W912HP-15-B-0004_Amend_03.pdf
PDF 94 KB Posted
- Attached to
- FY15 Charleston Entrance Channel Maintenance Dredging, Charleston County, South Carolina
- Solicitation number
- W912HP-15-B-0004
About this file
Amendment 03 Revised Dredging Specifications
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY15 Charleston Entrance Dredging
The purpose of this Amendment is to provide revised changes to Dredging Specification Section 35 20 23, Paragraph 1.4.3, Estimated Quantities.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-15-B-0004
X 9B. DATED (SEE ITEM 11)
13-Jul-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Aug-2015
CODE
U.S. ARMY CORPS OF ENGINEERS, CHARLESTON
DISTRICT, CONTRACTING DIVISION
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP-15-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been added by full text:
REVISED SECTION 35 20 23
Section 35 20 23, DREDGING, Paragraph 1.4.3. Estimated Quantities
Shoal Number 5, BASE Center Channel
Required Dredging Prism CY PL. Meas. has decreased from 120,000 to 55,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 200,000 to 150,000.
Total CY PL. Meas. has decreased from 320,000 to 205,000.
Shoal Number 6, BASE Center Channel
Required Dredging Prism CY PL. Meas. has decreased from 245,000 to 80,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 245,000 to 210,000.
Total CY PL. Meas. has decreased from 490,000 to 290,000.
Shoal Number 7, OPTION Center Channel
Required Dredging Prism CY PL. Meas. has decreased from 140,000 to 38,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 185,000 to 170,000.
Total CY PL. Meas. has decreased from 325,000 to 208,000.
Shoal Number 5, OPTION Wings
Required Dredging Prism CY PL. Meas. has decreased from 105,000 to 88,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 90,000 to 85,000.
Total CY PL. Meas. has decreased from 195,000 to 173,000.
Shoal Number 6, OPTION Wings
Required Dredging Prism CY PL. Meas. has decreased from 180,000 to 160,000.
Total CY PL. Meas. has decreased from 265,000 to 245,000.
Shoal Number 7, OPTION Wings
Required Dredging Prism CY PL. Meas. has decreased from 85,000 to 75,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 75,000 to 70,000.
Total CY PL. Meas. has decreased from 160,000 to 145,000.
Shoal Number 2, OPTION Channel and Wing
Required Dredging Prism CY PL. Meas. has decreased from 12,000 to 11,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 26,000 to 24,000.
Total CY PL. Meas. has decreased from 38,000 to 35,000.
W912HP-15-B-0004
Shoal Number 3, OPTION Channel and Wing
Required Dredging Prism CY PL. Meas. has decreased from 50,000 to 45,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 80,000 to 73,000.
Total CY PL. Meas. has decreased from 130,000 to 118,000.
Shoal Number 4, OPTION Channel and Wing
Required Dredging Prism CY PL. Meas. has decreased from 36,000 to 30,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 80,000 to 73,000.
Total CY PL. Meas. has decreased from 116,000 to 103,000.
Total
Required Dredging Prism CY PL. Meas. has decreased from 973,000 to 582,000.
Allowable Overdepth Prism CY PL. Meas. has decreased from 1,066,000 to 940,000.
Total CY PL. Meas. has decreased from 2,039,000 to 1,522,000.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .