Solicitation W912HN-26-Q-0001 - Bldg 212 R1 31JUL 1.pdf
PDF 298 KB Posted
- Attached to
- BLDG 212 Fort Stewart GA OTA
- Solicitation number
- W912HN26Q0001
About this file
This is a Request for White Paper/Solicitation for Progressive Design-Build (PDB) services for a military construction project. The U.S. Army Corps of Engineers (USACE), Savannah District, is seeking qualified Design-Builders to demolish Building 212 at Fort Stewart, Georgia, and design and construct a replacement 86-bed Permanent Party Unaccompanied Enlisted Personnel Housing (UEPH) Barracks facility. The project scope includes demolition, design, construction, and procurement/installation of all furniture, furnishings, and equipment (FF&E). The replacement facility will contain approximately 41,710 square feet and must comply with the 2025 Army Barracks Standard, applicable Unified Facilities Criteria (UFC), and industry standard building codes.
The solicitation employs a two-step Qualifications-Based Selection (QBS) process under Other Transaction Authority (10 U.S.C. § 2808a), which is not subject to FAR Part 15 procedures. Step 1 requires interested Design-Builders to submit a White Paper (maximum 15 pages, PDF format) by August 6, 2026, at 12:00 PM Eastern Time demonstrating capability, relevant experience on similar projects (minimum 30,000 square feet, new construction only), and technical/management approach. White Papers must address capability and experience (Element 1) and technical/management approach (Element 2), with Element 2 weighted as more important. The Government will shortlist up to three (3) qualified Design-Builders for Step 2, consisting of pitch presentations and facility tours (August 27–September 2, 2026). Step 2 evaluates collaborative capability/risk management (Element 3, weighted as most important) and manufacturing capability validation (Element 4, evaluated on Viable/Non-Viable basis only). Price is not an evaluation factor in Step 1; only the selected Design-Builder will submit Phase 1 pricing. The total program funding is $38,000,000 Not-to-Exceed (NTE), with a total agreement duration not-to-exceed 900 days. Phase 1 covers Design and Pre-Construction Services; Phase 2 (construction) may be added by modification upon successful negotiation of a Fixed-Price or Guaranteed Maximum Price at a future design milestone. The selected Design-Builder will be awarded an OT Agreement for Phase 1 after negotiation of fair and reasonable terms, anticipated for award by September 30, 2026. White Papers must be submitted electronically through PIEE (Proposal, Integrated Evaluation Environment) Solicitation Module only. The Government requires strict open-book cost accounting, CMMC Level 1 cybersecurity compliance, and active SAM.gov registration with valid UEI for all participating teams. All questions must be submitted through the ProjNet Bidder Inquiry System (www.projnet.org/projnet, Bidder Inquiry Key: UTKUDU-RCT6X2). The Agreements Officer, Jennifer L. Murphy (Jennifer.l.murphy@usace.army.mil), is the sole point of contact for all communications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W912HN-26-Q-0001
BLDG 212 Repair by Replacement, Fort Stewart, Georgia
SOLICITATION OVERVIEW
Key Acquisition Parameters
Federal Agency Name: U.S. Army Corps of Engineers (USACE), Savannah District (SAS)
Project Title: PN 111716 BLDG 212 Repair by Replacement
Solicitation Number: W912HN-26-Q-0001
Project Location: Fort Stewart, Georgia
Authority for Award: Title 10 U.S.C. § 2808a
Type of Instrument: Other Transaction (OT) Agreement for Progressive Design-Build.
Delivery Model: Progressive Design-Build (PDB) Phase 1 will be for Design and Pre-Construction
Services. Phase 2 may be added by modification for final design and construction upon successful negotiation of a Fixed-Price (FP)
NAICS Code: 236220 (Commercial and Institutional Building Construction)
PSC Code: Y1DB (Construction of Barracks/Dormitories)
Total Program Funding: Budget Ceiling Not-to-Exceed (NTE) $38,000,000.00
Total Agreement Duration: Not-to-Exceed 900 days
Solicitation POC: Jennifer L. Murphy, Agreements Officer (AO)
(Jennifer.l.murphy@usace.army.mil)
ANTICIPATED SCHEDULE
Note: This schedule is subject to change at the Government's discretion.
Milestone Event Target Date
Solicitation (RFWP) Issued July 28, 2026
Step 1 Submissions (White Papers) Due August 6, 2026
Evaluation of Step 1 Submissions August 7 – August 13, 2026
Notification of Step 1 Shortlist / Pitch Invitations August 14, 2026
Ft. Stewart Site Visit August 21, 2026
Step 2 Pitch Presentations August 27 – September 2, 2026 mailto:Jennifer.l.murphy@usace.army.mil
Selection of Design-Builder Partner September 9, 2026
Phase 1 Agreement & Terms Negotiations September 10 – September 22 2026
OT Agreement Award (Full NTE Obligation) September 30, 2026
1.0 PROJECT INFORMATION
1.1 Project Overview & Scope
The U.S. Army Corps of Engineers (USACE), Savannah District (SAS), is seeking qualified Design-
Builders (DBs) to participate in a Progressive Design-Build (PDB) acquisition utilizing an Other
Transaction (OT) pursuant to 10 U.S.C. § 2808a for the demolition of the existing Building 212 at Fort
Stewart, Georgia, and the design and construction of a replacement 86-bed Permanent Party
Unaccompanied Enlisted Personnel Housing (UEPH) Barracks.
The project includes demolition of the existing facility, design and construction of a new barracks facility, and procurement and installation of all required furniture, furnishings, and equipment (FF&E). The replacement facility will have an approximate gross area of 41,710 square feet and will comply with the
2025 Army Barracks Standard for Permanent Party Unaccompanied Housing, applicable Unified
Facilities Criteria (UFC), and industry standard building codes.
This Request for Statement of Qualifications / White Paper constitutes Step 1 of a competitive two-step
Qualifications-Based Selection (QBS) process. Interested Design-Builders shall submit a qualifications-based White Paper demonstrating their capability, experience, and technical approach. Based on the comparative evaluation of White Paper submissions, the Government intends to shortlist up to three (3) of the most highly qualified Design-Builders to participate in Step 2, consisting of an Individual Pitch
Meeting and Facility Tour.
This acquisition emphasizes:
• Qualifications-Based Selection (QBS): Design-Builders will be evaluated on demonstrated qualifications, experience, capability, and technical approach. Price is not an evaluation factor during Step 1.
• Collaborative Project Development: The selected Design-Builder will work collaboratively with USACE throughout Phase 1 to refine the design, validate costs, manage project risks, and develop the project for successful execution.
• Progressive Design-Build: This acquisition emphasizes early collaboration, open communication, innovation, and continuous cost validation throughout design development.
• Speed and Flexibility: This acquisition will be conducted using an Other Transaction (OT) pursuant to 10 U.S.C. § 2808a and is not subject to the Federal Acquisition Regulation (FAR) source selection procedures
The Government reserves the right to modify the solicitation requirements and evaluation approach as necessary.
1.2 Project Goals and Objectives
• Collaborative Project Development: Establish an integrated, non-adversarial environment where the Government and Design-Builder work collectively from Day 1 to co-develop the design, schedule, and cost.
• Innovation, Speed, and Flexibility: Leverage the OT framework outside traditional FAR constraints to emphasize speed, innovation (in materials, methods, and delivery), and optimal mission outcomes.
• Qualifications-Based Selection: Prioritize the selection of a Design-Build Partner based on proven past performance, team merit, and technical approach rather than detailed construction price proposals at this initial stage.
• Risk Management: Proactively identify, document, and manage technical, manufacturing, and installation risks using a joint "Living Risk Register" with dedicated mitigation strategies.
1.3 Funding
The total funding available for this project, including design, manufacturing, construction, and commissioning activities, may not exceed the $38,000,000.00 Not-to-Exceed (NTE) budget ceiling.
This affordability cap is a material requirement of the agreement. White Papers, Pitch Presentations, and the selected DB’s post-selection Phase 1 Proposal must demonstrate a highly credible and realistic approach to delivering a complete and usable barracks facility within this ceiling.
1.4 Delivery Model (PDB) & Pilot Program Context
This project utilizes a Progressive Design-Build (PDB) delivery model under Other Transaction
Authority (OTA). Unlike traditional design-build, PDB relies on a qualifications-based selection where the builder is selected early in the project. The team then collaboratively refines the design, validates scope, and performs open-book pricing during Phase 1 before finalizing the construction price for Phase
2. This evaluation is not conducted under FAR Part 15 procedures, and formal source selection processes do not apply.
Pilot Program Status: This project serves as the baseline pilot for potential follow-on requirements of multiple barracks facilities across installations in Georgia. This agreement will preserve the Government's ability to issue a follow-on production OTA in the future, subject to the requirements of 10 U.S.C. §
2808a.
2.0 SOLICITATION PROCESS
2.1 Step 1: Request for Statement of Qualifications / White Paper Submission
The initial phase consists of a rapid, written qualifications evaluation. Interested Design Build teams must submit a White Paper (maximum of 15 pages) demonstrating their capabilities and relevant experience on projects of similar scale, and their preliminary technical and management approach.
The Government will shortlist and invite up to three (3) of the top ranked qualified Design Builders to proceed to Step 2.
2.1.1 Submissions Requirements
White Papers shall be prepared in accordance with the requirements contained in this solicitation.
Submissions that fail to comply with these instructions may be determined non-conforming and eliminated from further consideration.
White Papers shall meet the following minimum requirements:
Requirement Standard
Font Minimum 11-point Arial, Calibri, or Times New Roman
Margins Minimum 1 inch
Page Size 8.5 x 11 inches (11 x 17 permitted for graphics only)
Maximum Length 15 pages
File Format PDF
The page limitation applies to all narrative content. Cover pages, table of contents, divider pages, and resumes are not required and should not be included unless specifically requested.
2.1.2 Step 1 Evaluation Criteria White Paper Content
The White Paper shall address the following evaluation elements.
ELEMENT 1 – CAPABILITY AND EXPERIENCE
What to Submit
Provide information demonstrating the Design-Builder's relevant experience and capability to successfully execute this project.
Relevant Experience
Submit two (2), but no more than four (4), completed new construction projects that demonstrate experience with projects of similar magnitude of effort, scope, complexity, and delivery method that meet the following requirements:
• Projects should be a minimum of 30,000 square feet.
• Projects should be multi-unit housing, dormitories, barracks, administration, etc.
• New construction is defined as a new build; renovations will not be accepted.
• For each project provide:
• Project Name
• Project Location
• Client
• Final Construction Value
• Delivery Method
• Period of Performance
• Reference Information (Company, Point of Contact, Email, Telephone)
• Description of Relevance
• Project Outcomes (Cost, Schedule, Quality, Safety)
Innovation & Speed
• For each project provided in relevant experience, describe the specific delivery methods, construction techniques, technologies, or manufacturing processes used to improve schedule, cost, quality, safety, or project execution. The Government reserves the right to contact references to verify any project information.
ELEMENT 2 – TECHNICAL AND MANAGEMENT APPROACH
What to Submit
Describe your team's proposed approach for successfully executing this project.
At a minimum, address the following:
Understanding
• Demonstrate an understanding of the project objectives, schedule constraints, technical requirements, and the Government's affordability objective by identifying key project challenges and describing a realistic approach to maintaining the project within the $38M budget ceiling and the not-to-exceed (NTE) 900-day total agreement duration.
Design Management
• Describe an approach to managing the design process, ensuring compliance with the 2025 Army
Barracks Standard, identified UFCs, and Industry Standard Building Codes.
Manufacturing Approach
• Describe the Design-Builder's manufacturing process, quality management procedures, production methodology, and experience producing comparable facilities. Explain how the proposed manufacturing approach supports successful execution of this project, including anticipated production sequencing, coordination with design activities, and integration with overall project delivery.
Collaborative DB Costing Philosophy
• Demonstrate a defined process for open-book cost management, identifying cost risks, evaluating alternatives, and collaboratively recommending scope, schedule, or design adjustments necessary to maintain the project within the established budget.
Risk Identification and Mitigation
• Demonstrate an understanding of the primary technical, schedule, cost, manufacturing, and coordination risks associated with the project. Describes a proactive approach for identifying, assessing, and mitigating risks throughout design development and preconstruction to support successful project execution within the established budget and schedule.
Organizational Structure
• Provide the proposed Organizational Chart identifying key roles and reporting lines.
2.1.3 Step 1 Government Evaluation Approach
The Government will conduct a comparative evaluation of all conforming White Paper submissions.
No numerical scores, point values, or mathematical weighting will be assigned.
For Step 1, Element 2 (Technical and Management Approach) is more important than Element 1
(Capability and Experience).
Based on the comparative evaluation of White Papers, the Government intends to select up to three (3) of the top-ranked Design-Builders for advancement to Step 2.
2.2 Step 2: Invitation for Pitch Meeting & Facility Tour
(This is ONLY required for Design-Builders invited to proceed to Step 2.)
Step 2 provides the Government with an opportunity to further evaluate the qualifications, collaborative capabilities, and technical approach of the shortlisted Design-Builders through interactive engagement.
Design-Builders selected to advance from Step 1 will be notified by email and invited to participate in the
Step 2 Pitch Meeting phase. This step consists of a pitch meeting and a facility tour.
The Pitch Meeting is intended to facilitate interactive discussions between the Government and each shortlisted Design-Builder to clarify technical approaches, evaluate collaborative problem solving, and further assess the Design-Builder's proposed methodology.
The Design-Builders will be required to provide redlined revisions of the Draft Model OT Agreement
(Attachment 1) the day after the pitch presentation. Only the selected Design-Builder will be required to submit Phase 1 Design and Pre-Construction proposed price.
2.2.1 Pitch Meeting Requirements
Each shortlisted Design-Builder shall participate in an interactive Pitch Meeting with the Government
Evaluation Team.
The purpose of the Pitch Meeting is to evaluate the Design-Builder's collaborative approach, technical understanding, communication skills, and ability to work effectively with the Government during
Progressive Design-Build project development.
The Government anticipates the Pitch Meeting will include:
• Opening introductions
• Design-Builder presentation
• Government questions
• Collaborative discussion
• Closing remarks
The Government will ask substantially similar core topics/questions of each Design-Builder to promote consistency throughout the evaluation process.
The Pitch Meeting is intended to be a collaborative discussion rather than a formal briefing. Design-
Builders should be prepared to explain their thought processes, respond to scenario-based questions, discuss potential design and construction alternatives, and demonstrate how they would work collaboratively with the Government to develop the project. The Government is interested in evaluating the team's communication, problem-solving, and collaborative decision-making in addition to its technical expertise.
Price proposal shall not be included in the presentation materials.
The technical Evaluation Team will not review or evaluate price proposals.
As described in 2.5 Negotiations, the Agreements Officer will independently evaluate the proposed Phase
1 price to determine if it is fair and reasonable prior to award.
2.2.1.1 Pitch Presentation Logistics
The Agreements Officer will provide each shortlisted Design-Builder with a written invitation identifying the date, time, location, and administrative instructions for the Facility Tour and Pitch Meeting.
Unless otherwise specified by the Agreements Officer, the following presentation format is anticipated:
Activity Approximate Duration
Introductions 10 Minutes
Design-Builder Presentation 60 Minutes
Government Questions and Collaborative Discussion 45 Minutes
Closing Remarks 10 Minutes
The Government reserves the right to adjust the agenda, durations, or sequence of activities as necessary to facilitate the evaluation process.
Each shortlisted Design-Builder will be afforded substantially equal time and opportunity to present its qualifications and respond to Government questions.
The Government may ask follow-up or clarifying questions throughout the presentation.
2.2.2 Step 2 Evaluation Criteria Factory Tour & Pitch Presentations
ELEMENT 3 – COLLABORATIVE CAPABILITY AND RISK MANAGEMENT (Pitch Meeting)
The Evaluation Team will evaluate the Design-Builder's oral presentation and their real-time responses to
Government questions (including follow-up questions) using a standardized interview ensure all Design-
Builders are evaluated against the same core questions and behavioral indicators
Evaluation considerations include:
Collaborative Budget Validation
• Presentations must demonstrate the ability during the Pitch Meeting to identify cost and schedule impacts, discuss practical alternatives, and explain how design decisions will be managed to maintain project affordability. The presenter must show a proactive methodology for executing cost-risk trade-offs during design to prevent scope creep beyond the $38M overall ceiling and the not-to-exceed (NTE) 900-day total agreement duration.
Technical Execution
• Presentations must demonstrate a logical, technically sound approach for advancing design, resolving technical issues, coordinating disciplines, and maintaining schedule and budget objectives throughout the Progressive Design-Build process.
Risk Management
• Presentations must demonstrate a structured approach for identifying, documenting, prioritizing, and mitigating project risks, supported by relevant examples showing how identified risks were successfully managed on comparable projects.
Collaborative Engagement
• Presentations must demonstrate effective communication, active listening, technical competence, and the ability to collaboratively evaluate alternatives, resolve differing viewpoints, and respond constructively to Government questions during the interactive Pitch Meeting.
ELEMENT 4 – MANUFACTURING CAPABILITY VALIDATION AND LOGISTICS (Facility
Tour)
The facility tour is intended to validate the manufacturing approach presented during Step 1 and confirm that the proposed manufacturing capability is operationally feasible for successful execution of this project. Element 4 will be evaluated on a Viable/Non-Viable basis. Any Design-Builder determined to be
Non-Viable will not be considered for section of the agreement.
Evaluation considerations include:
Manufacturing Capability Validation & Logistics
• The Evaluation Team will conduct an assessment of the Design-Builder's manufacturing capability and logistics. This element will be evaluated strictly on a Viable/Non-Viable basis, focusing on the commercial viability and operational feasibility of the production facility.
2.2.3 Step 2 Government Evaluation Approach
The Government will conduct a comparative evaluation of the pitch presentations.
No numerical scores, point values, or mathematical weighting will be assigned.
2.3 Total Evaluation Hierarchy of Qualitative Elements
Following completion of the Pitch Meetings and Facility Tours and to ensure a comprehensive and qualitative selection process, the final ranking and selection of the most qualified Design-Builder will be determined by an integrated comparative assessment of all elements evaluated across both steps of the solicitation.
1. Comparative Evaluation Methodology: For all qualified and viable Design-Builders, the
Evaluation Team will perform an integrated comparative assessment of the relative merits of each submission based on the documented strengths, weaknesses, risks, and overall merit of the
Design-Builder's proposed approach to successfully execute the project. No numerical scores, point values, or mathematical weighting will be assigned.
The relative importance of the qualitative evaluation elements will guide the Evaluation Team's comparative judgment. Element 3 is more important than Element 2, and Element 2 is more important than Element 1 (Element 3 > Element 2 > Element 1). This hierarchy does not establish a mathematical formula for selection. Rather, it reflects the Government's determination that demonstrated collaborative capability and technical execution are of greater importance than corporate experience alone. The Evaluation Team will consider the overall comparative merits of each Design-Builder consistent with the established hierarchy of evaluation elements.
2. Element 4 Manufacturing Capability Validation & Logistics is evaluated on a Viable/Non-Viable basis. A Design-Builder must be rated Viable under Element 4 to be eligible for final selection.
2.4 Final Selection
Following completion of the evaluation, the Government intends to select the most qualified Design-
Builder by an integrated comparative assessment of all elements evaluated across both steps of the solicitation. Selection does not constitute award of an OT agreement. The competitive selection process will consist of Step 1 White Paper evaluation and Step 2 Pitch Meeting evaluation.
Upon selection, the Government will enter into negotiations for Phase 1 Design and Pre-Construction
Services under the Other Transaction agreement.
2.5 Phase 1 Design and Pre-Construction Negotiations
All Shortlisted Design-Builder’s will be required to provide red-lined revisions of the Draft Model OT
Agreement (Attachment 1) the day after pitch presentation.
The selected Design-Builder will receive a request to submit their pricing for Phase 1 Design and Pre-
Construction Services due no later than two (2) days after notification of selection.
The selected Design-Builder's Phase 1 Proposal and redlined revision of the Draft Model OT Agreement will be used to support negotiation of the Phase 1 OT Agreement and may include the proposed design and pre-construction scope, staffing plan, labor categories, hourly rates, fee, schedule, assumptions, exclusions, and other information necessary to establish fair and reasonable Phase 1 terms and support future open-book cost development. The Phase 1 Proposal is not a separate competitive evaluation step and will not be issued to all shortlisted teams. The Phase 1 Proposal will not establish the final Phase 2 construction price, FFP, or GMP. Any target construction price, FFP, or GMP for Phase 2 will be developed later during Phase 1 and negotiated at a future design milestone.
The AO will negotiate the terms and conditions of the agreement, including negotiation of a fair and reasonable price for Phase 1 Design and Pre-Construction Services.
2.5.1 Award Structure
Upon successful negotiation, the AO will execute the single OT award.
• Phase 1 — Design and Pre-Construction Services: The selected Design-Builder may be awarded an OT Agreement for Phase 1 after successful negotiation of fair and reasonable Phase 1 terms.
No construction activities will be authorized under Phase 1. Phase 1 will be funded with available appropriate funds for planning, design, and preconstruction services, as applicable.
• Phase 2 — Design and Construction: Phase 2 may be added by modification to the OT
Agreement upon successful negotiation of a fair and reasonable FFP or GMP at a future design milestone. Phase 2 is subject to the Government's determination that the design, cost, schedule, risk posture, and project requirements are sufficiently defined and aligned, and progression to construction is in the Government's interest.
The Government will maintain overall decision authority and will actively participate in project governance to ensure timely and effective decision-making. The Government reserves the right to discontinue the OT process following Phase 1 and pursue an alternative procurement.
3.0 COMMUNICATIONS AND SUBMISSION INSTRUCTIONS
All communications regarding this solicitation shall be directed exclusively to the Agreements Officer
(AO). Jennifer Murphy, email Jennifer.l.Murphy@usace.army.mil
Design-Builders shall not contact other Government personnel concerning this acquisition unless specifically authorized by the AO.
3.1 ProjNet Inquiry System (All formal and technical questions regarding this Solicitation must be submitted through the ProjNet Suite Bidder Inquiry System:
• Website: www.projnet.org/projnet
• Solicitation Number: W912HN-26-Q-0001
• Bidder Inquiry Key: UTKUDU-RCT6X2
The ProjNet portal will close to new inquiries on 1 day prior to response date. Interested Design-Builders are encouraged to monitor the system regularly for published questions and official answers.
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
Steps 1 through 3: same as above.
1. Email. Enter the email address you used to register previously in ProjNet.
2. Click Continue. A page will then open asking for the answer to your Secret Question.
3. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
http://www.projnet.org/projnet
3.2 White Paper Submission via PIEE
Submissions must be uploaded electronically through the PIEE Solicitation Module. Late submissions may not be considered.
• Due Date: August 6, 2026, at 12:00 PM Eastern Time.
• Submission Channel: PIEE Solicitation Module (ONLY PIEE submissions will be accepted;
physical or email packages are non-conforming).
• File Formats Allowed: PDF is mandatory for the main package. Optional attachments may utilize .pptx, .docx, or .xlsx formats. Compilations ending in .zip or .exe are strictly prohibited.
• In order to submit through the Solicitation Module in PIEE, you must have an active Proposal
Manager role in PIEE at https://piee.eb.mil/.
• To upload the submission in Solicitation module in PIEE:
• Ensure you have an active role as Proposal Manager in PIEE.
• Log into PIEE at https://piee.eb.mil/ to access the Solicitation Module.
• Select Solicitation icon.
• At the Home screen of the Solicitation Module, select the Search link to find the solicitation you intend to post an offer against.
• In the Solicitation Search Criteria filter by entering the complete solicitation number and for
Status, select Open, then click Search.
• When search results display, select the solicitation number link to open the solicitation.
• The solicitation displays, with information as view only.
• To post the submission, click the Offer tab.
o Click the Add button to add an offer to the solicitation.
o Select the applicable CAGE Code for which you are submitting the offer. The list is pre-filtered based on the CAGEs in the Proposal Manager's profile.
o Click on the Choose Files link to upload attachments that comprise your offer.
o Enter Signature Date and click Signature button after entering all necessary information.
o Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and
OTP. Click the Sign and Submit button to continue.
o After successfully adding the Offer a successful message of the submission will be displayed providing confirmation of on-time/late proposal receipt.
• For addition information on PIEE Vendor Access Instructions or PIEE Solicitation Module
Frequently Asked Questions visit: https://dodprocurementtoolbox.com/site-pages/solicitation-module
• For additional instructions on how to post an offer, please refer to the Posting Offer demo:
https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf
• For additional instructions on the Solicitation module and Proposal Manager roles, please refer to the following link: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xht
4.0 SPECIAL CONSIDERATIONS
4.2 Open-Book Pricing, Cost Transparency, and Accountability
To ensure the integrity of the PDB process, the selected DB must maintain strict open-book cost accounting and scheduling throughout Phase 1.
• The DB must disclose all subcontractor bids, raw material costs, equipment charges, transport fees, and internal markup structures.
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xht
• No cost item may be charged or invoiced more than once. Costs included in the Phase 1 Design and Pre-Construction fee must be completely segregated and excluded from the Phase 2 construction pricing model. Total pricing for Phase 1 and Phase 2 is not-to-exceed $38M.
• Not-to-exceed (NTE) 900-day total agreement duration
• The DB is responsible for providing auditable accounting trails to verify that the final FFP construction proposal is fair, reasonable, and non-duplicative.
4.3 Cybersecurity Requirements (CMMC Level 1 Equivalent)
To protect Federal Contract Information (FCI), the selected DB and its subcontractors must implement and maintain cybersecurity controls equivalent to CMMC Level 1 (as codified in 32 CFR Part 170).
• Security Controls: At a minimum, the DB must implement the 15 basic safeguarding controls focusing on access control, identification and authentication, physical protection, and system integrity.
• Prior to the execution of the OT agreement, the selected DB must conduct a self-assessment and submit a signed attestation affirming full compliance with CMMC Level 1 standards. This flow-down requirement applies to all subcontractors handling FCI.
4.4 Governing Documents and SAM Registration
This Solicitation, along with its reference attachments, constitutes the entire solicitation package. In the event of a conflict or discrepancy, this main announcement takes precedence.
• All participating Design-Build Teams must be actively registered in the System for Award
Management (www.sam.gov) and possess a valid Unique Entity Identifier (UEI) to be eligible for award.
• The selected DB must maintain active, non-delinquent registration throughout the entire period of performance and final payment cycle of the OT agreement.
4.5 Agreements Officer Authority
Only the Agreements Officer has authority to modify the Other Transaction Agreement, approve changes affecting cost or schedule or otherwise bind the Government. Government direction, approval, acceptance, or authorization may be provided only by authorized Government representatives in accordance with the Agreement.
5.0 SOLICITATION ATTACHMENTS
The following attachments are incorporated by reference into this solicitation and form the basis of the competitive evaluation, post-selection, and resulting award of an OT Agreement:
• Attachment 1 – Draft Model OT Agreement: The baseline Other Transaction Agreement articles establishing the legal and administrative framework for the partnership.
• Attachment 2: Technical RFP / Performance Specifications for PN 111716 BLDG 212 Repair by
Replacement.
End of Solicitation http://www.sam.gov/