SF30_AMEND_0004_W912HP17B0002_Post_45_Contract_1_20170727.pdf

PDF 207 KB Posted

Attached to
Post 45 Charleston Entrance Channel Maintenance and New Work Dredging - Contract 1
Solicitation number
W912HP-17-B-0002
Issued by

About this file

SF30 AMD 0004

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912HP-17-B-0002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912HP-17-B-0002, Post 45 Contract 1 is hereby amended to change the follow ing:

1. Extend the bid opening date to 10 August 2017 at 2:00pm EDT.

2. To incorporate into the solicitation the data in the attached file "Geophysical.zip"

3. Revises Plans and Specs. See Summary of Changes on Next Page

THIS AMENDMENT 0004 IS MADE TO CORRECT ADMINISTRATIVE ERRORS IN AMENDMENT 0003. THEREFORE, THIS AMD 0004 REPLACES

AMD 0003 IN ITS ENTIRETY. AMD 0003 WILL NOT BE ISSUED.

All other Solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-17-B-0002

X 9B. DATED (SEE ITEM 11)

23-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jul-2017

CODE

US ARMY CORPS OF ENGINEERS, CHARLESTON

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The following have been modified:

AMD 0003 SUMMARY OF CHANGES

1. SECTION 00 73 00 SUPPLEMENTAL INSTRUCTIONS, Paragraph “Prosecution of Work” DELETE “The dredging work required shall be performed in its entirety, including cleanup and demobilization between 01 December 2017 and 31 March 2020.” and REPLACE with “The dredging work required shall be performed in its entirety and final acceptance of all sections made between 01 December 2017 and 31 March 2020. Work incidental to dredging including final submittals and demobilization shall be complete by 15 June 2020.”

2. SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION, Subparagraph “Movement of Plant to Minimize Risk of Turtle Takes” ADD to the end of the paragraph “Should the Government direct the plant to move to minimize risk of turtle takes, an interim survey would be performed. Upon returning to those areas, another survey would be performed and any shoaled material would be considered maintenance material as defined in Paragraph “Maintenance” of Section 35 20 23 DREDGING.”

3. SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION, Subparagraph “Trawling Period” ADD to the end of the paragraph “Continuous trawling begins when the vessel arrives on the project site and ends when the vessel departs the project site. Activities vital to the operation of the trawling activities including, but not limited to crew changes, fueling, temporary repairs, are included in continuous trawling.

Temporary suspension of trawling for repairs over 24 hours will not be considered continuous trawling for the purposes of payment, but will not cause dredging to cease, subject to approval by the Contracting Officer.”

4. SECTION 35 20 23 DREDGING, Paragraph “Continuity of Work” DELETE the entire paragraph and REPLACE with “Except in the case of progress payments within a single Acceptance Section, no payment will be made for work done in any area designated by the Contracting Officer until the full depth required under the contract is secured in the whole of such area, nor will payment be made for excavation in any area not adjacent to and in prolongation of areas where full depth has been secured except by decision of the Contracting Officer. Should any nonadjacent area be excavated to full depth during the operations carried on under the contract, payment for all work therein may be deferred until the required depth has been made in the area intervening. The Contractor may be required to suspend dredging at any time when for any reason the vertical and horizontal control systems cannot be seen or properly followed.”

5. SECTION 35 20 23 DREDGING, Paragraph “Maintenance” ADD to end of paragraph “Materials that shoal after acceptance of work or movement of dredge due to turtle take risks, regardless of depth, shall also be defined as maintenance material and paid at the contract price for maintenance dredging.”

6. SECTION 35 20 23 DREDGING, Subsection “ORDER OF WORK” ADD after the third sentence of the first paragraph “The Contractor shall complete and the Government will accept an entire Acceptance Section to full project depth prior to the end of each environmental window, if using a hopper dredge. Extents of Acceptance Sections may be adjusted in order to achieve this.”

7. ATTACHMENTS, Section “G Geotechnical Data” ADD to the end of the section the attached report titled “Jet Probe Sampling Methodology.”

ADD to the end of the section the attached report titled “Geophysical Investigation”

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 03-Aug-2017 02:00 PM to 10-Aug-2017 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .