PHASE 2 - Amend 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award_Notice__81st_RSC_SATOC_Region_West.pdf | ||
| W912HP-14-R-0015_Amend_0009.pdf | ||
| W912HP-14-R-0015_0008.pdf | ||
| W912HP-14-R-0015_Amend_7.pdf | ||
| W912HP-14-R-0015_0005.pdf | ||
| 14R0015_Phase_2_Successful_Notice.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is to initiate Phase 2 of this procurement. Phase 2 proposals must be submitted in accordance w ith this amendment no later than 2:00 pm, February 9, 2015.
1. CONTRACT ID CODE PAGE OF PAGES
1 44
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jan-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-14-R-0015
X 9B. DATED (SEE ITEM 11)
12-Mar-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Dec-2014
CODE
U.S. ARMY CORPS OF ENGINEERS, CHARLESTON
DISTRICT, CONTRACTING DIVISION
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP-14-R-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
NOTICE TO OFFERORS
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
81ST RSC WEST SATOC PHASE 2
81st RSC SATOC Region West
Section 00100 - Solicitation Contract Form
NOTES TO OFFERORS
PHASE 2
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE
LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL
NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT
AUTHORIZED.
DIRECTIONS FOR SUBMITTING PROPOSALS
a. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HP-14-R-0015_COMPANY NAME_VOLUME I
W912HP-14-R-0015_COMPANY NAME_VOLUME II
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at:
https://safe.amrdec.army.mil/SAFE2/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).
When completing the information for transmittal at the AMRDEC SAFE website, you will be asked to enter e-mail addresses for the recipients. When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Ms. Melisa Childs, whose e-mail address is Melisa.L.Childs@usace.army.mil The Contracting Officer for this project is Mr. Henry Wigfall Jr., whose e-mail address is Henry.Wigfall@usace.army.mil. These e-mail addresses are the ones you will enter as recipients.
Proposal Due Date and Time:
Request For Proposal No: W912HP-14-R-0015 Due Date of Proposal: February 9, 2015 Time by which Proposals are Due: 2:00 P.M. (E.T.)
Title of Project: 81st RSC SATOC Region West
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the information provided.
QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 01 for additional information.
WAGE DETERMINATIONS: The appropriate wage determination will be incorporated on a task order by task order basis
TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes that the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via e-mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
Bidder Inquiry Key: ZFFHTQ-K9MAQN
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. E-mail. Enter the e-mail address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access: Steps 1 through 3: same as above.
4. E-mail. Enter the e-mail address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
OVERVIEW
This Request for Proposal (RFP) solicits for a Single Award Task Order Contract (SATOC) under which task orders for General Construction are expected to be issued with work primarily in Tennesee, Kentucky, Alabama, Mississippi and Lousianna. Work may also be performed at other Federal Facilities outside the above- stated geographical boundary on an excepted basis as determined by the Contracting Officer. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either of a Construction or Design/Build nature. A project requiring use of civil funds is not authorized under this contract.
VOLUME I
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offerer. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Section 00600 – Representations and Certifications.
TAB C – Proposal Data Sheet – See Attachment 1 provided at the end of this section. Offerors should ensure telephone number; fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. A DUNS number shall also be provided for each company identified in any other proposed association of firms or Contractor Team Arrangement. The Offerer should also submit their Tax ID number on the proposal data sheet.
TAB D –Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
VOLUME II
TAB E– FACTOR 4 Technical Approach
The Offerer will submit a design narrative, conceptual design sketches and a quantitative proposal for the sample project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on Bid Schedule B (Cost Breakdown) and offerer shall provide ALL supporting documents (R.S Means break out, non-prices items, etc). Offerer’s proposal shall be prepared and meet the requirements as stated in Schedule “A” Notes to Offerer.
Offerors shall apply their proposed Area Coefficient for the Greenville Tennessee Army Reserve Center and their proposed Home Office Overhead for the base period to this project.
EVALUATION CRITERIA:
Offerors will be evaluated on their technical approach presented in the design narrative, conceptual design sketches and technical approach in determining their price proposal utilizing the applicable Construction Specification Institute (CSI) numbers and appropriate quantities.
Offerors will also be evaluated on how well they understand the required application of their proposed coefficient and mark-ups.
Technical Approach Ratings
OUTSTANDING - Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
GOOD - Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
ACCEPTABLE - Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
MARGINAL - Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
UNACCEPTABLE - Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.
TAB F – FACTOR 5 Costs / Price
Proposal Pricing Schedule, Section 00010—Schedule A, Capacity/Coefficient Bid Schedule, Schedule B and Schedule C.
Costs / Price will be a factor in establishing the competitive range in making the best value decision for award of any resultant contract. Coefficients for firm-fixed price type task orders shall be proposed and submitted on the Task Order Pricing Schedule shown at Section 00010 - Schedule A of the solicitation.
The Government will perform a price analysis on all proposals received. Price analysis will be performed on Schedule A in accordance with FAR 15.404-1, to determine fairness and reasonableness. Historical price information, competitive price information, the Independent
Government Estimate (IGE), or any other pricing tool as necessary will be utilized in this analysis. The evaluation will determine the extent to which the price proposal is consistent with the requirements of the RFP. Offerors are advised that any offer wherein pricing is deemed unfair or unreasonable will be rendered ineligible for award.
The Government shall use the total evaluated price from Schedule A as the evaluated price for making the best value decision.
BASIS FOR AWARD
Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include capability in accordance with the evaluation criteria and responsibility in accordance with
FAR 9.104.
In order to determine which proposal represents the best value, a comparative assessment of proposals against all source selection criteria in this RFP will be conducted, and in turn, the Government will compare proposals to one another. The Government will award a contract to the responsible Offeror whose technical submittal and price proposal contains the combination of those criteria described in this document offering the best value to the Government.
The successful Offeror, if any, will be awarded a SATOC with a ceiling of $49 Million and a $2,500.00 guaranteed minimum for the base ordering period.
As technical ratings and relative advantages and disadvantages become less distinct, differences in price between proposals are of increased importance in determining the most advantageous proposal. Conversely, as differences in price become less distinct, differences in scoring and relative advantages and disadvantages between proposals are of increased importance to the determination.
The Government reserves the right to award to other than the lowest reasonably priced Offerer. The right is also reserved to reject any and all offers.
SCHEDULE A- See Attached Spreadsheets These coefficients are to be used on all task orders and modifications written during the life of the contract.
Proposed Area Coefficient(s) shall be represented in decimal format (e.g. 4.0, 0.20, 8.0 or 0.08)
The offeror is required to fill in this chart. A separate coefficient is to be provided for each Site Code which represents a distinct geographic area. All entries are necessary for evaluation of price. Failure to submit all required data will result in non conformance with instructions.
HOME OFFICE OVERHEAD (HOOH): The following will be used for the base period:
Home Office Overhead – 1 Year Base Period ____________%
TOTAL FOR ITEM 0001 (Total Calculated Amount X HOOH) = ____________________
ITEM NO SUPPLIES SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Option Period 1 1 LS
COEFFICIENT: **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect** Home Office Overhead – Option Period 1: ____________%
ITEM NO SUPPLIES SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 Option Period 2 1 LS
COEFFICIENT **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect** Home Office Overhead – Option Period 2: ____________%
ITEM NO SUPPLIES SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 Option Period 3 1 LS
COEFFICIENT **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect** Home Office Overhead – Option Period 3: ____________%
COEFFICIENT **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect** Home Office Overhead – Option Period 4: ____________%
NON-PRICED ITEMS: The following percentages will be used throughout the life of the contract:
Field Office Overhead ____________________% Home Office Overhead ____________________% Bond Premium ____________________%
1. COEFFICIENT
1.1. The current year edition of the R.S. Means Construction Cost Data is hereby incorporated by reference and the current edition at the beginning of each calendar year will be incorporated into the contract for the duration of this contract including option periods. The Offeror shall use the Electronic Version of R. S. Means Building Professional’s Package which includes Building Construction Cost Data, Mechanical Cost Data, Plumbing Cost Data, Electric Cost Data and the Square Foot Cost. Offeror must purchase “Assemblies Cost Data” separately. For renovation projects, the offeror shall use the Repair and Remodeling Cost Data. The Offeror may use the quarterly pricing updates to the R.S. Means. Offeror shall use Means Cost Works Estimator to prepare and submit task order proposals. These items may be obtained from the R.S. Means Company at www.rsmeans.reedconstructiondata.com or 1-800-334-3509.
The offeror shall also be able to use and interface RS Means Cost Data and Means Cost Works Estimator with 4Clicks by 4Clicks Solutions, LLC. This software is frequently used by USACE for RS Means estimate compilations and comparisons with estimates by others in contracts of this type. The use of 4 Clicks can be a requirement for task orders issued under this SATOC.
1.2. Area Coefficient: The Offeror’s coefficients shall be represented as a percentage “increase” or “decrease” to the R.S. Means, without home office & field office overhead and profit. The “Total Bare Costs” column in the R.S. Means will be used. The Offeror’s coefficient SHALL contain all allowable costs EXCEPT PROFIT, HOME AND FIELD OFFICE OVERHEAD. Home Office Overhead will be set by this contract. Profit and field office overhead will be negotiated for each task order. Profit will be computed using the weighted guideline method specified in Specification Section 01 08 00.
1.3. Items Included in Area Coefficient:
1.3.1. There will be NO allowances for any additional costs beyond what the Area Coefficients covers; therefore the coefficients must be all inclusive of costs incurred.
1.3.1.1 The following items from R.S. Means will not be paid separately and shall be included in the Area Coefficient:
Cost Division 1 – General Requirements
• 01 11 31.20 - Construction Management Fees
• 01 21 16.50 - Contingencies
• 01 21 55.50 0010 thru 01 21 55.50 0010 1200 - Job Condition Allowances
• 01 21 57 – Overtime Allowances
• 01 21 61 – Cost Indexes
• 01 21 63 – Taxes (See paragraph 2.3.4 for exceptions)
• 01 31 13.30 - Insurance
• 01 31 13.50 – General Contractor’s Mark-up
• 01 31 13.90 – Performance Bond 01 41 26 – Permits 01 74 13.20 0050 (Daily clean-up)
• 01 74 13.20 0020 & 40 - After job completion Min & Max 01 54 39 70 0020 – Construction Equipment Small Tools
Specification Section 01 50 00
The Project Sign Only and The Safety Signs Only
Cost Adjustments The cost adjustments factor can only be applied for vertical work that exceeds 15 feet.
The cost adjustments for security can only be applied if the workers are required to be escorted while working in a secured compound.
1.3.2. Offeror WILL NOT be allowed to use the following items from the R.S. Means.
• 01 31 13.40 – Main Office Expense. This item should be taken into consideration when proposing the Home Office Overhead rate.
• 01 31 13.60 – Installing Contractor’s Main Office Overhead. Overhead will be negotiated and itemized for each individual task order.
1.3.3. The following line items will only apply after completion of a new facility or interior facility rehabilitation:
• 01 74 13.20 0100 – Final by GC at end of the job
1.3.4. Taxes. For the state of North Carolina, the Government will pay sales taxes for material cost only. The appropriate sales tax will be calculated on the material bare cost after applying the area coefficient.
1.4. Non-Priced Items. Items of work not covered in the R.S. Means, will be considered Non- Priced Items, if agreed upon by both the government and the contractor.
1.4.1. All proposed non-priced items shall be separately identified and priced. Proposed non- priced items must be documented by supporting information as specified below:
(a) A minimum of THREE (3) competitive contractor quotes
(or) if requested and approved by the Contracting Officer,
(b) A complete breakout of material, labor, and other direct or indirect costs required to complete the specific item. Costs shall be segregated and proposed on a DA Form 5413-R, “Construction Cost Breakdown’, or other format approved by the contracting officer.
1.4.1.1. Offeror shall provide a written justification for price/subcontractor/vendor selected.
1.4.2. Non-priced items proposed by the offeror will be fully negotiated prior to award.
1.4.3. The Area Coefficient SHALL NOT be applied to non-priced items. However, the Home Office Overhead rate fixed in the contract will be used and will not change. Home Office Overhead rate and Non-Priced mark-ups fixed in the contract shall be used and will not change.
1.4.3.1. Offeror shall be prepared to allow for negotiating area coefficients for locations outside the 81st RSC geographical area of NC, SC, TN, AL, KY, TN, LA, MS, FL and Puerto Rico.
1.5. Work to be performed by the prime contractor and subcontractor(s) shall be priced using the “BARE COSTS TOTAL” column in R.S. Means. The appropriate area coefficient will then be applied to the total of these costs. Work performed by the Professional Consultant (designer (s)) shall be priced using the “TOTAL INCL O&P” column in R.S. Means. The appropriate area coefficient will then be applied to the total of these costs.
1.6. Union Rates will be used for pricing Labor. Offeror shall consider any Davis Bacon wage rate increases in their proposed area coefficient.
1.7. The Area Coefficient will apply for the one (1) year base period and four (4) option periods of the contract or up to the maximum capacity of $49,900,000.00
2. TASK ORDER PROPOSALS.
SCHEDULE B
Summary Total With Mark-ups
1. CLIN 0001 Base: CONSTRUCTION OF HVAC AND
ELECTRICAL UPGRADES (RESET) AT US ARMY RESERVE
CENTER, GREENVILLE, TN
Construct $
2. CLIN 0002 Base: CONSTRUCTION OF HVAC AND
ELECTRICAL UPGRADES (RESET) AT US ARMY RESERVE
CENTER, GREENVILLE, TN
Design $
Total Proposed Fee: $
(Total with Mark-ups)
In addition to the RS Means submittal for the example project the offeror shall identify total costs for each division, taxes, non-priced item summaries along with overhead, profit, construction totals and design fees in Schedule C.
Schedule C
COST BREAKDOWN (GENERAL CONSTRUCTION)
Item Number Item Description TOTAL
Base Bid: Title $ XXXXXXXXX
Cost Division ?: $ etc, etc. $
Base Bid: Title $ etc, etc. $
Bare Cost Totals (BCT) = (Prime Work + Sub Work) $
Area Coefficient Total (ACT) = (BCT X Area Coeffic% Area Coefficient $
Taxes (If Applicable on Material Only) $
Total Non Priced Items (Attach 3 Quotes) $
Field Office Overhead (Attach Itemized Break Out) $
Prime Total Direct Cost (PTDC) = (ACT+Tax+Non-Price+FOOH) $
Home Office Overhead = (PTDC X % HOOH) % HOOH $
Construction Subtotal = (PTDC + HOOH) $
Profit = (Construction Subtotal X % Profit) % Profit
Construction Total $
Design Fee % Design $
Total Proposed Fee = (Construction Total + Design Fee) $
Notes to the Contractor:
1) Contractor shall submit all supporting documents: cost works, non- priced, competitive bids, etc.)
2) * Items identified as Modernization are subject to a statutory limit of
$750,000.
BID SCHEDULE
Notes to the Contractor:
1) Contractor shall submit all supporting documents: cost works, non-priced, competitive bids, etc.)
2) * Items identified as Modernization are subject to a statutory limit of $750,000.00.
2.1. The offeror shall prepare a detailed proposal by identifying tasks, refining quantities of both pre-priced and non-priced items, pricing non-priced items, developing performance times and preparing a completed proposal document for submission to the contracting officer. The offeror shall field verify all available as-builts as well as existing field conditions.
2.2. Where square foot costs are provided in the R.S. Means, those costs shall take precedence over cost for assembly cost and individual cost. Likewise, where assembly costs are provided in the R.S. Means, those costs shall take precedence over costs for individual items unless otherwise approved by the contracting officer.
2.3. Quantities used on individual task order proposals shall be taken from field measurements or design plan, as appropriate, without allowance for waste unless the R.S. Means authorizes under individual items. Waste of excessive material quantities is an incidental cost and is included in the coefficient.
2.4. Costs of expendable supplies, lubricants, wear and tear on tools, are included in the installation/construction cost in the R.S. Means cost of construction and will not be paid separately.
2.5. Equipment Rental may be considered only if the required item is not included in the crew descriptions for the R.S. Means line item that describe the work, unless approved by the contracting officer.
3. TASK ORDER CALCULATIONS.
3.1 . Calculating Total Cost.
3.1.1. In calculating the total cost, R.S. Means, the area coefficient (AC), U.S. National Averages (USNA), Home Office Overhead (HOOH), Field Office Overhead (FOOH) and Profit are all considered. When applicable, design costs and NC state taxes are also considered.
3.1.2. Using R.S. Means Database:
3.1.2.1. The offeror shall use the electronic version in developing a proposal. Each proposal will be generated from CostWorks using a CSI Number: The R.S. Means database consists of a MasterFormat System of classifications and numbering developed by the Construction Specification Institute (CSI). Each line item in the database has its own unique CSI identifier.
The offeror shall use the electronic version in developing a proposal, selecting the appropriate
CSI number(s) in the RS Means Cost works program for each individual item. R.S. Means is updated quarterly each year. The offeror must select the location. Typically, the City Cost Indexes are electronically applied to the CSI items. However, for this contract, the offeror is required to use the USNA. The example shown below is for informational purposes only:
3.1.2.2. Example: Design and construct a 10,000 SF Building: Combination Warehouse & Offices (typical for 10 locations): 125’x 80’x20’H, masonry structure.
A. Install an 8’x8’ (Commercial) wood Overhead Door in each building; including trim, hardware, and painting. Doors shall also have electric openers (including hardware) installed.
B. Install 10 Exterior wood doors (3’x6’-8”), frames, trim and hardware in each structure. Doors shall be weatherstripped, stained and finished.
C. Each building (10) shall have its front face (125’x20’) painted (2 coats exterior latex)
D. Install 10 Wrought iron security Doors, including hardware, in same opening as exterior wood doors.
NOTE: Example provided is only a small representation of all items needed for a complete Task Order Proposal.
Using the appropriate electronic version of R.S. Means the offeror shall select the appropriate CSI line item number. Below shows the CSI numbers utilizing the “Bare Costs”:
CSI Number Description Unit Bare
Material Bare Labor
Bare Equip
Bare Total
50 17 0010 Warehouse & Office Combination, complete with HVAC & plumbing
SF ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ $79.50
B2030 410
Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated
EA $1,577.28 $1,006.64 $0
$2,583.9
B2030 240
Single solid wood colonial door, 6 panel fir, 6’‐8” X 3’‐0” with food frame and trim. Stained & finished including hardware and weatherstripping
EA $783.96 $376.66 $0
$1,160.6
09 91 13.90 0580 & 0590
Painting Exterior CMU Walls:
Spray 2 coats exterior latex SF $0.10 $0.23 $0 $0.33
NOTE: Square Foot Costs were used for Warehouse Building and Assembly Costs were used for both the Overhead and Exterior Doors
Once the CSI number is selected, the offeror will input the appropriate quantity. See below.
Qty CSI Number Description Unit Bare
Material Bare Labor
Bare Equip
Bare Total
100,00
50 17 0010 Warehouse & Office Combination, complete with HVAC & plumbing
(25 @ 10,000 SF each)
SF ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ $7,950,000.00
10 B2030 410
Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated
EA
$15,772.8
$10,066.4
$0 $25,839.20
10 B2030 240
Single solid wood colonial door, 6 panel fir, 6’‐8” X 3’‐0” with food frame and trim. Stained & finished including hardware and weatherstripping
EA $7,839.60 $3766.60 $0 $11,606.20
25,000 09 91 13.90 0580 & 0590
Painting Exterior CMU Walls: Spray 2 coats exterior latex (125’X20’)
SF $2,500.00 $5,750.00 $0 $8,250.00
3.1.3. Applying the Area Coefficient:
3.1.3.1. Next sum all of the Bare Cost Totals for all of the CSI items to get a total direct cost.
Then apply the Area Coefficient to get the Area Coefficient Total for the task order.
Net Sum of all Bare Cost Totals = $7,950,000.00 (Warehouse) + $25,839.20 (Overhead Door) + $11,606.20 (Exterior Doors) + $8,250.00 (Painting) = $7,995,695.40 Then the proposed Area Coefficient is applied.
Area Coefficient Total = Net Sum of all Bare Cost Totals X Area Coefficient
For Example A: If your Area Coefficient is a net decrease of 0.95, your Area Coefficient Total would be: $7,995,695.40 X 0.95 = $7,595,910.63
Or
For Example B: If your Area Coefficient is a net increase of 1.20, your Area Coefficient Total would be: $7,995,695.40 X 1.20 = $9,594,834.48
3.1.4. Applying Sales Taxes (where applicable):
3.1.4.1. Only for projects in North Carolina, offeror will apply state taxes pertinent to that city/county to material costs only. Taxes will be calculated and added to the Area Coefficient Total to calculate the Adjusted Area Coefficient Subtotal:
For example Sales Taxes are 7%:
Description Bare
Material Sales Tax (7%)
Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated $15,772.80 $1,104.10
Single solid wood colonial door, 6 panel fir, 6’‐8” X 3’‐0” with food frame and trim. Stained & finished including hardware and weatherstripping
$7,839.60 $548.77
Spray painting siding: Primer & 2 coats exterior latex
$2,500.00 $175.00
Total Taxes $1,827.87
Adjusted Area Coefficient Subtotal = Area Coefficient Total + Total Taxes Example A: $7,595,910.63 + $1,827.87 = $7,597,738.50
Example B: $9,594,834.48 + $1,827.87 = $9,596,662.35
3.1.5. Applying Field Office Overhead (FOOH):
3.1.5.1. Next offeror will submit an itemized list of FOOH expenses utilizing R.S. Means. FOOH will be negotiated and added to the Adjusted Area Coefficient Total to calculate the Prime Total Direct Cost (PTDC):
For example if your (negotiated) FOOH is $5,000:
PTDC = Adjusted Area Coefficient Total + FOOH Example A: $7,597,738.50 + $5,000 = $7,602,738.50 Example B: $9,596,662.35 + $5,000 = $9,601,662.35
3.1.6. Applying Home Office Overhead (HOOH):
3.1.6.1. After calculating the Subtotal, the (fixed) HOOH will be calculated.
For this Example if your HOOH is 5%:
Construction Subtotal = PTDC x HOOH
Example A: $7,602,738.50 x 5% = ($380,136.93) + $7,602,738.50 = $7,982,875.43 Example B: $9,601,662.35 x 5% = ($480,083.12) + $9,601,662.35 = $10,081,745.47
3.1.7. Including Non-Priced Item:
3.1.7.1. Next offeror will submit three (3) itemized quotes list for items not located in R.S. Means.
Non-Priced Items will be negotiated and added to the PTDC + HOOH to calculate the Construction Subtotal:
The Wrought Iron Screen was not found in R.S. Means, therefore, three quotes were submitted.
Quote Description Qty Unit Materials Installation Unit Cost Total
Wrought Iron Security Doors, hardware not included in cost
10 EA $333.00 $89.00 $422.00 $4,220.00
(3’X6’8”) Wrought Iron Security Doors, installed; including hardware
10 EA $540.00 $129.00 $669.00 $6,690.00
Wrought Iron Security Doors, (3’X 6’‐8”) including hardware
10 EA $718.00 $119.00 $837.00 $8,370.00
Quote Number 1 was not selected because the price did not include hardware; Quote Number 2 was selected because all scope requirements were met; Quote Number 3 was not selected, although the scope requirements were met, the price was higher than Quote Number 2.
Costs for Non-Priced Items shall include their mark-ups for Field Office Overhead, Home Office Overhead and Bond Premium.
Let’s Say for Selected Quote Number 2:
Wrought Iron Security Doors = $6,690.00 Field Office Overhead is 5%: $6,690.00 x 5% = $334.50 $7,024.50 Home Office Overhead is 10%: $7,024.50 x 10% = 702.45 $7,726.95 Bond Premium is 1%: $7,726.95 x 1% = $77.27 Total for Non-Priced Item (w/mark-ups) = $7,804.22
Construction Subtotal = (PTDC + HOOH) + Non-Priced Item(s) Example A: $7,982,875.43 + $7,804.22 = $7,990,679.65
Example B: $10,081,745.47 +$7,804.22 = $10,089,549.69
3.1.8. Applying Profit:
3.1.8.1. After calculating the Construction Subtotal the (negotiated) Profit will be applied to achieve the Construction Total for the Task Order.
For this Example if your Profit is 8%:
Construction Total = (Construction Subtotal x Profit) Example A: $7,990,679.65 x 8% = ($639,254.37) + $7,990,679.65 = $8,629,934.02
[$8,629,934]* Example B: $10,089,549.69 x 8% = ($807,163.98) + $10,089,549.69 = $10,896,713.66
[$10,896,714]*
*For ease of calculations, please round final numbers.
3.1.9. Calculating Design Fee:
3.1.9.1. After achieving the Construction Total for the Task Order, Design Fee will be calculated as a percentage of the Construction Total. Design Fees are located in R.S. Means and are based on a percentage of the construction cost. These fees will be negotiated for each Task Order and added as a separate line item on the Offerors proposal.
For this Example if your Design Fee is 4% of the construction cost then the design cost is calculated as:
Design Costs = Construction Total x Fee % Example A: $8,629,934.02 x 4% = $345,197.36 [$345,197]* Example B: $10,896,713.66 x 4% = $435,868.55 [$435,869]*
*For ease of calculations, please round final numbers.
4. HOME OFFICE OVERHEAD
4.1. Home Office Overhead shall be represented as a percentage increase to the Applied Coefficient Total. The proposed rate will apply to ALL task orders issued under this contract.
4.2. Offeror’s shall propose a Home Office Overhead rate for the two (2) year base period and the three 1 year option periods. The rates awarded will be locked-in for the life of the contract and will not change.
5. PRICE EVALUATION PROCEDURE
5.1. Area Coefficient Estimated Capacity Values are identified for each location in the following table. The Estimated Capacity Value will be multiplied by the corresponding proposed area coefficient to determine a total for each location. These Applied Area Coefficient Totals will then be multiplied by the Home Office Overhead Rate for the Base Period only. These Evaluated Totals will then be added together to obtain the total evaluated price for Schedule A.
5.2. The Home Office Overhead Rates proposed for Option Periods 1, 2 a n d 3 WILL NOT be included in the evaluated price, but will be evaluated to ensure REASONABLENESS
ONLY.
Note: Proposed Area Coefficient(s)’ shall be represented in decimal format. Home Office OH shall be represented as a percentage.
SCOPE OF WORK TYPES
6. DESCRIPTION OF WORK:
6.1 Single Award Task Order Contract (SATOC) for General Construction and Design/Build Construction is intended to provide rapid response for: new construction, upgrades, maintenance or repair of situations relating, but not limited to, site work, interior/exterior finishes, architectural woodwork, electrical, mechanical, plumbing, structural and fire suppression system of Government facilities in a cost effective manner. Work requiring the use of civil funds is not allowed. Work may include, but not be limited to:
6.2. General Construction:
6.2.1. New construction, renovation, repair and/or upgrades of all permanent structures to include but not be limited to: interior/exterior finishes (floors, ceilings, doors, windows, paint, siding, etc.), architectural woodwork (molding, cabinets, etc.), electrical systems (conduit, wire, breakers, panels, transformers, emergency generators, interior/exterior high and low voltage electrical power lines, interior/exterior lights, emergency shut offs, lighting protection, etc.), mechanical systems (HVAC instrumentation & controls, HVAC control systems, commissioning, decommissioning, retro-commissioning, total building commissioning, gas lines, insulation, acoustical systems, underground high temperature lines, boilers, chillers & chilled water distribution systems, variable frequency controls on HVAC systems, etc.), plumbing systems (sanitary sewer, domestic water lines, backflow preventers, pumps, water coolers, etc.), fire suppression systems (fire alarm systems, sprinkler system, etc.), communication systems (mass notification system, IT lines, telephone & data lines, etc.), renewable energy systems (solar panels, ground source heat pumps, etc.), roofing systems (various roof types, gutters, downspouts, flashing, fascia, soffit, etc.), structural systems, fencing, gates, conduit and cables for security systems, Anti-Terrorism Force Protection systems (site layout, security design, building construction, threat development, level of protection, design constraints and communications, etc.) and the necessary appurtenances to consider the structure complete and usable.
6.3. Other Construction:
6.3.1. New construction, renovation, repairs and/or upgrades of highways, roads, streets, airport runways, concrete aprons & pads, sidewalks, decorative pavers, athletic/recreational surfaces, landscaping & irrigations systems, seeding/sodding, detection loops, pedestrian bridges, highway bridges (bridges that do not span over major waterways), parking lots, traffic lines/markings/signs. Work can also include the following, but not be limited to: site preparation, earthwork, grading, excavation & filling, clearing & grubbing, surveying, traffic & signalization and traffic studies. Storm water management, storm drainage systems and erosion control.
6.4. Incidental Work:
6.4.1. Work incidental to the tasks performed in any of the above paragraphs shall be include, but is not limited to demolition, carpentry, lighting, and similar minor electrical work that may be required to provide a complete, safe and usable facility during and after the course of roofing, mechanical, plumbing or painting services.
6.4.1.1. Damage such as ceiling replacement, painting and carpet cleaning as a result of roof leaks.
6.4.1.2. Lead, asbestos and mold remediation work incidental to renovation work.
6.4.1.3. Surface deterioration incidental to interior/exterior repairs such as patching drywall, replacing siding, trim work, etc.
6.4.1.4. Relocating furniture, workstations, etc incidental to construction.
6.4.1.5. Testing, reports and surveys associated with new construction, renovation, repairs and/or upgrades and additions to buildings (including lead and asbestos), structures, roads (including traffic/pedestrian patterns).
6.5. Restrictions: Task orders for design only or demolition only shall not be placed against the contract.
6 DESCRIPTION
a. Upon receipt of a Task Order, provide the labor, materials, supplies, parts (to include system components), supervision, equipment, and related services, (except when specified as Government furnished), to repair, construct, or maintain facilities and structures primarily at Federal facilities within the geographic boundaries of the 81st Regional Support Command. in strict accordance with the Contract or incorporated by reference.
b. Perform a site investigation as directed or indicated in the Task Order.
If required in the Task Order, prepare digital pictures or videotape recordings of the proposed project with emphasis on the particular area to be modified or repaired, including foundations and utilities. Review existing as-built drawings, maintenance records, and other pertinent documentation, as required to become familiar with the site. Interview onsite maintenance personnel and staff to determine the existing conditions of the area. Investigate and determine whether environmental surveys (asbestos, lead-based paint, etc.) are required in the work site/area.
During this site visit, gather the data required to prepare a site description, a hazard and risk analysis, and a site control document.
Investigate accessibility to areas where field efforts may occur. Develop a basis to prepare budget proposal costs for the proposed work.
c. If the Contractor chooses not to perform a site visit as directed in the RFP, it does so at its own risk. Contractors who decline the opportunity to investigate the site shall not be compensated for existing conditions not accounted for in its offer that would have been known had the Contractor taken the opportunity to investigate the site prior to formulating an offer.
d. The following list of discussion topics is provided to assist in gathering the necessary information during the site. It is not a comprehensive list of topics to discuss at the site visit meeting. Some of the topics may not be applicable to all Task Orders. Additional criteria and information may be required to fully determine the Task Order scope of work.
Environmental issues Functional layout – how does the customer plan to use the project?
Unusual details pertaining to the project Site improvements (i.e. parking, grading, drainage, etc.)
ADA accessibility Anti-terrorism/force protection requirements Sustainable design and construction Fire protection Plumbing, water and sewer requirements Electrical, interior, and exterior requirements Occupancy during construction Phasing requirements Schedule requirements Availability of as-built drawings
e. Contractor’s work and responsibility shall include the planning, programming, administrating, and managing necessary to provide the maintenance, repair, or construction as specified. Conduct the work in strict accordance with the Contract and applicable Federal, State, and local laws, regulations, codes, and directives. Provide related services such as preparing and submitting required reports, performing administrative work, and submitting necessary information, as specified under this Contract and within each Task Order. Ensure that the work provided meets the scope of work for each task order, and special specifications included with the individual Task Order or included in applicable documents.
f. The Government will provide a scope of work to the Contractor detailing the work to be accomplished. The detail provided will vary from a general idea of what is required with no drawings to complete design documents, depending on the complexity of the project. Use the information provided by the Government to submit a complete proposal, regardless of how much information is provided by the Government. The proposal shall include the method, labor, materials, and equipment necessary for performing the work required.
g. Complete the work and services under this Contract in accordance with schedules established in each Task Order. Required submittals will be identified in the Task Order. Types and numbers of submittals and dates and places for review meetings will be established by each task order.
7 DATA SUBMITTAL REQUIREMENTS
Provide the Contract data requirements as referenced in the Scope Of Work (SOW) for each task order.
8 INSTALLATION REQUIREMENTS
a. Work shall conform to Installation Design Guide Standards and requirements, to include compliance with sustainability requirements of the Department of Environmental Resources (DENR).
b. Paving and roadway work shall conform to Department of Transportation (DOT) Standards and requirements as well as the Manual on Uniform Traffic Control Devices (MUTCD) Standards for roadway and signal construction.
c. Airport work shall conform to the current Military specifications as required.
9 SERVICES TO BE PERFORMED
9.1 General Services
Upon issuance of a Task Order, provide the personnel, tools, equipment, transportation, materials, and supervision (except as otherwise noted or provided) to safely and efficiently perform the Contract data requirements.
a. Task orders shall be performed in accordance with applicable provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. A copy of the safety manual can be downloaded at http://publications.usace.army.mil/publications/eng-manuals/EM_385-1- 1_languages/EM_385-1-1_English_2008/toc.html
b. Task orders shall be performed in accordance with applicable provisions of the following unless other criteria are provided by the Contracting Officer:
U.S. Army Corps of the Savannah District Installations’ Design Guides:
http://www.sas.usace.army.mil/About/DivisionsandOffices/EngineeringDivisio n/EngineeringDesignCriteria.aspx Engineers Technical Instruction (TI) 800-01 Design Criteria:
http://apps.hnc.usace.army.mil/techinfo/ti.htm Joint Departments of the Army and Air Force, TM 5-818-8/AFJMAN 32-1030, Engineering Use of Geotextiles:
http://armypubs.army.mil/eng/DR_pubs/DR_a/pdf/tm5_818_8.pdf USDOT FHWA Manual of Uniform Traffic Control Devices (MUTCD):
http://mutcd.fhwa.dot.gov/ North Carolina DOT Specifications and Project Special Provisions at:
https://connect.ncdot.gov/resources/Specifications/Pages/Specificationsand- Special-Provisions.aspx (Note: State highway specifications may only be used for non-organizational parking, roads, streets, and driveways where the paving index is less than 5. Organizational vehicle parking, roads, and airfield concrete pavements will use the Unified Facilities guide specifications without exception.)
South Carolina DOT Specifications at http://www.scdot.org/
Georgia DOT Specifications and special provisions at http://mydocs.dot.ga.gov/info/gdotpubs/Publications/Forms/AllItems.aspx
9.2 Overall Responsibility
Provide site surveys; calculations; construction; equipment startups;
testing, repair, and training required for satisfactory completion of the Contract as required by the individual Task Orders. This shall include, but not be limited to, providing labor, equipment, materials, applicable engineering documentation, and other necessary services and products for the implementation or testing required.
9.3 Codes and Standards
The site surveys, construction, equipment startup, testing, and repair shall conform to the Contract. Adhere to codes and standards as specified herein and in the individual Task Orders. Codes and standard requirements shall be based on the latest edition of codes applicable at the time the task order is issued. Work shall comply with local, state, national, international, and military codes, as applicable.
9.4 Documentation
Implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of documentation, dates, and information necessary for internal management as well as for Government management of the individual projects and the total program.
9.5 Site Visits and Meetings
Times and locations of site visits and meetings will be identified in each Task Order Request For Proposal (RFP).
9.6 Safety and Health Program
Site activities performed in conjunction with this program may pose safety hazards which require specialized expertise to effectively address and eliminate. Prepare and implement an effective safety and health program, to include a generic site safety and health plan prepared in accordance with Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. This plan shall be capable of being adapted by means of a supplement to the main plan as required by individual task orders.
9.7 Quality Control Program
Develop, implement, and document an effective quality control plan for the program, and provide a generic site quality control plan prepared in accordance with Section 01 45 00.00 10 QUALITY CONTROL.
9.8 Permits
Identify and obtain the necessary permits from Federal, State, local, and Installation agencies.
10 DESIGN SERVICES
If design services are required, they will be indicated in the task order SOW. Design services shall be provided in accordance with Sections 01 08 50 DETAILED DESIGN PERFORMANCE REQUIREMENTS and 01 33 16 DESIGN AFTER…