SHEP Marsh Restoration at DCMA 1S Pre-Bid Conference Slides.pdf
PDF 1 MB Posted
- Solicitation number
- W912HN21B5002
About this file
This solicitation package describes a federal contract opportunity for marsh restoration work. The U.S. Army Corps of Engineers, Savannah District is seeking bids to complete restoration of approximately 29 acres of brackish marsh located on Onslow Island, Georgia. The contractor will excavate material and create feeder creeks to enable tidal connectivity, with a final marsh elevation of approximately +7.6 feet mean lower low water. Additional work includes erosion control measures, clearing and grubbing, and removal and disposal of excess excavated materials. The solicitation will utilize sealed bidding procedures and result in a fixed price contract between $10-25 million. The anticipated period of performance is 360 calendar days from notice to proceed. The pre-bid conference was held on April 29, 2021 and bids are due by the date specified in the solicitation package. The contract will be awarded to the lowest priced, responsive and responsible bidder.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
Pre-Bid Conference
Savannah District
April 29, 2021
MARSH RESTORATION AT DREDGED MATERIAL
CONTAINMENT AREA 1S (DMCA 1S)
(A MITIGATION REQUIREMENT OF SHEP)
File Name
INTRODUCTION
• The pre-bid conference is intended to provide information about this solicitation and to emphasize key elements of the project.
• Key Project Delivery Team Members:
• Whittni Hiscox – Contracting Officer
• Spencer Davis – Senior Project Manager
• Emily Wortman – Design Lead
• Todd McGalliard – Resident Engineer
• Jeremy Miller – Project Engineer
• Burt Moore – Chief, Dredging Section
File Name
DISCLAIMER
TODAY’S PRESENTATION IS INTENDED TO PROVIDE INFORMATION REGARDING THE SOLICITATION. IF SOMETHING IS MENTIONED IN THE MEETING THAT CONTRADICTS WHAT IS SHOWN IN THE ADVERTISED
PLANS AND SPECIFICATIONS, THE PLANS AND SPECIFICATIONS SHALL BE FOLLOWED.
Direct your questions to the U.S. Army Corps of Engineers, Savannah District, Contracting Office:
SFC Kassandra Robinson, Contracting Specialist Kassandra.n.Robinson@usace.army.mil
Whittni Hiscox, Contracting Officer Whittni.C.Hiscox@usace.army.mil
All bidder inquiries should be submitted in ProjNet Bidder Inquiry module by May 17, 2021.
PROJECT AREA
Material removed from the site on Onslow Island will be placed in DMCA 12A or DMCA 13A or the Sediment Basin Area. The designated area for placement is shown in the solicitation drawings.
The project site (outlined in RED) is located on Onslow Island and is accessible by water only. It is in the vicinity of a USACE formerly-used Dredged Material Containment Area
1S (DMCA 1S).
The contractor will complete the restoration of approximately 29 acres of brackish marsh, including excavation of material and creation of feeder creeks to enable tidal connectivity on the site. During excavation for marsh restoration, feeder creeks will be excavated to tie into adjacent bodies of water. The extent of the marsh restoration areas will begin at the toe of excavated 3H:1V cut slopes. Some additional, incidental work should be anticipated to establish vegetation across the face of the 3H:1V cut slopes. The final elevation for the marsh restoration is approximately +7.6’ mean lower low water (mllw). The project includes installation and removal of silt fence and other erosion control measures, clearing and grubbing, marsh restoration and feeder creek excavation, and removal/disposal of excavated materials from the site.
The project is located within a designated area on Onslow Island (Northing: 782,928.2516; Easting:
974,087.2680), within the Savannah River at the confluence of the Front River and Middle River and is within the boundaries of the Savannah National Wildlife Refuge. The site is owned and managed by the US Fish and Wildlife Service (USFWS). Access to the project site is by water only.
Photos of the project site(s) are permitted but any disturbance of the area (i.e. cutting of any vegetation, digging of any soil, etc.) is prohibited without a Special Use Permit issued by the USFWS. Point of contact for a permit is Mr. Russ Webb, Russell_webb@fws.gov, (912) 313-1366.
PROJECT SCOPE DESCRIPTION / LOCATION
WEATHER DAYS
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
14 12 10 6 6 8 11 9 6 4 8 12
Monthly Anticipated Adverse Weather Delay Workdays Based on 5-day Work Week
LIQUIDATED DAMAGES
Liquidated Damages for this contract are $1,167.00 per day
Period of construction for this solicitation is 360 calendar days from issuance of Notice to Proceed (NTP)
CONSTRUCTION DURATION
BID SCHEDULE
CLIN 0001 – Mobilization and Demobilization
CLIN 0002 – Silt Fence and Erosion Control Measures (sub-divided)
CLIN 0002AA – First 15,000 Linear Feet
CLIN 0002AB – All Over 15,000 Linear Feet (1,000 Feet)
CLIN 0002AC – Permanent Grassing (6 Acres)
CLIN 0002AD – Temporary Grassing (34.20 Acres)
CLIN 0003 – Clearing and Grubbing (sub-divided)
CLIN 0003AA – First 38 Acres
CLIN 0003AB – All Over 38 Acres (5 Acres)
CLIN 0004 – Excavation and Grading to include removal of excess material from the site (300,000 CYs)
CLIN 0005 – Excavation and Grading to include removal of excess material from feeder creeks (150,000 CYs)
All line items are included in the BASE BID, there are NO OPTIONAL BID ITEMS.
BID SUBMISSION AND INQUIRIES
ELECTRONIC SUBMISSION OF BIDS IS REQUIRED. Bids will be submitted using the link provided in the solicitation. The only authorized transmission method for bids in response to this solicitation is electronically via
SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND
CARRIED, ETC.) WILL BE ACCEPTED.
BID BOND GUARANTEE: An electronic copy of the bid bond guarantee must be submitted with the electronic bid submission IAW FAR 52.228-1. The original hardcopy bid bond guarantee must also be mailed to the address in the solicitation and received by the proposal due date. Failure to submit a bid bond guarantee could render your bid non-responsive.
BID ACCEPTANCE PERIOD: Minimum of 90 calendar days
BIDDER INQUIRIES: No technical questions will be answered in the pre-bid conference, all inquiries need to be submitted in the ProjNet Bidder Inquiry module. The Bidder Inquiry Key is provided in the solicitation. Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the IFB for receipt of bids.
QUESTIONS
File details come from the government source that posted it. Updated .