BID_ABSTRACT_W912HN19B5001.pdf

PDF 195 KB Posted

Attached to
Inner Harbor Dredging Reaches A & B Stations 70+000 to 103+000, Savannah GA
Solicitation number
W912HN19B5001
Issued by

About this file

Bid Abstract

View the file

Other files

File Type Posted
BID_ABSTRACT_W912HN19B5001-.pdf PDF
Attendance_Roster_Bid_Opening_W912HN19B5001.pdf PDF
Amd_4_conformed.pdf PDF
Amd_4.pdf PDF
KITB_Survey_12Jan17.xyz.txt TXT text file
19B5001.pdf PDF
KITB-2018-SHEP-ws-chn.lnw —
12a_design_11-13-18.txt TXT text file
12A_15-29oct2018.xyz.txt TXT text file
Amd3.pdf PDF
W912HN-19-B-5001_AMD2.pdf PDF
W912HN19B5001_P1c.pdf PDF
amd2.pdf PDF
19B5001.pdf PDF
Savannah_Harbor_As_Built_1994_FIO.pdf PDF
W912HN19B5001_P7.pdf PDF
W912HN19B5001_P1a.pdf PDF
W912HN19B5001_P1b.pdf PDF
Site_Visit_5-23-19.pdf PDF
19B5001.pdf PDF
amd1.pdf PDF
W912HN19B5001_P9.pdf PDF
W912HN19B5001_P4.pdf PDF
W912HN19B5001_P3.pdf PDF
W912HN19B5001_P1.pdf PDF
W912HN19B5001_P2.pdf PDF
W912HN19B5001_P5.pdf PDF
W912HN19B5001_P6.pdf PDF
W912HN19B5001_P7.pdf PDF
W912HN19B5001_P8.pdf PDF
W912HN19B5001_P3.pdf PDF
Savannah_Harbor_As_Built_1994_FIO.pdf PDF
W912HN19B5001_P2.pdf PDF
W912HN19B5001_P4.pdf PDF
19B5001.pdf PDF
W912HN19B5001_P1.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

10-May-19 2-Jul-19 1 4

SSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Bruce Helms

SIGNATURE DATE SIGNED

7/2/2019

ROJECT TITLE: 8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E and F.) A. OFFEROR A. OFFEROR

A. HIRED LABOR

X

7A.

ITEM NO.

7B. DESCRIPTION OF OFFERED ITEM 7C.

EST QTY.

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

0001 Mobilization and Demobilization 1 Job $ 4,279,000.00 $ 4,279,000.00 $ 10,500,000.00 $ 10,500,000.00 $ 25,450,000.00 $ 25,450,000.00

000101 Deleted by Amendment 00001

000102 Deleted by Amendment 00001

0002 Maintenance and Unclassified Dredging (STA 90+000 to 103+000) 1,385,900 Cubic Yard $ 24.50 $ 33,954,550.00 $ 24.85 $ 34,439,615.00 $ 26.50 $ 36,726,350.00

0003 Maintenance and Unclassified Dredging (Kings Island Turning Basin and transition (Stations 97+750 to 101+675)) 1,407,020 Cubic Yard $ 28.00 $ 39,396,560.00 $ 24.70 $ 34,753,394.00 $ 26.50 $ 37,286,030.00

0004 Maintenance and Unclassified Dredging (STA 80+000 to 90+000) 1,297,000 Cubic Yard 17.55$ 22,762,350.00$ 17.10$ 22,178,700.00$ 23.50$ 30,479,500.00$

0005 Maintenance and Unclassified Dredging (STA 70+000 to 80+000) 1,119,000 Cubic Yard 15.50$ 17,344,500.00$ 18.85$ 21,093,150.00$ 21.20$ 23,722,800.00$

0006 Equipment and Obstruction Removal DO NOT BID THIS CLIN

0006AA Equipment and Obstruction Removal First Day 1 Days $ 25,500.00 $ 25,500.00 $ 25,925.00 $ 25,925.00 $ 65,000.00 $ 65,000.00

0006AB Equipment and Obstruction Removal All Over 1 Day 2 Days 25,500.00$ 51,000.00$ 25,925.00$ 51,850.00$ 65,000.00$ 130,000.00$

0007 Dive Team, Mob/Demob. Personnel, materials, and equipment DO NOT BID THIS CLIN

0007AA Dive Team, Mob/Demob. Personnel, materials, and equipment First 6 Days 6 Days $ 11,500.00 $ 69,000.00 $ 8,000.00 $ 48,000.00 $ 5,100.00 $ 30,600.00

0007AB Dive Team, Mob/Demob. Personnel, materials, and equipment All Over 6 Days 6 Days $ 11,500.00 $ 69,000.00 $ 8,000.00 $ 48,000.00 $ 5,100.00 $ 30,600.00

0008 Standby Time DO NOT BID THIS CLIN

0008AA Standby Time First Day 1 Days 166,900.00$ 166,900.00$ 88,000.00$ 88,000.00$ 235,000.00$ 235,000.00$

0008AB Standby Time All Over 1 Day 3 Days $ 166,900.00 $ 500,700.00 $ 88,000.00 $ 264,000.00 $ 235,000.00 $ 705,000.00

0009 Moves, Over 2 Miles DO NOT BID THIS CLIN

0009AA Moves, Over 2 Miles First Move 1 Each 164,500.00$ 164,500.00$ 395,000.00$ 395,000.00$ 465,000.00$ 465,000.00$

0009AB Moves, Over 2 Miles All Over 1 Move 1 Each 164,500.00$ 164,500.00$ 395,000.00$ 395,000.00$ 465,000.00$ 465,000.00$

0010 Temporary Silt Fence (Sensitive, Double Row) 3,300 Linear Foot $ 11.50 $ 37,950.00 $ 21.00 $ 69,300.00 $ 20.00 $ 66,000.00

001001 Deleted by Amendment 0002

001002 Deleted by Amendment 0002

0011 Temporary Silt Fence (Non-Sensitive, Single Row) 5,200 Linear Foot 4.50$ 23,400.00$ 6.00$ 31,200.00$ 6.00$ 31,200.00$

Norfolk Dredging Company Great Lakes Dredge & Dock Co. LLC.

6. NUMBER OF AMENDMENTS ISSUED: 4

Unrestricted Solicitation

C. REASONABLE CONTRACT

(INCLUDING PROFIT)

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

B. REASONABLE CONTRACT

(WITHOUT PROFIT)

B. BID SECURITY (Type and Amount) Bid Bond 20%

B. BID SECURITY (Type and Amount) Bid Bond 20%

“Source Selection Information -- See FAR 2.101 and 3.104.”

NO. 1

Contracting Officer

W912HN19B5001

Inner Harbor Dredging Reaches A & B Stations 70+000 to 103+000, Savannah GA

ABSTRACT OF OFFERS - CONSTRUCTION

Department of the Army, Corps of Engineers Savannah District Contracting Office

100 W Oglethorpe Ave.

Savannah, GA 31401

9. OFFERS

NO. 2

I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.

LICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

10-May-19 2-Jul-19 2 4

SSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Bruce Helms

SIGNATURE DATE SIGNED

7/2/2019

ROJECT TITLE: 8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E and F.) A. OFFEROR A. OFFEROR

A. HIRED LABOR

X

7A.

ITEM NO.

7B. DESCRIPTION OF OFFERED ITEM 7C.

EST QTY.

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

Norfolk Dredging Company Great Lakes Dredge & Dock Co. LLC.

6. NUMBER OF AMENDMENTS ISSUED: 4

Unrestricted Solicitation

C. REASONABLE CONTRACT

(INCLUDING PROFIT)

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

B. REASONABLE CONTRACT

(WITHOUT PROFIT)

B. BID SECURITY (Type and Amount) Bid Bond 20%

B. BID SECURITY (Type and Amount) Bid Bond 20%

NO. 1

Contracting Officer

W912HN19B5001

Inner Harbor Dredging Reaches A & B Stations 70+000 to 103+000, Savannah GA

ABSTRACT OF OFFERS - CONSTRUCTION

Department of the Army, Corps of Engineers Savannah District Contracting Office

100 W Oglethorpe Ave.

Savannah, GA 31401

9. OFFERS

NO. 2

I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.

001101 Deleted by Amendment 0002

001102 Deleted by Amendment 0002

0012 Furnish and Place Bedding Stone and Filter Stone DO NOT BID THIS CLIN

0012AA Furnish and Place First 11,000 Tons 11,000 Gross Tons 114.00$ 1,254,000.00$ 81.00$ 891,000.00$ 78.00$ 858,000.00$

0012AB Furnish and Place All Over 11,000 Tons 1,000 Gross Tons $ 114.00 $ 114,000.00 $ 76.00 $ 76,000.00 $ 73.00 $ 73,000.00

0013 Furnish and Place Underlayer Stone DO NOT BID THIS CLIN

0013AA Furnish and Place Underlayer Stone First 15,500 Tons 15,500 Gross Tons 122.00$ 1,891,000.00$ 109.00$ 1,689,500.00$ 105.00$ 1,627,500.00$

0013AB Furnish and Place Underlayer Stone All Over 15,500 Tons 1,500 Gross Tons 122.00$ 183,000.00$ 105.00$ 157,500.00$ 101.00$ 151,500.00$

0014 Furnish and Place Armor Stone DO NOT BID THIS CLIN

0014AA Furnish and Place Armor Stone First 42,500 Tons 42,500 Gross Tons $ 147.00 $ 6,247,500.00 $ 117.00 $ 4,972,500.00 $ 113.00 $ 4,802,500.00

0014AB Furnish and Place Armor Stone All Over 42,500 Tons 4,000 Gross Tons 147.00$ 588,000.00$ 113.00$ 452,000.00$ 109.00$ 436,000.00$

0015 Seeding and Grassing DO NOT BID THIS CLIN

0015AA Seeding and Grassing First 10 Acres 10 Acre $ 1,410.00 $ 14,100.00 $ 3,150.00 $ 31,500.00 $ 3,000.00 $ 30,000.00

0015AB Seeding and Grassing All Over 10 Acres 2 Acre $ 1,410.00 $ 2,820.00 $ 3,150.00 $ 6,300.00 $ 3,000.00 $ 6,000.00

0016 Agricultural Lime 35 Gross Tons $ 260.00 $ 9,100.00 $ 295.00 $ 10,325.00 $ 284.00 $ 9,940.00

0017 Fertilizer, Nitrogen 7 Gross Tons $ 695.00 $ 4,865.00 $ 825.00 $ 5,775.00 $ 792.00 $ 5,544.00

0018 Fertilizer, Mixed Grade 7 Gross Tons $ 780.00 $ 5,460.00 $ 825.00 $ 5,775.00 $ 792.00 $ 5,544.00

0019 Clearing and Grubbing DO NOT BID THIS CLIN

0019AA Clearing and Grubbing First 15 Acres 15 Acre 1,001.00$ 15,015.00$ 30,220.00$ 453,300.00$ 29,000.00$ 435,000.00$

0019AB Clearing and Grubbing All Over 15 Acres 5 Acre 1,001.00$ 5,005.00$ 6,040.00$ 30,200.00$ 5,800.00$ 29,000.00$

TOTAL AMOUNT OF BASE CLINS 0001-00019: 129,343,275.00$ 133,162,809.00$ 164,357,608.00$

1. SOLICITATION NUMBER

ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Cons CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 cont which can be entered on the OF 1419. Use additional OF 1419's for contra Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

NO. 3 NO. 4

A. OFFEROR A. OFFEROR

B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. B. C.

ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT

0001 1 Job 18,975,000.00$ 18,975,000.00$ 26,750,000.00$ 26,750,000.00$ 000101

000102

0002 1,385,900 Cubic Yard 29.58$ 40,994,922.00$ 48.00$ 66,523,200.00$ 0003 1,407,020 Cubic Yard 29.58$ 41,619,651.60$ 41.00$ 57,687,820.00$ 0004 1,297,000 Cubic Yard 26.58$ 34,474,260.00$ 32.00$ 41,504,000.00$ 0005 1,119,000 Cubic Yard 24.58$ 27,505,020.00$ 27.00$ 30,213,000.00$

0006AA 1 Days 18,969.00$ 18,969.00$ 50,000.00$ 50,000.00$ 0006AB 2 Days 18,969.00$ 37,938.00$ 50,000.00$ 100,000.00$

0007AA 6 Days 6,312.18$ 37,873.08$ 7,500.00$ 45,000.00$ 0007AB 6 Days 6,312.18$ 37,873.08$ 7,500.00$ 45,000.00$

0008AA 1 Days 72,000.00$ 72,000.00$ 350,000.00$ 350,000.00$ 0008AB 3 Days 72,000.00$ 216,000.00$ 350,000.00$ 1,050,000.00$

0009AA 1 Each 70,000.00$ 70,000.00$ 250,000.00$ 250,000.00$ 0009AB 1 Each 70,000.00$ 70,000.00$ 250,000.00$ 250,000.00$

0010 3,300 Linear Foot 10.30$ 33,990.00$ 5.00$ 16,500.00$ 001001

Inner Harbor Dredging Reaches A & B Stations 70+000 to 103+000, Savannah GA Marinex Construction, Inc. Weeks Marine Inc.

Bid Bond 20% Bid Bond 20%

4 4

W912HN19B5001 3 of 4

001002

0011 5,200 Linear Foot 10.30$ 53,560.00$ 5.00$ 26,000.00$ 001101

001102

0012AA 11,000 Gross Tons 92.70$ 1,019,700.00$ 100.00$ 1,100,000.00$ 0012AB 1,000 Gross Tons 61.80$ 61,800.00$ 100.00$ 100,000.00$

0013AA 15,500 Gross Tons 108.15$ 1,676,325.00$ 125.00$ 1,937,500.00$ 0013AB 1,500 Gross Tons 100.94$ 151,410.00$ 100.00$ 150,000.00$

0014AA 42,500 Gross Tons 115.36$ 4,902,800.00$ 145.00$ 6,162,500.00$ 0014AB 4,000 Gross Tons 105.06$ 420,240.00$ 100.00$ 400,000.00$

0015AA 10 Acre 2,060.00$ 20,600.00$ 2,500.00$ 25,000.00$ 0015AB 2 Acre 2,060.00$ 4,120.00$ 2,500.00$ 5,000.00$

0016 35 Gross Tons 51.50$ 1,802.50$ 85.00$ 2,975.00$ 0017 7 Gross Tons 103.00$ 721.00$ 1,500.00$ 10,500.00$ 0018 7 Gross Tons 103.00$ 721.00$ 800.00$ 5,600.00$

0019AA 15 Acre 6,283.00$ 94,245.00$ 5,750.00$ 86,250.00$ 0019AB 5 Acre 6,283.00$ 31,415.00$ 5,750.00$ 28,750.00$

TOTAL $172,477,296.26 234,874,595.00$

2019-07-02T18:08:49-0400
HELMS.BRUCE.A.1054395090

File details come from the government source that posted it.