This solicitation is for a Multiple Award Task Order Contract to provide power generation services in Puerto Rico. The Army Corps of Engineers seeks to award contracts to all qualifying offerors to supply temporary generator sets with a combined output of at least 60 megawatts for periods up to 24 months. Offerors must propose transporting and installing generators and associated liquefied natural gas fuel systems at existing power plants, then operating and maintaining the equipment continuously. The solicitation identifies technical and management criteria offerors must address, including key personnel requirements. It provides instructions for submitting proposals in two parts by July 2023 and evaluates proposals based on technical approach, past performance, and small business participation. The contract has a maximum value of $5 billion over five years.

View the file

Other files

File Type Posted
W912HN23R5005 0003.pdf PDF
W912HN23R5005 0002.pdf PDF
W912HN23R5005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN23R5005

X 9B. DATED (SEE ITEM 11)

05-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

As a result of Amendment 0001, Solicitation W912HN23R5005 for Puerto Rico Power System Stabilization, Power Generation Services is hereby modif ied as follows:

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2023

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN23R5005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

CONTINUATION PAGE

A. Section H has been amended per bidder inquiry posted to ProjNet.

B. Page limitations have been set for Part IIA: Technical/Management Approach (Factor 1) Elements A, B, and D.

C. Part IIB: Past Performance (Factor 2) has been amended to reduce the threshold of $100M to $50M.

D. Part IIC: Small Business Participation (Factor 3) has been amended to include attachments.

E. Language stating “Volume II – Cost/Price” from Section L has been removed.

F. All other terms and conditions remain unchanged.

G. The due date has not been extended due to this change.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SCOPE OF WORK

Multiple-Award Task Order Contract (MATOC) Scope of Work (SOW) Puerto Rico Power System Stabilization, Power Generation Services MATOC

1 Introduction The Contractor shall be responsible for providing power generation services to customers of the U.S. Army Corps of Engineers. The power generation services consist of rental and delivery of generator units; electrical connection of the generator output to the power grid; installation of new, or modification/repair of existing, power monitoring and control systems; testing and commissioning of the power generation and electrical systems; and operation and maintenance of the installed systems, to include fueling. Ancillary activities will include the repair, replacement, installation, operation, and maintenance of power transmission components as necessary to connect the contract-supplied temporary power or power generated from other sources to the grid; to monitor, control, and protect new and existing components of the power generation and transmission system; and to improve the stability of the grid.

The Contractor shall furnish all materials, equipment, supplies, personnel, and all other services required to perform the services outlined in this contract Scope and as specifically identified in the performance work statement (PWS) as specifically identified in the individual task orders.

1.1 Scope

The Contractor shall furnish all materials, equipment, supplies, personnel, and all other services required to perform the power generation services outlined in this statement of work and as specifically identified in the individual task orders. The services required by this contract are expected to be limited to the territory of Puerto Rico. Task orders will use performance-based work statements. A PWS structures all aspects of an acquisition around the purpose of the work to be performed and does not dictate how the work is to be accomplished. It is written to ensure that Contractors are given the freedom to determine how to meet the Government’s performance objectives and provides for payment only when the results meet or exceed these objectives. It maximizes Contractor control of work processes and allows for innovation in approaching various work requirements. A PWS emphasizes performance that can be contractually defined so that the results of the Contractor’s effort can be measured in terms of technical and quality achievement, schedule progress, or cost performance.

A PWS will be prepared for each individual task order. The PWS will include specific performance objectives and performance elements. The time frame and specific procedures for each item of work will be described in the individual task order. The description of stated herein provides a general understanding of the Contractor functions to be performed. Individual task orders will contain the specific requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract.

2 General Requirements The Contractor must have the capability and experience to perform or provide a wide range of power generation, procurement, operation, maintenance, and repair services required to support the USACE power mission. Most costs are anticipated to be equipment rental and fueling costs associated with the power generation services.

2.1 Non-Personal Services

The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

2.2 Business Relations

The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The Contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

2.3 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

2.3.1 Contract Management

The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirements specified in each task order. The Contractor must maintain continuity between the support operations and the Contractor's corporate offices.

2.3.2 Contract Administration

The Contractor shall establish processes and assign appropriate resources to effectively administer the requirement.

The Contractor shall respond to Government requests for Contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders.

2.3.3 Personnel Administration

The Contractor shall provide the following management and support as required. The Contractor shall provide for employees during designated Government non-workdays or other periods where Government offices are closed due to weather or security conditions. The Contractor shall maintain the training currency of their employees by providing initial and refresher training as required to meet the scope requirements. The Contractor shall make necessary travel arrangements for employees. The Contractor shall provide necessary infrastructure to support contract tasks. The Contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs). Time expended on contract tasks by Contractor personnel will be reported weekly to the Task Leader and may be requested for review by the COR, or Government POC for the specific Contractor.

2.4 Subcontract Management

The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after Contracting Officer’s notification and approval.

2.5 Contractor Personnel, Disciplines, and Specialties

The Contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The Contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The Contractor shall ensure the labor categories, labor rates, and man-hours utilized in the performance of each task order issued hereunder will be the minimum necessary to accomplish the task. The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

Contractor Key Personnel to be included:

Project Manager The project manager is required to be a graduate engineer with a minimum of 7 years experience and must have performed in the role of Project Manager, being the primary person responsible for managing scope, schedule, and budget of at least $100 million of contract value, on at least three (3) separate projects.

Project Superintendent The project superintendent is required to have a minimum of 7 years of experience managing the construction of infrastructure projects greater than $20 million, to include at least two power generation projects, each of which included the installation of at least 30 MW of prime power generation.

LNG Specialist The LNG Specialist is required to have a minimum of 7 years of LNG experience, or 3 years of LNG and 7 additional years of experience with other types of fossil fuels. Required expertise in installing, maintaining, and operation of a storage and regassification LNG plant. Additionally, LNG specialist must have management experience of delivery/utilization of a minimum 2 million gallons of fuel within a 30-day period.

Contractor Quality Control System Manager The Contractor Quality Control (CQC) System Manager is required to have a degree in architecture, engineering, or construction management from an ABET-accredited university/institution and a minimum of five (5) years of experience in related quality management work. This experience shall include a minimum of one project that included installation of at least 30 MW of new power generation for which the individual served as the CQC System Manager.

Site Safety & Health Officer (SSHO) The SSHO must have familiarity with EM 385-1-1 and is required to have proof of employment meeting one of the options detailed below:

1. Five (5) years of continuous construction industry safety experience in supervising/ managing general construction (managing safety programs or processes or conducting hazard analyses and developing controls), or

2. Five (5) years of continuous general industry safety experience in supervising/ managing general industry (managing safety programs or processes or conducting hazard analyses and developing controls), or

3. If the SSHO has a Third-Party, Nationally Accredited (ANSI or National Commission for Certifying Agencies -NCCA) SOH-related certification, only 4 years of experience is needed. > See Appendix Q or EM 285-1-1 for list of certifications.

Design Project Manager The Design Project Manager is required to be a registered professional engineer with a minimum of seven years of experience, to include at least two power generation projects, each of which included the installation of at least 30 MW of prime power generation.

2.6 Location and Hours of Work

Accomplishment of the results contained in this SOW requires work within territory of Puerto Rico. Specific locations for the work will be determined at the task order level. Normal workdays are Monday through Friday except US Federal Holidays. Workers typically work eight (8) hours per day, 40 hours per week.

Work will be required outside of typical work hours (up to 24 hours a day, 7 days a week) and additional detail will be provided at the task order level.

2.7 Travel / Temporary Duty (TDY)

Travel to other government facilities or other Contractor facilities may be required and will be specified at the task order level. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures). Travel costs will be negotiated for each task order as applicable.

The Contractor shall use government vehicles when requested, authorized, and determined to be advantageous to the government. This will be specified at the task order level. It is understood that the Contractor’s liability insurance will cover all contract personnel operating government vehicles. If not specified, the Contractor shall provide all necessary transportation to fulfill the requirements of the contract.

3 Scope Requirements The following section specifies the objectives, requirements and services under the Puerto Rico Power System Stabilization, Power Generation Services MATOC. Contractor shall provide all labor, materials, and supplies necessary to supply temporary power to various points within the power grid of Puerto Rico for periods of up to 24 months. This temporary power will be supplied by dual-fuel, medium-voltage engine-generator sets (generators).

Generators are anticipated to be land-based, trailer-mounted units of between 5 and 30 megawatts (MW) each;

however, task order PWS will allow contractors to propose other solutions that might be more advantageous to the Government.

While most projected costs incurred as part of this MATOC are anticipated to be associated with rental of generators and fuel, this SOW can be generally divided into three phases: mobilization, power supply, and demobilization.

In addition to the temporary power generation requirement, there is the potential for repair and replacement of power generation equipment at existing power generation facilities and power generating units. The scope of work, schedule, and performance requirements for power generation repair and/or replacement will be defined for each task order.

3.1 The Contractor shall perform power generation services during the mobilization phase for various USACE customers.

Contractor shall be capable of procurement of land-based generators (5MW or greater) via a term rental with an option for the utility provider to buy the rented generator(s) at the end of the term and all logistics required with transporting generators to the requisite location. Further, Contractor shall be capable of all ancillary services required for connecting the generators to the electrical power grid at a utility-provider-owned facility. Examples of some, but not all, of the anticipated services required are listed below:

a. Installation of generators and all ancillary equipment necessary for power generation such: as control rooms;

protective monitoring systems; generator starting systems; auxiliary transformers; batteries; rectifier battery chargers; turbine enclosure fire suppression; switchgear; and emissions controls.

b. Installation of electrical grounding systems.

c. Performance of all sitework necessary to install temporary power and support systems. Sitework may include geotechnical site investigation, demolition, installation of pilings or other foundation types, grading and stormwater management, installation of gravel pads, fencing, and signage.

d. Installation of Liquified Natural Gas (LNG) and diesel fuel systems. Fuel systems may include storage tanks, spill containment structures, refilling systems, piping, regassification units, metering, monitoring, control, fire detection, and fire suppression.

e. Emissions control on power generation units, to include installation of demineralized (demi) water systems including connections to existing supply points, piping, metering, monitoring, and disposal of associated waste streams, or other emission control strategy capable of meeting the terms of the New Source Performance Standards (NSPS), National Emission Standards for Hazardous Air Pollutants (NESHAP), and Prevention of Significant Deterioration (PSD) regulations, as applicable.

f. Electrical connection of the generator output (expected to be in the 13.8KV range) to the power grid (at various levels from 38KV to 230KV), through the installation of new components and/or the repair of existing components such as:

a. Generator Step Up (GSU) transformers;

b. Protective and isolating devices such as medium-voltage circuit breakers; fused or unfused switches;

c. Power conductors; and

d. Conductor mounting poles and standoff insulators.

g. Installation of new, or modification/repair of existing, power monitoring and control systems including:

a. Paralleling gear;

b. Potential Transformers (PT’s) and Current Transformers (CT’s);

c. Control relays;

d. Generator and substation control systems (hardware and software); and

e. Communication and control cables, including SCADA.

h. Provision, operation, and maintenance of ancillary facilities required to support on-site Contractor staff such as parking facilities, site lighting, breakrooms, and portable restrooms.

i. Testing and commissioning of the systems listed above, both individually and as they interact with each other and with the existing utility-provider-owned systems under various scenarios.

3.2 The Contractor shall perform power generation services during the power supply phase for various USACE customers.

Contractor shall be capable of fueling, operation, and maintaining generators and ancillary equipment while complying with all USACE policies, procedures, and applicable federal, state, and/or local statutes, rules, and regulations. Additional requirements are detailed below. These examples are not intended to be all inclusive.

a. Provision of all fuel required to operate the generators 24 hours per day, 7 days per week (24/7), excluding downtime for scheduled maintenance.

b. Operation (24/7, excluding maintenance periods) and maintenance of the generators and other systems described in this scope of work by qualified Contractor personnel.

c. Provision of all other materials and supplies required to ensure continuous operation and adequate maintenance of the generators and other systems described in this scope of work.

3.3 The Contractor shall perform power generation services during the demobilization phase for various USACE customers.

Contractor shall be capable of demobilization/removal of all equipment utilized and restoration of the project site.

Additional requirements are detailed below. These examples are not intended to be all inclusive.

a. Demobilization and removal of any equipment, materials, and supplies not already owned by the utility provider or purchased by them at the end of the rental period.

b. Restoration of the project site and utility-provider-owned equipment and materials as needed, including activities as such as:

o Remediation or removal/replacement of soil contaminated by Contractor activities such as diesel fuel spills;

o Regrading;

o Replacement of topsoil;

o Reseeding;

o Repair of roads or other paved surfaces that were damaged, beyond reasonable wear and tear, by the

Contractor;

o Replacement of fencing as required to revert to pre-project layouts; and o Capping of water line taps that were installed during mobilization.

3.4 The Contractor shall perform repairs associated with power generation equipment and the electrical grid.

Contractor shall be capable of performing priority repairs to the power generation equipment on the Puerto Rico grid, including existing power generation equipment and temporary power equipment listed above. The equipment may be Contractor or utility provider owned and requirements will be detailed at the task order level.

4 Special Requirements This section describes the special requirements for this contract. The following sub-sections provide details of various considerations on this contract.

4.1 Security and Safety

This is not a classified procurement. The primary security considerations associated with this acquisition are Contractor employee identification and physical access to the power plants, which will have varying access and safety requirements to be identified at the task order level.

4.2 Status Reports and Invoices

The Contractor shall submit, according to each task order, a narrative status report and an invoice, in electronic format, at a frequency determined for the task order (expected to be no less frequently than monthly). This report and a payment invoice are expected to be provided for approval by the 10th working day of the month following the month in which the services were performed, unless stated otherwise in the task order. The status report shall include project break-out by hours for each task performed and a brief summary of each task and shall be in Microsoft Word and PDF format to the authorized Contracting Officers Representative (COR). COR's will be assigned at the task order level. Generally invoicing procedures will be tailored at the task order level.

4.3 Government Furnished Materials

If applicable, Government Furnished Information related to the required services will be provided at the task order level.

4.4 Environmental Requirements

The Contractor, the Contractor’s subcontractors, and the Contractor’s suppliers shall perform all work in full compliance with applicable Federal, State, and Local environmental laws and regulations including NSPS, NESHAP, and PSD. Nothing in this contract shall relieve the Contractor of his responsibility to comply with laws and regulations.

Any incidents of spills, releases, or noncompliance with regulations noted by the Contractor shall immediately be brought to the attention of the Contracting Officer and Contracting Officer’s Representative, with written notice provided as soon as possible thereafter.

4.5 Applicable Directives

The Contractor shall comply with all documents listed as mandatory and referenced IAW the instructions as outlined per individual task order.

4.6 Quality Control

This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.

4.6.1 Quality Control Plan (QCP)

The Contractor shall develop a task order-level QCP and maintain an effective quality control program to ensure services are performed in accordance with the MATOC and each individual PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which it assures the work complies with the requirement of the contract. The finalized QCP will be reviewed by the Government at the time of the award of the task order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."

4.6.2 Quality Assurance Surveillance Plan (QASP)

The Government shall monitor the Contractors performance under each task order in accordance with the Government’s QASP (provided at the task order level).

5 Deliverables The Contractor shall provide deliverables as described in subsequent task orders. Deliverables shall be specified by the Government.

6 Related Documents Related documents will be provided at the task order level, as required for that particular project.

SPECIAL INSTRUCTIONS

The intent of this solicitation is to award to each and all qualifying offerors for Multiple-Award Task Order Contract (MATOC) contracts that will be providing power generation services to customers of the U.S. Army Corps of Engineers. The MATOC will be 5 years duration from the date of award and the maximum capacity of $5,000,000,000.00.

The government intends to award to each and all qualifying offerors Indefinite Delivery Indefinite Quantity (IDIQ) contracts with this solicitation.

This procurement is unrestricted, NAICS: 221112, Fossil Fuel Electric Power Generation, Size Standard 950.

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

The awardees will receive a minimum guarantee of $2,500.00.

Offerors shall submit their proposals to the US Army Corps of Engineers through the Procurement Integrated Enterprise Environment (PIEE) - https://piee.eb.mil/. Proposals are not to be submitted any later than the time and date specified in Block 16 of Standard Form33.

Instructions on how to create a vendor account will be posted to sam.gov and can be located at:

https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf

Instructions on how to submit an offer will be posted to sam.gov and can be located at:

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf

NOTE: DO NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

For contractual/technical questions, please use the projnet link and inquiry key listed below. Technical Points of Contact shall not be contacted prior to award.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within PIEE Solicitation Module site. Do not assume that electronic submission will occur instantaneously.

Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process.

Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

Electronic Files: Submission shall be in a searchable Adobe PDF format.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

• W912HN23R5005-FIRMNAME -PART I

• W912HN23R5005-FIRMNAME -PART II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization:

• Use standard 8.5 x 11-inch pages in portrait orientation. Figures, timelines, or data flow diagrams may be in landscape orientation.

• Number each page.

• Use only one-inch margins for the top, bottom, and page sides. Page numbers, notations of proprietary information, and any other identifying information printed on each page are excluded from the margin requirement.

• Paragraphs shall be single spaced.

• Text font shall be no smaller than 11 point for all words in the proposal. An exception to this font size requirement is the documentation for proof of plant ownership (United States Coast Guard (USCG) certificate or the equivalent State registration, bill of sale, title, certificate of origin, builder’s certification, or insurance documentation.

• Information presented should be organized to pertain to only the evaluation factor in the section that the information is presented.

• A table of contents shall be included for the Part I and Part II electronic files and the table of contents is excluded from the page count.

Electronic Files: Files shall be in their native format (i.e., doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Nov 2021),” subparagraph (e), which is found in Section L of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to proposal submittal. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (previously DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from DUN and Bradstreet by calling 1-800-333-0505. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.

Training tools are available on the SAM website to help you get familiar with SAM. Start by going to www.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well as Quick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates, and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

CONTRACT KEY PERSONNEL

The Project Manager, Project Superintendent, LNG Specialist, Contractor Quality Control System Manager, Safety Professional, and Design Project Manager are designated Key Personnel. The contractor will use the key personnel listed in the proposal on all awarded task orders. The contractor shall obtain Contracting Officer approval for any proposed replacement candidate for all Key Personnel positions prior to that individual filling the position. The contractor will notify the Contracting Officer not later than two weeks prior to change of the contractor employee filling a Key Personnel billet, unless the employee leaves the contractor’s employment and gives the contractor less than two weeks’ notice or the contractor terminates an employee for cause, in which case the contractor will notify the Contracting Officer as soon as the contractor learns of the departure or terminates the employee.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

ATTACHMENTS

Attachment 1- NAVFAC/USACE Past Performance Questionnaire (PPQ)

Attachment 2 - Small Business Participation Plan

NAVFAC / USACE Past Performance Questionnaire (PPQ) Form PPQ -0 (9/30/11)

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

CAGE Code: ______________ DUNs Number: _______________________

1. Contractor Information Firm Name: _______________________________________________ Address: ________________________________________________ Phone Number: __________________________________________ Email Address: ____________________________________________ Point of Contact: ___________________________________________ Contact Phone Number: ______________

Sub Contractor Joint Venture Other (Explain)2. Work Performed as: Prime Contractor Percent of project work performed: _________ If subcontractor, who was the prime (Name/Phone #): ___________________________________________________

Cost Reimbursement Other (Please specify):

3. Contract Information Contract Number: ____________________________________ Delivery/Task Order Number (if applicable): ________________________________________ Contract Type: Firm Fixed Price ____________________ Contract Title: ______________________________________________________________________ Contract Location: __________________________________________________________________

Award Date (mm/dd/yy): ________________________ Contract Completion Date (mm/dd/yy): _________________ Actual Completion Date (mm/dd/yy): ___________________ Explain Differences: _______________________________________________________________________________

Original Contract Price (Award Amount): _________________ Final Contract Price (to include all modifications, if applicable): ___________________ Explain Differences: _______________________________________________________________________________

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.) __________________________________________________________________________________

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name: _________________________________________ Title: __________________________________________ Phone Number: _________________________________ Email Address: ______________________________________________

6. Describe the client’s role in the project: ___________________________________________________________

7. Date Questionnaire was completed (mm/dd/yy): _____________________

8. Client’s Signature: ______________________________________________

NOTE: NAVFAC/USACE requests that the client completes this questionnaire and submits directly back to the offeror.

The offeror will submit the completed questionnaire to USACE with their proposal, and may duplicate this questionnaire for future submission on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to USACE. Please contact the offeror for USACE POC information. The Government reserves the right to verify any and all information on this form.

Attachment 1

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE SELECT THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

Attachment 2 – Small Business Participation Plan

The Small Business Participation Plan shall be organized as follows:

(1) Prime Contractor type of business (check all that apply):

( ) Large ( ) Small (also check type of small business) ( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business ( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business

(2) Percentage of your participation as a prime contractor: __________________ %

NOTE: Small Business primes’ self-performance counts as Small Business Participation, and small business primes may achieve small business participation goals through their own performance/participation as a prime and/or through subcontracting to other small businesses.

(3) Percentage of total contract value of subcontracts planned for:

% of Total Contract Value

Large %

Total Small %

Small Non-Disadvantaged %

Small Disadvantaged %

Small Woman Owned %

Small HUB Zone %

Small Veteran Owned %

Small Service Disabled Veteran Owned %

Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.

NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.

(4) List principal supplies/services (be specific) to be subcontracted to:

Business Size/Socioeconomic Status

Name of Company

CAGE

Code

Anticipated

NAICS

Code(s)

Type of Service/Supply

Large

Small Non-Disadvantaged

Small Disadvantaged

Small Woman Owned

Small HUB Zone

Small Veteran Owned

Small Service Disabled Veteran Owned

(5) Prior Performance Information: Provide any information substantiating the offeror’s track record of utilizing small business on past contracts.

(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.

(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.

Small Business Subcontracting Plan: Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9. This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS

Electronic Submission: Electronic copies of each factor shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Proposals submitted by mail or hand carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the FAR. For instructions on how to post an offer, please refer to the Posting Offer demonstration: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.

It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by emailing the Contracting Officer, Levi Speth at levi.r.speth@usace.army.mil and Contract Specialist, Jessica Stone at Jessica.m.stone@usace.army.mil. If the Solicitation Module is down, the alternate method for proposal submission is via email to the Contracting Officer and Contract Specialist identified in the preceding sentence. The Offeror must obtain prior approval from the Contracting Officer or Contract Specialist to use the alternate submission method.

Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission. Electronic copies of each factor shall be compatible with Adobe Acrobat Reader 11. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each factor, section, and item.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties carefully ensure their electronic files adhere to the following naming convention:

•…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .