B.08 Drawings Amendment 0001.pdf
PDF 442 KB Posted
- Solicitation number
- W912HN21B5002
About this file
This solicitation package describes a fixed price construction contract for marsh restoration. The U.S. Army Corps of Engineers seeks to restore approximately 29 acres of brackish marsh through excavation of material and creation of feeder creeks to enable tidal connectivity. The work includes erosion control, clearing, grubbing, marsh and feeder creek excavation, and disposal of excavated materials. The location is Onslow Island within the Savannah National Wildlife Refuge. The pre-bid conference will be held on April 29, 2021 and bids are due by June 15, 2021. Evaluation will be based on price. The period of performance is 360 calendar days from notice to proceed.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYPICAL FEEDER CREEK SECTION
STA. 0+00-19+16, 100+00-104+93, AND 110+62-113+07
N.T.S.
5' 5'
10'
ELEV. VARIES (0.0 TO 0.5 FT. MLLW)
EXCAVATION
REQUIRED EXCAVATION
SECTION
EXISTING GROUND
ELEVATION VARIES
TYPICAL FEEDER CREEK SECTION
WITH LIMITED FOOTPRINT
106+97-108+25
N.T.S.
5' 5'
10'
ELEV. VARIES (0.18 TO 0.23 FT. MLLW)
EXCAVATION
REQUIRED EXCAVATION
SECTION
EXISTING GROUND
ELEVATION VARIES
GENERAL MARSH RESTORATION EXCAVATION DETAIL
N.T.S.
ELEV. VARIES (7.6 +/-0.5 FT. MLLW)
REQUIRED EXCAVATION
EXISTING GROUND
ELEVATION VARIES
TIE TO EXISTING
MAX. TOLERANCE
MIN. TOLERANCE
TYPICAL FEEDER CREEK SECTION
TRANSITION TO/FROM LIMITED FOOTPRINT
STA. 104+93-106+97 AND 108+25-110+62
N.T.S.
5' 5'
10'
ELEV. VARIES
(0.09 TO 0.18 FT. MLLW, 0.23 TO 0.31 FT. MLLW)
X
EXCAVATION
REQUIRED EXCAVATION
SECTION
X
EXISTING GROUND
ELEVATION VARIES
SIDE SLOPE VARIES
FROM 3:1 TO 5:1
SIDE SLOPE VARIES
FROM 3:1 TO 5:1
ELEV. VARIES (7.6 +/-0.5 FT. MLLW)
ELEV. VARIES (7.6 +/-0.5 FT. MLLW)
CN301
T Y
P I C
A L
S
E C
T I O
N S
A
D
G E
N E
R A
L
E
X C
A V
A T
I O
N
D E
T A
I L S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
D A
T E
C O
N T
R A
C T
O
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
C A
T E
G O
R Y
D
E
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
-W H
N B
A P
R I L
S A
V A
N N
A H
G
A
W
O
G L E
T H
O R
E
V E
S A
V A
N N
H
D
I S
T R
I C
T
F Y
D M
M
R
S
T O
R A
T I O
N
C H
A T
H A
M
C
O U
N T
Y
G
E O
R G
I A
READY TO ADVERTISE (RTA)
C W
K
L
W i l l i a m s
K6ENHETW 5/18/2021 8:32:06 AM C:\USERS\K6ENHETW\DESKTOP\TELEWORK\CWK0609\04_GEOTECH\CAD\PLAN SHEETS\Z0RCN301.DWG
N A
M E
N A
M E
N A
M E
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M E
N D
E M
E N
T
M
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
D A
T E
C O
N T
R A
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
F
E
N G
I N
E E
R S
C A
T E
G O
D
E
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
-W H
N B
A P
R I L
S A
V A
N N
A H
G
A
W
O
G L E
T H
O R
V E
S A
V A
N N
S
T R
I C
T
F Y
D M
M
R
S
T O
R A
T I O
N
C H
A T
H A
M
C
O U
N T
Y
G
E O
R G
I A
READY TO ADVERTISE (RTA)
C W
K
L
W i l l i a m s
K6ENHETW 5/18/2021 8:29:15 AM C:\USERS\K6ENHETW\DESKTOP\TELEWORK\CWK0609\04_GEOTECH\CAD\PLAN SHEETS\Z0RCE-GENERAL, NOTES.DWG
E
W
O R
T M
A N
E
W
O R
T M
A N
G
M
U S
E
CERTIFICATIONS:
PRIMARY PERMITTEE/OWNER:
THE DEPARTMENT OF THE ARMY
USACE PLANNING BRANCH
C/O STEVE FOX
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
(912) 652-6210
STEPHEN.M.FOX@USACE.ARMY.MIL
24 HOUR CONTACT INFORMATION:
STEVE FOX
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
STEPHEN.M.FOX@USACE.ARMY.MIL
(912) 652-6210
DESIGN PROFESSIONAL:
PROJECT ENGINEER
EMILY WORTMAN, P.E.
USACE, SAVANNAH DISTRICT
(912) 324-0133
THE DESIGN PROFESSIONAL WHO PREPARED THE E.S. & P.C. PLAN IS TO INSPECT THE
INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER
CONTROL BMPS WITHIN 7 DAYS AFTER INSTALLATION. THE DESIGN PROFESSIONAL IS TO
REPORT THE RESULTS OF THE INSPECTION TO THE PRIMARY PERMITTEE WITHIN 7 DAYS,
AND THE PERMITTEE MUST CORRECT ALL DEFICIENCIES WITHIN 2 BUSINESS DAYS OF
RECEIPT OF THE INSPECTION REPORT.
TO BE UPDATED BY SUCCESSFUL BIDDER WITH CONCURRENCE BY THE CONTRACTING
OFFICER AT LEAST 14 DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
ACTIVITIES I.A.W. PART II, A.1. OF GENERAL PERMIT NO. GAR100001
POINT OF CONTACT INFORMATION:
PROJECT DESCRIPTION INCLUDES THE RESTORATION OF APPROXIMATELY 28 ACRES OF BRACKISH MARSH WITH
THE CONSTRUCTION OF MULTIPLE FEEDER CREEKS.
IMPERVIOUS AREAS HAVE BEEN INCLUDED IN THE PRE AND POST CONSTRUCTION DRAINAGE PLANS SHOWN IN
THESE DRAWINGS. TOTAL PROJECT LIMITS = 38.4 ACRES. PROJECT DISTURBED ACREAGE = 38.4 ACRES.
TOTAL CUT VOLUME FOR PERMITTING PURPOSES DUE TO PROPOSED GRADE IS APPROXIMATELY 450,000
CY.THESE VALUES ARE FOR PERMITTING PURPOSES ONLY.
TOPOGRAPHIC SURVEY AND 1' CONTOURS WITHIN THE CONSTRUCTION LIMITS OF THE PROJECT WAS OBTAINED
BY THE U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT.
ALL DEBRIS WILL BE HAULED OFF SITE TO A STATE APPROVED LANDFILL OR BURNED ONSITE..
THIS PROPERTY LIES WITHIN FEMA FIRM MAP 13051C0045G DATED 08/16/2018
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND
SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
THERE ESA WETLAND BOUNDARIES ARE DELINEATED ON THE SITE PLANS CE101-CE102.
COASTAL MARSHLAND ENCROACHMENT BUFFER VARIANCE IS REQUIRED FOR THIS PROJECT ALONG THE MIDDLE
AND SAVANNAH RIVER.
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS
MEASURED FORM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND
BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST ACQUIRING THE
NECESSARY VARIANCES AND PERMITS.
ESTIMATE OF CURVE NUMBER OF THE SITE PRIOR TO AND AFTER CONSTRUCTION ACTIVITIES ARE COMPLETED:
SITE - PRE: COMPOSITE CN 77
SITE - POST: COMPOSITE CN 74
PROJECT INFORMATION & DATA:
AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON
BMPS WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN
PROFESSIONAL.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION
OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND
DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE
STABILIZED WITH MULCH OR TEMPORARY SEEDING.
ES&PC PLAN GENERAL NOTES:
THE EROSION CONTROL PLAN IS DESIGNED UTILIZING BMPs IN ACCORDANCE WITH GSWCC
REQUIREMENTS AND IS INTENDED TO BE SEQUENCED AS FOLLOWS:
INITIAL PHASE
· INSTALL PERIMETER CONTROL BMPs (SILT FENCE, CONSTRUCTION ENTRANCE/EXITS)
· INSTALL TEMPORARY DIVERSION SWALES
· CLEARING AND GRUBBING
CONSTRUCTION PHASE
· MAINTAIN PERIMETER CONTROL BMPs.
· CONTINUE GRADING.
· MAINTAIN CONSTRUCTION ENTRANCE/EXITS AS INDICATED ON PLANS.
· INSTALL TEMPORARY/PERMANENT GRASSING OR COVER DISTURBED AREAS AS
NEEDED.
· ADJUST DIVERSIONS AS NEEDED TO MAINTAIN CONVEYANCE OF SEDIMENT LADEN
STORMWATER TO SILT FENCE AND DIVERSION SWALES.
STABILIZATION PHASE
· ALL BMPS ARE TO BE MAINTAINED AND KEPT EFFECTIVE UNTIL ENTIRE CONTRIBUTING
BASIN IS STABILIZED.
· BRING SITE TO GRADE.
· INSTALL PERMANENT GRASS SEED.
· CONNECT FEEDER CREEKS TO SAVANNAH AND MIDDLE RIVER.
· BMPS TO BE REMOVED WHEN SITE IS STABILIZED PER GSWCC REQUIREMENTS.
DESCRIPTION OF BMPS & SEQUENCE OF WORK:
THIS SCHEDULE IS TO BE USED FOR PERMITTING PURPOSES ONLY. REFER
TO APPROVED PROJECT SCHEDULE FOR EXACT CONSTRUCTION SEQUENCING.
GRADING AND DRAINAGE BMPs
FEEDER CREEK GRADING
CONNECT FEEDER CREEKS TO RIVER
FINAL STABILIZATION
FINE GRADING
DESCRIPTION
INITIAL PHASE CONTROLS
CLEARING, GRUBBING, ROUGH GRADING
MAINT. OF EROSION CONTROL BMPs
TEMPORARY STABILIZATION
START DATE
END DATE
CONSTRUCTION ACTIVITY SCHEDULE
1 2
JULY, 2021 (PROJECTED NTP)
AUG., 2022 (PROJECTED)
3 4 5 6 7 8 9 10 11 12
SEDIMENT STORAGE ON SITE IS MANAGED THROUGH THE USE OF SILT FENCE. SILT FENCE
HAS BEEN UTILIZED IN AREAS WHERE A SEDIMENT TRAP WAS NOT FEASIBLE AND COULD
DRAIN OFFSITE. SEE CALCULATIONS FOR REQUIRED AND PROVIDED CUBIC YARDS OF
SEDIMENT STORAGE ON PLAN SHEETS AND DETAIL SHEETS CE502.
CE001
E S
P
C
G
E N
E R
A L
N
O T
E S
E
W
O R
T M
A N
E
W
O R
T M
A N
G
M
U
CERTIFICATION AND SIGNATURE OF THE PERMITTEE IN ACCORDANCE WITH PART IV.G.2.C
OF THE PERMIT.
I CERTIFY UNDER PENALTY OF LAW THAT THIS REPORT AND ALL ATTACHMENTS WERE
PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM
DESIGNED TO ASSURE THAT CERTIFIED PERSONNEL PROPERLY GATHER AND EVALUATE
THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS
WHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR
GATHERING THE INFORMATION, THE INFORMATION SUBMITTED IS, TO THE BEST OF MY
KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT THERE
ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE
POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING VIOLATIONS."
SIGNATURE DATE
CERTIFICATION AND SIGNATURE OF THE DESIGN PROFESSIONAL IN ACCORDANCE WITH
PART IV OF THE PERMIT.
I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL
PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST
MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY CONTROL ACT
AND THE DOCUMENT "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA"
(MANUAL) PUBLISHED BY THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION AS
OF JANUARY 1 OF THE YEAR IN WHICH THE LAND-DISTURBING ACTIVITY WAS PERMITTED,
PROVIDES FOR THE SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE
STORM WATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT
PRACTICES AND SAMPLING METHODS IS EXPECTED TO MEET THE REQUIREMENTS
CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100001.
I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT
TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER
MY SUPERVISION.
SIGNATURE DATE
R E
V I S
C
O R
D A
N C
E
W
I T
H
A
M E
N D
M E
M
| CN301 TYPICAL SECTIONS AND GENERAL EXCAVATION DETAIL |
| CE001 EROSION, SEDIMENTATION, & POLLUTION CONTROL GENERAL NOTES |
File details come from the government source that posted it. Updated .