Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the due date of proposals and delete current Scope Of Work and replace w ith revised scope of w ork dated 9 July 2015. Changes w ere made to Section 33, Trailer Only.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-15-R-0017

X 9B. DATED (SEE ITEM 11)

10-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2015

CODE

U.S. ARMY CORPS OF ENGINEERS, CHARLESTON

DISTRICT, CONTRACTING DIVISION

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP-15-R-0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Jul-2015 02:00 PM to 24-Jul-2015 02:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SCOPE OF WORK

SCOPE OF WORK Revised 9 July 2015

Specifications for Aluminum Survey Boat and Trailer

1. Overall:

The boat shall be aluminum catamaran demi-hull. The boat shall be arranged with a forward house, twin outboard propulsion, space for a Honda 3000w air cooled generator, through hull water tight transducer well, and a retractable over bow mount for a multibeam transducer.

Particulars are delineated below.

In addition to the requirements in this specification, the boat shall meet all applicable standards of ABYC.

2. Operational Area:

The boat operational area is the North Atlantic Ocean Coastwise, near Charleston, SC, within 20 miles of shoreline.

3. Hull, Motor Platform and Cockpit:

Hull - The hull shall be a catamaran with squared bow above the demi-hulls.

Hull length from bow to transom, measured on deck, shall be 25 to 26 feet. Hull beam (not including rub strakes) may be between 102 and 112 inches. 3

The hull shall provide a minimum 8 inch wide walkway outboard of the cabin on both sides. The outboard mounting platform shall be sized for mounting twin outboards with a 25 to 30 inch transom leg length.

The hull deck shall run continuous with no steps in way of the deckhouse. The hull aft of the house will have a cockpit area. The selection must meet the flotation and stability requirements identified below in this specification.

Push knees will be provided forward with minimum 4” solid rubber bumpers and will extend to as near the waterline possible (for contact with floating docks) without affecting normal operation and planing of vessel. Push knees may need removable horizontal bumper to facilitate contact with daymarker poles and protect sonar system.

One push knee with have a vertical hand grab rail lined up with trailer access ramp hand rail. This rail should be out of the operator’s direct line of sight.

Hull shall have sufficient reserve buoyancy in the bow to offset the weight of sonar mount and push knees. In addition when recovering boat on trailer bow design will keep retractable arm hardware and necessary cable loops at a safe distance of above center trailer guide bunks.

Hull shall have extra reinforcements to protect keel(s) during beaching from bow eye to midships.

Stern shall have mount for navigation transducers.

Any dissimilar metal fasteners attached to hull shall be protected from galvanic corrosion with Tef-Gel or similer.

Efforts should be made to reduce the height of vessel on trailer as much as possible.

4. Display of Capacity Information

The boat shall be provided with a Display of Capacity Information, as required in 33CFR Part 183, Subpart B "Display of Capacity Information". The display shall include a capacity of between 4 and 6 persons.

It is recognized that the referenced CFR is applicable to boats under 20 feet in length. However, for this contract, the 33 CFR Part 183, Subpart B requirements shall be applied, even though the boat is longer than 20 feet.

A MARPOL V pollution placard will be posted and visible to crew and passengers.

An Oil Discharge Pollution Placard will be posted near bilge pump controls.

5. Flotation and Stability:

The vessel shall satisfy ISO International Standard 12217-1.

“Small Craft – Stability and buoyancy assessment and categorization – Part1: Non Sailing boats of hull length greater than or equal to 6 m”. The standard shall be applied with 6 person crew and for Design Category B.

a. Flotation Watertight Bulkheads

Flotation and watertight bulkheads shall be provided in the hull and Outboard Motor Platform as needed to meet the flotation requirement above.

b. Cockpit Self Bailing

The cockpit deck shall be self bailing. The cockpit areas forward and aft of the cabin shall meet the requirements for “quick draining cockpits” set forth in;

ISO Standard 11812 “Small Craft – Watertight cockpits and quick draining cockpits”.

The draining section for each cockpit shall not be less that “.05 Vc” as identified in section 7.2 of the ISO standard.

The deck shall be no less than 6 inches above the static waterline. The deck shall be located higher than 6 inches if required to meet the stability standards identified above.

Drainage scuppers shall be provided for the cockpit. At a minimum, two 4 inch diameter scuppers shall be provided.

6. Structure:

All aluminum used shall be either 5,086 or 5,083 series marine aluminum alloy. The hull structure shall be adequate for 30 knot speed in 3 foot wave height.

The hull structure shall also be adequate for loads applied during trailering.

The boat shall be fitted with bow eye as required for trailering. The bow of the boat shall be reinforced for the loads applied by the trailering bow eye.

7. Design and Construction Standards:

In addition to the features in this specification, the boat shall meet all applicable standards of ABYC.

8. Deckhouse Arrangements:

Deckhouse shall be single level with pilot's station and surveyor’s station. Interior cabin dimensions shall be 10’ long and as wide as possible for hull design taking into account outboard walkways.

9. Windows and Doors:

Windows shall be suitable for open water operation. Spacing between windows to be minimized for best all around visibility. Deckhouse forward windows shall rake forward at the top and include heaters or de-foggers.

The forward operator window shall be fitted with heavy duty marine wipers. The wipers shall be heavy duty all weather, sweep clear a minimum of 80% of the clear glass window area. Operator window to be equipped with washer sprayer and reservoir.

Windows each house side shall be slide opening. UV blocking tinted glass shall be provided for all aft and side windows. Tinted Mylar shades shall be provided for side middle and aft windows.

Dogged aluminum sliding weather tight door that slides to the port side shall be provided in the after house bulkhead. The door shall be provided with a 6 inch sill.

A dogged aluminum watertight door shall be provided in the house as forward as possible to the front bulkhead in order to allow maximum space and visibility out of front windows. The door shall be provided with a 6 inch sill. The door shall be equipped with a window, matching the height of the house windows. The window in this door shall not have a wiper. If the house deck level is below the exterior deck level, steps shall be provided inside the house, at the forward and after doors.

Doors will be equipped with attachment points to place security locks. Slide windows will close securely to prevent access from outside of the vessel.

10. Bilge Pumps and Alarm Systems:

Each hull watertight compartment and each outboard motor platform watertight compartment shall be provided with a self priming 12VDC bilge pump.

The hull bilge pump overboard discharge lines shall be looped with the loop extending as high as possible under the hull deck.

The outboard platform bilge pump lines shall be routed to pipe verticals against the transom. The pipe ID shall be at least equal to the pump discharge ID.

These shall be "looped" with 180 deg. returns such that the outboard platform bilge pump discharge is also as close as practical to the hull deck.

Bilge pumps shall be 12 VDC. Minimum bilge pump rated capacity shall be 1500 GPH at 3 foot discharge head.

Bilge pumps shall be configured to allow either automatic or manual operation. The switch controls for each bilge pump shall be located at the operator's station. The bilge pump controls shall allow operator selection of either automatic or manual operation.

11. Outfit:

a. Cabin interior:

Treadplate (diamond plate) or grey non-slip paint shall be provided on Deckhouse floor.

Deckhouse sides and overhead shall be sheathed in white fiberglass reinforced wall panel. 1” acoustic and thermal insulation shall be provided behind the sheathing.

All interior structures shall be constructed from aluminum.

Cabin height should be no less than 6’4” at centerline.

b. Survey Station:

Surveyor’s station will consist of a 4 foot long aluminum desk incorporating an electronics rack with three trays underneath it that will extend from the port wall to the door with the Surveyor facing forward and having a foot rest. There shall be easy access to all equipment from the rear and side and a space at the back to store wiring.

Wall of cabin will incorporate mount that rotate 90 degrees and lock in place on desk for one 24” monitor. 3” holes with rubber guards to protect from chafe will be incorporated into desk to allow cables to run to desktop to electronics rack. Contact COR with specific mounting options before construction.

The survey station shall be fitted with a heavy duty captain’s chair with armrests for support on a height/slide adjustable pedestal that meets ABYC standards for helm use. Behind the seat will be a storage compartment.

Surveyor should be able to have line of sight vision out of side windows. Survey station will be designed to keep clear access space to forward house door and have space to walk from forward to aft of cabin.

c. Operators Station:

The operator's station shall be fitted with a marine shock mitigation seat. This shall be heavy duty with adjustable backrest, armrest, and 5” of slider movement meeting or exceeding ABYC standards for helm use.

Large footrest will be built into kick plate. Steering wheel will be tilt adjustable.

A mechanical engine governor will be provided at the throttles. This will be a simple mechanism that the operator will flip up when the sonar arm is in the water to limit the throw length of the throttles and prevent the vessel from exceeding the speed that will damage the arm. It will be adjustable so the operator can determine the max survey speed.

Electronic instrument rack will be provided in overhead above pilot’s seat for VHF radio and marine AM/FM/MP3 stereo. Stereo will be located inboard.

Steering station will allow enough depth to mount navigation display and small 15” monitor for Hypack display.

d. Seating

Padded benches wide enough to fit two people with flip up seats and storage under shall be provided in the house aft of the operator station.

Behind the bench will be a storage compartment for small life raft and emergency gear. Specific dimensions will be provided by COR.

12. Cleats, Chocks and Rub Strakes

a. Cleats

The hull shall be provided with 3 appropriately sized aluminum welded cleats mounted on each side at the bow, stern, and center.

b. Chocks

Anchoring shall be from the port or starboard bow and may be fitted with chocks as required. All chocks shall be sized for 3/4 inch diameter rope.

c. Rub Strakes

Rubber D-rails running the length of the strait hull with a minimum nominal diameter of 3” will be provided at the deck edge. The rubber attachment to the hull shall not penetrate into the hull interior.

Any dissimilar metal fasteners attached to hull shall be protected from galvanic corrosion with Tef-Gel or similer.

Welded aluminum rub strakes running the length of the strait hull shall be provided at the 8” above the waterline and midway way between the top rail. Rub rail shall protrude past scupper fairings for protection.

13. Anchor Rode and Line Locker:

A anchor locker on the foredeck shall be provided and sized appropriately for the anchor and line. The anchor locker shall be watertight, and separate from the hull compartments.

The line locker shall include self draining overboard drain above the waterline, and a watertight aluminum hatch.

The line locker shall not drain into the hull.

An anchor sized for the boat shall be provided, including 200 feet of ¾ inch nylon three strand line and 20 feet of chain.

14. Railings, Grab Bars, Ladder:

Grab Bars shall be provided either on the house sides, or the house top.

Retractable swim ladder will be provided, or separate ladder with an easy to access storage location and a means to make it fast to the vessel to assist in boarding from the water. Retractable swim ladder preferable.

Ladder shall be integrated into the cabin to facilitate roof access and raising and lowering antennas.

15. Hatches:

Quick acting watertight aluminum hatches, similar to Freeman, shall be provided for deck entry into all hull compartments.

16. Fuel System & Flow Metering:

a. Fuel System

Two independent fuel tanks shall be provided. Tank capacity for each tank shall be between 60 and 90 gallons.

Tanks shall be provided with independent fills with metal caps. Each outboard motor shall be plumbed to one tank. No tank crossovers or combining manifolds shall be provided.

The two tanks shall be fitted for stick sounding through the deck or fills.

In addition, the tanks shall be fitted with remote read out fuel gages. The fuel gages shall be matched to the fuel tank shape such than the gage reading corresponds to the amount of fuel in the tank, not the level of fuel.

The fuel supply to the outboard motors shall incorporate Racor 10 Micron water separating filters with stainless mounts. Filters shall be located in an easily accessible position, above the deck to allow draining.

b. Fuel Flow Metering

See Propulsion. The system flow capacity shall be matched to the max rated flow of the outboard motors. The flow sensors for the two outboards shall be matched within 2%.

17. Propulsion:

Propulsion shall be sufficient to provide vessel top speed of no less than 30 MPH in the fully loaded condition.

The fully loaded condition is defined as:

Vessel fully complete & ready for service.

Full gasoline fuel.

4 person crew & effects at 250 pounds total per person.

400 pounds survey gear.

4 life jackets stowed on board.

200 pounds of crew supplied cabin tools, parts & misc. gear.

Propulsion shall consist of twin four-stroke outboard motors. Power per engine shall be between 150 and 200HP.

Outboards shall be counter rotating. Outboard leg length shall be for either 25 inch or 30 inch transom, as determined by the builder’s selection of transom height. Outboards shall be four stroke and include OEM digital network square style gauges. Gauges shall be configured in accordance with manufacturer Network Wiring Diagrams and include digital Tachometers w/trim and tilt and hour meter and Fuel Management gauges w/speedometer and fuel gauge and NMEA compatible GPS. Digital Network Premium Gauges as available.

Propellers shall be aluminum.

Steering system shall be hydraulic. Steering system shall provide Hard Over to Hard Over travel in no more than 4 turns of the steering wheel. Wheel should be equipped with spinner knob/suicide knob.

The steering system shall utilize a mechanical tie bar between the engines. Outboard controls shall be dual binnacle type, with integral switches for outboard trim & tilt. The controls shall be equipped with engine synchronization capability as available.

The outboards selected shall have warranty service available in Charleston, SC through multiple dealerships. An outboard protection bar shall be provided and installed to protect the outboards while docking and during towing.

18. Generator and AC Electrical:

The vessel shall have a dedicated enclosed space for one stern mounted, air cooled, gasoline powered Honda generator of no less than three (3.0) kilowatts (kW) and shall be mounted to maximize aft deck space. The enclosure shall allow for easy fueling of the generator set and access to the front control panel. The generator will be installed with intake and exhausts routed to prevent overheating and carbon monoxide build up. The exhaust will be protected with heat shields to prevent burns if located in an accessible place where body contact could occur.

The AC electrical distribution system shall be in accordance with ABYC requirements.

Generator power shall route to a single main AC circuit breaker in the cabin. All AC and DC circuit breaker panels, circuit breakers, and cabin receptacles should be located for ease of access by the crew and protected from the weather. All circuit breakers and panels shall be labeled for identification. Use nonmetallic receptacle boxes and connecting nonmetallic conduit in the cabin.

The vessel shall be wired using marine grade electrical wiring of appropriate size for the loads to be incurred. All wiring shall be routed neatly using plastic conduits. The wiring shall be run so as the interior paneling of the vessel will not have to be removed to replace or add any wiring.

The AC system shall provide power to the Air Conditioner, and AC receptacles.

Duplex 120VAC outlets shall be provided as follows:

Survey Station - 3 duplex receptacles, two forward, one aft.

Operators station - 2 duplex receptacle, one forward, one aft .

Battery Charger, 1 or 2 duplex receptacle for charger(s).

19. Batteries & AC Charger

Identical marine combined deep cycle & starting batteries shall be provided, one for each outboard motor and recommended required amount (one or more) for house DC power, and one for the retractable sonar mount. The batteries shall be sized for the outboard motor starting CCA plus 20%. CCA rating for above 32 degrees shall be used to size the batteries.

Batteries shall be selected appropriately for designated use.

A dedicated marine AC battery charger(s) will be provided. Charger(s) output shall be sized appropriately for the system . The charger shall sense battery condition and automatically switch from bulk charging mode to charge maintenance mode.

The two engine start batteries as well as the house battery shall be charged by the outboard motors as well as the AC chargers.

Batteries shall be mounted in battery boxes. The battery mounting shall be fastened to the deck such that the batteries will not move during hull accelerations and shall be positioned to balance the vessel (starboard/port) when at rest.

20. DC Electrical:

The DC system shall include a battery management cluster for twin engines with the automatic charging relays to charge the house bank. All DC power distribution housed outside the cabin will be in a weather protected space.

The DC system shall include a distribution panel and digital DC power meter. The distribution panel shall include a rotary switch to allow power to be selected from any one of the batteries. An electrical distribution box with individual breaker/circuits for survey equipment shall be provided with at least four circuits for survey equipment and four spares. Distribution box shall be placed near the survey station and shall be easily accessible by both surveyor and boat operator.

The vessel shall be wired using marine grade electrical wiring of appropriate size for the loads to be incurred. All wiring shall be routed neatly. The wiring shall be run so as the interior paneling of the vessel will not have to be removed to replace or add any wiring.

A DC electrical system shall be provided for:

Survey gear power; 12v panel for equipment with fuses, 1500w Sine Wave Inverter for laptop computer, 2 monitors, and singlebeam echosounder.

Sonar mount, Bilge pumps, Fans, Windshield wipers, Navigation lights, Navigation gear, Engines, DC lighting, Communication equipment

(2) DC console outlets (cigarette lighter type) one each at surveyor’s and operator’s station

21. Shore Power:

A single 120 VAC 30 amp shore power system shall be provided, to include 30 foot shore power cable. The shore power system shall have either a UL approved Isolation Transformer or a UL Approved Galvanic Isolator. The shore power system shall provide power when the generator is not in use.

22. DC Lighting and Fans:

The DC Lighting System shall consist of 4 (four) LED fixtures for night operation in the deckhouse. Each fixture shall have red and white light, with a selector switch on the fixture to switch between red and white.

