B.08.03_-_Amendment_0001_Estimated_Quantities_REV_A_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf

PDF 136 KB Posted

Attached to
FY19 Charleston Upper Harbor Maintenance Dredging
Solicitation number
W912HP19B0003
Issued by

About this file

Estimated Quantities

View the file

Other files

File Type Posted
C.03.07_-_Bid_Opening_Sign_in_Sheet_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
C.04.11_-_Bid_Opening_Abstract_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance.pdf PDF
B.08.03_-_Amendment_0002_to_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0002_Conformed_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_XYZ_(20190626_CHU_PTR_MB_30D)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_XYZ_(20190628_CHU_SYR_LFSB_30day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_XYZ_(20190627_CHU_SH3_DIB_MB_30Day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_XYZ_(20190626_CHU_ORTB_MB_30D)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_XYZ_(20190627_CHU_SH2_DIR_MB_30Day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_PLAN_SHEETS_C-02_-_C-08_REVa_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_XYZ_(20190627_CHU_SH4-5_NYR_MB_30Day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_to_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_Conformed_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_BIDDING_SCHEDULE_REVa._-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
A.03.03_DRAWINGS_RTA_Plans.pdf PDF
A.02.16_RTA_specifications.pdf PDF
B.08.02_-_Solicitation_(released)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY19 CHARLESTON UPPER HARBOR W912HP-19-B-0003

MAINTENANCE DREDGING

SECTION 35 20 23 PAGE 1

1.4.3 Estimated Quantities

The total estimated quantity of material necessary to be removed from within the specified limits to complete the work are as follows:

REQUIRED

DREDGING

PRISM

ALLOWABLE

OVERDEPTH

PRISM

TOTAL C.Y.

SHOAL

NO. LOCATION CY MEAS. * CY MEAS. ** PL.

1 Shipyard River 200,000 98,000 298,000

2+00 to 34+00

2 Daniel Island Reach 150,000 120,000 270,000 1348+00 to 1410+00

3 Daniel Island Bend 65,000 26,000 91,000 1420+00 to 1438+00

4 Navy Yard Reach (Right) 24,000 25,000 49,000

1538+00 to 1564+00 6 Port Terminal Reach 16,000 17,000 33,000

1658+00 to 1670+00 7 Ordnance Reach 150,000 74,000 224,000

1690+00 to 1720+83

8 Ordnance Reach TB 460,000 100,000 560,000 1698+64 to 1720+83

TC Dock DESC 1,000 1,000 2,000 1703+90 to 1704+90

MSDDC 39,000 14,000 53,000

1704+90 to 1720+83

TOTALS 1,105,000 475,000 1,580,000

NOTE:

* 1. Required depth will be as shown on the contract drawings. The required dredging prism quantities include the optional side slope material associated with the required depth.

** 2. The allowable overdepth quantities include optional side slope materials associated with the allowable overdepth.