A.07.23_Solicitation_SOW_and_Bid_Schedule.doc

DOC document 74 KB Posted

Attached to
CRRP Woodward MicroNet Equipment and Services
Solicitation number
W912HP-18-R-5001
Issued by

About this file

SOW and Bid Schedule

View the file

Other files

File Type Posted
A.07.23__MicroNet_Vendor_Questions_&_Answers.pdf PDF
A.07.23_Combined_Synopsis-Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section SF 1449 - CONTINUATION SHEET

STATEMENT OF WORK

U.S. Army Corps of Engineers

Charleston District 69A Hagood Ave. Charleston, SC 29403 Statement of Work

MicroNet Governor Equipment & Services

Cooper River Rediversion Project

St. Stephen Hydro Power Plant

St. Stephen, South Carolina

6 June 2018

STATEMENT OF WORK

Woodward MicroNet Plus 5200 Equipment & Services Brand Name or Equal

1. GENERAL: This document describes specifications for the supply of Governor Equipment and Engineering Services for the St. Stephen Hydro Power Plant Units 1, 2 & 3. An On-Site visit is available upon request.

2. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (FAR 52.211-10): Equipment and services shall be provided within 280 calendar days of contract award based on standard lead times for Woodward hardware purchases of 15 weeks and module service of 7 weeks.

3. SUBMITTALS: Complete product specification sheets/information must be submitted for all proposed equipment.

4. GENERAL SCOPE: The CRRP St. Stephen Hydro Power Plant operates three (3) hydroelectric generators; the governor for each unit is critical for operation of the unit. The current governors have experienced multiple failures within the past few years, spare parts are obsolete and new parts are no longer available. The new Woodward MicroNet Governor Equipment requested is a direct replacement and required to maintain power plant operations for the next twenty (20) years.

5. MATERIALS: This request for proposal is for the supply of the following MicroNet Governor Equipment and Engineering Service. The proposal will include Shipping costs to the location noted in Section 7. Detailed MicroNet equipment/services specifications are found in Section 8.

6. ACCEPTANCE: The Woodward MicroNet Plus 5200 system (or approved equal) supplied under this SOW will be warranted against defect for at least one year after completion. If deficiencies are found with equipment inside the warranty period, the supplier must provide replacement parts without further cost to the Government.

7. INVOICING: Invoices should be sent to the attention of:

Mr. James C. Carter, Jr.

Operations Project Manager

Cooper River Rediversion Project

St. Stephen Hydro Power Plant

1275 Rediversion Road

St. Stephen, SC 29479

8. MICRONET EQUIPMENT/SERVICES SPECIFICATIONS:

a. Supply the following Hardware and Software:

Quantity
Part Number
Description
4
5453-829
MicroNet Plus 9 Slot Chassis
7
5466-1001
MicroNet Plus High Voltage Power Supply
4
5466-1245
MicroNet Plus 5200 CPU
1
5466-348
SIO Module
4
5466-526
High Density Analog Module 24/8
4
5466-1050
High Density Discrete Module
1
5466-316
MPU / Analog Module
1
5441-693
High Density Discrete FTM Module
1
8928-810
GAP 3.0 Editor License
1
8928-5014
Control Assistant License
1
8928-5007
Monitor Gap License
4
5466-348
SIO Module - Send to Woodward for update / repair to latest hardware / firmware revisions.
4
5466-316
SIO Module - Send to Woodward for update / repair to latest hardware / firmware revisions.

b. Supply the following Engineering Services:

a) Conversion of existing GAP application to GAP 3

b) Field installation and commissioning for MicroNet equipment on Units 1, 2 & 3

c) On-site training and instruction on GAP 3.0 software

c. Additional deliverables required by vendor:

a) Schedule of work by unit

b) Electronic copy of System Manual

c) Electronic copy of Product Documentation

d) Electronic copy of Training Material

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

MicroNet Equipment & Services Woodward MicroNet Plus 5200 Equipment & Services

Brand Name or Equal Includes equipment, shipment, warranty, installation, field service, commissioning, testing, On-site training and manuals.

**See Statement of Work

FOB: Destination

MILSTRIP: W81D4A73066978

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
280 dys. ADC
1
ST. STEPHEN POWER PLANT

JAMES CARTER

1275 REDIVERSION ROAD

ST. STEPHEN SC 29479

843-567-5700

FOB: Destination

W912HP

File details come from the government source that posted it.