16R15vol2.pdf
PDF 2 MB Posted
- Solicitation number
- W912HN-16-R-0015
About this file
W912HN-16-R-0015 SPECS VOL2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd8.pdf | ||
| 16R15vol1.pdf | ||
| amd_7.pdf | ||
| 16R15vol1.pdf | ||
| 16R15vol2.pdf | ||
| amd6.pdf | ||
| 16R15vol1.pdf | ||
| amd3.pdf | ||
| W912HN-16-R-0015_AMD5.pdf | ||
| 16R15vol2.pdf | ||
| amd5.pdf | ||
| 16R15vol3.pdf | ||
| 16R15vol1.pdf | ||
| 16R15vol3.pdf | ||
| 16R15vol2.pdf | ||
| 16R15vol1.pdf | ||
| W912HN-16-R-0015_AMD4.PDF | ||
| amd4.pdf | ||
| 16R15vol2.pdf | ||
| W912HN-16-R-0015_AMD3.PDF | ||
| 16R15vol1.pdf | ||
| 16R15vol3.pdf | ||
| amd2.pdf | ||
| amd1.pdf | ||
| 16R15vol3.pdf | ||
| 16R15vol1.pdf | ||
| W912HN-16-R-0015.PDF | ||
| SF330_fillable.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Moody AFB, Georgia
Solicitation Number
W912HN-16-R-0015
Replace Pumphouse and Truck Fillstands Volume 2 of 3: Specification Divisions 06 through 23
PN DESC1710
June 2016
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
Replace Pumphouse and Truck Fillstands 16R15 Moody AFB, GA
TABLE OF CONTENTS - Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 23.33 AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS
01 33 29 SUSTAINABILITY REPORTING
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL
SYSTEMS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 51 13 BUILT-UP ASPHALT ROOFING
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
TABLE OF CONTENTS - Page 2
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 51 13 ALUMINUM WINDOWS
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
09 97 13.15 LOW VOC POLYSULFIDE INTERIOR COATING OF WELDED STEEL
PETROLEUM FUEL TANKS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 36 00.00 20 MANUFACTURED VANITIES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS (PUMP HOUSE)
13 34 20 METAL BUILDING SYSTEMS (FILLSTAND CANOPY)
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 23 00 REFRIGERANT PIPING
23 31 13.00 40 METAL DUCTS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
TABLE OF CONTENTS - Page 3
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 BASE COURSE FOR RIGID PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 31 13.53 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 01 50.01 CLEANING FUEL STORAGE TANKS
33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 09 53 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 32 13.14 PACKAGED SEWAGE LIFT STATIONS, GRINDER PUMP TYPE
33 34 00 FORCE MAINS; SEWER
33 40 00 STORM DRAINAGE UTILITIES
33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.12 AVIATION FUEL PANTOGRAPHS
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 52 43.23 AVIATION FUEL PUMPS
33 52 43.28 FILTER SEPARATOR, AVIATION FUELING SYSTEM
33 52 80 LIQUID FUELS PIPELINE COATING SYSTEMS
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 56 13.13 STEEL TANKS WITH FIXED ROOFS
33 56 19 FUEL IMPERMEABLE LINER SYSTEM
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.17 CRANES, SINGLE-GIRDER BRIDGE, MONORAIL AND JIB
41 22 13.24 BRIDGE CRANES, OVERHEAD HAND OPERATED, UNDER RUNNING
APPENDICES
Appendix A MOODY AFB ARCHITECTURE ENGINEERING DESIGN GUIDE
SECTION TABLE OF CONTENTS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SECTION 06 10 00
ROUGH CARPENTRY
02/12
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY AND STORAGE
1.4 GRADING AND MARKING
1.4.1 Lumber
1.4.2 Plywood
1.4.3 Preservative-Treated Lumber and Plywood
1.4.4 Fire-Retardant Treated Lumber
1.5 SIZES AND SURFACING
1.6 MOISTURE CONTENT
1.7 PRESERVATIVE TREATMENT
1.8 FIRE-RETARDANT TREATMENT
1.9 CERTIFICATES OF GRADE
1.10 LOCAL/REGIONAL MATERIALS
PART 2 PRODUCTS
2.1 PLYWOOD
2.2 OTHER MATERIALS
2.2.1 Nonstress Graded Members
2.2.2 Blocking
2.2.3 Adhesives
2.3 ROUGH HARDWARE
2.3.1 Bolts, Nuts, Studs, and Rivets
2.3.2 Anchor Bolts
2.3.3 Expansion Shields
2.3.4 Lag Screws and Lag Bolts
2.3.5 Wood Screws
2.3.6 Nails
2.3.7 Wire Nails
PART 3 EXECUTION
3.1 INSTALLATION
3.2 MISCELLANEOUS
3.2.1 Roof Edge Strips and Nailers
3.2.2 Wood Blocking
3.2.3 Wood Furring
3.2.4 Temporary Closures
3.2.5 Temporary Centering, Bracing, and Shoring
3.3 WASTE MANAGEMENT
-- End of Section Table of Contents --
SECTION 06 10 00 Page 1
SECTION 06 10 00
ROUGH CARPENTRY
02/12
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN LUMBER STANDARDS COMMITTEE (ALSC)
ALSC PS 20 (2010) American Softwood Lumber Standard
AMERICAN WOOD COUNCIL (AWC)
AWC NDS (2012) National Design Specification (NDS) for Wood Construction
AWC WFCM (2012) Wood Frame Construction Manual for One- and Two-Family Dwellings
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA M2 (2015) Standard for Inspection of Treated Wood Products
