Appendix C Proposal Data Sheet
NOTE TO OFFERORS
This OFFEROR PERFORMANCE CAPABILITY PROPOSAL DATA SHEET must be completed and attached as the first page of the body of your proposal. The information required by this data sheet may be completed directly on this form or attached to the form as supplemental data sheets.
1. Name of Offeror
Name of Offeror(s):
If a joint venture or prime contractor-subcontractor association of firms*, list the individual firms and briefly describe the nature of the association.
Firm 1:
Firm 2:
*Add firms as needed. Nature of Association:
2. DUNS Number for Offeror (If more than one DUNS number is to be considered, explain the affiliation of the DUNS numbers to the Offeror)
3. CCASS Identification for Offeror
4. Authorized Negotiators (Reference FAR 52.215-11)
The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this solicitation. List name(s), title(s), and telephone number(s) of the authorized negotiator(s)*.
Name of Person Authorized to Negotiate: Negotiator's Address:
Negotiator's Telephone Number:
*Add names, addresses and telephone numbers as needed. Offeror are advised to limit the number of authorized negotiators to the minimum necessary to represent the prime contractor responding to the solicitation.
5. CAGE Code
6. Tax ID Number 7.
Appendix D Factor 1 - CORPORATE RELEVANT SPECIALIZED EXPERIENCE PROJECT INFORMATION SHEET
1. For each project submitted for evaluation in Factor 1, the Offeror shall provide the following information:
Project Title: Location: Contract Number:
Nature of Involvement in this Project (i.e., General Contractor, Subcontractor): Procuring Activity:
Procurement Point of Contact (name, telephone number, and e-mail address):
Performance period (month/year start to month/year end, if complete, or month/year start, % complete and scheduled completion date, if underway):
Address of Project:
Address and Telephone Number of Owner:
Indicate Type of Project (Private Sector, Government, Planned Unit Development, etc.): General Description of Project:
· Narrative Summary of Project
· Address how this project meets the Corporate Relevant Specialized Experienced criteria of this solicitation (narrative)
· Cost/Price Data (must clearly indicate yearly price information):
· Initial Award / Year 2 / Year 3/ etc.
· Modifications:
· Total cost:
2. TERMINATED PROJECTS. On an attached sheet, list any projects within the last five years that have been terminated. Provide an explanation for the termination.
3.
Appendix K
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE DATA SHEET
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
| 1. Contractor Information | |
| Firm Name: | CAGE Code: |
| Address: | DUNs Number: |
Phone Number: Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy): Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable): Explain Differences:
| 4. Project Description: | |||
| Complexity of Work | High | Med | Routine |
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name: Title:
Phone Number: Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
| (E) Exceptional |
| Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified. |
| (VG) Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified. |
| (S) Satisfactory |
| Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract. |
| (M) Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented. |
| A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner. |
| (U) Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective. |
| An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. |
| (N) Not Applicable |
| No information or did not apply to your contract |
| Rating will be neither positive nor negative. |
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
| a) Quality of technical data/report preparation efforts | |||||
| E | VG | S | M | U | N |
| b) Ability to meet quality standards specified for technical performance | |||||
| E | VG | S | M | U | N |
| c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance | |||||
| E | VG | S | M | U | N |
| d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) | |||||
| E | VG | S | M | U | N |
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
| b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract | |||||
| E | VG | S | M | U | N |
3. CUSTOMER SATISFACTION:
| a) To what extent were the end users satisfied with the project? | |||||
| E | VG | S | M | U | N |
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
| c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? | |||||
| E | VG | S | M | U | N |
| d) Overall customer satisfaction | |||||
| E | VG | S | M | U | N |
4. MANAGEMENT/ PERSONNEL/LABOR
| a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? | |||||
| E | VG | S | M | U | N |
| b) Ability to hire, apply, and retain a qualified workforce to this effort | |||||
| E | VG | S | M | U | N |
| c) Government Property Control | |||||
| E | VG | S | M | U | N |
| d) Knowledge/expertise demonstrated by contractor personnel | |||||
| E | VG | S | M | U | N |
| e) Utilization of Small Business concerns | |||||
| E | VG | S | M | U | N |
| f) Ability to simultaneously manage multiple projects with multiple disciplines | |||||
| E | VG | S | M | U | N |
| g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes | |||||
| E | VG | S | M | U | N |
| h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) | |||||
| E | VG | S | M | U | N |
5. COST/FINANCIAL MANAGEMENT
| a) Ability to meet the terms and conditions within the contractually agreed price(s)? | |||||
| E | VG | S | M | U | N |
| b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client | |||||
| E | VG | S | M | U | N |
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back- up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
| d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. | |
| Yes | No |
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
| f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. | |
| Yes | No |
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
| b) Contractor complied with all security requirements for the project and personnel security requirements. | |||||
| E | VG | S | M | U | N |
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
| b) Compliance with contractual terms/provisions (explain if specific issues) | |||||
| E | VG | S | M | U | N |
| c) Would you hire or work with this firm again? (If no, please explain below) | |
| Yes | No |
| d) In summary, provide an overall rating for the work performed by this contractor. | |||||
| E | VG | S | M | U | N |
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
Appendix N Price Proposal Analysis Sheet
| CLIN |
| Item |
| Cost |
| 0001 |
| Base Bid |
General Requirements
Demolition
Concrete
Masonry
Metals
Wood, Plastics & Composites
Thermal & Moisture Protection
Openings
Finishes
Specialties
Plumbing
Fire Protection
HVAC
Electrical
Communications
Electronic Safety & Security
Site Work
| 0002 |
| Option 1 - Commissioning |
| 0003 |
| Option 2 - Demo Existing Chiller & Cooling Tower |
| 0004 |
| Option 3 - Add A/C to New Chiller Plant |
| 0005 |
| Option 4 - Add Clerestory Window and Brick |
Option 5 - Add PV Array, Lightning Protection & Guard Rail
| 0007 |
| Option 6 - Add B27 Interior Renovations |
Total Options
Total Base & Options