progress Chart (ENG Form 2454)
The Contractor shall submit three copies of the initial Progress Chart after the receipt of the Notice to Proceed and prior to the commencement of work. Blank ENG Form 2454 will be furnished the Contractor as soon after award as practicable for his use in submitting his contract progress schedules for approval. Three copies of monthly updated progress schedules are to be furnished by the Contractor and submitted with all progress payments. All copies of the chart shall be full-size and legible.
1.2.3 Preparation of Progress Chart
The Contractor shall indicate on the progress chart the bid items contained in the contract, showing the amount of the item and its relative weighted percentage of the total contract. The Contractor may separate features of work under each item to show salient work elements. These salient features shall total to the cost and weighted percentages shown for the major bid item. When quantity variations impact the weighted percentage of a separate item by five percent or more, the Contractor shall revise the contract progress charts to accurately reflect the impact of such variations.
1.2.4 Modifications
Modifications to the contract that are minor in nature shall be listed and scheduled separately in order of their issuance and as reported on the associated request for partial payment. Completion of work on minor modifications shall be noted as work progresses.
When major modifications are issued in which one or more of the bid items are significantly changed monetarily or in time of completion, the progress schedule should be revised to incorporate such changes showing revised item completion dates and overall new completion date, as applicable.
1.3 CERTIFICATES OF COMPLIANCE
Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in one (1) copy unless otherwise specified.
Each certificate shall be signed by an official authorized to certify in behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the
SECTION 01100 PAGE 5
Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS
1.4.1 Environmental Protection
It is the responsibility of the Contractor to investigate and comply with all Federal, State, county, and municipal laws concerning pollution of air and water, and for the protection of public and employee health, and for damages to shell fish, fish, and wildlife. The Contractor will provide sufficient safeguards to prevent pollution to the waterways by spillage or waste of paints, fuels, oils, bitumen’s, calcium chloride, insecticides, herbicides or other similar materials harmful to the health and well being of employees, the public, fish, shellfish, or wildlife. The Contractor shall also comply with the requirements specified in Section 01 57 19 TEMPORARY ENVIRONMENTAL
CONTROLS.
1.4.2 Environmental Litigation
If the performance of all or any part of the work is suspended, delayed, or interrupted due to an order of a court of competent jurisdiction as a result of environmental litigation, as defined below, the Contracting Officer, at the request of the Contractor, shall determine whether the order is due in any part to the acts or omissions of the Contractor or a Subcontractor at any tier not required by the terms of this contract. If it is determined that the order is not due in any part to acts or omissions of the Contractor or a Subcontractor at any tier other than as required by the terms of this contract, such suspension, delay, or interruption shall be considered as if ordered by the Contracting Officer in the administration of this contract under the terms of the Contract Clause, SUSPENSION OF WORK. The period of such suspension, delay or interruption shall be considered unreasonable, and an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) as provided in that clause, subject to all the provision thereof.
The term, environmental litigation, as used herein, means a lawsuit alleging that the work will have an adverse effect on the environment or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment.
1.4.3 Work in Quarantined Areas
The work called for by this contract involves activities in counties quarantined by the Department of Agriculture to prevent the spread of certain plant pests that may be present in the soil. The Contractor agrees that all construction equipment and tools to be moved from such counties shall be thoroughly cleaned of all soil residues at the construction site with water under pressure and that hand tools shall be thoroughly cleaned by brushing or other means to remove all soil. In addition, if this contract involves the identification, SECTION 01100 PAGE 6 shipping, storage, testing, or disposal of soils from such a quarantined area, the Contractor agrees to comply with the provisions of ER 1110-1-5 and attachments, a copy of which will be made available by the Contracting Officer upon request. The Contractor agrees to assure compliance with this obligation by all subcontractors.
1.5 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in the Contract Clauses, PERMITS AND RESPONSIBILITIES. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to the Contract Clause, CHANGES will be made as full compensation to the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant, regardless of the cause of such damage, shall be repaired to the satisfaction of the Contracting Officer at the Contractor’s expense,
1.6 PHYSICAL CONDITIONS AND DATA
1.6.1 General
Data and information furnished or referred to below are for the Contractor's information.
