Diesel Pump.JPG
JPG image 202 KB Posted
- Solicitation number
- W912HN25C00SM
About this file
This document is a Request for Information (RFI) from the U.S. Army Corps of Engineers Savannah District regarding a requirement to replace a 50kW diesel generator, fuel tank, and automatic transfer switch (ATS) at the Lock Operations Building. The RFI provides a draft Statement of Work, which describes the need to replace the existing equipment with a new propane-fueled generator set, fuel tank, and ATS to be installed on a new elevated equipment pad adjacent to the existing service transformer. The RFI is seeking information on vendors who can perform this work and their delivery timelines. No award date, pricing terms, or set-asides are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dam Diesel Fuel Storage Tank.JPG | JPG image | |
| Cable Tower.JPG | JPG image | |
| Diesel Generator.JPG | JPG image | |
| Draft Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .