Attch1_W912HP-18-B-0004_Amendment_0001.pdf
PDF 368 KB Posted
- Solicitation number
- W912HP-18-B-0004
About this file
Attachment 1 - SF 30
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to update draw ings and add attachments to this solicitation. See continuation sheet for detailed infomation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Oct-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HP18B0004
X 9B. DATED (SEE ITEM 11)
06-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Oct-2018
CODE
U.S. ARMY CORPS OF ENGINEERS, CHARLESTON
DISTRICT, CONTRACTING DIVISION
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP18B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
SUMMARY OF CHANGES
1. CONTRACT DRAWINGS, SHEETS C-1 THROUGH C-14
DELETE Contract Drawing Sheets C-1 through C-14 and REPLACE with Contract Drawing Sheets C-1 through C- 14 bearing the notation AM0001 (see attachment).
PLEASE NOTE: Approximate location of rock outcroppings identified during the previous deepening project (1999) have been added to plan sheets C-03 and C-04.
There are no changes/updates to Sheet C-14.
2. SECTION 01 57 20.00 ENVIRONMENTAL PROTECTION, PARAGRAPH “HISTORICAL,
ARCHAEOLOGICAL, AND CULTURAL RESOURCES”
DELETE from the second paragraph the phrase “in the vicinity,” and REPLACE with “when actively dredging within 500 feet.”
3. SECTION 35 20 23 DREDGING, SUBPARAGRAPH “CONTINUITY OF WORK”
After the final sentence ADD a new paragraph “Under this contract, there will be no paid slope where acceptance sections are abut/adjacent to on another, but rather an assumed vertical slope. If CLIN 0005 (Acceptance Section 9) is awarded, Acceptance Section 7 will have a vertical slope where the two acceptance sections are adjacent. If CLIN 0005 is not awarded, Acceptance Section 7 will have a 4H:1V slope where the two acceptance sections are adjacent.
Any acceptance section that is not contiguous with another acceptance section shall have an end slope (i.e.
Acceptance Section 7 – Upper Wando Reach will have a 4H:1V end slope beyond the northern noncontiguous limit).
4. ATTACHMENT G – (attached) INSERT “SCI Borings.pdf” (see attachment).
5. XYZ DATA (attached)
- 20170800_CHL_MB_CS.xyz (Survey data collected 08-10 August 2017)
- 20180700_CHL_MB_CS.xyz (Survey data collected 16, 17, 23, 30, 31 July & 03 August 2018)
- 20180916_CHU-CHL_SB_PostFlo.xyz (Survey data collected 16 September 2018)
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 11-Oct-2018 02:00 PM to 25-Oct-2018 12:00 AM.
The number of offeror copies required has increased by 1 from 0 to 1.
(End of Summary of Changes)