B.08.03_-_Amendment_0001_BIDDING_SCHEDULE_REVa._-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf

PDF 70 KB Posted

Attached to
FY19 Charleston Upper Harbor Maintenance Dredging
Solicitation number
W912HP19B0003
Issued by

About this file

Bidding Schedule Rev A

View the file

Other files

File Type Posted
C.03.07_-_Bid_Opening_Sign_in_Sheet_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
C.04.11_-_Bid_Opening_Abstract_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance.pdf PDF
B.08.03_-_Amendment_0002_to_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0002_Conformed_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_XYZ_(20190626_CHU_PTR_MB_30D)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_Estimated_Quantities_REV_A_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_XYZ_(20190628_CHU_SYR_LFSB_30day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_XYZ_(20190627_CHU_SH3_DIB_MB_30Day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_XYZ_(20190626_CHU_ORTB_MB_30D)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_XYZ_(20190627_CHU_SH2_DIR_MB_30Day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_PLAN_SHEETS_C-02_-_C-08_REVa_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_XYZ_(20190627_CHU_SH4-5_NYR_MB_30Day)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.xyz XYZ file
B.08.03_-_Amendment_0001_to_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
B.08.03_-_Amendment_0001_Conformed_Solicitation_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
A.03.03_DRAWINGS_RTA_Plans.pdf PDF
A.02.16_RTA_specifications.pdf PDF
B.08.02_-_Solicitation_(released)_-_W912HP19B0003_-_FY19_Charleston_Upper_Harbor_Maintenance_Dredging.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 00 10 00 Page 1

SECTION 00 10 00_revA

BIDDING SCHEDULE

ITEM

NO.

DESCRIPTION ESTIMATED

QUANTITY

U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND DEMOBILIZATION

– MAINTENANCE DREDGING IN

CHARLESTON UPPER HARBOR

1 JA JOB $_________

0002 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN SHOAL 2

- DANIEL ISLAND REACH

270,000 CY $_________ $_________

0003 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN SHOAL 3

- DANIEL ISLAND BEND

91,000 CY $_________ $_________

0004 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN SHOAL 4

- NAVY YARD REACH (RIGHT)

49,000 CY $_________ $_________

0005 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN SHOAL 6

- PORT TERMINAL REACH

33,000 CY $_________ $_________

0006 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN SHOAL 7

- ORDNANCE REACH

224,000 CY $_________ $_________

0007 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN SHOAL 8

- ORDNANCE REACH TURNING BASIN

560,000 CY $_________ $_________

TOTAL (COMBINATION OF BASE BID

ITEMS 0001-0007)

OPTIONS

0008 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN SHOAL 1

- SHIPYARD RIVER

298,000 CY $_________ $_________

DREDGING OF UNCLASSIFIED

MATERIAL TC DOCK

0009AA

MOBILIZATION AND DEMOBILIZATION

MAINTENANCE DREDGING IN JOINT

BASE CHARLESTON CHANNEL TC Dock

1 JA JOB $_________

Section 00 10 00 Page 2

0009AB DESC (Sta. 1703+90 to 1704+90) 1 JA JOB $_________

0009AC MSDDC (Sta. 1704+90 to 1720+83) 55,000 CY $_________ $_________

TOTAL (COMBINATION OF OPTIONAL

BID ITEMS 0008-0009)

TOTAL

TOTAL (COMBINATION OF ALL BID

ITEMS 0001-0009)

STATEMENT

Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.

All bidders are advised materially unbalanced bids may be rejected as non-responsive. See FAR 52.214-19 Contract Award – Sealed Bidding – Construction.

Quantities indicated are ESTIMATED and are comprised of material within the required channel prism including the maximum optional pay slope material and allowable overdepth, as depicted on the Contract Drawings.

SECTION 00 73 00 PAGE 1