amd7.pdf

PDF 63 KB Posted

Attached to
Blood Donor Center Replacement
Solicitation number
W912HN18R3001
Issued by

About this file

W912HN-18-R-3001 PH2 AMD7

View the file

Other files

File Type Posted
18R3001PH2vol1.PDF PDF
18R3001PH2vol2.PDF PDF
amd8.pdf PDF
18R3001PH2vol1.PDF PDF
18R3001PH2vol1.PDF PDF
18R3001PH2vol3.PDF PDF
amd6.pdf PDF
amd5.pdf PDF
18R3001PH2vol2.PDF PDF
18R3001PH2vol3.PDF PDF
18R3001PH2vol1.PDF PDF
SiteSurveyFortGordonBDC.zip ZIP file
amd4.pdf PDF
18R3001PH2vol1.PDF PDF
18R3001PH2vol1.PDF PDF
18R3001PH2vol2.PDF PDF
18R3001PH2vol3.PDF PDF
amd3.pdf PDF
amd2.pdf PDF
18R3001_Ph1.pdf PDF
amd1.pdf PDF
18R3001_Ph1.pdf PDF
18R3001_Ph1.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to update the CLIN schedule to add tw o (2) options. 52.217-7 has been added and 52.211-10 has been updated as a result.

Technical Proposals remain due 2 July 2018 at 2pm EDT. How ever, Price and Bid Bond (Volume I, Tabs B and C) are due no later than 18

July 2018 at 2:00pm EDT utilizing the same submission instructions via AMRDEC. Proposals w ill not be considered fully submitted until all pieces are received timely.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN18R3001

X 9B. DATED (SEE ITEM 11)

02-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jun-2018

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN18R3001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

CLIN 0005 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

OPTION Option 1

NET AMT

SUBCLIN 0005AA is added as follows:

0005AA 6 Job OPTION Relay Rack, Aluminum JSN A0900

FOB: Destination

SUBCLIN 0005AB is added as follows:

0005AB 52 Job OPTION Cable Management, Horizontal Base Unit JSN A0901

SUBCLIN 0005AC is added as follows:

0005AC 26 Job OPTION Rear Wire Frame JSN A0902

SUBCLIN 0005AD is added as follows:

0005AD 26 Job OPTION Rear Hinged Cover, for LAN Rack JSN A0903

SUBCLIN 0005AE is added as follows:

0005AE 2 Job OPTION Fiber Optic Cabinet, 36 Port, Rack Mount JSN A0904

SUBCLIN 0005AF is added as follows:

0005AF 2 Job OPTION Patch Panel, Copper, UTP JSN A0907

SUBCLIN 0005AG is added as follows:

0005AG 26 Job OPTION Patch Panel, 110 Block/RJ-45, Cat 5E, 48 Port,568A JSN A0908

CLIN 0006 is added as follows:

0006 1 Job OPTION Option 2 Electronic Security System per RFP section 5.10.12 (complete)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0005:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A N/A

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AA:

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AD:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AE:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AF:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AG:

The following Acceptance/Inspection Schedule was added for CLIN 0006:

The following have been added by full text:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options by written notice to the Contractor within 540 calendar days after issuance of Notice to Proceed. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 540 Calendar Days after issuance of Notice to Proceed (NTP). Option CLINs, if exercised, will be performed concurrently with the Base. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)