AWPA M6 (2013) Brands Used on Preservative Treated Materials
APA - THE ENGINEERED WOOD ASSOCIATION (APA)
APA L870 (2010) Voluntary Product Standard, PS 1-09, Structural Plywood
ASME INTERNATIONAL (ASME)
ASME B18.2.1 (2012; Errata 2013) Square and Hex Bolts and Screws (Inch Series)
ASME B18.2.2 (2010) Nuts for General Applications:
Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)
ASME B18.5.2.1M (2006; R 2011) Metric Round Head Short Square Neck Bolts
ASME B18.5.2.2M (1982; R 2010) Metric Round Head Square Neck Bolts
ASME B18.6.1 (1981; R 2008) Wood Screws (Inch Series)
ASTM INTERNATIONAL (ASTM)
ASTM A153/A153M (2009) Standard Specification for Zinc
SECTION 06 10 00 Page 2
Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A307 (2014) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM D2898 (2010) Accelerated Weathering of Fire-Retardant-Treated Wood for Fire Testing
ASTM F1667 (2013) Driven Fasteners: Nails, Spikes, and Staples
ASTM F547 (2006; R 2012) Nails for Use with Wood and Wood-Base Materials
FM GLOBAL (FM)
FM 4435 (2013) Roof Perimeter Flashing
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2012) International Building Code
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-1923 (Rev A; Notice 2) Shield, Expansion (Lag, Machine and Externally Threaded Wedge Bolt Anchors)
CID A-A-1924 (Rev A; Notice 2) Shield, Expansion (Self Drilling Tubular Expansion Shell Bolt Anchors
CID A-A-1925 (Rev A; Notice 2) Shield Expansion (Nail Anchors)
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Fire-retardant treatment
SD-06 Test Reports
Preservative-treated lumber and plywood
SECTION 06 10 00 Page 3
SD-07 Certificates
Certificates of grade
Manufacturer's certificates (approved by an American Lumber Standards approved agency) attesting that lumber and material not normally grade marked meet the specified requirements.
Certificate of Inspection for grade marked material by an American Lumber Standards Committee (ALSC) recognized inspection agency prior to shipment.
Preservative treatment
SD-11 Closeout Submittals
Local/Regional Materials; (LEED NC)
LEED documentation relative to local/regional materials credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.
Adhesives; (LEED NC)
LEED documentation relative to low emitting materials credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.
1.3 DELIVERY AND STORAGE
Deliver materials to the site in an undamaged condition. Store, protect, handle, and install prefabricated structural elements in accordance with manufacturer's instructions and as specified. Store materials off the ground to provide proper ventilation, with drainage to avoid standing water, and protection against ground moisture and dampness. Store materials with a moisture barrier at both the ground level and as a cover forming a well ventilated enclosure. Store wood I-beams and glue-laminated beams and joists on edge. Adhere to requirements for stacking, lifting, bracing, cutting, notching, and special fastening requirements. Remove defective and damaged materials and provide new materials. Store separated reusable wood waste convenient to cutting station and area of work.
1.4 GRADING AND MARKING
1.4.1 Lumber
Mark each piece of framing and board lumber or each bundle of small pieces of lumber with the grade mark of a recognized association or independent inspection agency. Such association or agency shall be certified by the Board of Review, American Lumber Standards Committee, to grade the species used. Surfaces that are to be exposed to view shall not bear grademarks, stamps, or any type of identifying mark. Hammer marking will be permitted on timbers when all surfaces will be exposed to view.
1.4.2 Plywood
Mark each sheet with the mark of a recognized association or independent inspection agency that maintains continuing control over the quality of the plywood. The mark shall identify the plywood by species group or span
SECTION 06 10 00 Page 4 rating, exposure durability classification, grade, and compliance with APA L870.Surfaces that are to be exposed to view shall not bear grademarks or other types of identifying marks.
1.4.3 Preservative-Treated Lumber and Plywood
The Contractor shall be responsible for the quality of treated wood products. Each treated piece shall be inspected in accordance with AWPA M2 and permanently marked or branded, by the producer, in accordance with AWPA M6. The Contractor shall provide Contracting Officer's Representative (COR) with the inspection report of an approved independent inspection agency that offered products comply with applicable AWPA Standards. The appropriate Quality Mark on each piece will be accepted, in lieu of inspection reports, as evidence of compliance with applicable AWPA treatment standards.
1.4.4 Fire-Retardant Treated Lumber
Mark each piece in accordance with AWPA M6, except pieces that are to be natural or transparent finished. In addition, exterior fire-retardant lumber shall be distinguished by a permanent penetrating blue stain.
Labels of a nationally recognized independent testing agency will be accepted as evidence of conformance to the fire-retardant requirements of
AWPA M6.
1.5 SIZES AND SURFACING
ALSC PS 20 for dressed sizes of yard and structural lumber. Lumber shall be surfaced four sides. Size references, unless otherwise specified, are nominal sizes, and actual sizes shall be within manufacturing tolerances allowed by the standard under which the product is produced. Other measurements are IP or SI standard.
1.6 MOISTURE CONTENT
Air-dry or kiln-dry lumber. Kiln-dry treated lumber after treatment.
Maximum moisture content of wood products, other than lumber, shall be in accordance with standard under which the product is produced.
1.7 PRESERVATIVE TREATMENT
Treat plywood, nailers, and edge strips, intended for aboveground use:
0.25 pcf
1.8 FIRE-RETARDANT TREATMENT
Fire-retardant treated wood shall be pressure treated Treatment and performance inspection shall be by an independent and qualified testing agency that establishes performance ratings. Each piece or bundle of treated material shall bear identification of the testing agency to indicate performance in accordance with such rating. Treated materials to be exposed to rain wetting shall be subjected to an accelerated weathering technique in accordance with ASTM D2898 prior to being tested. Such items which will not be inside a building, and such items which will be exposed to heat or high humidity, shall receive exterior fire-retardant treatment.
Fire-retardant-treated wood products shall be free of halogens, sulfates, ammonium phosphate, and formaldehyde. Items to be treated include the following:
SECTION 06 10 00 Page 5
1.9 CERTIFICATES OF GRADE
Submit certificates attesting that products meet the grade requirements specified in lieu of grade markings where appearance is important and grade marks will deface material.
1.10 LOCAL/REGIONAL MATERIALS
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources.
PART 2 PRODUCTS
2.1 PLYWOOD
C-D Grade, Exposure 1, and a minimum thickness of 3/4 inch
2.2 OTHER MATERIALS
2.2.1 Nonstress Graded Members
Members shall include bridging, corner bracing, furring, grounds, and nailing strips. Furring shall be 1 inch by 3 nches. Nailing strips shall be 1 inch by 3 inches ir 1 inch by 4 inches when used as shingle base or interior finish, otherwise 2 inch stock.
2.2.2 Blocking
Blocking shall be standard or number 2 grade.
2.2.3 Adhesives
Comply with applicable regulations regarding toxic and hazardous materials and as specified. Interior adhesives, sealants, primers and sealants used as filler must meet the requirements of LEED low emitting materials credit.
2.3 ROUGH HARDWARE
Unless otherwise indicated or specified, rough hardware shall be of the type and size necessary for the project requirements. Sizes, types, and spacing of fastenings of manufactured building materials shall be as recommended by the product manufacturer unless otherwise indicated or specified. Rough hardware exposed to the weather or embedded in or in contact with preservative treated wood, exterior masonry, or concrete walls or slabs shall be hot-dip zinc-coated in accordance with ASTM A153/A153M.
2.3.1 Bolts, Nuts, Studs, and Rivets
ASME B18.2.1, ASME B18.5.2.1M, ASME B18.5.2.2M and ASME B18.2.2.
2.3.2 Anchor Bolts
ASTM A307, size as indicated, complete with nuts and washers.
2.3.3 Expansion Shields
CID A-A-1923, CID A-A-1924, and CID A-A-1925. Except as shown otherwise, SECTION 06 10 00 Page 6 maximum size of devices shall be 3/8 inch.
2.3.4 Lag Screws and Lag Bolts
ASME B18.2.1.
2.3.5 Wood Screws
ASME B18.6.1.
2.3.6 Nails
ASTM F547, size and type best suited for purpose. For sheathing and subflooring, length of nails shall be sufficient to extend 1 inch into supports. In general, 8-penny or larger nails shall be used for nailing through 1 inch thick lumber and for toe nailing 2 inch thick lumber;
16-penny or larger nails shall be used for nailing through 2 inch thick lumber. Nails used with treated lumber and sheathing shall be hot-dipped galvanized in accordance with ASTM A153/A153M. Nailing shall be in accordance with the recommended nailing schedule contained in AWC WFCM.
Where detailed nailing requirements are not specified, nail size and spacing shall be sufficient to develop an adequate strength for the connection. The connection's strength shall be verified against the nail capacity tables in AWC NDS. Reasonable judgment backed by experience shall ensure that the designed connection will not cause the wood to split. If a load situation exceeds a reasonable limit for nails, a specialized connector shall be used.
2.3.7 Wire Nails
ASTM F1667.
PART 3 EXECUTION
3.1 INSTALLATION
Conform to AWC WFCM unless otherwise indicated or specified. Select lumber sizes to minimize waste. Fit framing lumber and other rough carpentry, set accurately to the required lines and levels, and secure in place in a rigid manner. Do not splice framing members between bearing points. Frame members for the passage of pipes, conduits, and ducts. Provide as necessary for the proper completion of the work all framing members not indicated or specified. Spiking and nailing not indicated or specified otherwise shall be in accordance with the Nailing Schedule contained in ICC IBC; perform bolting in an approved manner. Spikes, nails, and bolts shall be drawn up tight.
3.2 MISCELLANEOUS
3.2.1 Roof Edge Strips and Nailers
Provide at perimeter of roof, around openings through roof, and where roofs abut walls, curbs, and other vertical surfaces. Except where indicated otherwise, nailers shall be 6 inches wide and the same thickness as the insulation. Anchor nailers securely to underlying construction. Anchor perimeter nailers in accordance with FM 4435.
SECTION 06 10 00 Page 7
3.2.2 Wood Blocking
Provide proper sizes and shapes at proper locations for the installation and attachment of wood and other finish materials, fixtures, equipment, and items indicated or specified.
3.2.3 Wood Furring
Provide where shown and as necessary for facing materials specified. Except as shown otherwise, furring strips shall be nominal one by 3, continuous, and spaced 16 inches o.c. Erect furring vertically or horizontally as necessary. Nail furring strips to masonry. Do not use wood plugs.
Furring shall be plumb, rigid, and level and shall be shimmed as necessary to provide a true, even plane with surfaces suitable to receive the finish required.
3.2.4 Temporary Closures
Provide with hinged doors and padlocks and install during construction at exterior doorways and other ground level openings that are not otherwise closed. Cover windows and other unprotected openings with polyethylene or other approved material, stretched on wood frames. Provide dustproof barrier partitions to isolate areas as directed.
3.2.5 Temporary Centering, Bracing, and Shoring
Provide for the support and protection of masonry work during construction.
Forms and centering for cast-in-place concrete work are specified in Section 03 30 00.00 10 CAST-IN-PLACE CONCRETE.
3.3 WASTE MANAGEMENT
In accordance with the Waste Management Plan and as specified. Separate and reuse scrap sheet materials larger than 2 square feet, framing members larger than 16 inches, and multiple offcuts of any size larger than 12 inches. Clearly separate damaged wood and other scrap lumber for acceptable alternative uses on site, including bracing, blocking, cripples, ties, and shims.
Separate treated, stained, painted, and contaminated wood and place in designated area for hazardous materials. Dispose of according to local regulations. Prevent sawdust and wood shavings from entering the storm drainage system. Do not burn scrap lumber that has been pressure treated, or lumber that is less than one year old.
-- End of Section --
SECTION 06 10 00 Page 8
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 21 13
BOARD AND BLOCK INSULATION
05/11
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
1.3.2 Storage
1.4 SAFETY PRECAUTIONS
PART 2 PRODUCTS
2.1 BLOCK OR BOARD INSULATION
2.1.1 Thermal Resistance
2.1.2 Fire Protection Requirement
2.1.3 Other Material Properties
2.1.4 Recycled Materials
2.1.5 Prohibited Materials
2.2 VAPOR RETARDER
2.2.1 Vapor Retarder in Frame Walls and Roofs
2.2.2 Dampproofing for Masonry Cavity Walls
2.2.3 Vapor Retarder under Floor Slab
2.3 PRESSURE SENSITIVE TAPE
2.4 PROTECTION BOARD OR COATING
2.5 ACCESSORIES
2.5.1 Adhesive
2.5.2 Mechanical Fasteners
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
3.2 PREPARATION
3.3 INSTALLATION
3.3.1 Insulation Board
3.3.2 Electrical Wiring
3.3.3 Continuity of Insulation
3.4 INSTALLATION ON WALLS
3.4.1 Installation on Masonry Walls
3.4.2 Adhesive Attachment to Concrete and Masonry Walls
3.5 PERIMETER INSULATION
3.5.1 Manufacturer's Instructions
3.5.2 Insulation on Vertical Surfaces
3.5.3 Protection of Insulation
3.6 VAPOR RETARDER
SECTION 07 21 13 Page 1
SECTION 07 21 13
BOARD AND BLOCK INSULATION
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C1289 (2015) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM C203 (2005; R 2012) Breaking Load and Flexural Properties of Block-Type Thermal Insulation
ASTM C272/C272M (2012) Standard Test Method for Water Absorption of Core Materials for Sandwich Constructions
ASTM C591 (2015) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D1621 (2010) Compressive Properties of Rigid Cellular Plastics
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM D4397 (2010) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM E136 (2012) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C
ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover
ASTM E84 (2015b) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2014) Standard Test Methods for Water Vapor Transmission of Materials
SECTION 07 21 13 Page 2
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 211 (2016) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T803 OM (2010) Puncture Test of Container Board
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Block or board insulation; G-OMA
Vapor retarder
Pressure sensitive tape
Protection board or coating
Accessories
SD-08 Manufacturer's Instructions
Block or Board Insulation
Adhesive
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.3.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.4 SAFETY PRECAUTIONS
Consider safety concerns and measures as outlined in ASTM C930.
SECTION 07 21 13 Page 3
PART 2 PRODUCTS
2.1 BLOCK OR BOARD INSULATION
Provide only thermal insulating materials recommended by manufacturer for type of application indicated. Provide board or block thermal insulation conforming to the following standards and the physical properties listed below:
a. Unfaced Preformed Rigid Polyurethane and Polyisocyanurate Board:
ASTM C591
b. Faced Rigid Cellular Polyisocyanurate and Polyurethane Insulation:
ASTM C1289
2.1.1 Thermal Resistance
As indicated,with a minimum R-6.0 per inch thickness.
2.1.2 Fire Protection Requirement
a. Flame spread index of 25 or less when tested in accordance with ASTM E84.
b. Smoke developed index of 450 or less when tested in accordance with
ASTM E84.
2.1.3 Other Material Properties
Provide thermal insulating materials with the following properties:
a. Rigid cellular plastics: Compressive Resistance at Yield: Not less than 10 pounds per square inch (psi) when measured according to
ASTM D1621.
b. Flexural strength: Not less than 25 psi when measured according to
ASTM C203.
c. Water Vapor Permeance: Not more than 0.03 Perms or less when measured according to ASTM E96/E96M, desiccant method, in the thickness required to provide the specified thermal resistance, including facings, if any.
d. Water Absorption: Not more than 1 percent by total immersion, by volume, when measured according to ASTM C272/C272M.
2.1.4 Recycled Materials
Provide thermal insulation containing recycled materials to the extent practicable, provided that the material meets all other requirements of this section. The minimum required recycled material contents (by weight, not volume) are:
Polyisocyanurate/Polyurethane: 9 percent Phenolic Rigid Foam : 5 percent Perlite Board: 23 percent
2.1.5 Prohibited Materials
Do not provide materials containing more than one percent of asbestos.
SECTION 07 21 13 Page 4
2.2 VAPOR RETARDER
2.2.1 Vapor Retarder in Frame Walls and Roofs
a. 6 mil thick polyethylene sheeting conforming to ASTM D4397 and having a water vapor permeance of one perm or less when tested in accordance with ASTM E96/E96M.
b. Membrane with the following properties:
Water Vapor Permeance: ASTM E96/E96M: 1 perm Maximum Flame Spread: ASTM E84: 25 Combustion Characteristics: Passing ASTM E136 Puncture Resistance: TAPPI T803 OM: 25
2.2.2 Dampproofing for Masonry Cavity Walls
Parging material is specified in Section 04 20 00 MASONRY.
2.2.3 Vapor Retarder under Floor Slab
a. Water vapor permeance: 0.2 Perm or less when tested in accordance with ASTM E96/E96M.
b. Puncture resistance: Maximum load no less than 40 pounds when tested according to ASTM E154/E154M.
2.3 PRESSURE SENSITIVE TAPE
As recommended by manufacturer of vapor retarder and having a water vapor permeance rating of one perm or less when tested in accordance with
ASTM D3833/D3833M.
2.4 PROTECTION BOARD OR COATING
As recommended by insulation manufacturer.
2.5 ACCESSORIES
2.5.1 Adhesive
As recommended by insulation manufacturer.
2.5.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that all areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If installing perimeter or under slab insulation, check that the fill is flat, smooth, dry, and well tamped. If moisture or other conditions are found that do not allow the proper installation of the insulation, do not proceed but notify the Contracting Officer of such conditions.
SECTION 07 21 13 Page 5
3.2 PREPARATION
Unless using insulation board that passes ASTM E136 in addition to the requirements in PART 2 PRODUCTS, install non-combustible blocking around heat producing devices to provide the minimum clearances as required by NFPA 211 for vents and vent connectors used for venting products of combustion, flues, and chimneys other than masonry chimneys.
3.3 INSTALLATION
3.3.1 Insulation Board
Install and handle insulation in accordance with the manufacturer's installation instructions. Keep material dry and free of extraneous materials. Observe safe work practices.
3.3.2 Electrical Wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.3.3 Continuity of Insulation
Butt tightly against adjoining boards, studs, rafters, joists, sill plates, headers and obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joint, roof, and floor. Avoid creating any thermal bridges or voids.
3.4 INSTALLATION ON WALLS
3.4.1 Installation on Masonry Walls
Apply board directly to masonry with adhesive or fasteners as recommended by the insulation manufacturer. Fit between obstructions without impaling board on ties or anchors. Apply in parallel courses with joints breaking midway over course below. Put ends in moderate contact with adjoining insulation without forcing. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other services. Seal around cut-outs with sealant. Install board in wall cavities so that it leaves at least a nominal one inch free air space outside of the insulation to allow for cavity drainage.
3.4.2 Adhesive Attachment to Concrete and Masonry Walls
Apply adhesive to wall and completely cover wall with insulation.
a. As recommended by the insulation manufacturer.
b. Use only full back method for pieces of one square foot or less.
c. Butt all edges of insulation and seal edges with tape.
3.5 PERIMETER INSULATION
Install perimeter thermal insulation where heated spaces are adjacent to exterior walls or slab edges in slab-on-grade or floating-slab construction.
SECTION 07 21 13 Page 6
3.5.1 Manufacturer's Instructions
Install, attach, tape edges, provide vapor retarder and other requirements such as protection against vermin, insects, damage during construction as recommended in manufacturer's instructions.
3.5.2 Insulation on Vertical Surfaces
Install thermal insulation on exterior of foundation walls Fasten insulation with adhesive.
3.5.3 Protection of Insulation
Protect insulation on vertical surfaces from damage during construction and back filling by application of protection board or coating. Do not leave installed vertical insulation unprotected overnight. Install protection over entire exposed exterior insulation board.
3.6 VAPOR RETARDER
Apply a continuous vapor retarder as indicated. Overlap all joints at least 6 inches and seal with pressure sensitive tape. Seal at sill, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.
SECTION 07 21 13 Page 7
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
1.3.2 Storage
1.4 SAFETY PRECAUTIONS
1.4.1 Respirators
1.4.2 Smoking
1.4.3 Other Safety Concerns
PART 2 PRODUCTS
2.1 BLANKET INSULATION
2.1.1 Thermal Resistance Value (R-VALUE)
2.1.2 Recycled Materials
2.1.3 Prohibited Materials
2.2 BLOCKING
2.3 VAPOR RETARDER
2.4 PRESSURE SENSITIVE TAPE
2.5 ACCESSORIES
2.5.1 Adhesive
2.5.2 Mechanical Fasteners
2.5.3 Wire Mesh
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
3.2 INSTALLATION
3.2.1 Insulation
3.2.1.1 Electrical wiring
3.2.1.2 Continuity of Insulation
3.2.1.3 Installation at Bridging and Cross Bracing
3.2.1.4 Insulation without Affixed Vapor Retarder
3.2.1.5 Sizing of Blankets
3.2.1.6 Special Requirements for Ceilings
3.2.2 Installation of Separate Vapor Retarder
SECTION 07 21 16 Page 1
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C665 (2012) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM D4397 (2010) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM E136 (2012) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C
ASTM E84 (2015b) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2014) Standard Test Methods for Water Vapor Transmission of Materials
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 211 (2016) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2015) National Fuel Gas Code
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T803 OM (2010) Puncture Test of Container Board
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
SECTION 07 21 16 Page 2
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Blanket insulation
Vapor retarder
Pressure sensitive tape
Accessories
SD-08 Manufacturer's Instructions
Insulation
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.3.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.4 SAFETY PRECAUTIONS
1.4.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134.
1.4.2 Smoking
Do not smoke during installation of blanket thermal insulation.
1.4.3 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
SECTION 07 21 16 Page 3
PART 2 PRODUCTS
2.1 BLANKET INSULATION
ASTM C665, Type I, blankets without membrane coverings;with a flame spread of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84.
2.1.1 Thermal Resistance Value (R-VALUE)
As indicated
2.1.2 Recycled Materials
Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:
Rock Wool: 75 percent slag Fiberglass: 20 to 25 percent glass cullet
2.1.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.2 BLOCKING
Wood, metal, unfaced mineral fiber blankets in accordance with ASTM C665, Type I, or other approved materials. Use only non-combustible materials meeting the requirements of ASTM E136 for blocking around heat producing devices.
2.3 VAPOR RETARDER
a. 6 mil thick polyethylene sheeting conforming to ASTM D4397 and having a water vapor permeance of 1 perm or less when tested in accordance with ASTM E96/E96M.b. Membrane with the following properties:
Water Vapor Permeance: ASTM E96/E96M: 1 perm Maximum Flame Spread: ASTM E84: 25 Combustion Characteristics: Passing ASTM E136 Puncture Resistance: TAPPI T803 OM: 25
2.4 PRESSURE SENSITIVE TAPE
As recommended by the vapor retarder manufacturer and having a water vapor permeance rating of one perm or less when tested in accordance with
ASTM D3833/D3833M.
2.5 ACCESSORIES
2.5.1 Adhesive
As recommended by the insulation manufacturer.
2.5.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
SECTION 07 21 16 Page 4
2.5.3 Wire Mesh
Corrosion resistant and as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
PREPARATION
Install non-combustible blocking around heat producing devices to provide the following clearances:
a. Vents and vent connectors used for venting the products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211.
b. Gas Fired Appliances: Clearances as required in NFPA 54.
c. Oil Fired Appliances: Clearances as required in NFPA 31.
Blocking around flues and chimneys is not required when insulation blanket, including any attached vapor retarder, passed ASTM E136, in addition to meeting all other requirements stipulated in Part 2. Blocking is also not required if the chimneys are certified by the manufacturer for use in contact with insulating materials.
3.2 INSTALLATION
3.2.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.2.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.2.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions.
Where insulation required is thicker than depth of joist, provide full width blankets to cover across top of joists. Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.
SECTION 07 21 16 Page 5
3.2.1.3 Installation at Bridging and Cross Bracing
Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.
3.2.1.4 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between studs and other framing, such as at door and window heads, jambs, and sills, band joists, and headers.
3.2.1.5 Sizing of Blankets
Provide only full width blankets when insulating between trusses, joists, or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.
3.2.1.6 Special Requirements for Ceilings
Place insulation under electrical wiring occurring across joists. Pack insulation into narrowly spaced framing. Do not block flow of air through soffit vents.
3.2.2 Installation of Separate Vapor Retarder
Apply continuous vapor retarder as indicated. Overlap joints at least 6 inches and seal with pressure sensitive tape. Seal at sill, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.
SECTION 07 21 16 Page 6
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 51 13
BUILT-UP ASPHALT ROOFING
05/12
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualifications of Applicator
1.4.2 Fire Resistance
1.4.3 Preroofing Conference
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.5.3 Handling
1.6 ENVIRONMENTAL CONDITIONS
1.7 SEQUENCING
1.8 WARRANTY
1.8.1 Roof Membrane Manufacturer Warranty
1.8.2 Roofing System Installer Warranty
1.8.3 Continuance of Warranty
1.9 CONFORMANCE AND COMPATIBILITY
PART 2 PRODUCTS
2.1 GENERAL
2.2 FIBERGLASS FELT MATERIALS
2.3 BASE FLASHING MEMBRANE
2.4 ASPHALT
2.5 AGGREGATE FOR SURFACING BUILT-UP ROOFING
2.6 PRIMER
2.7 ASPHALT ROOF CEMENT
2.8 UNSATURATED FELT OR ROSIN-SIZED BUILDING PAPER
2.9 FASTENERS AND PLATES
2.10 PRE-MANUFACTURED ACCESSORIES
2.11 ROOF INSULATION BELOW MEMBRANE SYSTEM
2.12 MEMBRANE LINER
PART 3 EXECUTION
3.1 VERIFICATION OF CONDITIONS
3.2 PREPARATION
3.2.1 Protection of Property
3.2.1.1 Protective Coverings
3.2.1.2 Bitumen Stops
3.2.2 Equipment
3.2.2.1 Mechanical Application Devices
3.2.2.2 Flame-Heated Equipment
SECTION 07 51 13 Page 1
3.2.2.3 Open Flame Application Equipment
3.2.3 Priming of Surfaces
3.2.3.1 Priming of Concrete and Masonry Surfaces
3.2.3.2 Priming of Metal Surfaces
3.2.4 Heating of Asphalt
3.3 APPLICATION
3.3.1 Ply Felts
3.3.2 Membrane Flashing
3.3.2.1 Strip Flashing
3.3.2.2 Set-On Accessories
3.3.3 Aggregate Surfacing
3.3.4 Correction of Deficiencies
3.3.5 Clean Up
3.4 PROTECTION AGAINST MOISTURE ABSORPTION
3.5 FIELD QUALITY CONTROL
3.5.1 Test for Surface Dryness
3.5.2 Construction Monitoring
3.6 INFORMATION CARD
SECTION 07 51 13 Page 2
SECTION 07 51 13
BUILT-UP ASPHALT ROOFING
05/12
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D1863/D1863M (2005; R 2011; E 2012) Mineral Aggregate Used on Built-Up Roofs
ASTM D1864/D1864M (1989; E 2009; R 2009) Moisture in Mineral Aggregate Used on Built-Up Roofs
ASTM D1970/D1970M (2015a) Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D2170/D2170M (2010) Kinematic Viscosity of Asphalts (Bitumens)
ASTM D2178/D2178M (2015a) Asphalt Glass Felt Used in Roofing and Waterproofing
ASTM D312/D312M (2015) Standard Specification for Asphalt Used in Roofing
ASTM D41/D41M (2011) Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D4263 (1983; R 2012) Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4402/D4402M (2015) Viscosity Determination of Asphalt at Elevated Temperatures Using a Rotational Viscometer
ASTM D448 (2012) Sizes of Aggregate for Road and Bridge Construction
ASTM D4586/D4586M (2007; E 2012; R 2012) Asphalt Roof Cement, Asbestos-Free
ASTM D4601/D4601M (2004; R 2012) Asphalt-Coated Glass Fiber Base Sheet Used in Roofing
ASTM D4637/D4637M (2015) EPDM Sheet Used in Single-Ply Roof Membrane
ASTM D4869/D4869M (2015) Standard Specification for Asphalt-Saturated Organic Felt
SECTION 07 51 13 Page 3
Underlayment Used in Steep Slope Roofing
ASTM D4897/D4897M (2001; R 2009) Standard Specification for Asphalt-Coated Glass-Fiber Venting Base Sheet Used in Roofing
ASTM D6163/D6163M (2000; R 2015; E 2015) Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Glass Fiber Reinforcements
ASTM D6757 (2007; R 2013) Standard Specification for Underlayment Felt Containing Inorganic Fibers Used in Steep-Slope Roofing
ASTM E108 (2011) Fire Tests of Roof Coverings
FM GLOBAL (FM)
FM 4470 (2010) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA RoofMan (2011 thru 2014) The NRCA Roofing Manual
UNDERWRITERS LABORATORIES (UL)
UL 790 (2004; Reprint Jul 2014) Standard Test Methods for Fire Tests of Roof Coverings
UL RMSD (2012) Roofing Materials and Systems Directory
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM
Asphalt applied, 4-ply felt, aggregate-surfaced, built-up roof membrane system.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Asphalt
Felts, including ply felt, base sheet and ventilating felt as applicable ; G, OMA
SECTION 07 51 13 Page 4
FLASHING MEMBRANE ; G, RO
Fasteners
Primer
Asphalt Roof Cement
Pre-Manufactured Accessories to be incorporated in the system installation; G-OMA
Sample Warranties certificates; G-OMA
Submit all data required with requirements of this section.
Include in Data written acceptance by the roof membrane manufacturer of the products and accessories provided. List products in the applicable wind uplift and fire rating classification listings, unless approved otherwise by the Contracting Officer.
SD-07 Certificates
Bill of Lading
Submit when labels of asphalt containers do not indicate the finished blowing temperature, flash point and equiviscous temperature.
Qualifications of Applicator
Submit evidence of the roofing system manufacturer's approval.
SD-08 Manufacturer's Instructions
Felts; G, RO
Flashings; G, RO
Asphalt
Primer
Roof Cement
Fasteners
SD-11 Closeout Submittals
WARRANTY
INFORMATION CARD
1.4 QUALITY ASSURANCE
1.4.1 Qualifications of Applicator
The roofing system applicator must be approved, authorized, or licensed in writing by the roofing system manufacturer and must have a minimum of 3
SECTION 07 51 13 Page 5 years experience as an approved, authorized, or licensed applicator with the manufacturer and be approved at a level capable of providing the specified warranty.
1.4.2 Fire Resistance
Complete roof covering assembly must:
a. Be Class A rated in accordance with ASTM E108, FM 4470, or UL 790; and
b. Be listed as part of Fire-Classified roof deck construction in UL RMSD, or Class I roof deck construction in FM APP GUIDE.
1.4.3 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
a. Drawings and specifications and submittals related to the roof work;
b. Roof system components installation;
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representatives to roof manufacturer;
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing; and
e. Quality control plan for the roof system installation;
f. Safety requirements.
Coordinate preroofing conference scheduling with the Contracting Officer.
The conference must be attended by the Contractor, the Contracting Officer's designated personnel, and personnel directly responsible for the installation of roofing and insulation, flashing and sheet metal work, , other trades interfacing with the roof work,Fire Marshall, and representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials in manufacturers' original unopened containers and rolls with manufacturer's labels intact and legible. Mark and remove wet or damaged materials from site. Where materials are covered by a referenced specification, container must bear specification number, type, and class, as applicable. Indicate on labels or bill of lading for roofing asphalt the asphalt type, finished blowing temperature (FBT), flash point (FP), and equiviscous temperature (EVT), that is, the temperature at which the viscosity is either 125 centistokes when tested in accordance with
SECTION 07 51 13 Page 6
ASTM D2170/D2170M or 75 centipoise when tested in accordance with ASTM D4402/D4402M. Deliver materials in sufficient quantity to allow work to proceed without interruption.
1.5.2 Storage
Protect materials against moisture absorption, contamination, or other damage. Avoid crushing or crinkling of roll materials. Store roll materials on end on clean raised platforms in dry locations in enclosed buildings or trailers with adequate ventilation. Do not store roll materials in buildings under construction until concrete, mortar, and plaster work are finished and dry. Do not store materials outdoors unless approved by the Contracting Officer. Completely cover felts stored outdoors, on and off roof, with waterproof canvas protective covering. Do not use polyethylene sheet as a covering. Tie covering securely to pallets to make completely weatherproof and yet provide sufficient ventilation to prevent condensation. Maintain roll materials at temperature above 50 degrees F for a 24-hour period immediately prior to application. Keep aggregate dry as defined by ASTM D1863/D1863M.