HAP_QASP_Title_Legal_Closing_Services.pdf
PDF 129 KB Posted
- Attached to
- Notice of Intent to Sole Source Modify Contract
- Solicitation number
- W912HN-16-T-0007
About this file
Quality Assurance Surveillance Plan
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
EXPANDED HOMEOWNERS ASSISTANCE PROGRAM
TITLE, LEGAL AND CLOSING SERVICES
For All Fifty (50) States, The District Of Columbia, and Puerto Rico
1 INTRODUCTION…………………………………………………………………3
1.1 Purpose……………………………………………………………………………...3
1.2 Performance Management Approach…………………………………………….3
1.3 Performance Management Strategy……………………………………………...3
2 ROLES AND RESPONSIBILITIES……………………………………………..4
2.2 The Contracting Officer’s Representative (COR)……………………………… 4
2.3 Contractor Representatives……………………………………………………… 4
2.4 Identification of Required Performance Standards/Quality Levels……………5
3 METHODOLOGIES TO MONITOR PERFORMANCE……………………...5
3.1 Contract Surveillance……………………………………………………………...5
3.2 Customer Feedback………………………………………………………………..5
3.3 Acceptable Quality Levels…………………………………………………………5
4 QUALITY ASSURANCE DOCUMENTATION………………………………..5
4.1 The Performance Management Feedback Loop…………………………………5
4.2 Monitoring Forms………………………………………………………………….5
5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT…………………….6
5.1 Determining Performance…………………………………………………………6
5.2 Reporting……………………………………………………………………………6
5.3 Reviews and Resolution…………………………………………………………….6
Attachment 1: PERFORMANCE REQUIREMENTS SUMMARY……………………7 Attachment 2: SAMPLE QUALITY ASSURANCE MONITORING FORM…………8
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the Statement of Work (SOW/PWS) entitled Expanded Homeowners Assistance Program Title Evidence and Closing Services – For all Fifty (50) States, the District of Columbia, and Puerto Rico. This plan sets forth the procedures and guidelines USACE, Real Estate Division, Acquisition/HAP Branch will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the SOW and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The SOW structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the COR to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the SOW are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the SOW. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the SOW.
This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The Government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer (KO)
The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the contractor. The KO will designate one full-time COR as the Government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO.
2.2 The Contracting Officer’s Representative (COR)
The COR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
2.3 Contractor Representatives
The following employees of the contractor serve as the contractor's Program Manager and Task Manager for this contract. (Complete this section after the contract award) Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address> Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address> Other Key Contract Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
2.4 Identification of Required Performance Standards/Quality Levels The required performance standards and/or quality levels are included in the SOW and in Attachment 1, “Performance Requirements Summary.” Failure to meet the required service or performance level may result in a deduction from the invoiced service fee.
3 METHODOLOGIES TO MONITOR PERFORMANCE
3.1 Contract Surveillance
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate contractor performance when appropriate. The primary methods of surveillance are
Random monitoring, which shall be performed by the COR designated inspector.
100% Inspection – Each month, the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
Periodic Inspection – COR typically performs the periodic inspection of services initiated on a monthly basis.
3.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees, subcontractors, vendors and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR or KO as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR or KO.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer inquiries and complaints.
3.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the services are performed. For all services, the desired performance level is established at 100 percent.
4 QUALITY ASSURANCE DOCUMENTATION
4.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes.
Performance requirements are expressed in the SOW and are assessed using the performance requirements methods shown in Attachment 1.
4.2 Monitoring Forms
The Government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2. The form, when completed, will document the Government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
4.2.1 The COR will retain a copy of all completed QA surveillance forms for review.
5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
5.1 Determining Performance
5.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment, using the method shown in Attachment 1.
5.2 Reporting
5.2.1 At the end of each month, the COR will prepare a written report for summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the Government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
5.3 Reviews and Resolution
5.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the KO and other Government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self- assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
Issues arising from the performance monitoring processes.
5.3.2 The COR must coordinate and communicate with the contractor and the KO to resolve issues and concerns regarding marginal or unacceptable performance.
5.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action.
Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification issued by the
KO/ACO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Professional
Services
Performance Standards
Acceptable
Quality Levels
Methods of
Contract Surveillance
Impact on Contractor Payments
Provide professionally written and prepared title, legal, DOJ inspections and closing services
Administer quality control program including subcontractor management in accordance with QCP
Submit management reports as required
All Documents and legal services to accurately depict each HAP Acquisition and Resale Closing
Contractor is in compliance with QCP 100% of the time
100%
100%
Periodic meetings and or inspections, and random, observations
Periodic inspections, and random, observations
Payment will be issued in accordance with the quantities and established pricing of services provided. Require accurate and timely invoicing, including back up document-ation as needed.
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: 100 %
Service Provider’s Performance (Check): Meets SOW Standards
Does Not Meet SOW Standards
Narrative of Performance during Survey Period:
COR SIGNATURE: DATE: _
COR NAME (PLEASE PRINT):
2.3 Contractor Representatives
File details come from the government source that posted it. Updated .