AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMD 0004 is hereby issued add/revise specs and draw ings. Please see continuation page for Summary of Changes. The Follow ing attachments have been revised / added and made a part of the solicitation / contract by reference.

- 20170809_CHE_REEFS_MB_CS.zip

- Geophysical Data.zip

- Geophysical Investigations.pdf

- Jet Probe Sampling Methodology.pdf

- Subsurface Investigation and Geotechnical Laboratory Testing Results.pdf

- Summary Washprobe & Boring Data.pdf

- Contract Draw ing Sheets C-7_REVa through C-18_REVa

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-17-B-0004

X 9B. DATED (SEE ITEM 11)

06-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2017

CODE

US ARMY CORPS OF ENGINEERS, CHARLESTON

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP-17-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The following have been added by full text:

AMD 0004

SUMMARY OF CHANGES

1. CONTRACT DRAWINGS, SHEETS C-7 THROUGH C-17

DELETE Contract Drawing Sheets C-7 through C-17 and REPLACE with Contract Drawing Sheets C-7 through C- 17 bearing the notation REV A (see attachment).

2. SECTION 00 73 00 SUPPLEMENTARY CONDITIONS, CLAUSE 52.211-10 COMMENCEMENT,

PROSECTION, AND COMPLETION OF WORK (APR 1984)

DELETE Paragraph (a) “Prosecution of Work” and REPLACE with “The Contractor will be required to commence dredging work under this contract within 45 calendar days after the date of receipt by him of Notice to Proceed

(NTP).

The Contractor will be required to prosecute the dredging work in the Charleston Harbor Entrance Channel at an average rate of not less than 350,000 cubic yards per month over the entire project period of performance from 45 days after issuance of the NTP, and to complete it within the number of days after the limiting date fixed for commencement. The Contractor shall prosecute the dredging work in the Charleston Entrance Channel at a minimum production rate of 700,000 cubic yards for each quarter (3-months) over the entire project period of performance from 45 days after issuance of the NTP; provided that excavation and disposal efforts shall be pursued in a continuous manner from commencement until fully complete with no continuous period without bonafide production work greater than 30 calendar days except for excusable delays as permitted by the Default Clause or authorized by the Contracting Officer. ”

DELETE from Paragraph (b), Continuously Working, the language “and shall work continuously for every calendar month until the project is completed.”

DELETE from Paragraph (b), Continuously Working, the phrase “average monthly rate” and REPLACE with “average quarterly rate.”

3. SECTION 01 57 20.00 10 ENVIRONEMENTAL PROTECTION, Paragraph “Avoidance of Right Whales,” Subparagraph “Vessel Speed"

DELETE the entire paragraph and REPLACE with “From November 1 through April 30, all project vessels operating in the Atlantic Ocean that are greater than or equal to 65 ft in overall length will maintain a speed of 10-knots or less and slow to 5 knots or the minimum safe navigable speed when visibility is reduced by night, fog, precipitation, or if sea state is greater than 3 ft, as determined by the licensed vessel captain of record.

4. SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION, Subparagraph “Movement of Plant to Minimize Risk of Turtle Takes”

ADD to the end of the paragraph “Should the Government direct the plant to move to minimize risk of turtle takes, an interim survey would be performed. Upon returning to those areas, another survey would be performed and any shoaled material would be considered maintenance material as defined in Paragraph “Maintenance” of Section 35 20

23 DREDGING.”

5. SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION, Subparagraph “Trawling Period”

ADD to the end of the paragraph “Continuous trawling begins when the vessel arrives on the project site and ends when the vessel departs the project site. Activities vital to the operation of the trawling activities including, but not limited to crew changes, fueling, temporary repairs, are included in continuous trawling. Temporary suspension of trawling for repairs over 24 hours will not be considered continuous trawling for the purposes of payment, but will not cause dredging to cease, subject to approval by the Contracting Officer.”

6. SECTION 35 20 23 DREDGING, Paragraph “Continuity of Work”

DELETE the entire paragraph and REPLACE with “Final payment for and formal acceptance of Acceptance Sections will not be rendered until the Acceptance Section is excavated to the full depth and extents required by the contract. If the Contractor requests, and the Government approves, to adjust the extents of an Acceptance Section, in accordance with Paragraph “Acceptance of Work,” and then is unable to complete that Acceptance Section prior to the end of the environmental window, if using a hopper dredge, or any other planned departure of plant, then the Contractor shall be responsible for the removal of any additional material that may shoal, accrete, or otherwise be deposited in that Section prior to acceptance by the Government, at no additional costs to the Government. If other than hopper plant, see provisions in Subparagraph “Shoaling.” Progress Payments will be made in accordance with SECTION 35 20 23, Subsection MEASUREMENT AND PAYMENT.”

7. SECTION 35 20 23 DREDGING, Paragraph “Maintenance”

ADD to end of paragraph “Materials that shoal after acceptance of work or movement of dredge due to turtle take risks, regardless of depth, shall also be defined as maintenance material and paid at the contract price for maintenance dredging.”

8. SECTION 35 20 23 DREDGING, Paragraph “Shoaling”

ADD to the end of the paragraph “Shoaling, including natural lowering of the side slopes, that occurs after the before dredge survey for an Acceptance Section and before final acceptance of that Section, shall be the responsibility of the Contractor to remove, at no additional costs to the Government, except in the case of the Government directing the Contractor to move to reduce the risk of turtle takes or otherwise at the direction of the Contracting Officer.”

9. SECTION 35 20 23 DREDGING, CLAUSE 1.3.5

DELETE “Paragraph ’Acceptance of Work’” and REPLACE with “Paragraph ’Acceptance and Compliance of Work.’”

10. SECTION 35 20 23 DREDGING, Subsection MEASUREMENT AND PAYMENT

DELETE “Progress payments shall be based on a mutually agreeable percentage of completed work.” REPLACE with “Progress payments shall be based on a mutually agreeable percentage of completed work, as described in Paragraph 1.4.2 ‘Work Covered By Contract Price.’”

11. SECTION 35 20 23 DREDGING, Paragraph “Mechanically Dredged Materials”

DELETE entire Paragraph 3.7.5.2.1 “Mechanically Dredged Materials” and REPLACE with “Based on expertise of CONTRACTOR, and using non-mechanical dredging operations under this contract, potential areas of material to be placed in Mitigation Reefs by mechanical dredging methods shall be recommended by CONTRACTOR during dredging operations, and mutually agreed upon by both parties. The desired quality of material will be primarily new work limestone. Once an area is agreed upon by both parties, material that is mechanically dredged from this area will be acceptable for construction of mitigation reefs, unless that material drastically differs from the desired primary material stated above (i.e. mud, silt, sand, clay).”

12. ATTACHMENTS, Section “G Geotechnical Data”

DELETE Washprobe and Boring Data Summary Table “G-2 through G-10” and REPLACE with “Summary Washprobe & Boring Data” (see attachment) ADD to the end of the section the attached report titled “Jet Probe Sampling Methodology.”

ADD to the end of the section the attached report titled “Geophysical Investigations.”

ADD to the end of the section the attached report titled "Subsurface Investigation and Geotechnical Laboratory Testing Results."

(End of Summary of Changes)