Appendix_B.docx
DOCX document 12 KB Posted
- Solicitation number
- W912HP-13-R-0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| St_Stephen_Crane_Control_Site_Visit_Questions.docx | DOCX document | |
| St__Stephen_Bridge_Crane_Rehab_-_Specifications.docx | DOCX document | |
| St_Stephen_Crane_Control_-_Amemdment__1.docx | DOCX document | |
| St_Stephen_Bridge_Crane_Rehab_-_Scope_of_Work_Final_V_1_(2).docx | DOCX document | |
| 13r0013_site_visit_roster_2013.03.06.pdf | ||
| Full_Package_RTA_Crane_Rehab2_19_13.pdf | ||
| Bridge_Crane_7C.GIF | GIF image | |
| Appendix_C.docx | DOCX document | |
| Bridge_Crane_7B.GIF | GIF image | |
| Bridge_Crane_7A.GIF | GIF image | |
| Appendix_K.docx | DOCX document | |
| Appendix_A.docx | DOCX document | |
| Appendix_D.docx | DOCX document | |
| Bridge_Crane_9F.GIF | GIF image | |
| Bridge_Crane_1A.GIF | GIF image | |
| Bridge_Crane_7D.GIF | GIF image |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(Appendix B)
PAST PERFORMANCE DATA SHEET
TAB G
FACTOR 1: PAST PERFORMANCE INFORMATION.
Using the following format, provide information for a minimum of three projects that are successfully completed, or substantially completed (fully designed and at least 60% construction progress completed), preferably of similar design or features (size, scope and complexity) to that specified in the RFP, that are being or have been constructed by the Offeror to be used for reference and evaluation purposes. Ideally, these should be the same projects for which have been provided under Corporate Relevant Specialized Experience.
For each project provide the following information:
Project Title:
Location:
Contract number:
Procuring activity:
Procurement point of contact and telephone number:
Construction period (month/year start to month/year end or percent complete if construction is underway):
Address of Project(s):
Address and telephone number of owner:
Indicate type of project (private sector, Government, planned unit development, etc.):
General description of project:
How this project to relevant to the requirements of this solicitation:
Total cost:
Total cost of all modifications:
LIQUIDATED DAMAGES. On an attached sheet, list any projects within the last five years that have been assessed liquidated damages. Provide an explanation.
TERMINATED PROJECTS. On an attached sheet, list any projects within the last five years that have been terminated. Provide an explanation.
GOVERNMENT PROJECTS. On an attached sheet, list all contracts with the Government within the last five years. Indicate Government contract number and contracting agency (with contact names and telephone numbers
File details come from the government source that posted it. Updated .