Revised_Consolidated_Report_Attch_L.pdf
PDF 33 KB Posted
- Attached to
- FY15 Charleston Entrance Channel Maintenance Dredging, Charleston County, South Carolina
- Solicitation number
- W912HP-15-B-0004
About this file
Revised Consolidated Report (Attch L)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSOLIDATED REPORT - DREDGING
L-1 ATTACHMENT L
TITLE: MAINTENANCE DREDGING IN LOWER CHARLESTON HARBOR AND WANDO RIVER
IFB NO. W912HP-15-B-0004 CONTRACT NO. W912HP-15-C-00xx
DRAWING NO. 9552
COORDINATES: NAD1983
GOVERNMENT INSPECTOR:
CONTRACTOR:
CONTRACTOR'S SUPERINTENDENT:
TYPE EQUIPMENT USED ON JOB:
DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)
OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)
SUBCONTRACTORS:
DATES:
ADVERTISEMENT: BID OPENING:
AWARD: NOTICE TO PROCEED:
REQUIRED STARTING: ACTUAL STARTING:
REQUIRED COMPLETION DATE: ACTUAL COMPLETION:
NUMBERS DAYS ON JOB (PUMPING):
NUMBERS DAYS ON JOB (TOTAL):
DREDGING QUANTITIES:
REQUIRED PRODUCTION RATE:
ACTUAL PRODUCTION RATE:
CHARACTER OF MATERIALS:
NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE
NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED
WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP
WAS USED FOR REMOVAL.
L-2 ATTACHMENT L
ADVERTISED QUANTITIES
REQUIRED ALLOWABLE
SHOAL DREDGING PRISM OVERDEPTH PRISM TOTAL C.Y.
NO. LOCATION CY PL. MEAS. * CY PL. MEAS. ** PL. MEAS.
5 BASE
Center Channel 585+00 to 650+00
6 BASE
Center Channel 650+00 to 700+00
7 OPTION
Center Channel 700+00 to 770+00
5 OPTION
Wings 585+00 to 650+00
6 OPTION
Wings 650+00 to 700+00
7 OPTION
Wings 700+00 to 770+00
2 OPTION
Channel and Wing 422+00 to 452+00
4 OPTION
Channel and Wing 525+00 to 585+00
3 OPTION
Channel and Wing 462+00 to 525+00
TOTALS
L-3 ATTACHMENT L
BEFORE DREDGE QUANTITIES
NO. LOCATION CY PL. MEAS. * CY PL. MEAS. ** PL. MEAS.
5 BASE
Center Channel 585+00 to 650+00
6 BASE
Center Channel 650+00 to 700+00
7 OPTION
Center Channel 700+00 to 770+00
5 OPTION
Wings 585+00 to 650+00
6 OPTION
Wings 650+00 to 700+00
7 OPTION
Wings 700+00 to 770+00
2 OPTION
Channel and Wing 422+00 to 452+00
4 OPTION
Channel and Wing 525+00 to 585+00
3 OPTION
Channel and Wing
L-4 ATTACHMENT L
AFTER DREDGE QUANTITIES
NO. LOCATION CY PL. MEAS. * CY PL. MEAS. ** PL. MEAS.