The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1.6.2 Physical Conditions
The physical conditions indicated on the drawings and in the specifications are the result of site investigations by the U.S. Army Corps of Engineers, Design Branch, Geotechnical Section, Charleston District. It is highly recommended that bidders conduct their own investigations and decide for themselves the character of the materials and difficulties of performing the work.
1.6.3 Weather Conditions
The areas in which work is to be done under these specifications are workable during the entire year; however, tropical storms may require that operations be suspended temporarily. The season for tropical storms is during the period June - November; during
SECTION 01100 PAGE 7
such disturbances precaution should be taken to secure all plant and equipment. The U.S.
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA) compiled the following data based on readings taken at Columbia Metropolitan airport recording station:
Average annual precipation 45.6 inches Average monthly high precipitation 9.1 inches Average annual temperature 62.1 degrees F
Average monthly high temperature 73.6 degrees F Average monthly low temperature 50.5 degrees F
Additional information can be obtained from the NOAA Environmental Data Service Office in
Ashville, North Carolina.
1.6.4 Transportation Facilities
The project sites are served by public highways. The Contractor shall be responsible for knowledge of conditions, such as availability of roads, load limits for bridges and roads, and other conditions that will affect the transportation of equipment and materials to the work sites. Repeated loading of heavy equipment on local roads may damage the road and subgrade. The Contractor will be responsible to repair damaged roads and subgrades caused by heavy equipment loads at his own expense.
1.6.5 Condition of Site
It is highly recommended that prospective bidders examine the areas of work, prior to submission of bids, in order to determine the accessibility for transportation of personnel, supplies, and equipment. Prospective bidders should examine the areas of work also to familiarize themselves as to the nature and general arrangement of work areas. The Contractor shall obtain any and all right-of-entries across private lands that he may use.
1.6.9 Records
Field notes, maps, records and other design data used to formulate the plans and specifications for this work are available for review at the Corps of Engineers, Charleston District, Design Branch, 69A Hagood Avenue, Charleston, South Carolina. Bidders can schedule appointments to view these records with Mr. Vernard Cleveland, phone (843) 329-8133. Copies of historical files other than those that Mr. Cleveland has assembled may be requested under the Freedom of Information Act, attention Office of Council, Room 301. These records will be released to the Contractor within ten working days after the receipt of a proper Freedom of Information Act request.
1.6.10 Weather Conditions
The project area is subject to tropical storms and hurricanes from June through November, and to windy and/or rainy weather, including severe electrical storms and other sudden and locally severe meteorological occurrences that approach hurricane
SECTION 01100 PAGE 8
conditions, during any time of the year. The Contractor shall maintain full-time monitoring of the NOAA marine weather broadcasts, and avail themselves of such other local commercial weather forecasting services as may be available. It shall be the Contractor’s responsibility to obtain information concerning rain and wind conditions that could influence his construction operations. Reference is made to the following publications that contain climatological and meteorological observations and data.
(a) Local Climatological Data. Monthly Summary, published by NOAA, Asheville, N.C. Subscription price and ordering information available from the National Climatic Data Center, Federal Building, Asheville, North Carolina 28801. This publication gives hourly wind speed and direction observations for the area. The Annual Summary gives a summary of the observations for the period of record.
(b) United States Coast Pilot Atlantic Coast – Cape Henry to Key West, Published by NOAA. This publication is for sale by the National Ocean Service and its agents.
(c) Summary of Synoptic Meteorological Observations: North American Coastal Marine Areas Atlantic and Gulf Coasts. Produced by Naval Weather Service, U.S.
Department of Commerce. Distributed by National Technical Information Service, U.S. Department of Commerce.
(d) National Weather Service Internet Website -http://www.nws.noaa.gov/om/marine/home.htm
1.6.11 ER 415-1-15 Time Extensions For Unusually Severe Weather (OCT 1989)
(a) This clause specifies the procedure for determination of time extensions for unusually severe weather in accordance with the clause entitled DEFAULT (FIXED-PRICE CONSTRUCTION).
In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
(b) The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration or similar data for the project location and will constitute the base line for monthly weather time evaluations.
The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON 5-DAY WORK WEEK
SECTION 01100 PAGE 9
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
6 7 8 6 6 7 8 8 5 4 4 6
(c) Upon acknowledgement of the notice to proceed and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b) above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled DEFAULT (FIXED-PRICE CONSTRUCTION).
1.7 CONTRACTOR’S USE OF PROJECT SITE FACILITIES
Except as required for Security Guards in the performance of their assigned duties, no Contractor’s personnel on any project site shall be allowed to use as living quarters any facilities in areas set aside for the Contractor’s use as administrative area, storage facilities or use by security personnel.
1.8 TESTING
All testing required under the technical provisions sections of this contract shall be performed by and at the expense of the Contractor unless the test specifically states the Government will perform the test. The Contractor shall furnish all instrumentation, equipment and personnel required for the testing.
1.9 CONSTRUCTION SCHEDULE CONSTRAINTS
1.9.1 Occupancy
The work to be performed is to be accomplished in areas adjacent to facilities which will be occupied and in normal usage during the course of construction. It is the intent of these provisions to provide for maximum coordination between construction activities pursuant to this contract and concurrent ongoing routine activities of the public and site personnel. Interference with and inconvenience to the occupants or routine use of the surrounding areas shall be held to an absolute minimum.
1.9.2 Coordination With Other Contractors
The attention of the Contractor is directed to the fact that other Contractors may be working in the vicinity of the project site concurrently with the work under this contract.
SECTION 01100 PAGE 10
The Contractor shall not interfere with materials, appliances, or workmen of any Contractor who may be concurrently performing work under other contracts near the site as hereinbefore specified. As far as is practicable, all Contractors shall have equal rights to use all roads and grounds. In case of disagreement regarding the use of such, the decision of the Contracting Officer will be final.
1.9.3 Continuity
All tools, labor and materials required to complete any item of work within a given work area, shall be available at the site prior to commencement thereof. Once work has commenced on an item of work, said work shall be continuously and diligently performed to completion and acceptance.
1.10 AS-BUILT DRAWINGS
1.10.1 As-Built Contract Drawings
The Contractor shall maintain a separate set of full size contract drawings, marked up in red, to indicate as-built conditions. Each as-built contract drawing shall include the Contract Number (W912HP-0X-X-XXXX, to be provided at time of award) associated with the contract. These drawings shall be current at all times until completion of the work and shall be available for review by Government personnel at all times. All variations from the contract drawings, for whatever reason, including those occasioned by modification, shall be indicated. These variations shall be shown in the same general detail utilized in the contract drawings. Upon completion of the work, the marked-up drawings shall be furnished to the Contracting Officer prior to acceptance of the work. The Government reserves the right to withhold two percent of the total price of the items for which as-built contract drawings have not been submitted.
1.11 ACCESS ROUTES
Prior to beginning any work, the Contractor shall coordinate all ingress/egress with the local official and the government official. The Contractor will be required to use access routes as shown on the drawings or approved in writing by the Contracting Officer. The Contractor shall maintain the access routes at all times. Upon completion of all work, the Contractor shall restore all access routes to their original condition, as directed by the Contracting Officer. The Contractor, as approved by the Contracting Officer, shall promptly repair all damage to pavements, structures or other facilities resulting from the Contractors’ construction activities under this contract. The cost of maintenance and repair of the access routes as mentioned above, shall be considered as a subsidiary obligation of the Contractor. The axle load of any heavy equipment operating on paved streets shall not exceed South Carolina State Highway Department load limits.
1.12 DATUM AND BENCH MARKS
SECTION 01100 PAGE 11
The plane of reference as used in these specifications is that determined by benchmarks shown on the drawings. Monument records are available for inspection in Room 200, Design Branch, Corps of Engineers, 69A Hagood Avenue, Charleston, South Carolina.
Bidders can schedule appointments to view these records with Mr. Vernard Cleveland, phone (843) 329-8133. Copies of historical files other than those that Mr. Cleveland assembled may be requested under the Freedom of Information Act, attention Office of Council, Room 301. These records will be released to the Contractor within ten working days after the receipt of a proper Freedom of Information Act request.
1.13 WORK PLAN
The Contractor’s work plan, at a minimum, shall include the following: (a) Source of materials; (b) Plan of operation for placement of fill material; (c) Anticipated problem areas of project; (d) Monitoring plan for environmental concerns; (e) Procedures for notification to responsible parties for emergencies; (f) Procedures to assure that the work will proceed within the contract requirements; and (g) Locations for field offices and other temporary buildings, staging areas, and storage areas. Work shall not commence until all comments have been addressed to the satisfaction of the Contracting Officer, and the plan approved.
The Plan shall be updated on at least a monthly basis to insure work is progressing according to the contract specifications.
1.14 SUNDAYS, HOLIDAYS, AND NIGHT WORK
It is anticipated that the Contractor will operate 5 days per week. Normal working hours are 0700 to 1630, Monday through Friday (except holidays). Work on weekends and holidays shall be requested in writing a minimum of 72 hours in advance of such need. Adequate lighting for thorough inspection of night operations shall be provided by and at the expense of the Contractor.
1.15 CONTRACTOR FURNISHED DISPOSAL AREAS
Trash, debris, and other objectionable matter shall be disposed of off-site in an approved landfill in accordance with Federal, state and local regulations.
1.16 STORAGE AREAS
Storage areas will be provided. The Contractor's equipment storage and staging areas shall be at locations subject to the approval of the Contracting Officer.
1.17 PUBLIC ACCESS
The Contractor shall make provisions as necessary to protect the public from all hazards in the construction areas. This requirement may be accomplished as the Contractor elects but must be in compliance with 29 CFR 1910, Occupational Safety and Health Standards;
29 CFR 1926, Safety and Health Regulations; and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. This responsibility shall be included
SECTION 01100 PAGE 12
in the Contractor’s submitted Accident Prevention Plan and will be discussed at the preconstruction safety conference.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section 01100 --
SECTION 01 33 00 Page 1
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18
1.1.1 Submittal Information
1.1.2 Project Type
1.1.3 Submision of Submittals
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 SUBMITTALS
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (G)
1.4.2 For Information Only
1.4.3 O&M Data
1.5 PREPARATION
1.5.1 Transmittal Form
1.5.2 Submittal Format
1.5.2.1 Format of SD-01 Preconstruction Submittals
1.5.2.2 Format for SD-02 Shop Drawings
1.5.2.2.1 Drawing Identifaction
1.5.2.3 Format of SD-03 Product Data
1.5.2.3.1 Product Information
1.5.2.3.2 Standards
1.5.2.3.3 Data Submission
SECTION 01 33 00 Page 2
1.5.2.4 Format of SD-04 Samples
1.5.2.4.1 Sample Characteristics
1.5.2.4.2 Sample Incorporation
1.5.2.4.3 Comparison Sample
1.5.2.5 Format of SD-05 Design Data
1.5.2.6 Format of SD-06 Test Reports
1.5.2.7 Format of SD-07 Certificates
1.5.2.8 Format of SD-08 Manufacturer's Instructions
1.5.2.8.1 Standards
1.5.2.9 Format of SD-09 Manufacturer's Field Reports
1.5.2.10 Format of SD-10 Operation and Maintenance Data (O&M)
1.5.2.11 Format of SD-11 Closeout Submittals
1.5.3 Source Drawings for Shop Drawings
1.5.3.1 Source Drawings
1.5.3.2 Terms and Conditions
1.5.4 Electronic File Format
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of SD-01 Preconstruction Submittal Copies
1.6.2 Number of SD-02 Shop Drawing Copies
1.6.3 Number of SD-03 Product Data Copies
1.6.4 Number of SD-04 Samples
1.6.5 Number of SD-05 Design Data Copies
1.6.6 Number of SD-06 Test Report Copies
1.6.7 Number of SD-07 Certificate Copies
1.6.8 Number of SD-08 Manufacturer's Instructions Copies
1.6.9 Number of SD-09 Manufacturer's Field Report Copies
1.6.10 Number of SD-10 Operation and Maintenance Data Copies
1.6.11 Number of SD-11 Closeout Submittals Copies
1.7 INFORMATION ONLY SUBMITTALS
1.8 PROJECT SUBMITTAL REGISTER AND DATABASE
1.8.1 Submittal Management
1.8.2 Design-Build Submittal Register
1.8.3 Preconstruction Use of Submittal Register
1.8.4 Contractor Use of Submittal Register
1.8.5 Approving Authority Use of Submittal Register
1.8.6 Action Codes
1.8.6.1 Government Review Action Codes
1.8.6.2 Government Review Action Codes
1.8.6.3 Contractor Action Codes
1.8.6.4 Contractor Action Codes
1.8.7 Delivery of Copies
1.9 VARIATIONS
1.9.1 Considering Variations
1.9.2 Proposing Variations
1.9.3 Warranting that Variations are Compatible
1.9.4 Review Schedule Extension
1.10 SCHEDULING
1.10.1 Reviewing, Certifying, and Approving Authority
1.10.2 Constraints
1.10.3 QC Organization Responsibilities
1.10.4 Government Reviewed Design
1.11 GOVERNMENT APPROVING AUTHORITY
1.11.1 Review Notations
1.12 DISAPPROVED SUBMITTALS
1.13 APPROVED SUBMITTALS
1.14 APPROVED SAMPLES
1.15 WITHHOLDING OF PAYMENT
1.16 STAMPS
SECTION 01 33 00 Page 3
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
ENG Form 4025-R
Appendix A - Submittal Register
SECTION 01 33 00 Page 4
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18
1.1.1 Submittal Information
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
1.1.2 Project Type
The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
The Contractor and the Designer of Record (DOR), if applicable, are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;
samples; O&M manuals (including parts list); certifications; warranties;
and other such required submittals.
1.1.3 Submision of Submittals
Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SECTION 01 33 00 Page 5
SD-01 Preconstruction Submittals
Submittals that are required prior to or commencing with the start of work on site. Submittals that are required prior to or at the start of construction (work) or the next major phase of the construction on a multiphase contract.
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates Of Insurance
Surety Bonds
List Of Proposed Subcontractors
List Of Proposed Products
Baseline Network Analysis Schedule (NAS)
Submittal Register
Schedule Of Prices Or Earned Value Report
Accident Prevention Plan Health And Safety Plan
Work Plan
Quality Control (QC) plan
Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be
SECTION 01 33 00 Page 6 judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards ensuring work can be judged. Includes assemblies or portions of assemblies that are to be incorporated into the project and those that will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
Design submittals, design substantiation submittals and extensions of design submittals.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by
SECTION 01 33 00 Page 7 responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
Text of posted operating instructions
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-10 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
Data required by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
Data incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
SECTION 01 33 00 Page 8
1.2.2 Approving Authority
Office or designated person authorized to approve the submittal.
1.2.3 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals Submittal
Register; G
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, variations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government.
Government approval is required for any variations from the Solicitation or the Accepted Proposal and for other items as designated by the Government.
Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, submittals are considered to be "shop drawings."
1.4.2 For Information Only
Submittals not requiring Government approval will be for information only.
1.4.3 O&M Data
Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
In the event the Contractor fails to deliver O&M data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the items to which such O&M data apply.
1.5 PREPARATION
1.6.1 Transmittal Form
Use the ENG Form 4025-R transmittal form for submitting both Government-approved and information-only submittals. Submit in accordance with the instructions on the reverse side of the form. These forms will be
SECTION 01 33 00 Page 9 included in the RMS CM software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.6.2 Submittal Format
1.6.3.1 Format of SD-01 Preconstruction Submittals
When the submittal includes a document that is to be used in the project, or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.
Provide data in the unit of measure used in the contract documents.
1.6.3.2 Format for SD-02 Shop Drawings
Provide shop drawings not less than 8 1/2 by 11 inches nor more than 30 by 42 inches, except for full-size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless another form is required. Ensure drawings are suitable for reproduction and of a quality to produce clear, distinct lines and letters, with dark lines on a white background.
a. Include the nameplate data, size, and capacity on drawings. Also include applicable federal, military, industry, and technical society publication references.
b. Dimension drawings, except diagrams and schematic drawings. Prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.
Present shop drawings sized 8 1/2 by 11 inches as part of the bound volume for submittals. Present larger drawings in sets. Submit an electronic copy of drawings in PDF format.
1.6.3.2.1 Drawing Identification
Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph
IDENTIFYING SUBMITTALS.
Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location next to the title block. Place the Government contract number in the margin, immediately below the title block, for each drawing.
Reserve a blank space, no smaller than 2 inches on the right-hand side of each sheet for the Government disposition stamp.
1.6.3.3 Format of SD-03 Product Data
Present product data submittals for each section as a complete, bound volume.
Include a table of contents, listing the page and catalog item numbers for product data.
Indicate, by prominent notation, each product that is being submitted;
indicate the specification section number and paragraph number to which it
SECTION 01 33 00 Page 10 pertains.
1.6.3.3.1 Product Information
Supplement product data with material prepared for the project to satisfy the submittal requirements where product data does not exist. Identify this material as developed specifically for the project, with information and format as required for submission of SD-07 Certificates.
Provide product data in units used in the Contract documents. Where product data are included in preprinted catalogs with another unit, submit the dimensions in contract document units, on a separate sheet.
1.6.3.3.2 Standards
Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), or Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer.
State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
1.6.3.3.3 Data Submission
Collect required data submittals for each specific material, product, unit of work, or system into a single submittal that is marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will not be accepted for expedition of the construction effort.
Submit the manufacturer's instructions before installation.
SECTION 01 33 00 Page 11
1.6.3.4 Format of SD-05 Design Data
Provide design data and certificates on 8 1/2 by 11 inch paper. Provide a bound volume for submittals containing numerous pages.
1.6.3.5 Format of SD-06 Test Reports
Provide reports on 8 1/2 by 11 inch paper in a complete bound volume.
By prominent notation, indicate each report in the submittal. Indicate the specification number and paragraph number to which each report pertains.
1.6.3.6 Format of SD-07 Certificates
Provide design data and certificates on 8 1/2 by 11 inch paper. Provide a bound volume for submittals containing numerous pages.
1.6.3.7 Format of SD-08 Manufacturer's Instructions
Present manufacturer's instructions submittals for each section as a complete, bound volume. Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry, and technical-society publication references. If supplemental information is needed to clarify the manufacturer's data, submit it as specified for SD-07 Certificates.
Submit the manufacturer's instructions before installation.
1.6.3.7.1 Standards
Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), or Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer.
State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
1.6.3.9 Format of SD-09 Manufacturer's Field Reports
Provide reports on 8 1/2 by 11 inch paper in a complete bound volume.
By prominent notation, indicate each report in the submittal. Indicate the specification number and paragraph number to which each report pertains.
1.6.3.10 Format of SD-10 Operation and Maintenance Data (O&M)
Comply with the requirements specified in Section 01 78 23 OPERATION AND
SECTION 01 33 00 Page 12
MAINTENANCE DATA for O&M Data format.
1.6.3.11 Format of SD-11 Closeout Submittals
When the submittal includes a document that is to be used in the project or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.
Provide data in the unit of measure used in the contract documents.
Provide all dimensions in administrative submittals in metric. Where data are included in preprinted material with English units only, submit metric dimensions on separate sheet.
1.6.4 Source Drawings for Shop Drawings
1.6.4.1 Source Drawings
The entire set of source drawing files (DWG) will not be provided to the Contractor. Request the specific Drawing Number for the preparation of shop drawings. Only those drawings requested to prepare shop drawings will be provided. These drawings are provided only after award.
1.6.4.2 Terms and Conditions
Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse is at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim, and waives to the fullest extent permitted by law any claim or cause of action of any nature against the Government, its agents, or its subconsultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities, or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic source drawing files are not construction documents.
Differences may exist between the source drawing files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic source drawing files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. The Contractor is responsible for determining if any conflict exists. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished source drawing files, the signed and sealed construction documents govern. Use of these source drawing files does not relieve the Contractor of the duty to fully comply with the contract documents, including and without limitation the need to check, confirm and coordinate the work of all contractors for the project.
If the Contractor uses, duplicates or modifies these electronic source drawing files for use in producing construction data related to this contract, remove all previous indication of ownership (seals, logos, signatures, initials and dates).
1.6.5 Electronic File Format
Provide submittals in electronic format, with the exception of material samples required for SD-04 Samples items. In addition to the electronic submittal, provide three hard copies of the submittals. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, and coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer.
Generate PDF files from original documents with bookmarks so that the text included in the PDF file is searchable and can be copied.
If documents are scanned, optical character resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature or a scan of a signature.
E-mail electronic submittal documents smaller than 10 MB to an e-mail address as directed by the Contracting Officer. Provide electronic documents over 10 MB on an optical disc or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website: https://safe.amrdec.army.mil/safe/.
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of SD-01 Preconstruction Submittal Copies