A 50 watt DC searchlight shall be provided on the house top. The searchlight shall be controllable from the operator's station.

A light bar, with 4 inch flashing amber and red strobe lights shall be provided and mounted on a raised arch on the house roof. Two adjustable and oscillating fans will be provided in the overhead of the cabin, one directed at the pilot’s seat and one directed at the surveyor’s seat with switches at the pilot’s seat.

23. Noise:

Deckhouse interior noise levels shall not exceed the following criteria:

82db, top speed, with maximum propulsion engine power.

75db., surveying, with 20% propulsion engine power and gen-set running.

70db., dockside, with no propulsion and gen-set running.

The contractor shall provide acoustic treatments and engine silencing treatments as required to meet the above noise levels.

24. Coatings, Signage & Draft Marks:

No paint on house, or hull. Non-skid gray paint shall be provided on exterior decks.

The vessel shall have the following markings:

Font: Helvetica Medium

1. The name of the vessel “WINYAH” shall appear on both sides below (or above depending on space) the deck house windows (forward) and shall be written in a single line of four (4) inch black vinyl lettering.

2. The word “SURVEY” shall appear on both sides below (or above depending on space) the deck house windows (aft) and shall be written in a single line of six (6) inch black vinyl lettering.

3. The words “CORPS OF ENGINEERS U. S. ARMY” shall appear on both sides of the hull below the top rub rail and shall be written in a single line of four (4) inch black vinyl lettering.

25. Through-Hull Transducer:

Survey grade transducer mounted in hull by means of a through-hull mount fitting Odom Hydrographic’s SS538 single frequency 200 kHz transducer’s dimensions. Mount shall be located on the aft deck with configuration as necessary to provide direct access through aft deck and maintain the flush aft deck. Transducer will be installed according to manufactures specifications and may have to be slightly reset into hull to avoid contact with trailer bunks. Transducer and will be supplied by bidder after contract award.

A secondary sonar mount that is removable will be installed on the sonar mounting strut (#28). Mount will be fitted for Odom Hydrographic’s M108 dual frequency transducer’s dimensions and will be attached to the rear of the pole by a 2” trailer hitch receiver configuration held in place with a pin and clip. Transducer will be supplied by USACE after contract award. Contact COR with specific mounting options before construction.

26. Sonar Mounting Strut:

An electric powered rotating arm to deploy hydrographic survey sensors shall be mounted on the bow between the catamaran demi-hulls utilizing gear reduction for deployment. Arm shall be mounted in such a way as it does not sit outside the vessel footprint when in the stored position. All hardware that operates arm, except chain, will be composed of stainless steel and survive prolonged exposure to saltwater environment. Pole will be machined to accept Universal Sonar Mount (www.universalsonarmount.com) 15degree tilt adapter which will be provided on contract award (Option to utilize R2Sonic flange kit to mount tilt adapter to pole). Pole section that is underwater will include a small fairing to minimize vibration.

Arm shall be operated from a fixed control switch at the pilot station.

Bidder will provide CAD drawings of design and provide examples of similar constructed designs.

27. Universal Sonar Mount Base Plate:

An aluminum plate will be installed on the port bow gunnel two feet forward of the cabin roof line to mount a Universal Sonar Mount base. The gunnel will incorporate extra support to minimize flexing. Dimensions of plate shall be 20” (fore and aft) x 11” (port and starboard) x 0.5” thick. www.universalsonarmount.com

28. Swing Arm Davit:

Vessel shall be equipped with a removable Swing Arm Davit installed on the forward deck area of the vessel in a position to be determined after the Universal Sonar Mount base plate is installed. A second Davit receptacle shall be installed on the aft, port side of the cabin roof for Davit service to the aft deck. Davit shall be able to reach overboard the side of the vessel with a hook height of a minimum of 3 feet. Davit shall be designed with a 600lbs lifting capacity and the capacity shall be labeled on the boom.

29. Bar Check, IMU (Inertial Measurement Unit) Compensator Platform and Survey Antenna Mounts:

a. Bar Check

A Bar Check shall be provided, sized for the provided sonar. The bar check shall be an aluminum flat bar, nominally 8 Ft. long, by 6 inches in width by 1/2 inch thick. The bar check shall be suspended below vessel down to 50 foot water depth, by means of 1/8 inch stainless steel chain. The chain attachment to the bar at each end shall incorporate a bridle, and a stainless steel turnbuckle.

A stowage rack shall be provided on the aft side of the deckhouse.

b. IMU Compensator Platform

The builder shall provide and install a mounting plate for the Motion Reference Unit (MRU), approximately 10 inches square. Inertial Motion Unit (IMU) mounting plate shall be placed at boat center of gravity at survey speed (8 knots). IMU mounting plate shall be accessible through a hatch 25% larger than the mounting plate and shall be flush when closed. A separate wire run for IMU cable shall be run through the deck to the survey station.

c. Survey Antenna Mounts

Two breakaway mounting posts that allow mounting of survey grade GPS antennas will be placed along the centerline of the vessel. Breakaway connections shall be constructed of nylon bolts. The antenna mounts should contain 5/8” x 11 male thread adapters for the mounting of survey grade GPS antennas and should be spaced no less than 2 meters apart forward and aft. Height of all instruments should be level or slightly higher than the top of the air conditioning unit. One antenna mount should be directly above the IMU reference point. The mounting posts should have a dedicated wire path through the roof of the cabin by way of a 180 degree gooseneck with a 6” diameter bend to a wire way. No panels should be removed to run new or replace cables.

All efforts should be made to reduce height of vessel from ground when the vessel is resting on the trailer.

Contact COR with specific mounting options before construction.

30. Survey Wire Ways:

The contractor shall provide a dedicated wire-way for the survey gear. The wire-way shall run:

From the survey computer station to the bow hyperarm.

From the survey computer station to the survey GPS antennas.

From the survey computer station to the IMU.

From the survey computer station to the operator’s station (power and video cables to monitor mount).

Two temporary cable runs (one from forward deck and one from the aft decks) through 3” capped pipe nipples through the forward and aft cabin bulkhead. Penetrations shall be in the upper port corner of the forward and aft cabin bulkheads.

Wire-ways shall provide wire strapping bars at no more than 12 inch spacing. No vessel wiring shall be located in any of the survey wire-ways.

The wire-ways shall be fitted with removable joiner panels for the areas inside the deckhouse.

The exterior wire-ways shall terminate in minimum 6 inch diameter clear openings with a 180 degree gooseneck.

No vessel wiring shall be located in any of the survey wire ways.

31. Heating & Air Conditioning:

A low-profile roof mounted Heating & Air Conditioning shall be provided in deckhouse. The heating and air conditioning systems sizing shall be sized to provide heating/cooling for 3 men and all the survey equipment. The heating and air conditioning shall be powered by the AC generator, and by shore power.

32. Navigation & Communication:

The builder shall provide and install the following equipment and fabricated components:

Nav. Lighting on sides of house and on a retractable/lowering mast.

Roof mounted navigation equipment rack with dedicated wire way and gooseneck through roof. No equipment should be attached directly to the roof.

Complete LED navigation Lights.

Dual trumpet stainless steel horn

Compass, 2 Inch, dash mount.

Carbon Monoxide Sensor

Gasoline Fume Detector

(1) VHF Radios & antennas, ICOM M604 or equal.

Navigation Equipment

Humminbird 1199ci HD SI Combo 1100 Series item #409230-1 with Side Imaging/HD Down Imaging transducer mounted on transom of demi-hull, spoiler mounted antenna, AIS option, and Humminbird Class B AIS Transceiver with VHF antenna splitter installed under dash. *Transducer mount fittings and wiring should not penetrate through hull and should be installed per manufacturer’s recommendations.

Flare Kit

Boat Hook, aluminum, 6 foot with storage mount.

(1) fire extinguisher of type 2-A:10,B-C USCG approved mounted with bracket.

(1) fire extinguisher of type 1-A:10,B-C, USCG approved mounted with bracket.

First aid Kit fixed inside cabin 16 person or greater meeting ANSI Z308.1

Ring Buoy, 24 inch with line and bracket mounted aft.

Marine AM/FM/MP3 Radio or better, with spoiler mounted antenna and two 6” round speakers installed.

33. Trailer

Characteristics of Boat Trailer:

Furnish a new aluminum commercial/military grade boat trailer to fit an catamaran hull. with a weight of 10,000 lbs. A dual torsion bar axle trailer shall be custom designed to fit this planing catamaran hull. Furnish the dual axle trailer with trailer brakes and industrial rubber mat fenders. All fasteners shall be stainless steel and bunk supports shall be aluminum.

Components shall include, but not be limited to:

Electric over hydraulic disc brakes, heavy duty 316 Stainless Steel Caliper and 304 Stainless Steel Rotor, watertight pressure sealed vault-hub assemblies, galvanized steel torsion bar axles, and all nylon no rust mini hydro brake lines and fittings, including flexible hoses with brass union end fittings at each caliper. Furnish and install 4 industrial rubber mat fenders and two spare tires mounted to the trailer.

Furnish and install a complete seven (7) way wiring harness for all running light fixtures and plug to fit receptacle on the towing vehicle, 2014 Ford F-350; for a complete running light system on the trailer; to include two (2) watertight red LED stop lights, one on the top of each PVC pipe sleeve mounted on either side at the rear of the trailer. Wiring shall be run with zero splices from the tow connection junction to the lights. All wiring is connected with a mechanically chemically bonded and heat shrunk to seal. Lighting fixtures, locations, etc., shall meet all the requirements of South Carolina Department of Transportation (SCDOT) and the current NHTSB requirements for motor vehicle/trailer lighting. Secure the new wiring to the trailer structure at no more than 18-inch intervals, and at each fixture connection.

Furnish and install bunks with carpeting on the trailer. All bunks shall be a new, single, solid piece of lumber, not manufactured or composite wood created from several layers of lumber. The bunks shall be installed at an elevation that allows the hull of the vessel to bear zero contact with the trailer fenders, even during vessel movement. The vessel hull shall be in contact with each bunk over the entire length of the bunk. A piece of 3/8-inch thick synthetic material (UHMWPE, or approved equal) shall be installed on top of each bunk, over the entire length of each bunk and on the bow cross member and any location where the vessel may touch the trailer while loading. This synthetic material shall be the only material that comes in contact with the bottom of the vessel when it is on the trailer. All bunks and chocks shall be custom fitted to the hull of the vessel so the combined trailer and vessel height shall meet OTR guides and be under 13’ 6” tall on the trailer.

Furnish and install one (1) new drop leg tongue jack with a vertical crank (not horizontal).

Furnish and install a 3,600 pound (min.) capacity, 2-speed hand winch on the trailer with suitable size Samson Amsteel Blue synthetic rope and a suitable size stainless steel bow hook.

Fabricate side guides to position the boat hulls on the bunks. The side guide rails shall consist of two rails 1 port and 1 starboard spanning the length of the hull. The rails will be fabricated from a new solid single piece of lumber lined with carpet and capped with UHMWPE.

Furnish and install a bow stop that incorporates the bracket for the hand winch. A tongue mounted ladder to access the vessel at the bow shall be provided. Install a carpeted solid wood timber between the bow stop uprights to fit across the vessel’s push knees. Fabricate forward and aft braces on the bow stop as needed for support. Apply non- skid surface tape to ladder steps.

34. Tests and Trials:

Prior to delivery from the builder's facility, the contractor shall complete the following tests and trials.

Operational trials - demonstrate the correct operation of all on board systems and machinery components.

Full Load Speed trials - demonstrate the vessel top speed.

Noise Survey - demonstrate that the vessel meets the required noise limits.

Trailering - demonstrate launching from trailer into the water, and hauling from the water onto the trailer.

Shore power - demonstrate operation of AC electrical components on shorepower.

35. Documentation:

The following electronic documents shall be provided by the builder, for the purpose of operating and maintaining the vessel:

Arrangement drawings, hull line drawings, hull structural drawings, hull hydrostatics in salt water table drawing (labeling plate thickness and structural member sizes).

AC and DC electrical schematics and wiring diagrams.

Fuel line schematics.

Trailer VIN.

Equipment Operating manuals.

Trial Reports.

Warranties.

36. DELIVERY INFORMATION:

Delivery Date or Dates:

Delivery is needed on or before 180days after award.

Vessel shall be shipped to:

USACE Construction and Survey Annex 1050 Remount Rd Bldg 3555 North Charleston, SC 29406

Receiving Point of Contact (POC):

Name and title – Matthew Foss Email address – matthew.d.foss@usace.army.mil Work phone – 843-329-8206

Alternate receiving point of contact is Bradford Schultz 253-250-1230.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .