Specs_V2-B_DIV_08-23_95pct.pdf

PDF 4 MB Posted

Attached to
PN88725 MCA2 University Registrar, Force Modernization & Proponency Facility Federal contract opportunity
Solicitation number
W912HN19R07QN
Issued by
Department of the Army Corps of Engineers Engineering District Savannah

About this file

This sources sought notice requests capability statements from contractors interested in a design-build project to construct a SCI Mission Command, University Registrar, Force Modernization and Proponency Facility for approximately $40-120 million. Respondents must have experience as a prime contractor completing similar scope projects and multiple projects in the same area dealing with shared utilities. They must also have experience with SCIF or secret/top secret rooms and cleared personnel. Respondents must complete the Joint Certification Program process, familiarizing themselves with the instructions and DD2345. Only vetted contractors will compete for this project to be awarded through the Federal Business Opportunities website.

View the file

Other files for this federal contract opportunity

Other files attached to PN88725 MCA2 University Registrar, Force Modernization & Proponency Facility, newest first.
File Type Posted
MCA2 Industry Day Attendees.pdf PDF
MCA2 Industry Day Slides - 25 Sep 2020.pptx PPTX presentation
Industry Day - 07Oct20.pdf PDF
PN88725_95pct_VOL1B.pdf PDF
MCA2 20B3003 Bid Schedule V2 17 Jun 20.docx DOCX document
Specs_V2-A_DIV_00-07_95pct.pdf PDF
PN88725_95pct_VOL1E.pdf PDF
PN88725_95pct_VOL1K.pdf PDF
PN88725_95pct_VOL1A.pdf PDF
PN88725_95pct_VOL1G.pdf PDF
PN88725_95pct_VOL1L.pdf PDF
PN88725_95pct_VOL1D.pdf PDF
Specs_V2-C_DIV_25-Appendices_95pct.pdf PDF
PN88725_95pct_VOL1H.pdf PDF
PN88725_95pct_VOL1F.pdf PDF
PN88725_95pct_VOL1J.pdf PDF
PN88725_95pct_VOL1C.pdf PDF
Introduction_to_Proper_Handling_of_DoD_Export-Controlled_Technical_Data_v2.pdf PDF
DD_Form_2345_(Blank)_2019.pdf PDF
DD_Form_2345_Instructions_(July_2019).pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cyber Center of Excellence

95% Design Submittal

SCI Mission Command, University Registrar, Force Modernization and Proponency Facility (MCA-2) Volume 2 Specifications - B - Division 08 – 23

Contract No.: W912HN-18-F-2005

July 22, 2020 Fort Gordon, Georgia

THIS PAGE INTENTIONALLY LEFT BLANK

FY20 PN 88752 SCI Mission Cmd/Univ Registrar/Force Modernization/Proponency Ft Gordon, GA W912HN-18-F-2005 95% Submission - July 22, 2020

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 03 00 OPTIONS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 30 00.00 23 FORT GORDON, GA INSTALLATION SPECIFIC REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 10 ABBREVIATIONS - TERMINOLOGY

01 43 39 MOCK-UPS

01 45 00.00 10 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 73 29 CUTTING AND PATCHING

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 74 23 CLEANING

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 39 23.13 CHEMICAL COMPOUND MEMBRANE CONCRETE CURING

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

05 72 00 DECORATIVE METAL SPECIALTIES

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 16 43 GYPSUM SHEATHING

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AND AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 14 00 COLD FLUID-APPLIED WATERPROOFING

07 16 00.01 VAPOR EMISSION CONTROL FOR CONCRETE FLOORS WITH FINISH

FLOORING

07 21 13 BOARD AND BLOCK INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 13 METAL WALL PANELS (MPS-1/MPS-2/MPS-3A/B)

07 42 29 TERRACOTTA RAINSCREEN WALL PANELS (TCRS-1, TCRS-2, TCS-1)

07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING (EPDM)

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

07 95 00 EXPANSION JOINTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 33 23 OVERHEAD COILING DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 41 26 ALL-GLASS ENTRANCES AND STOREFRONTS

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 87 33 DECORATIVE FILM

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 16 NON-STRUCTURAL METAL FRAMING

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 66 23 RESINOUS MATRIX TERRAZZO FLOORING

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 72 00 WALLCOVERINGS

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.20 INTERIOR SIGNAGE

PROJECT TABLE OF CONTENTS Page 2

10 14 53 TRAFFIC SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 29 UPFOLDING PANEL PARTITIONS (Bid Alternate #5)

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 75 00 FLAGPOLES

DI VI SI ON 11 - EQUI PMENT

11 14 13 SECURITY TURNSTILES

11 24 23 WINDOW WASHING SYSTEM

11 24 26 SAFETY TIE-BACKS

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

12 36 00 COUNTERTOPS

12 93 00 SITE FURNISHINGS

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 10 COMBINED WET PIPE SPRINKLER AND STANDPIPE SYSTEM, FIRE

PROTECTION

21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 14 29.00 40 SUMP PUMPS

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 11 25 FACILITY GAS PIPING

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 57 10.00 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM

HEAT EXCHANGERS

PROJECT TABLE OF CONTENTS Page 3

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.00 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 05 11.01 CYBERSECURITY FOR FIRE LIFE SAFETY (FLS) CONTROL SYSTEMS

25 05 11.02 CYBERSECURITY FOR UTILITY CONTROL SYSTEMS

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10.00 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND

INTEGRATION

DI VI SI ON 26 - ELECTRI CAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 09 23 LIGHTING CONTROL DEVICES

26 09 43 PLUG-LOAD CONTROL SYSTEM

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 LOW-VOLTAGE SWITCHGEAR

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 00 01 EARTHWORK - BUILDING SUBGRADE

31 05 19 GEOTEXTILE

31 05 21 GEOGRID SOIL REINFORCEMENT

31 05 22 GEOTEXTILES USED AS FILTERS

31 10 00 CLEARING FOR CIVIL WORKS

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

31 32 00.11 M30-P1 CABLE BARRIER SYSTEM

31 32 11 SOIL SURFACE EROSION CONTROL

31 60 00 FOUNDATION PREPARATION

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSES

32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 17 HOT MIX BITUMINOUS PAVEMENT

32 12 43 POROUS FLEXIBLE PAVING

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

PROJECT TABLE OF CONTENTS Page 4

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKINGS

32 31 13 EXTERIOR GATES

32 31 27 SECURITY FENCE

32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 84 23 UNDERGROUND SPRINKLER SYSTEMS

32 92 22 NATIVE LAWN SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

32 94 13 LANDSCAPE EDGING

32 94 50 STRUCTURAL SOIL CELLS

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION

33 63 13.19 CONCRETE TRENCH HYDRONIC AND STEAM ENERGY DISTRIBUTION

33 71 02.01 UNDERGROUND ELECTRICAL DISTRIBUTION FOR COMMUNICATIONS

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

PROJECT TABLE OF CONTENTS (APPENDICES) Page 1

APPENDIX A

AUGUSTA UTILITIES DEPARTMENT (AUD) SPECIFICATIONS

14.2 WATER DISTRIBUTION SYSTEMS DESIGN AND CONSTRUCTION

14.3 WASTEWATER COLLECTION SYSTEMS DESIGN AND CONSTRUCTION

14.4 EXCAVATION AND BACKFILLING

APPENDIX B

CCoE COMPREHENSIVE CAMPUS PLAN - FINAL REPORT

-- End of Project Table of Contents (Appendices) --

SECTION 08 11 13

STEEL DOORS AND FRAMES

02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A879/A879M (2012) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface

ASTM A924/A924M (2017a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591 (2017) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation

ASTM D2863 (2017) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)

ASTM E1332 (2016) Standard Classification for Rating Outdoor-Indoor Sound Attenuation

ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen

SECTION 08 11 13 Page 1

ASTM E413 (2016) Classification for Rating Sound Insulation

ASTM E90 (2009) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.115 (2016) Hardware Preparation in Steel Doors and Steel Frames

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 105 (2016; TIA 16-1) Standard for Smoke Door Assemblies and Other Opening Protectives

NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies

NFPA 80 (2016; TIA 16-1) Standard for Fire Doors and Other Opening Protectives

STEEL DOOR INSTITUTE (SDI/DOOR)

SDI/DOOR 113 (2001; R2006) Standard Practice for Determining the Steady State Thermal Transmittance of Steel Door and Frame Assemblies

SDI/DOOR A250.11 (2001) Recommended Erection Instructions for Steel Frames

SDI/DOOR A250.6 (2003; R2009) Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames

SDI/DOOR A250.8 (2003; R2008) Recommended Specifications for Standard Steel Doors and Frames

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BDC Ref Guide (2013) USGBC LEED Reference Guide for Building Design and Construction, v4

UNDERWRITERS LABORATORIES (UL)

UL 10C (2016) UL Standard for Safety Positive Pressure Fire Tests of Door Assemblies

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Architect/Engineer approval is required for submittals marked with an "AE" designation. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SECTION 08 11 13 Page 2

SD-02 Shop Drawings

Doors; G, AE

Frames; G, AE

Accessories

Show elevations, construction details, metal gages, hardware provisions, method of glazing, and installation details.

Schedule of doors; G, AE

Schedule of frames; G, AE

Submit door and frame locations.

SD-03 Product Data

Doors; G, AE

Frames; G, AE

Accessories

Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel (internal) reinforcement, insulation, and door edge construction. When "custom hollow metal doors" are provided in lieu of "standard steel doors," provide additional details and data sufficient for comparison to SDI/DOOR A250.8 requirements.

Compliance with LEED MRc3 Building Product Disclosure and Optimization, Environmental Product Declarations (EPD); G, AE

Compliance with LEED MRc4 Building Product Disclosure and Optimization, Sourcing of Raw Materials; G, AE

Compliance with LEED MRc5 Building Product Disclosure and Optimization, Material Ingredient Optimization (HPD, CSR, Cradle to Cradle, and Declare); G, AE

SD-06 Test Reports

Sound Rated Steel Doors; G, AE

Sound Transmission Class (STC) test report in accordance with ASTM E90 and ASTM E413 for assembly of identical materials and construction, as applicable. Outdoor-Indoor Transmission Class (OITC) test report in accordance with ASTM E90 and ASTM E1332 for assembly of identical materials and construction, as applicable.

Tested door is hung in frame as indicated and is fully operable with hardware and sound seals installed. Include laboratory and test method accreditation references.

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver doors, frames, and accessories undamaged and with protective

SECTION 08 11 13 Page 3 wrappings or packaging. Provide temporary steel spreaders securely fastened to the bottom of each welded frame. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.

PART 2 PRODUCTS

Products in this section need to be compliant with:

a. LEED MRc3 Building Product Disclosure and Optimization, Environmental Product Declarations (EPD).

b. LEED MRc4 Building Product Disclosure and Optimization, Sourcing of Raw Materials.

c. LEED MRc5 Building Product Disclosure and Optimization, Material Ingredient Optimization (HPD, CSR, Cradle to Cradle, and Declare).

d. See Section 01 33 29 SUSTAINABILITY REPORTING for additional information on requirements.

2.1 STANDARD STEEL DOORS

SDI/DOOR A250.8 , except as specified otherwise. Prepare doors to receive door hardware as specified in Section 08 71 00. Undercut where indicated. Exterior doors shall have top edge closed flush and sealed to prevent water intrusion. Doors shall be 1-3/4 inch thick, unless otherwise indicated.

2.1.1 Classification - Level, Performance, Model

2.1.1.1 Heavy Duty Doors 16 GA

SDI/DOOR A250.8 , Level 2, physical performance Level B, Model 2, with core construction as required by the manufacturer for interior doors , of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners shall be filled with mineral board insulation.

2.2 PERFORMANCE REQUIREMENTS

Products in this Section are required to report material qualities for TPC Building Product Disclosure Optimization credit MRc4 as outlined in the LEED BDC Ref Guide . Products that have either recycled content, are within 500 radial miles of the Project Site, have rapidly renewable content, or have FSC certified wood shall submit in accordance with PART 1 SUBMITTALS.

Not all products in this Section are required to have this type of content.

Products in this Section are required to report materials qualities for TPC Building Product Disclosure Optimization credits MRc3 and MRc5 as outlined in the LEED BDC Ref Guide . Materials need to have an EPD certificate, Manufacturer Inventory with CASRN for all ingredients, HPD certificate, Cradle to Cradle certificate, GreenScreen v1.2 Benchmark, REACH Optimization, Declare Label, or CSR report. Not all products in this Section are required to have one of these reports. Coordinate with Section

01 33 29 SUSTAINABILITY REPORTING.

SECTION 08 11 13 Page 4

2.3 SOUND RATED STEEL DOORS

Doors shall have a Sound Transmission Class (STC) and/or Outdoor-Indoor Transmission Class (OITC) as indicated on the drawings.

2.4 ACCESSORIES

2.4.1 Astragals

For pairs of exterior steel doors which will not have aluminum astragals or removable mullions, as specified in Section 08 71 00 DOOR HARDWARE provide overlapping steel astragals with the doors. For interior pairs of fire rated and smoke control doors, provide stainless steel astragals complying with NFPA 80 for fire rated assemblies and NFPA 105 for smoke control assemblies.

2.5 LITES

Provide lite kits as indicated in door schedule. See Section 08 81 00 GLAZING FOR MATERIAL. Locate bottom of glazed panel 43 inch maximum above finish floor. Locate fixed stop at exterior face integral to door. Locate removable stop on interior face. Snap-in stops or stops secured with countersunk Phillip head machine screws. for fire rated doors, provide label as required for opening. Provide fire rated glass test as part of door assembly and labeled for intended opening.

2.6 INSULATION CORES

Insulated cores shall be of type specified, and provide an apparent U-factor of .48 in accordance with SDI/DOOR 113 and shall conform to:

a. Rigid Cellular Polyisocyanurate Foam: ASTM C591, Type I or II, foamed-in-place or in board form, with oxygen index of not less than 22 percent when tested in accordance with ASTM D2863; or

b. Rigid Polystyrene Foam Board: ASTM C578, Type I or II; or

c. Mineral board: ASTM C612, Type I.

2.7 STANDARD STEEL FRAMES

SDI/DOOR A250.8 , Level 2, except as otherwise specified. Form frames to sizes and shapes indicated on drawings (including extended profiles noted as frame type 1A), with welded corners. Provide steel frames for doors and mullions, unless otherwise indicated.

2.7.1 Welded Frames

Continuously weld frame faces at corner joints. Mechanically interlock or continuously weld stops and rabbets. Grind welds smooth.

Weld frames in accordance with the recommended practice of the Structural Welding Code Sections 1 through 6, AWS D1.1/D1.1M and in accordance with the practice specified by the producer of the metal being welded.

2.7.2 Mullions and Transom Bars

Mullions and transom bars shall be closed or tubular construction and be a member with heads and jambs butt-welded thereto. Bottom of door mullions

SECTION 08 11 13 Page 5 shall have adjustable floor anchors and spreader connections.

2.7.3 Stops and Beads

Form stops and beads from 20 gage steel. Provide for glazed and other openings in standard steel frames. Secure beads to frames with oval-head, countersunk Phillips self-tapping sheet metal screws or concealed clips and fasteners. Space fasteners approximately 12 to 16 inch on center.

Miter molded shapes at corners. Butt or miter square or rectangular beads at corners.

2.7.4 Anchors

Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage.

2.7.4.1 Wall Anchors

Provide at least three anchors for each jamb. For frames which are more than 7.5 feet in height, provide one additional anchor for each jamb for each additional 2.5 feet or fraction thereof.

a. Masonry: Provide anchors of corrugated or perforated steel straps or 3/16 inch diameter steel wire, adjustable or T-shaped.

b. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding.

2.7.4.2 Floor Anchors

Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each jamb member. Where floor fill occurs, terminate bottom of frames at the indicated finished floor levels and support by adjustable extension clips resting on and anchored to the structural slabs.

2.8 FIRE AND SMOKE DOORS AND FRAMES

NFPA 80 and NFPA 105 and this specification. The requirements of NFPA 80 and NFPA 105 shall take precedence over details indicated or specified.

2.8.1 Labels

Fire doors and frames shall bear the label of Underwriters Laboratories (UL), Factory Mutual Engineering and Research (FM), or Warnock Hersey International (WHI) attesting to the rating required. Testing shall be in accordance with NFPA 252 or UL 10C . Labels shall be metal with raised letters, and shall bear the name or file number of the door and frame manufacturer. Labels shall be permanently affixed at the factory to frames and to the hinge edge of the door. Door labels shall not be painted.

2.8.2 Oversized Doors

For fire doors and frames which exceed the size for which testing and labeling are available, furnish certificates stating that the doors and frames are identical in design, materials, and construction to a door which has been tested and meets the requirements for the class indicated.

SECTION 08 11 13 Page 6

2.8.3 Astragal on Fire and Smoke Doors

On pairs of labeled fire doors, conform to NFPA 80 and UL requirements.

On smoke control doors, conform to NFPA 105 .

2.9 WEATHERSTRIPPING

As specified in Section 08 71 00 DOOR HARDWARE.

2.9.1 Integral Gasket

Black synthetic rubber gasket with tabs for factory fitting into factory slotted frames, or extruded neoprene foam gasket made to fit into a continuous groove formed in the frame, may be provided in lieu of head and jamb seals specified in Section 08 71 00 DOOR HARDWARE. Insert gasket in groove after frame is finish painted. Air leakage of weatherstripped doors shall not exceed 0.5 cubic feet per minute of air per square foot of door area when tested in accordance with ASTM E283.

2.10 HARDWARE PREPARATION

Provide minimum hardware reinforcing gages as specified in SDI/DOOR A250.6 .

Drill and tap doors and frames to receive finish hardware. Prepare doors and frames for hardware in accordance with the applicable requirements of SDI/DOOR A250.8 and SDI/DOOR A250.6 . For additional requirements refer to ANSI/BHMA A156.115 . Drill and tap for surface-applied hardware at the project site. Build additional reinforcing for surface-applied hardware into the door at the factory. Locate hardware in accordance with the requirements of SDI/DOOR A250.8 , as applicable. Punch door frames, with the exception of frames that will have weatherstripping or soundproof gasketing, to receive a minimum of two rubber or vinyl door silencers on lock side of single doors and one silencer for each leaf at heads of double doors. Set lock strikes out to provide clearance for silencers.

2.11 FINISHES

2.11.1 Factory-Primed Finish

All surfaces of doors and frames shall be thoroughly cleaned, chemically treated and factory primed with a rust inhibiting coating as specified in SDI/DOOR A250.8 . Where coating is removed by welding, apply touchup of factory primer.

2.11.2 Hot-Dip Zinc-Coated and Factory-Primed Finish

Fabricate exterior doors and frames from hot dipped zinc coated steel, alloyed type, that complies with ASTM A924/A924M and ASTM A653/A653M . The coating weight shall meet or exceed the minimum requirements for coatings having 0.4 ounces per square foot, total both sides, i.e., A40. Repair damaged zinc-coated surfaces by the application of zinc dust paint.

Thoroughly clean and chemically treat to insure maximum paint adhesion.

Factory prime as specified in SDI/DOOR A250.8 . Provide for exterior doors.

2.11.3 Electrolytic Zinc-Coated Anchors and Accessories

Provide electrolytically deposited zinc-coated steel in accordance with ASTM A879/A879M , Commercial Quality, Coating Class A. Phosphate treat and factory prime zinc-coated surfaces as specified in SDI/DOOR A250.8 .

SECTION 08 11 13 Page 7

2.12 FABRICATION AND WORKMANSHIP

Finished doors and frames shall be strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle. Molded members shall be clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment. Dress exposed welded and soldered joints smooth. Design door frame sections for use with the wall construction indicated. Corner joints shall be well formed and in true alignment. Conceal fastenings where practicable.

2.12.1 Grouted Frames

For frames to be installed in exterior walls and to be filled with mortar or grout, fill the stops with strips of rigid insulation to keep the grout out of the stops and to facilitate installation of stop-applied head and jamb seals.

2.13 PROVISIONS FOR GLAZING

Materials are specified in Section 08 81 00, GLAZING.

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Frames

Set frames in accordance with SDI/DOOR A250.11 . Plumb, align, and brace securely until permanent anchors are set. Anchor bottoms of frames with expansion bolts or powder-actuated fasteners. Build in or secure wall anchors to adjoining construction.

Solidly pack mineral wool insulation of 6 to 12 PCF behind frames as needed to meet STC and/or OITC rating indicated. Solidly fill space between frames and wall with mortar as needed to meet STC and/or OITC rating indicated.

Adjust sound seals and door for full engagement of sound seals with no gaps or leaks when door is latched.

3.1.2 Doors

Hang doors in accordance with clearances specified in SDI/DOOR A250.8 .

After erection and glazing, clean and adjust hardware.

3.1.3 Fire and Smoke Doors and Frames

Install fire doors and frames, including hardware, in accordance with NFPA 80 . Install fire rated smoke doors and frames in accordance with NFPA 80 and NFPA 105 .

3.2 PROTECTION

Protect doors and frames from damage. Repair damaged doors and frames prior to completion and acceptance of the project or replace with new, as directed. Wire brush rusted frames until rust is removed. Clean thoroughly. Apply an all-over coat of rust-inhibitive paint of the same type used for shop coat.

SECTION 08 11 13 Page 8

3.3 CLEANING

Upon completion, clean exposed surfaces of doors and frames thoroughly.

Remove mastic smears and other unsightly marks.

-- End of Section --

SECTION 08 11 13 Page 9

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 08 11 13 Page 10

SECTION 08 31 00

ACCESS DOORS AND PANELS

05/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable

ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel

ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A666 (2015) Standard Specification for Annealed or Cold-Worked Austenitic Stainless Steel Sheet, Strip, Plate and Flat Bar

ASTM E413 (2016) Classification for Rating Sound Insulation

ASTM E90 (2009) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements

MASTER PAINTERS INSTITUTE (MPI)

MPI 79 (2012) Primer, Alkyd, Anti-Corrosive for Metal

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BDC Ref Guide (2013) USGBC LEED Reference Guide for Building Design and Construction, v4

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

SECTION 08 31 00 Page 1 submittals not having a "G" designation are for Contractor Quality Control approval. Architect/Engineer approval is required for submittals marked with an "AE" designation. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Access Doors And Panels; G , AE

SD-03 Product Data

Access Doors And Panels; G , AE

Hardware Including Locks and Keys; G , AE

Accessories; G , AE

SD-04 Samples

Finishes; G , AE

SD-06 Test Reports

STC ratings of Assemblies; G , AE

1.3 MISCELLANEOUS REQUIREMENTS

For access doors and panels provide the following:

1.3.1 Shop Drawings

For field assembled access doors and panels, provide plans, elevations, sections, and details for each type of access door and panel assembly.

Indicate frame, surface and edge construction, materials, and accessories. Indicate types of finished surfaces and details for panel edge conditions. Provide a door schedule with a unique number for each access door and panel, specific location in the project, location of hinges and hardware for each door. Indicate STC ratings of assemblies.

1.3.2 Product Data

For shop assembled access doors and panels, provide literature indicating sizes, types, frame and edge construction, finishes, hardware, accessories such as gaskets, seals and weatherstripping, and location of each door and panel in the project. Indicate STC ratings of assemblies. Provide details of adjoining work for each condition indicated.

1.3.3 Finish Samples

Submit two color charts from manufacturer's standard color and finish options for each type of frame and panel assembly finish indicated.

1.3.4 Test Reports

Provide Sound Transmission Class (STC) test reports for acoustical assemblies when tested in accordance with ASTM E90 and classified in accordance with ASTM E413.

SECTION 08 31 00 Page 2

1.4 PERFORMANCE REQUIREMENTS

1.4.1 Structural Requirements

Provide floor access assemblies to support live loads indicated for floors. Deflection must not exceed 1/180 of span.

1.4.2 Acoustical Requirements

Provide access panels with a minimum sound transmission class (STC) as needed to maintain STC rating of the wall. Provide gasketing in accordance with manufacturer's written recommendations.

1.4.3 Insulated Access Panels

Provide panels in a thickness as necessary to achieve a minimum R-value of R-10. Provide gasketing as necessary for an airtight installation.

1.4.4 Access Panels for Wet Areas

Provide panel assemblies that will be located in wet areas with corrosion resistant finishes and hardware and water resistant gasketing.

1.5 DELIVERY, STORAGE, AND PROTECTION

Protect from corrosion, deformation, and other types of damage. Store items in an enclosed area free from contact with soil and weather. Remove and replace damaged items with new items.

PART 2 PRODUCTS

2.1 RECYCLED CONTENT

Provide products with recycled content and provide certificates of compliance in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.

2.2 PERFORMANCE REQUIREMENTS

Products in this Section are required to report material qualities for TPC Building Product Disclosure Optimization credit MRc4 as outlined in the LEED BDC Ref Guide . Products that have either recycled content, are within 500 radial miles of the Project Site, have rapidly renewable content, or have FSC certified wood shall submit in accordance with PART 1 SUBMITTALS.

Not all products in this Section are required to have this type of content.

2.3 MATERIALS

2.3.1 Steel Plates, Shapes, and Bars

Provide in accordance with ASTM A36/A36M.

2.3.2 Sheet Steel

Provide cold rolled steel sheet substrate in accordance with ASTM A1008/A1008M , Commercial Steel (CS), exposed.

SECTION 08 31 00 Page 3

2.3.3 Stainless Steel

Provide in accordance with ASTM A666, type 302 or 304.

2.3.4 Metallic Coated Steel Sheet

Provide in accordance with ASTM A653/A653M , Commercial Steel (CS), Type B;

with minimum G60 (Z180) or A60 (ZF180) metallic coating.

2.3.5 Hardware

Provide automatic closing devices. Provide latch releases operable from insides of doors.

2.3.6 Hinges

Provide concealed spring hinges, 175 degrees of opening, with removable hinge pins to allow removal of door panel from frame. Provide hinges of same steel as door and frame or in accordance with manufacturer's written recommendations. If providing non-continuous hinges, provide in numbers required to maintain alignment of door panel with frame. Provide coatings as necessary to permanently protect dissimilar metals from contact with one another; see Part 3 herein for more information.

2.3.7 Locks

Unless otherwise indicated, provide flush screwdriver operated cam lock.

Provide plastic sleeve or stainless steel bushings to protect holes in surface finishes for screwdriver to access lock.

2.3.8 Accessories

Provide anchors in size, number and location on four sides to secure access door to substrate. Provide anchors in types as recommended by manufacturer's written installation instructions for each substrate indicated. Provide shims, bushings, clips, gaskets, and other devices as necessary for a complete installation.

2.4 FABRICATION

2.4.1 Thickness, Size, Edges

Fabricate frames for access doors of steel not lighter than 16 gage with welded joints and anchorage for securing to adjacent construction. Unless noted otherwise on the drawings, provide doors a minimum of 24 by 24 inches and of not lighter than 16 gage steel, with stiffened edges and welded attachments. Provide with eased (lightly rounded) edges, without burrs, snags or sharpness and exposed welds ground smooth.

2.4.2 Welding

Provide in accordance with AWS D1.1/D1.1M .

2.5 ACCESS ASSEMBLY TYPES

Unless indicated otherwise, provide flush-face steel access doors and panels with steel frames and flanges.

SECTION 08 31 00 Page 4

2.5.1 Recessed Doors

Provide recessed access doors with gypsum wallboard bead flanges. Depth of door panel recess must accommodate the installed thickness of the finish material of the wall or ceiling assembly for a flush finished condition of the wall/ceiling and the access panel face. Reinforce panel and frame to prevent sagging.

2.5.2 Acoustical Doors

Manufacturer's standard assembly rated in accordance with acoustical requirements indicated herein. Acoustical insulating materials must have a flame spread rating of no more than 25.

2.5.3 Insulated Doors

Provide access door panels with 25 pounds per square inch density polystyrene or 5 pound per cubic foot density, chlorofluorocarbon (CFC) free, foamed urethane with a flame spread rating of no more than 25.

2.6 FINISHES

Field paint frames and panels to match wall and ceiling surfaces in which they occur. Provide exposed fastenings that approximately match the color and finish of the each material to which fastenings are applied.

PART 3 EXECUTION

3.1 PREPARATION

Field verify all measurements prior to fabrication. Verify access door locations and sizes provide required maintenance access to installed building services components. Protect existing construction and completed work from damage during installation.

3.2 GENERAL INSTALLATION REQUIREMENTS

Install items at locations indicated, in accordance with manufacturer's written instructions. Include materials and parts as necessary for a complete installation of each item. Conceal fastenings where practicable. Poor matching of holes to fasteners is cause for rejection of the work.

3.3 ACCESS LOCATIONS

Install removable access panels directly below each valve, flow indicator, damper, air splitter or other utility requiring access that is located above ceilings, other than at acoustical panel ceilings, and that would otherwise not be accessible. Install access doors and panels permitting access to service valves, traps, dampers, cleanouts, and other mechanical, electrical and conveyor control items concealed in walls and partitions.

3.4 ACCESS LOCATIONS IN WET AREAS

When possible, avoid locating access panels in wet areas. When such locations cannot be avoided, provide moisture resistant assemblies as indicated in Part I herein.

SECTION 08 31 00 Page 5

3.5 FIELD PAINTING

Field painting primed access doors in accordance with the requirements of Section 09 90 00 PAINTS AND COATINGS.

3.6 DISSIMILAR MATERIALS

Where dissimilar metals are in contact, protect surfaces with a coating in accordance with MPI 79 to prevent galvanic or corrosive action.

3.7 ADJUSTMENT

Adjust hardware so that door panel opens freely. Adjust door when closed center door panel in frame.

3.8 ENVIRONMENTAL CONDITIONS

Do not paint surfaces when damp or exposed to weather, when surface temperature is below 45 degrees F or over 95 degrees F, unless approved by the Contracting Officer.

SECTION 08 31 00 Page 6

SECTION 08 33 23

OVERHEAD COILING DOORS

08/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7 (2017) Minimum Design Loads for Buildings and Other Structures

ASME INTERNATIONAL (ASME)

ASME B29.400 (2001; R 2013) Combination, "H" Type Mill Chains, and Sprockets

ASTM INTERNATIONAL (ASTM)

ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A27/A27M (2017) Standard Specification for Steel Castings, Carbon, for General Application

ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength

ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel

ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A666 (2015) Standard Specification for Annealed or Cold-Worked Austenitic Stainless Steel Sheet, Strip, Plate and Flat Bar

ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of

SECTION 08 33 23 Page 1

Hot-Dip Galvanized Coatings

ASTM A924/A924M (2017a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM D2000 (2012; R 2017) Standard Classification System for Rubber Products in Automotive Applications

ASTM E330/E330M (2014) Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure Difference

ASTM E84 (2018) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM F568M (2007) Standard Specification for Carbon and Alloy Steel Externally Threaded Metric Fasteners

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA ICS 2 (2000; R 2005; Errata 2008) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V

NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures

NEMA MG 1 (2016; SUPP 2016) Motors and Generators

NEMA ST 1 (1988; R 1994; R 1997) Specialty Transformers (Except General Purpose Type)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17)

National Electrical Code

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BDC Ref Guide (2013) USGBC LEED Reference Guide for Building Design and Construction, v4

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control

SECTION 08 33 23 Page 2 approval. Architect/Engineer approval is required for submittals marked with an "AE" designation. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Overhead Coiling Doors; G , AE

Counterbalancing Mechanism; G ,AE

Electric Door Operators; G , AE

Bottom Bars; G , AE

Guides; G , AE

Mounting Brackets; G , AE

Overhead Drum; G , AE

Hood; G , AE

Installation Drawings; G , AE

SD-03 Product Data

Overhead Coiling Doors; G , AE

Hardware; G , AE

Counterbalancing Mechanism; G , AE

Electric Door Operators; G , AE

SD-05 Design Data

Overhead Coiling Doors; G , AE

SD-10 Operation and Maintenance Data

Operation and Maintenance Manuals; G

Materials; G

Devices; G

Procedures; G

Parts Lists; G

SD-11 Closeout Submittals

Warranty; G

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver doors to the jobsite wrapped in a protective covering with the

SECTION 08 33 23 Page 3 brands and names clearly marked thereon. Store doors in an adequately ventilated dry location that is free from dirt and dust, water, or other contaminants. Store in a manner that permits easy access for inspection and handling.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

Doors to be coiling type, with interlocking slats, complete with anchoring and door hardware, guides, hood, and operating mechanisms, and designed for use on openings as indicated. Use grease-sealed or self-lubricating bearings for rotating members.

2.1.1 Design Requirements

2.1.1.1 Overhead Coiling Door Detail Shop Drawings

Provide installation drawings for overhead coiling door assemblies which show: elevations of each door type, shape and thickness of materials, finishes, details of joints and connections, details of guides and fittings, rough opening dimensions, location and description of hardware, anchorage locations, and counterbalancing mechanism and door operator details. Show locations of replaceable fusible links on wiring diagrams for power, signal and controls. Include a schedule showing the location of each door with the drawings.

2.1.2 Performance Requirements

2.1.2.1 Wind Loading

Design and fabricate door assembly to withstand the wind loading pressure as indicated on the structural drawings with a maximum deflection of 1/120 of the opening width. Provide test data showing compliance with ASTM E330/E330M . Sound engineering principles may be used to interpolate or extrapolate test results to door sizes not specifically tested. Ensure complete assembly meets or exceeds the requirements of ASCE 7.

2.1.2.2 Operational Cycle Life

Design all portions of the door, hardware and operating mechanism that are subject to movement, wear, or stress fatigue to operate through a minimum number of 10 cycles per day. One complete cycle of door operation is defined as when the door is in the closed position, moves to the fully open position, and returns to the closed position.

2.2 PERFORMANCE REQUIREMENTS

Products in this Section are required to report material qualities for TPC Building Product Disclosure Optimization credit MRc4 as outlined in the LEED BDC Ref Guide . Products that have either recycled content, are within 500 radial miles of the Project Site, have rapidly renewable content, or have FSC certified wood shall submit in accordance with PART 1 SUBMITTALS.

Not all products in this Section are required to have this type of content.

SECTION 08 33 23 Page 4

2.3 COMPONENTS

2.3.1 Overhead Coiling Doors

2.3.1.1 Curtain Materials and Construction

Provide curtain slats fabricated from Grade A steel sheets conforming to ASTM A653/A653M , with the additional requirement of a minimum yield point of 33,000 psi. Provide sheets, galvanized in accordance with ASTM A653/A653M and ASTM A924/A924M .

Fabricate doors from interlocking cold-rolled slats, with section profiles as specified, designed to withstand the specified wind loading. Ensure the provided slats are continuous without splices for the width of the door.

Provide slats filled with manufacturer's standard thermal insulation complying with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, according to ASTM E84. Enclose insulation completely within slat faces on interior surface of slats.

2.3.1.2 Curtain Bottom Bar

Install curtain bottom bars as pairs of angles from the manufacturer's standard steel, stainless and aluminum extrusions not less than 2.0 by 2.0-inches by 0.188-inch. Ensure steel extrusions conform to ASTM A36/A36M.

Stainless steel extrusions conforming to ASTM A666, Type 304. Aluminum extrusions conforming to ASTM B221. Galvanize angles and fasteners in accordance with ASTM A653/A653M and ASTM A924/A924M . Coat welds and abrasions with paint conforming to ASTM A780/A780M .

Provide two 2-inch by 2-inch by 1/8-inch structural steel angles.

2.3.1.3 Locks

Provide end and/or wind locks of Grade B cast steel conforming to ASTM A27/A27M, galvanized in accordance with ASTM A653/A653M , ASTM A153/A153M and ASTM A924/A924M . Secure locks at every other curtain slat.

2.3.1.4 Weather Stripping

Ensure weather-stripping at the door-head and jamb is 1/8-inch thick sheet of natural or neoprene rubber with air baffles. Secure weather stripping to the insides of hoods with galvanized-steel fasteners through continuous galvanized-steel pressure bars at least 5/8-inch wide and 1/8-inch thick.

Ensure threshold weather-stripping is 1/8-inch thick sheet natural or neoprene rubber secured to the bottom bars.

Provide weather-stripping of natural or neoprene rubber conforming to

ASTM D2000.

2.3.1.5 Locking Devices

Ensure slide bolt engages through slots in tracks for locking by padlock, located on both left and right jamb sides, operable from coil side.

Provide a locking device assembly which includes cylinder lock, SECTION 08 33 23 Page 5 spring-loaded dead bolt, operating handle, cam plate, and adjustable locking bars to engage through slots in tracks.

2.3.1.6 Safety Interlock

Equip power-operated doors with safety interlock switch to disengage power supply when door is locked.

2.3.1.7 Overhead Drum

Fabricate drums from nominal 0.028-inch thick, hot-dip galvanized steel sheet with G90 (Z275) zinc coating, complying with ASTM A653/A653M .

2.3.1.8 Slats

No. 5F, 18 gauge, Grade 40 steel, ASTM A653/A653M galvanized steel zinc coating.

2.3.2 Hardware

Ensure all hardware conforms to ASTM A153/A153M , ASTM A307, ASTM F568M, and ASTM A27/A27M.

2.3.2.1 Guides

Fabricate curtain jamb guides from the manufacturer's standard angles or channels of same material and finish as curtain slats unless otherwise indicated. Provide guides with sufficient depth and strength to retain curtain, and to withstand loading. Ensure curtain operates smoothly.

Slot bolt holes for track adjustment.

Ensure guides are roll-formed steel channel bolted to angle or structural grade, three angle assembly of steel to form a slot of sufficient depth to retain curtains in guides to achieve 20 psf windload standard. Guides may be provided with integral windlock bars and removable bottom bar stops.

2.3.2.2 Equipment Supports

Fabricate door-operating equipment supports from the manufacturer's standard steel shapes and plates conforming to ASTM A36/A36M, galvanized in accordance with ASTM A653/A653M and ASTM A924/A924M . Size the shapes and plates in accordance with the industry standards for the size, weight, and type of door installation.

2.3.2.3 Hood

Provide a hood with a minimum 24-gauge galvanized sheet metal, flanged at top for attachment to header and flanged at bottom to provide longitudinal stiffness. The hood encloses the curtain coil and counterbalance mechanism.

2.3.3 Counterbalancing Mechanism

Counterbalance doors by means of manufacturer's standard mechanism with an adjustable-tension, steel helical torsion spring mounted, around a steel shaft and contained in a spring barrel connected to top of curtain with barrel rings. Use grease-sealed or self-lubricating bearings for rotating members.

SECTION 08 33 23 Page 6

2.3.3.1 Brackets

Provide the manufacturer's standard mounting brackets with one located at each end of the counterbalance barrel conforming to ASTM A48/A48M.

Provide brackets of either cast iron or cold-rolled steel.

Brackets will be of 3/16-inch minimum thick steel plates, with permanently sealed ball bearings. Designed to enclose ends of coil and provide support of counterbalance pipe at each end.

2.3.3.2 Counterbalance Barrels

Fabricate spring barrel of manufacturer's standard hot-formed, structural-quality, welded or seamless carbon-steel pipe, conforming to ASTM A53/A53M. Ensure the barrel is of sufficient diameter and wall thickness to support rolled-up curtain without distortion of slats. Limit barrel deflection to not more than 0.03 inch per foot of span under full load.

a. Barrel

Provide steel pipe capable of supporting curtain load with maximum deflection of 0.03 inches per foot of width.

b. Spring Balance

Provide an oil-tempered, heat-treated steel helical torsion spring assembly designed for proper balance of door. Ensure that effort to operate manually operated units does not exceed 25 lbs. Provide wheel for applying and adjusting spring torque.

2.3.4 Electric Door Operators

Provide electrical wiring and door operating controls conforming to the applicable requirements of NFPA 70 .

Electric door-operator assemblies needs to be the sizes and capacities recommended and provided by the door manufacturer for specified doors.

Furnish complete assemblies with electric motors and factory-prewired motor controls, starter, gear reduction units, solenoid-operated brakes, clutch, remote-control stations, manual or automatic control devices, and accessories as required for proper operation of the doors.

Design the operators so that motors may be removed without disturbing the limit-switch adjustment and affecting the emergency auxiliary operators.

Provide a manual operator of crank-gear or chain-gear mechanisms with a release clutch to permit manual operation of doors in case of power failure. Arrange the emergency manual operator so that it may be put into and out of operation from floor level, and its use does not affect the adjustment of the limit switches. Provide an electrical or mechanical device that automatically disconnects the motor from the operating mechanism when the emergency manual operating mechanism is engaged.

2.3.4.1 Door-Operator Types

Provide an operator mounted to the inside front wall on the left or right side of door and connected to door drive shaft with drive chain and sprockets. Side room is required for this type of mounting. Wall mounted

SECTION 08 33 23 Page 7 operator can…