CONSOLIDATED REPORT - DREDGING

L-1 ATTACHMENT L

TITLE: MAINTENANCE DREDGING IN LOWER CHARLESTON HARBOR AND WANDO RIVER

IFB NO. W912HP-15-B-0004 CONTRACT NO. W912HP-15-C-00xx

DRAWING NO. 9552

COORDINATES: NAD1983

GOVERNMENT INSPECTOR:

CONTRACTOR:

CONTRACTOR'S SUPERINTENDENT:

TYPE EQUIPMENT USED ON JOB:

DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)

OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)

SUBCONTRACTORS:

DATES:

ADVERTISEMENT: BID OPENING:

AWARD: NOTICE TO PROCEED:

REQUIRED STARTING: ACTUAL STARTING:

REQUIRED COMPLETION DATE: ACTUAL COMPLETION:

NUMBERS DAYS ON JOB (PUMPING):

NUMBERS DAYS ON JOB (TOTAL):

DREDGING QUANTITIES:

REQUIRED PRODUCTION RATE:

ACTUAL PRODUCTION RATE:

CHARACTER OF MATERIALS:

NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE

NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED

WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP

WAS USED FOR REMOVAL.

L-2 ATTACHMENT L

ADVERTISED QUANTITIES

REQUIRED ALLOWABLE

SHOAL DREDGING PRISM OVERDEPTH PRISM TOTAL C.Y.

NO. LOCATION CY PL. MEAS. * CY PL. MEAS. ** PL. MEAS.

5 BASE

Center Channel 585+00 to 650+00

6 BASE

Center Channel 650+00 to 700+00

7 OPTION

Center Channel 700+00 to 770+00

5 OPTION

Wings 585+00 to 650+00

6 OPTION

Wings 650+00 to 700+00

7 OPTION

Wings 700+00 to 770+00

2 OPTION

Channel and Wing 422+00 to 452+00

4 OPTION

Channel and Wing 525+00 to 585+00

3 OPTION

Channel and Wing 462+00 to 525+00

TOTALS

L-3 ATTACHMENT L

BEFORE DREDGE QUANTITIES

NO. LOCATION CY PL. MEAS. * CY PL. MEAS. ** PL. MEAS.

5 BASE

Center Channel 585+00 to 650+00

6 BASE

Center Channel 650+00 to 700+00

7 OPTION

Center Channel 700+00 to 770+00

5 OPTION

Wings 585+00 to 650+00

6 OPTION

Wings 650+00 to 700+00

7 OPTION

Wings 700+00 to 770+00

2 OPTION

Channel and Wing 422+00 to 452+00

4 OPTION

Channel and Wing 525+00 to 585+00

3 OPTION

Channel and Wing

L-4 ATTACHMENT L

AFTER DREDGE QUANTITIES

NO. LOCATION CY PL. MEAS. * CY PL. MEAS. ** PL. MEAS.

5 BASE

Center Channel 585+00 to 650+00

6 BASE

Center Channel 650+00 to 700+00

7 OPTION

Center Channel 700+00 to 770+00

5 OPTION

Wings 585+00 to 650+00

6 OPTION

Wings 650+00 to 700+00

7 OPTION

Wings 700+00 to 770+00

2 OPTION

Channel and Wing 422+00 to 452+00

4 OPTION

Channel and Wing 525+00 to 585+00

3 OPTION

Channel and Wing

L-5 ATTACHMENT L

EFFECTIVE AND NON-EFFECTIVE TIME:

NAME OF DREDGE:

PUMPING:

HANDLING PIPE LINES:

HANDLING SWING LINES:

CLEARING PUMP AND PIPELINES:

CLEARING CUTTER:

CHANGING LOCATION ON JOB:

PASSING VESSELS:

SHORE LINE & SHORE WORK:

MINOR REPAIR:

PREPARATION:

MISCELLANEOUS:

MOBILIZATION AND DEMOBILIZATION:

PRIVATE WORK:

SUNDAYS AND HOLIDAYS:

MAJOR REPAIRS:

LOST TIME:

LOST TIME NOT CHARGEABLE TO COST AT WORK:

TOTAL TIME:

AVERAGES:

WIDTH OF CUT:

LIFT:

CUBIC YARDS PUMPED PER HOUR - CREDIT:

CUBIC YARDS PUMPED PER HOUR - GROSS:

CUBIC YARDS PUMPED PER DAY - CREDIT:

CUBIC YARDS PUMPED PER DAY - GROSS:

PUMPING TIME - HOURS PER DAY:

TIME DELAYS AND CAUSES OF SUCH DELAYS:

L-6 ATTACHMENT L

COSTS/PRICES:

ORIGINAL CONTRACT PRICE:

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND 1 JA LUMP SUM $__________

DEMOBILIZATION FOR

MAINENANCE DREDGING IN

CHARLESTON ENTRANCE CHANNEL

0002 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 5

(MAIN CHANNEL 49’, 2’ OD)

0003 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 6

(MAIN CHANNEL 49’, 2’ OD)

0004 COMPLIANCE WITH ENDANGERED 1 JA $__________ $__________

SPECIES ACT AND MARINE MAMMALS

PROTECTION ACT (CHARLESTON

ENTRANCE CHANNEL)

0005 NON-CAPTURE TRAWL SWEEPING 10 DAY $__________ $__________

(12 HOUR DAYS) (CHARLESTON

ENTRANCE CHANNEL)

OPTIONS

0006 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 7

(MAIN CHANNEL 49’, 2’ OD)

0007 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 5

(WINGS 44’, 2’ OD)

0008 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 6

(WINGS 44’, 2’ OD)

0009 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 7

(WINGS 44’, 2’ OD)

L-7 ATTACHMENT L

0010 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 2

(MAIN 49’, WINGS 44’, 2’ OD)

0011 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 4

(MAIN 49’, WINGS 44’, 2’ OD)

0012 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 3

(MAIN 49’, 44’ WINGS, 2’ OD)

TOTAL (COMBINATION OF BASE ITEMS 0001-0005) $_______________

TOTAL (COMBINATION OF OPTIONAL ITEMS 0006-0012) $_______________

TOTAL (COMBINATION OF ITEMS 0001-0012) $_______________

L-8 ATTACHMENT L

ACTUAL CONTRACT PRICE:

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND 1 JA LUMP SUM $__________

DEMOBILIZATION FOR

MAINENANCE DREDGING IN

CHARLESTON ENTRANCE CHANNEL

0002 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 5

(MAIN CHANNEL 49’, 2’ OD)

0003 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 6

(MAIN CHANNEL 49’, 2’ OD)

0004 COMPLIANCE WITH ENDANGERED 1 JA $__________ $__________

SPECIES ACT AND MARINE MAMMALS

PROTECTION ACT (CHARLESTON

ENTRANCE CHANNEL)

0005 NON-CAPTURE TRAWL SWEEPING 10 DAY $__________ $__________

(12 HOUR DAYS) (CHARLESTON

ENTRANCE CHANNEL)

OPTIONS

0006 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 7

(MAIN CHANNEL 49’, 2’ OD)

0007 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 5

(WINGS 44’, 2’ OD)

0008 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 6

(WINGS 44’, 2’ OD)

0009 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 7

(WINGS 44’, 2’ OD)

0010 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

L-9 ATTACHMENT L

ENTRANCE CHANNEL SHOAL 2

(MAIN 49’, WINGS 44’, 2’ OD)

0011 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 4

(MAIN 49’, WINGS 44’, 2’ OD)

0012 DREDGING OF UNCLASSIFIED _________ CY $__________ $__________

MATERIAL IN CHARLESTON

ENTRANCE CHANNEL SHOAL 3

(MAIN 49’, 44’ WINGS, 2’ OD)

TOTAL (COMBINATION OF BASE ITEMS 0001-0005) $_______________

TOTAL (COMBINATION OF OPTIONAL ITEMS 0006-0012) $_______________

TOTAL (COMBINATION OF ITEMS 0001-0012) $_______________

L-10 ATTACHMENT L

MODIFICATIONS:

MOD 1: (BRIEF DESCRIPTION)

MOD 2: (BRIEF DESCRIPTION)

CLAIMS:

CLAIM 1: (BRIEF DESCRIPTION)

CLAIM 2: (BRIEF DESCRIPTION)

ADDITIONAL COSTS:

NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE