14r0019 FL ELINS 1503050 Grounds Maintenance _2014.05.05.xlsx
XLSX spreadsheet 240 KB Posted
- Solicitation number
- W912HP-14-R-0019
About this file
ELINs 1503050 Grounds
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS Summary Grounds Maintenance Services Summary
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | Total | |
| 0009 | Base Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 0010 | Base Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 0011 | Base Period Indefinite Quantity | $0.00 |
| 0019 | Base Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 0019AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 0019AB | CAMP BLANDING USARC | $0.00 |
| 0019AC | CORRY STATION USARC | $0.00 |
| 0020 | Base Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 0020AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 0020AB | CAMP BLANDING USARC | $0.00 |
| 0020AC | CORRY STATION USARC | $0.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 1010 | First Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 1011 | First Option Period Indefinite Quantity | $0.00 |
| 1019 | First Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 1019AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 1019AB | CAMP BLANDING USARC | $0.00 |
| 1019AC | CORRY STATION USARC | $0.00 |
| 1020 | First Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 1020AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 1020AB | CAMP BLANDING USARC | $0.00 |
| 1020AC | CORRY STATION USARC | $0.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 2010 | Second Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 2011 | Second Option Period Indefinite Quantity | $0.00 |
| 2019 | Second Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 2019AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 2019AB | CAMP BLANDING USARC | $0.00 |
| 2019AC | CORRY STATION USARC | $0.00 |
| 2020 | Second Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 2020AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 2020AB | CAMP BLANDING USARC | $0.00 |
| 2020AC | CORRY STATION USARC | $0.00 |
| 3009 | Third Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 3010 | Third Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 3011 | Third Option Period Indefinite Quantity | $0.00 |
| 3019 | Third Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 3019AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 3019AB | CAMP BLANDING USARC | $0.00 |
| 3019AC | CORRY STATION USARC | $0.00 |
| 3020 | Third Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 3020AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 3020AB | CAMP BLANDING USARC | $0.00 |
| 3020AC | CORRY STATION USARC | $0.00 |
| 4009 | Fourth Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 4010 | Fourth Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 4011 | Fourth Option Period Indefinite Quantity | $0.00 |
| 4019 | Fourth Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 4019AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 4019AB | CAMP BLANDING USARC | $0.00 |
| 4019AC | CORRY STATION USARC | $0.00 |
| 4020 | Fourth Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 4020AA | JACKSONVILLE AFRC & AMSA #44 (G) | $0.00 |
| 4020AB | CAMP BLANDING USARC | $0.00 |
| 4020AC | CORRY STATION USARC | $0.00 |
| $0.00 | |
| Note: Either CLIN 0009 or CLIN 0010 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer. |
&F
J-0200000-07 &A &P of &N
ELINS Summary Sheet
GROUNDS MAINTENANCE (1503050)
| This sheet is filled out automatically as other sheets are completed | |||
| CLIN / SUBCLIN | Site | ELINS | Total Price |
| 0009 | Base Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 0009AA | FL003 | (Items A001 Through A002) | $0.00 |
| 0009AB | FL004 | (Items A003 Through A004) | $0.00 |
| 0009AC | FL008 | (Items A005 Through A006) | $0.00 |
| 0009AD | FL009 | (Items A007 Through A008) | $0.00 |
| 0009AE | FL014 | (Items A009 Through A010) | $0.00 |
| 0009AF | FL017 & FL134 | (Items A011 Through A012) | $0.00 |
| 0009AG | FL019 | (Items A013 Through A015) | $0.00 |
| 0009AH | FL020 | (Items A016 Through A017) | $0.00 |
| 0009AJ | FL021 | (Items A018 Through A019) | $0.00 |
| 0009AK | FL022 | (Items A020 Through A021) | $0.00 |
| 0009AL | FL023 & FL115 &FL125 | (Items A022 Through A024) | $0.00 |
| 0009AM | FL027 | (Items A025 Through A026) | $0.00 |
| 0009AN | FL029 | (Items A027 Through A028) | $0.00 |
| 0009AO | FL031 | (Items A029 Through A030) | $0.00 |
| 0009AP | FL037 | (Items A031 Through A032) | $0.00 |
| 0009AQ | FL040 & FL135 | (Items A033 Through A034) | $0.00 |
| 0009AR | FL041 & FL136 | (Items A035 Through A036) | $0.00 |
| 0009AS | FL103 & FL137 | (Items A037 Through A038) | $0.00 |
| 0009AT | FL126 | (Items A039 Through A040) | $0.00 |
| 0009AU | FL127 | (Items A041 Through A042) | $0.00 |
| $0.00 | |||
| 0010 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 0010AA | FL003 | (Items A101 Through A102) | $0.00 |
| 0010AB | FL004 | (Items A103 Through A104) | $0.00 |
| 0010AC | FL008 | (Items A105 Through A106) | $0.00 |
| 0010AD | FL009 | (Items A107 Through A108) | $0.00 |
| 0010AE | FL014 | (Items A109 Through A110) | $0.00 |
| 0010AF | FL017 & FL134 | (Items A111 Through A112) | $0.00 |
| 0010AG | FL019 | (Items A113 Through A115) | $0.00 |
| 0010AH | FL020 | (Items A116 Through A117) | $0.00 |
| 0010AJ | FL021 | (Items A118 Through A119) | $0.00 |
| 0010AK | FL022 | (Items A120 Through A121) | $0.00 |
| 0010AL | FL023 & FL115 &FL125 | (Items A122 Through A124) | $0.00 |
| 0010AM | FL027 | (Items A125 Through A126) | $0.00 |
| 0010AN | FL029 | (Items A127 Through A128) | $0.00 |
| 0010AO | FL031 | (Items A129 Through A130) | $0.00 |
| 0010AP | FL037 | (Items A131 Through A132) | $0.00 |
| 0010AQ | FL040 & FL135 | (Items A133 Through A134) | $0.00 |
| 0010AR | FL041 & FL136 | (Items A135 Through A136) | $0.00 |
| 0010AS | FL103 & FL137 | (Items A137 Through A138) | $0.00 |
| 0010AT | FL126 | (Items A139 Through A140) | $0.00 |
| 0010AU | FL127 | (Items A141 Through A142) | $0.00 |
| $0.00 | |||
| 0011 | Base Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A749 | $0.00 | ||
| 0019 | Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 0019AA | FL010 & FL133 | (Items A001 Through A002) | $0.00 |
| 0019AB | FL122 | (Items A003 Through A004) | $0.00 |
| 0019AC | FL141 | (Items A005 Through A006) | $0.00 |
| $0.00 | |||
| 0020 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 0020AA | FL010 & FL133 | (Items A101 Through A102) | $0.00 |
| 0020AB | FL122 | (Items A103 Through A104) | $0.00 |
| 0020AC | FL141 | (Items A105 Through A106) | $0.00 |
| $0.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 1009AA | FL003 | (Items B001 Through B002) | $0.00 |
| 1009AB | FL004 | (Items B003 Through B004) | $0.00 |
| 1009AC | FL008 | (Items B005 Through B006) | $0.00 |
| 1009AD | FL009 | (Items B007 Through B008) | $0.00 |
| 1009AE | FL014 | (Items B009 Through B010) | $0.00 |
| 1009AF | FL017 & FL134 | (Items B011 Through B012) | $0.00 |
| 1009AG | FL019 | (Items B013 Through B015) | $0.00 |
| 1009AH | FL020 | (Items B016 Through B017) | $0.00 |
| 1009AJ | FL021 | (Items B018 Through B019) | $0.00 |
| 1009AK | FL022 | (Items B020 Through B021) | $0.00 |
| 1009AL | FL023 & FL115 &FL125 | (Items B022 Through B024) | $0.00 |
| 1009AM | FL027 | (Items B025 Through B026) | $0.00 |
| 1009AN | FL029 | (Items B027 Through B028) | $0.00 |
| 1009AO | FL031 | (Items B029 Through B030) | $0.00 |
| 1009AP | FL037 | (Items B031 Through B032) | $0.00 |
| 1009AQ | FL040 & FL135 | (Items B033 Through B034) | $0.00 |
| 1009AR | FL041 & FL136 | (Items B035 Through B036) | $0.00 |
| 1009AS | FL103 & FL137 | (Items B037 Through B038) | $0.00 |
| 1009AT | FL126 | (Items B039 Through B040) | $0.00 |
| 1009AU | FL127 | (Items B041 Through B042) | $0.00 |
| $0.00 | |||
| 1010 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 1010AA | FL003 | (Items B101 Through B102) | $0.00 |
| 1010AB | FL004 | (Items B103 Through B104) | $0.00 |
| 1010AC | FL008 | (Items B105 Through B106) | $0.00 |
| 1010AD | FL009 | (Items B107 Through B108) | $0.00 |
| 1010AE | FL014 | (Items B109 Through B110) | $0.00 |
| 1010AF | FL017 & FL134 | (Items B111 Through B112) | $0.00 |
| 1010AG | FL019 | (Items B113 Through B115) | $0.00 |
| 1010AH | FL020 | (Items B116 Through B117) | $0.00 |
| 1010AJ | FL021 | (Items B118 Through B119) | $0.00 |
| 1010AK | FL022 | (Items B120 Through B121) | $0.00 |
| 1010AL | FL023 & FL115 &FL125 | (Items B122 Through B124) | $0.00 |
| 1010AM | FL027 | (Items B125 Through B126) | $0.00 |
| 1010AN | FL029 | (Items B127 Through B128) | $0.00 |
| 1010AO | FL031 | (Items B129 Through B130) | $0.00 |
| 1010AP | FL037 | (Items B131 Through B132) | $0.00 |
| 1010AQ | FL040 & FL135 | (Items B133 Through B134) | $0.00 |
| 1010AR | FL041 & FL136 | (Items B135 Through B136) | $0.00 |
| 1010AS | FL103 & FL137 | (Items B137 Through B138) | $0.00 |
| 1010AT | FL126 | (Items B139 Through B140) | $0.00 |
| 1010AU | FL127 | (Items B141 Through B142) | $0.00 |
| $0.00 | |||
| 1011 | First Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - B701 THROUGH B749 | $0.00 | ||
| 1019 | First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 1019AA | FL010 & FL133 | (Items B001 Through B002) | $0.00 |
| 1019AB | FL122 | (Items B003 Through B004) | $0.00 |
| 1019AC | FL141 | (Items B005 Through B006) | $0.00 |
| $0.00 | |||
| 1020 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 1020AA | FL010 & FL133 | (Items B101 Through B102) | $0.00 |
| 1020AB | FL122 | (Items B103 Through B104) | $0.00 |
| 1020AC | FL141 | (Items B105 Through B106) | $0.00 |
| $0.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 2009AA | FL003 | (Items C001 Through C002) | $0.00 |
| 2009AB | FL004 | (Items C003 Through C004) | $0.00 |
| 2009AC | FL008 | (Items C005 Through C006) | $0.00 |
| 2009AD | FL009 | (Items C007 Through C008) | $0.00 |
| 2009AE | FL014 | (Items C009 Through C010) | $0.00 |
| 2009AF | FL017 & FL134 | (Items C011 Through C012) | $0.00 |
| 2009AG | FL019 | (Items C013 Through C015) | $0.00 |
| 2009AH | FL020 | (Items C016 Through C017) | $0.00 |
| 2009AJ | FL021 | (Items C018 Through C019) | $0.00 |
| 2009AK | FL022 | (Items C020 Through C021) | $0.00 |
| 2009AL | FL023 & FL115 &FL125 | (Items C022 Through C024) | $0.00 |
| 2009AM | FL027 | (Items C025 Through C026) | $0.00 |
| 2009AN | FL029 | (Items C027 Through C028) | $0.00 |
| 2009AO | FL031 | (Items C029 Through C030) | $0.00 |
| 2009AP | FL037 | (Items C031 Through C032) | $0.00 |
| 2009AQ | FL040 & FL135 | (Items C033 Through C034) | $0.00 |
| 2009AR | FL041 & FL136 | (Items C035 Through C036) | $0.00 |
| 2009AS | FL103 & FL137 | (Items C037 Through C038) | $0.00 |
| 2009AT | FL126 | (Items C039 Through C040) | $0.00 |
| 2009AU | FL127 | (Items C041 Through C042) | $0.00 |
| $0.00 | |||
| 2010 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 2010AA | FL003 | (Items C101 Through C102) | $0.00 |
| 2010AB | FL004 | (Items C103 Through C104) | $0.00 |
| 2010AC | FL008 | (Items C105 Through C106) | $0.00 |
| 2010AD | FL009 | (Items C107 Through C108) | $0.00 |
| 2010AE | FL014 | (Items C109 Through C110) | $0.00 |
| 2010AF | FL017 & FL134 | (Items C111 Through C112) | $0.00 |
| 2010AG | FL019 | (Items C113 Through C115) | $0.00 |
| 2010AH | FL020 | (Items C116 Through C117) | $0.00 |
| 2010AJ | FL021 | (Items C118 Through C119) | $0.00 |
| 2010AK | FL022 | (Items C120 Through C121) | $0.00 |
| 2010AL | FL023 & FL115 &FL125 | (Items C122 Through C124) | $0.00 |
| 2010AM | FL027 | (Items C125 Through C126) | $0.00 |
| 2010AN | FL029 | (Items C127 Through C128) | $0.00 |
| 2010AO | FL031 | (Items C129 Through C130) | $0.00 |
| 2010AP | FL037 | (Items C131 Through C132) | $0.00 |
| 2010AQ | FL040 & FL135 | (Items C133 Through C134) | $0.00 |
| 2010AR | FL041 & FL136 | (Items C135 Through C136) | $0.00 |
| 2010AS | FL103 & FL137 | (Items C137 Through C138) | $0.00 |
| 2010AT | FL126 | (Items C139 Through C140) | $0.00 |
| 2010AU | FL127 | (Items C141 Through C142) | $0.00 |
| $0.00 | |||
| 2011 | Second Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - C701 THROUGH C749 | $0.00 | ||
| 2019 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 2019AA | FL010 & FL133 | (Items C001 Through C002) | $0.00 |
| 2019AB | FL122 | (Items C003 Through C004) | $0.00 |
| 2019AC | FL141 | (Items C005 Through C006) | $0.00 |
| $0.00 | |||
| 2020 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 2020AA | FL010 & FL133 | (Items C101 Through C102) | $0.00 |
| 2020AB | FL122 | (Items C103 Through C104) | $0.00 |
| 2020AC | FL141 | (Items C105 Through C106) | $0.00 |
| $0.00 |
| 3009 | Third Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 3009AA | FL003 | (Items D001 Through D002) | $0.00 |
| 3009AB | FL004 | (Items D003 Through D004) | $0.00 |
| 3009AC | FL008 | (Items D005 Through D006) | $0.00 |
| 3009AD | FL009 | (Items D007 Through D008) | $0.00 |
| 3009AE | FL014 | (Items D009 Through D010) | $0.00 |
| 3009AF | FL017 & FL134 | (Items D011 Through D012) | $0.00 |
| 3009AG | FL019 | (Items D013 Through D015) | $0.00 |
| 3009AH | FL020 | (Items D016 Through D017) | $0.00 |
| 3009AJ | FL021 | (Items D018 Through D019) | $0.00 |
| 3009AK | FL022 | (Items D020 Through D021) | $0.00 |
| 3009AL | FL023 & FL115 &FL125 | (Items D022 Through D024) | $0.00 |
| 3009AM | FL027 | (Items D025 Through D026) | $0.00 |
| 3009AN | FL029 | (Items D027 Through D028) | $0.00 |
| 3009AO | FL031 | (Items D029 Through D030) | $0.00 |
| 3009AP | FL037 | (Items D031 Through D032) | $0.00 |
| 3009AQ | FL040 & FL135 | (Items D033 Through D034) | $0.00 |
| 3009AR | FL041 & FL136 | (Items D035 Through D036) | $0.00 |
| 3009AS | FL103 & FL137 | (Items D037 Through D038) | $0.00 |
| 3009AT | FL126 | (Items D039 Through D040) | $0.00 |
| 3009AU | FL127 | (Items D041 Through D042) | $0.00 |
| $0.00 | |||
| 3010 | Third Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 3010AA | FL003 | (Items D101 Through D102) | $0.00 |
| 3010AB | FL004 | (Items D103 Through D104) | $0.00 |
| 3010AC | FL008 | (Items D105 Through D106) | $0.00 |
| 3010AD | FL009 | (Items D107 Through D108) | $0.00 |
| 3010AE | FL014 | (Items D109 Through D110) | $0.00 |
| 3010AF | FL017 & FL134 | (Items D111 Through D112) | $0.00 |
| 3010AG | FL019 | (Items D113 Through D115) | $0.00 |
| 3010AH | FL020 | (Items D116 Through D117) | $0.00 |
| 3010AJ | FL021 | (Items D118 Through D119) | $0.00 |
| 3010AK | FL022 | (Items D120 Through D121) | $0.00 |
| 3010AL | FL023 & FL115 &FL125 | (Items D122 Through D124) | $0.00 |
| 3010AM | FL027 | (Items D125 Through D126) | $0.00 |
| 3010AN | FL029 | (Items D127 Through D128) | $0.00 |
| 3010AO | FL031 | (Items D129 Through D130) | $0.00 |
| 3010AP | FL037 | (Items D131 Through D132) | $0.00 |
| 3010AQ | FL040 & FL135 | (Items D133 Through D134) | $0.00 |
| 3010AR | FL041 & FL136 | (Items D135 Through D136) | $0.00 |
| 3010AS | FL103 & FL137 | (Items D137 Through D138) | $0.00 |
| 3010AT | FL126 | (Items D139 Through D140) | $0.00 |
| 3010AU | FL127 | (Items D141 Through D142) | $0.00 |
| $0.00 | |||
| 3011 | Third Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - D701 THROUGH D749 | $0.00 | ||
| 3019 | Third Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 3019AA | FL010 & FL133 | (Items D001 Through D002) | $0.00 |
| 3019AB | FL122 | (Items D003 Through D004) | $0.00 |
| 3019AC | FL141 | (Items D005 Through D006) | $0.00 |
| $0.00 | |||
| 3030 | Third Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 3020AA | FL010 & FL133 | (Items D101 Through D102) | $0.00 |
| 3020AB | FL122 | (Items D103 Through D104) | $0.00 |
| 3020AC | FL141 | (Items D105 Through D106) | $0.00 |
| $0.00 |
| 4009 | Fourth Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 4009AA | FL003 | (Items E001 Through E002) | $0.00 |
| 4009AB | FL004 | (Items E003 Through E004) | $0.00 |
| 4009AC | FL008 | (Items E005 Through E006) | $0.00 |
| 4009AD | FL009 | (Items E007 Through E008) | $0.00 |
| 4009AE | FL014 | (Items E009 Through E010) | $0.00 |
| 4009AF | FL017 & FL134 | (Items E011 Through E012) | $0.00 |
| 4009AG | FL019 | (Items E013 Through E015) | $0.00 |
| 4009AH | FL020 | (Items E016 Through E017) | $0.00 |
| 4009AJ | FL021 | (Items E018 Through E019) | $0.00 |
| 4009AK | FL022 | (Items E020 Through E021) | $0.00 |
| 4009AL | FL023 & FL115 &FL125 | (Items E022 Through E024) | $0.00 |
| 4009AM | FL027 | (Items E025 Through E026) | $0.00 |
| 4009AN | FL029 | (Items E027 Through E028) | $0.00 |
| 4009AO | FL031 | (Items E029 Through E030) | $0.00 |
| 4009AP | FL037 | (Items E031 Through E032) | $0.00 |
| 4009AQ | FL040 & FL135 | (Items E033 Through E034) | $0.00 |
| 4009AR | FL041 & FL136 | (Items E035 Through E036) | $0.00 |
| 4009AS | FL103 & FL137 | (Items E037 Through E038) | $0.00 |
| 4009AT | FL126 | (Items E039 Through E040) | $0.00 |
| 4009AU | FL127 | (Items E041 Through E042) | $0.00 |
| $0.00 | |||
| 4010 | Fourth Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 4010AA | FL003 | (Items E101 Through E102) | $0.00 |
| 4010AB | FL004 | (Items E103 Through E104) | $0.00 |
| 4010AC | FL008 | (Items E105 Through E106) | $0.00 |
| 4010AD | FL009 | (Items E107 Through E108) | $0.00 |
| 4010AE | FL014 | (Items E109 Through E110) | $0.00 |
| 4010AF | FL017 & FL134 | (Items E111 Through E112) | $0.00 |
| 4010AG | FL019 | (Items E113 Through E115) | $0.00 |
| 4010AH | FL020 | (Items E116 Through E117) | $0.00 |
| 4010AJ | FL021 | (Items E118 Through E119) | $0.00 |
| 4010AK | FL022 | (Items E120 Through E121) | $0.00 |
| 4010AL | FL023 & FL115 &FL125 | (Items E122 Through E124) | $0.00 |
| 4010AM | FL027 | (Items E125 Through E126) | $0.00 |
| 4010AN | FL029 | (Items E127 Through E128) | $0.00 |
| 4010AO | FL031 | (Items E129 Through E130) | $0.00 |
| 4010AP | FL037 | (Items E131 Through E132) | $0.00 |
| 4010AQ | FL040 & FL135 | (Items E133 Through E134) | $0.00 |
| 4010AR | FL041 & FL136 | (Items E135 Through E136) | $0.00 |
| 4010AS | FL103 & FL137 | (Items E137 Through E138) | $0.00 |
| 4010AT | FL126 | (Items E139 Through E140) | $0.00 |
| 4010AU | FL127 | (Items E141 Through E142) | $0.00 |
| $0.00 | |||
| 4011 | Fourth Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - E701 THROUGH E749 | $0.00 | ||
| 4019 | Fourth Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 4019AA | FL010 & FL133 | (Items E001 Through E002) | $0.00 |
| 4019AB | FL122 | (Items E003 Through E004) | $0.00 |
| 4019AC | FL141 | (Items E005 Through E006) | $0.00 |
| $0.00 | |||
| 4040 | Fourth Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 4020AA | FL010 & FL133 | (Items E101 Through E102) | $0.00 |
| 4020AB | FL122 | (Items E103 Through E104) | $0.00 |
| 4020AC | FL141 | (Items E105 Through E106) | $0.00 |
| $0.00 |
&"Arial,Regular"&10&F
J-0200000-07
&P of &N
ELINS BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A142 |
| CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green) |
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| FL003 | LT ALEXANDER NINNINGER JR USAR | ||||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A002 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AA (Items A001 Through A002) | $0.00 |
| FL004 | GAINESVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| A003 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A004 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AB (Items A003 Through A004) | $0.00 |
| FL008 | CLARENCE L BURPEE USARC | ||||
| Firm Fixed-Price Work | |||||
| A005 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A006 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AC (Items A005 Through A006) | $0.00 |
| FL009 | LTC ROBERT R MILAM USARC | ||||
| Firm Fixed-Price Work | |||||
| A007 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A008 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AD (Items A007 Through A008) | $0.00 |
| FL014 | JAMES WEST USARC | ||||
| Firm Fixed-Price Work | |||||
| A009 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A010 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AE (Items A009 Through A010) | $0.00 |
| FL017 | COL F.M. WILLIAMS USARC | ||||
| FL134 | AMSA #47 G | ||||
| Firm Fixed-Price Work | |||||
| A011 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A012 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AF (Items A011 Through A012) | $0.00 |
| FL019 | MILTON USARC | ||||
| Firm Fixed-Price Work | |||||
| A013 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A014 | Semi-Improved Grounds (Spec Item C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A015 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AG (Items A013 Through A015) | $0.00 |
| FL020 | OCALA USARC | ||||
| Firm Fixed-Price Work | |||||
| A016 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A017 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AH (Items A016 Through A017) | $0.00 |
| FL021 | MICHAEL MCCOY USARC | ||||
| Firm Fixed-Price Work | |||||
| A018 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A019 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AJ (Items A018 Through A019) | $0.00 |
| FL022 | ORANGE COUNTY USARC | ||||
| Firm Fixed-Price Work | |||||
| A020 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A021 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AK (Items A020 Through A021) | $0.00 |
| FL023 | TAFT USARC | ||||
| FL115 | WILSON AFRC | ||||
| FL125 | AMSA #50 | ||||
| Firm Fixed-Price Work | |||||
| A022 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A023 | Semi-Improved Grounds (Spec Item C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A024 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AL (Items A022 Through A024) | $0.00 |
| FL027 | JOSEPH STILWELL USARC | ||||
| Firm Fixed-Price Work | |||||
| A025 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A026 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AM (Items A025 Through A026) | $0.00 |
| FL029 | NEWKIRK SUTHERLAND JR USARC | ||||
| Firm Fixed-Price Work | |||||
| A027 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A028 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AN (Items A027 Through A028) | $0.00 |
| FL031 | LTC LUIS E. MARTINEZ USARC | ||||
| Firm Fixed-Price Work | |||||
| A029 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A030 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AO (Items A029Through A030) | $0.00 |
| FL037 | 1LT MAX R. STOVER USARC | ||||
| Firm Fixed-Price Work | |||||
| A031 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A032 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AP (Items A031 Through A032) | $0.00 |
| FL040 | T. WHIDDON USARC | ||||
| FL135 | BMA 151 (G) | ||||
| Firm Fixed-Price Work | |||||
| A033 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A034 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AQ (Items A033 Through A034) | $0.00 |
| FL041 | C. LOVEJOY USARC | ||||
| FL136 | AMSA #53 (G) | ||||
| Firm Fixed-Price Work | |||||
| A035 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A036 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AR (Items A035 Through A036) | $0.00 |
| FL103 | RATTLESNAKE POINT AFRC | ||||
| FL137 | AMSA (M) #51 | ||||
| Firm Fixed-Price Work | |||||
| A037 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A038 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AS (Items A037 Through A038) | $0.00 |
| FL126 | CLEARWATER ASF | ||||
| Firm Fixed-Price Work | |||||
| A039 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A040 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AT (Items A039 Through A040) | $0.00 |
| FL127 | C.W. BILL YOUNG AFRC | ||||
| Firm Fixed-Price Work | |||||
| A041 | Improved Grounds (Section C, 3.1) | 11 | Month | $ - 0 | $ - 0 |
| A042 | Storm Drainage Systems (Spec Item 3.3) | 11 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AU (Items A041 Through A042) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A042 $0.00
CLIN 0010 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| FL003 | LT ALEXANDER NINNINGER JR USAR | ||||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A102 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AA (Items A101 Through A102) | $0.00 |
| FL004 | GAINESVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| A103 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A104 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Items A103 Through A104) | $0.00 |
| FL008 | CLARENCE L BURPEE USARC | ||||
| Firm Fixed-Price Work | |||||
| A105 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A106 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AC (Items A105 Through A106) | $0.00 |
| FL009 | LTC ROBERT R MILAM USARC | ||||
| Firm Fixed-Price Work | |||||
| A107 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A108 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AD (Items A107 Through A108) | $0.00 |
| FL014 | JAMES WEST USARC | ||||
| Firm Fixed-Price Work | |||||
| A109 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A110 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AE (Items A109 Through A110) | $0.00 |
| FL017 | COL F.M. WILLIAMS USARC | ||||
| FL134 | AMSA #47 G | ||||
| Firm Fixed-Price Work | |||||
| A111 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A112 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AF (Items A111 Through A112) | $0.00 |
| FL019 | MILTON USARC | ||||
| Firm Fixed-Price Work | |||||
| A113 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A114 | Semi-Improved Grounds (Spec Item C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A115 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AG (Items A113 Through A115) | $0.00 |
| FL020 | OCALA USARC | ||||
| Firm Fixed-Price Work | |||||
| A116 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A117 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AH (Items A116 Through A117) | $0.00 |
| FL021 | MICHAEL MCCOY USARC | ||||
| Firm Fixed-Price Work | |||||
| A118 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A119 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AJ (Items A118 Through A119) | $0.00 |
| FL022 | ORANGE COUNTY USARC | ||||
| Firm Fixed-Price Work | |||||
| A120 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A121 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AK (Items A120 Through A121) | $0.00 |
| FL023 | TAFT USARC | ||||
| FL115 | WILSON AFRC | ||||
| FL125 | AMSA #50 | ||||
| Firm Fixed-Price Work | |||||
| A122 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A123 | Semi-Improved Grounds (Spec Item C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A124 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AL (Items A122 Through A124) | $0.00 |
| FL027 | JOSEPH STILWELL USARC | ||||
| Firm Fixed-Price Work | |||||
| A125 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A126 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AM (Items A125 Through A126) | $0.00 |
| FL029 | NEWKIRK SUTHERLAND JR USARC | ||||
| Firm Fixed-Price Work | |||||
| A127 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A128 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AN (Items A127 Through A128) | $0.00 |
| FL031 | LTC LUIS E. MARTINEZ USARC | ||||
| Firm Fixed-Price Work | |||||
| A129 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A130 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AO (Items A129Through A130) | $0.00 |
| FL037 | 1LT MAX R. STOVER USARC | ||||
| Firm Fixed-Price Work | |||||
| A131 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A132 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AP (Items A131 Through A132) | $0.00 |
| FL040 | T. WHIDDON USARC | ||||
| FL135 | BMA 151 (G) | ||||
| Firm Fixed-Price Work | |||||
| A133 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A134 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AQ (Items A133 Through A134) | $0.00 |
| FL041 | C. LOVEJOY USARC | ||||
| FL136 | AMSA #53 (G) | ||||
| Firm Fixed-Price Work | |||||
| A135 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A136 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AR (Items A135 Through A136) | $0.00 |
| FL103 | RATTLESNAKE POINT AFRC | ||||
| FL137 | AMSA (M) #51 | ||||
| Firm Fixed-Price Work | |||||
| A137 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A138 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AS (Items A137 Through A138) | $0.00 |
| FL126 | CLEARWATER ASF | ||||
| Firm Fixed-Price Work | |||||
| A139 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A140 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AT (Items A139 Through A140) | $0.00 |
| FL127 | C.W. BILL YOUNG AFRC | ||||
| Firm Fixed-Price Work | |||||
| A141 | Improved Grounds (Section C, 3.1) | 11 | Month | $ - 0 | $ - 0 |
| A142 | Storm Drainage Systems (Spec Item 3.3) | 11 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AU (Items A141 Through A142) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A142 $0.00
&F
&P of &N
ELINS BASE PERIOD FFP (OPTNL)
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A106 |
| CLIN 0019 - Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL |
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| FL010 | JACKSONVILLE AFRC | ||||
| FL133 | AMSA #44 (G) | ||||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A002 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AA (Items A001 Through A002) | $0.00 |
| FL122 | CAMP BLANDING USARC | ||||
| Firm Fixed-Price Work | |||||
| A003 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A004 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AB (Items A003 Through A004) | $0.00 |
| FL141 | CORRY STATION USARC | ||||
| Firm Fixed-Price Work | |||||
| A005 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A006 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AC (Items A005 Through A006) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A006 $0.00
CLIN 0020 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL
| FL010 | JACKSONVILLE AFRC | ||||
| FL133 | AMSA #44 (G) | ||||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A102 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AA (Items A101 Through A102) | $0.00 |
| FL122 | CAMP BLANDING USARC | ||||
| Firm Fixed-Price Work | |||||
| A103 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A104 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AB (Items A103 Through A104) | $0.00 |
| FL141 | CORRY STATION USARC | ||||
| Firm Fixed-Price Work | |||||
| A105 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A106 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AC (Items A105 Through A106) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A106 $0.00
&F
&P of &N
ELINS BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A749 |
| CLIN 0011 - Base Period - Indefinite Quantity Work |
| EST | UNIT OF | UNIT | TOTAL | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| A701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A702 | Tree and Stump Removal | |||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A703 | Tree and Stump Removal | |||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A704 | Shrub and Stump Removal | |||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A705 | Shrub and Stump Removal | |||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A706 | Shrub and Stump Removal | |||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A707 | Complete Tree Pruning | |||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | 1 | Each | $ - 0 | $0.00 |
| A708 | Complete Tree Pruning | |||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | 15 | Each | $ - 0 | $0.00 | |||
| A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | 25 | Each | $ - 0 | $0.00 | |
| A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 20 | M.S.F. | $ - 0 | $0.00 |
| A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $0.00 |
| A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 25 | Each | $ - 0 | $0.00 |
| A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $0.00 | |||
| A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 250 | Each | $ - 0 | $0.00 | |
| A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 |
| A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 | |||
| A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |
| A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||||
| Work shall be completed within 14 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |||
| A719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 |
| A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 50 | Each | $ - 0 | $0.00 |
| A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 1,000 | L.F. | $ - 0 | $0.00 | |||
| A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $0.00 | |
| A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $0.00 | |
| A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | 50 | M.S.F. | $ - 0 | $0.00 | |
| A725 | Control Undesired Vegetation | Remove vegetation along fence lines and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | |||||
| Work shall be completed within 10 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 | |||
| A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | 25 | M.S.F. | $ - 0 | $0.00 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the raked area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | ||||||
| A727 | FL003 | LT ALEXANDER NINNINGER JR USAR | 3 | Each | $ - 0 | $0.00 | |
| A728 | FL004 | GAINESVILLE USARC | 3 | Each | $ - 0 | $0.00 | |
| A729 | FL008 | CLARENCE L BURPEE USARC | 3 | Each | $ - 0 | $0.00 | |
| A730 | FL009 | LTC ROBERT R MILAM USARC | 3 | Each | $ - 0 | $0.00 | |
| A731 | FL010& FL133 | JACKSONVILLE AFRC & AMSA #44 (G) | 3 | Each | $ - 0 | $0.00 | |
| A732 | FL014 | JAMES WEST USARC | 3 | Each | $ - 0 | $0.00 | |
| A733 | FL017& FL134 | COL F.M. WILLIAMS USARC & AMSA #47 G | 3 | Each | $ - 0 | $0.00 | |
| A734 | FL019 | MILTON USARC | 3 | Each | $ - 0 | $0.00 | |
| A735 | FL020 | OCALA USARC | 3 | Each | $ - 0 | $0.00 | |
| A736 | FL021 | MICHAEL MCCOY USARC | 3 | Each | $ - 0 | $0.00 | |
| A737 | FL022 | ORANGE COUNTY USARC | 3 | Each | $ - 0 | $0.00 | |
| A738 | FL023& FL115& FL125 | TAFT USARC & WILSON AFRC & AMSA 50 | 3 | Each | $ - 0 | $0.00 | |
| A739 | FL027 | JOSEPH STILLWELL USARC | 3 | Each | $ - 0 | $0.00 | |
| A740 | FL029 | NEWKIRK SUTHERLAND JR USARC | 3 | Each | $ - 0 | $0.00 | |
| A741 | FL031 | LTC LUIS E. MARTINEZ USARC | 3 | Each | $ - 0 | $0.00 | |
| A742 | FL037 | 1LT MAX R. STOVER USARC | 3 | Each | $ - 0 | $0.00 | |
| A743 | FL040 & FL135 | T. WHIDDON USARC & AMSA #52 (G) | 3 | Each | $ - 0 | $0.00 | |
| A744 | FL041 & FL136 | C. LOVEJOY USARC & AMSA #53 (G) | 3 | Each | $ - 0 | $0.00 | |
| A745 | FL103 & FL137 | RATTLESNAKE POINT USARC & AMSA (M) #51 | 3 | Each | $ - 0 | $0.00 | |
| A746 | FL122 | CAMP BLANDING USARC | 3 | Each | $ - 0 | $0.00 | |
| A747 | FL126 | CLEARWATER ASF | 3 | Each | $ - 0 | $0.00 | |
| A748 | FL127 | C.W. BILL YOUNG AFRC | 3 | Each | $ - 0 | $0.00 | |
| A749 | FL141 | CORRY STATION USARC | 3 | Each | $ - 0 | $0.00 |
TOTAL IQ LINE ITEMS - A701 THROUGH A749 $0.00
&F
&A &P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .