FY19 CHARLESTON UPPER HARBOR W912HP-19-B-0003
MAINTENANCE DREDGING
SECTION 35 20 23 PAGE 1
1.4.3 Estimated Quantities
The total estimated quantity of material necessary to be removed from within the specified limits to complete the work are as follows:
REQUIRED
DREDGING
PRISM
ALLOWABLE
OVERDEPTH
PRISM
TOTAL C.Y.
SHOAL
NO. LOCATION CY MEAS. * CY MEAS. ** PL.
1 Shipyard River 200,000 98,000 298,000
2+00 to 34+00
2 Daniel Island Reach 150,000 120,000 270,000 1348+00 to 1410+00
3 Daniel Island Bend 65,000 26,000 91,000 1420+00 to 1438+00
4 Navy Yard Reach (Right) 24,000 25,000 49,000
1538+00 to 1564+00 6 Port Terminal Reach 16,000 17,000 33,000
1658+00 to 1670+00 7 Ordnance Reach 150,000 74,000 224,000
1690+00 to 1720+83
8 Ordnance Reach TB 460,000 100,000 560,000 1698+64 to 1720+83
TC Dock DESC 1,000 1,000 2,000 1703+90 to 1704+90
MSDDC 39,000 14,000 53,000
1704+90 to 1720+83
TOTALS 1,105,000 475,000 1,580,000
NOTE:
* 1. Required depth will be as shown on the contract drawings. The required dredging prism quantities include the optional side slope material associated with the required depth.
** 2. The allowable overdepth quantities include optional side slope materials associated with the allowable overdepth.