5 BASE
Center Channel 585+00 to 650+00
6 BASE
Center Channel 650+00 to 700+00
7 OPTION
Center Channel 700+00 to 770+00
5 OPTION
Wings 585+00 to 650+00
6 OPTION
Wings 650+00 to 700+00
7 OPTION
Wings 700+00 to 770+00
2 OPTION
Channel and Wing 422+00 to 452+00
4 OPTION
Channel and Wing 525+00 to 585+00
3 OPTION
Channel and Wing
L-5 ATTACHMENT L
EFFECTIVE AND NON-EFFECTIVE TIME:
NAME OF DREDGE:
PUMPING:
HANDLING PIPE LINES:
HANDLING SWING LINES:
CLEARING PUMP AND PIPELINES:
CLEARING CUTTER:
CHANGING LOCATION ON JOB:
PASSING VESSELS:
SHORE LINE & SHORE WORK:
MINOR REPAIR:
PREPARATION:
MISCELLANEOUS:
MOBILIZATION AND DEMOBILIZATION:
PRIVATE WORK:
SUNDAYS AND HOLIDAYS:
MAJOR REPAIRS:
LOST TIME:
LOST TIME NOT CHARGEABLE TO COST AT WORK:
TOTAL TIME:
AVERAGES:
WIDTH OF CUT:
LIFT:
CUBIC YARDS PUMPED PER HOUR - CREDIT:
CUBIC YARDS PUMPED PER HOUR - GROSS:
CUBIC YARDS PUMPED PER DAY - CREDIT:
CUBIC YARDS PUMPED PER DAY - GROSS:
PUMPING TIME - HOURS PER DAY:
TIME DELAYS AND CAUSES OF SUCH DELAYS:
L-6 ATTACHMENT L
COSTS/PRICES:
ORIGINAL CONTRACT PRICE:
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND 1 JA LUMP SUM $__________
DEMOBILIZATION FOR
MAINENANCE DREDGING IN
CHARLESTON ENTRANCE CHANNEL
0002 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 5
(MAIN CHANNEL 49’, 2’ OD)
0003 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 6
(MAIN CHANNEL 49’, 2’ OD)
0004 COMPLIANCE WITH ENDANGERED 1 JA $__________ $__________
SPECIES ACT AND MARINE MAMMALS
PROTECTION ACT (CHARLESTON
ENTRANCE CHANNEL)
0005 NON-CAPTURE TRAWL SWEEPING 10 DAY $__________ $__________
(12 HOUR DAYS) (CHARLESTON
ENTRANCE CHANNEL)
OPTIONS
0006 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 7
(MAIN CHANNEL 49’, 2’ OD)
0007 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 5
(WINGS 44’, 2’ OD)
0008 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 6
(WINGS 44’, 2’ OD)
0009 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 7
(WINGS 44’, 2’ OD)
L-7 ATTACHMENT L
0010 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 2
(MAIN 49’, WINGS 44’, 2’ OD)
0011 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 4
(MAIN 49’, WINGS 44’, 2’ OD)
0012 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 3
(MAIN 49’, 44’ WINGS, 2’ OD)
TOTAL (COMBINATION OF BASE ITEMS 0001-0005) $_______________
TOTAL (COMBINATION OF OPTIONAL ITEMS 0006-0012) $_______________
TOTAL (COMBINATION OF ITEMS 0001-0012) $_______________
L-8 ATTACHMENT L
ACTUAL CONTRACT PRICE:
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND 1 JA LUMP SUM $__________
DEMOBILIZATION FOR
MAINENANCE DREDGING IN
CHARLESTON ENTRANCE CHANNEL
0002 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 5
(MAIN CHANNEL 49’, 2’ OD)
0003 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 6
(MAIN CHANNEL 49’, 2’ OD)
0004 COMPLIANCE WITH ENDANGERED 1 JA $__________ $__________
SPECIES ACT AND MARINE MAMMALS
PROTECTION ACT (CHARLESTON
ENTRANCE CHANNEL)
0005 NON-CAPTURE TRAWL SWEEPING 10 DAY $__________ $__________
(12 HOUR DAYS) (CHARLESTON
ENTRANCE CHANNEL)
OPTIONS
0006 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 7
(MAIN CHANNEL 49’, 2’ OD)
0007 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 5
(WINGS 44’, 2’ OD)
0008 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 6
(WINGS 44’, 2’ OD)
0009 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 7
(WINGS 44’, 2’ OD)
0010 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
L-9 ATTACHMENT L
ENTRANCE CHANNEL SHOAL 2
(MAIN 49’, WINGS 44’, 2’ OD)
0011 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 4
(MAIN 49’, WINGS 44’, 2’ OD)
0012 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________
MATERIAL IN CHARLESTON
ENTRANCE CHANNEL SHOAL 3
(MAIN 49’, 44’ WINGS, 2’ OD)
TOTAL (COMBINATION OF BASE ITEMS 0001-0005) $_______________
TOTAL (COMBINATION OF OPTIONAL ITEMS 0006-0012) $_______________
TOTAL (COMBINATION OF ITEMS 0001-0012) $_______________
L-10 ATTACHMENT L
MODIFICATIONS:
MOD 1: (BRIEF DESCRIPTION)
MOD 2: (BRIEF DESCRIPTION)
CLAIMS:
CLAIM 1: (BRIEF DESCRIPTION)
CLAIM 2: (BRIEF DESCRIPTION)
ADDITIONAL COSTS:
NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE
File details come from the government source that posted it. Updated .