15-R-0035_Amd_3_Conformed.doc

DOC document 2 MB Posted

Attached to
Regional Environmental Acquisition Tool: Military Munitions Response Program (MMRP)
Solicitation number
W912HN-15-R-0035
Issued by

About this file

Amd 3 Conformed

View the file

Other files

File Type Posted
15-R-0035_Amd_4.docx DOCX document
15-R-0035_Amd_4_Conformed.doc DOC document
Bid_Schedule_SEED_Proj.docx DOCX document
15-R-0035_Amd_3.doc DOC document
15-R-0035_Amd_2.docx DOCX document
15-R-0035_Amd_2_Conformed.docx DOCX document
SF33-14a.pdf PDF
I04GA004401_01.08_0500_a.pdf PDF
W912HN-15-R-0035.pdf PDF
I04GA004401_01.09_0500_p.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
48,000,000
Dollars, U.S.

MILITARY MUNITIONS RESPONSE PROGRAMFFP

Base Period (3 years). Component of the South Atlantic Division's Regional Environmental Acquisition Tool Military Munitions Response Program (MMRP) MATOC. The base period amount has been estimated at $28,800,000.00 but no more than $48,000,000.00 for the total contract award; actual value of base period may vary based on actual contract use.

FOB: Destination

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Dollars, U.S.
OPTION
MILITARY MUNITIONS RESPONSE PROGRAMFFP

Option Period (2 years). Component of the South Atlantic Division's Regional Environmental Acquisition Tool Military Munitions Response Program (MMRP) MATOC. The Option period amount has been estimated at $19,200,000.00 but no more than $48,000,000.00.

FOB: Destination

MAX

NET AMT

CONTRACT DISCIPLINE RATES

CONTRACT DISCIPLINE RATES (Schedule A)

(APPLICABLE TO ALL TASK ORDERS ISSUED DURING LIFE OF THE CONTRACT)

Discipline
Base - Period (3 years)
Option Period (2 years)

Program Manager

Project Manager

Safety & Health Manager

UXO Senior Supervisor

UXO QC Supervisor

UXO Safety Officer

OESS (Ord. Explosive Safety Specialist)

Senior Geophysicist

Geophysicist- Mid-level

Geophysicist - Junior

Senior Chemist

Mid-level Chemist

Risk Assessor

GIS Specialist

UXO Sweeper

UXO Technician I

UXO Technician II

UXO Technician III

Senior Contracts Manager

Senior Geologist

Geologist – Mid Level

Geologist – Junior

HydroGeologist

Civil Engineer

Environmental Engineer

Engineering Technician

Biologist

Regulatory Specialist

Estimator

Hazardous Waste/Transportation Spec

CADD Operator

Word Processor

Clerical

Data Processor

Community Relation Spec.

NOTES TO OFFERORS

REGIONAL ENVIRONMENTAL ACQUISITION TOOL-ENVIRONMENTAL MILITARY MUNITIONS RESPONSE PROGRAM (MMRP)

W912HN-15-R-0035

SECTION B - NOTES TO OFFERORS

This Acquisition is 100% Set-Aside for 8(a) competition. This is a Multiple Award Task Order Contract (MATOC) for Military Munitions Response Program.

ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT AUTHORIZED.

DIRECTIONS FOR SUBMITTING PROPOSALS

a. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912HN-15-R-0035_COMPANY NAME_VOLUME I

W912HN-15-R-0035_COMPANY NAME_VOLUME II

Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at: https://safe.amrdec.army.mil/SAFE/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).

When completing the information for transmittal at the AMRDEC SAFE website, you will be asked to enter e-mail addresses for the recipients. When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Mr. Mark Hiscox whose e-mail address is mark.a.hiscox@usace.army.mil. The Contracting Officer for this project is Mr. Adrian Goolsby, whose e-mail address is adrian.e.goolsby@usace.army.mil. These e-mail addresses are the ones you will enter as recipients.

SITE VISIT INFORMATION:

Date: January 20th, 2016

Time: 8:00 a.m. (EST)

Meeting Place: Rayonier, U.S. Forest Resources

6830 Floyd James Road

Manor, GA 31550 Proposal Due Date and Time:

Request For Proposal No: W912HN-15-R-0035

Due Date of Proposal: February, 3rd, 2016 Time by which Proposals are Due: 10:00 a.m.

Title of Project: Regional Environmental Acquisition Tool-Environmental Military Munitions Response Program (MMRP)

The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the information provided.

WAGE DETERMINATIONS: The appropriate wage determination will be incorporated on a task order by task order basis.

TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the solicitation for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.

If an Offeror believes that the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via e-mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.

W912HN-15-R-0035

Regional Environmental Acquisition Tool-Environmental Military Munitions Response Program (MMRP)

Bidder Inquiry Key: XK9489-PVXEV8

Specific Instructions for Initial ProjNet Bid Inquiry Access:

1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.

2. Identify the Agency as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. E-mail. Enter the e-mail address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

Steps 1 through 3: same as above.

4. E-mail. Enter the e-mail address you used to register previously in ProjNet.

5. Click Continue. A page will then open asking for the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.

HOURLY RATES VERBIAGE

Travel IAW FAR negotiated per task order. TRAVEL AND PER DIEM SHALL BE NEGOTIATED AND DETERMINED IN ACCORDANCE WITH THE GOVERNMENT’S Federal aCQUISITION REGULATION (far part 31.205-46).

Overhead – included in rates. THE UNIT PRICES IN THIS SCHEDULE SHALL BE LOADED RATES WHICH INCLUDE RAW LABOR, OVERHEAD, FRINGE AND G&A. PROFIT WILL BE NEGOTIATED PER TASK ORDER.

Profit – not included in rates.

THIS IS AN INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT.

THE MAXIMUM AMOUNT OF THIS CONTRACT SHALL NOT EXCEED $48,000,000.00. THE ESTIMATED DOLLAR AMOUNT IS $28,800,000.00 FOR THE BASE (FIRST 3 YEARS) AND $19,200,000.00 FOR THE FOURTH AND FIFTH YEAR. ACTUAL OBLIGATION PER YEAR MAY BE GREATER THAN OR LESS THAN THESE AMOUNTS.

THE CONTRACTOR SHALL FURNISH THE NECESSARY PERSONNEL, FACILITIES, MATERIAL, AND EQUIPMENT TO FULFILL ANY AND ALL REQUIREMENTS WITHIN THE SCOPE OF THIS CONTRACT IN ACCORDANCE WITH SECTION C, DESCRIPTION/SPECS/WORK STATEMENT.

PERSONNEL REQUIRED FOR EACH OF THE FOLLOWING LABOR CATEGORIES INCLUDES BUT IS NOT LIMITED TO THOSE DISCIPLINES IDENTIFIED IN THE HOURLY FIXED RATE MATRIX.

OTHER DIRECT COSTS FOR SPECIALIZED EQUIPMENT AND SUPPLIES WILL BE NEGOTIATED FOR EACH TASK ORDER AS REQUIRED.

SUBCONTRACTING COSTS AND OTHER DISCIPLINES WILL ALSO BE NEGOTIATED FOR EACH TASK ORDER AS REQUIRED.

UNIT OF MEASURE

HR– Hour Rate

The following table is that portion of the Pricing Schedule which will pertain to all costs other than prime labor already priced as shown above. These rates will be applied and paid to other direct negotiated costs such as, but not limited to, reproduction, travel, subcontracting effort, specialized equipment and so forth.

Rates / Markups (Costs Other Than Hourly Labor Rates Shown in Table above):

Base

Period

Year 1 Base

Period

Year 2 Base

Period

Year 3 Option

Period

Year 4 Option

Period

Year 5

G&A Rate*
%
%
%
%
%

*Must be substantiated by DCAAater time

For ordering purposes, the “Hourly Labor Rate (Firm Fixed Price)” table and information shown above are part of this solicitation. Each successful offeror will have a completed Schedule A attached to their assigned contract. Prices used in formulating proposals shall be dictated by the date of task order requirement. These rates will be the maximum rates that can be proposed at the task order level. A contractor may utilize lower rates during the task order proposal process. Modifications to task orders will reflect the applicable labor rates to be used at the time the modification is issued. For example, assume that the rate schedule changes over on 1 November of each year; a task order that is issued on 1 Sep 2015 for 12 months work, shall apply the labor rates that were effective on 1 Nov 2014. If a modification to this task order is required in December 2015, labor rates effective on 1 Nov 2015 will be applied.

Section C - Descriptions and Specifications

SCOPE OF WORK FOR BASE CONTRAC

Scope of Work

Military Munitions Response Program (MMRP) MATOC

Regional Environmental Acquisition Tool (REAT)

July 2015

1.0 INTRODUCTION

The Contractor shall be responsible for completing Munitions Response activities on a Firm Fixed Price basis under a Performance-Based Contract (PBC) by conducting all required environmental investigation and remediation services for which the United States Army Corps of Engineers (USACE) is responsible; addressing any and all unforeseen environmental, scheduling, and regulatory issues; and, assuming contractual liability and responsibility for the achievement of the performance objectives for the Military Munitions Response Program (MMRP). The Contractor shall furnish all materials, equipment, supplies, personnel, and all other services required to perform the Military Munitions Response activities outlined in this scope of work and as specifically identified in the individual task orders.

1.1 Project Scope

The services required for this contract will be provided for the customers of the U.S. Army Corps of Engineers, South Atlantic Division, and the Southeastern Regional Environmental Office on the Installation Management Agency (SERO). This includes the States of Georgia, South Carolina, North Carolina, Florida, Alabama, Tennessee, Kentucky, Mississippi and the territories of Puerto Rico, Virgin Islands, and Guam. Work may also be performed at other Former Used Defense Sites (FUDS) and Federal Facilities outside the above-stated geographical boundary by exception as determined by the Contracting Officer or in accordance with MOA (Memorandum of Agreement) with other USACE Districts. While the SERO established the primary geographical area of responsibility for this contract, it is not limited to only Army customers. The Contractor may be required to perform tasks on-site or at their own facilities. Task orders may use performance-based work statements (PWSs). The Contractor must have the capability and experience to perform, or provide, a wide range of investigative, remedial design, and remediation services required for military munitions. Work will include:

1) Anomaly avoidance for MMRP

2) Blast effects engineering analysis

3) Explosives storage

4) MMRP remedial investigation

5) MMRP remedial design

6) MMRP removal actions

7) Explosive safety submissions preparation

8) Lead removal in small arms ranges

9) Range and debris clearance

10) MMRP geophysical mapping services

11) Military munitions identification

12) Military munitions debris management and disposal

13) Unexploded Ordnance (UXO) demolition

14) Visual surveys of Munitions Response Areas (MRA)

15) Chemical Warfare Material (CWM) Investigation/Remediation

16) Construction Support in MRA

17) Preparation of Remedial Investigation (RI) report for military munitions prepared under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) ,

18) identification and addressing of data gaps

19) Preparation of Feasibility Studies (FS),

20) Preparation of Decision Documents

21) Public Involvement (including development and maintenance of the CERCLA Administrative Record),

22) Preparation of Explosives Safety Submission (ESS)

23) Development of documentation to support remedy-in-place or response complete (RIP/RC) determination

24) Development of a land use control implementation and recurring review plans

The Contractor shall comply with all applicable federal, state and local laws and regulations and shall fulfill the performance objectives of the Scope of Work (SOW) in a manner that is consistent with any applicable orders or permits, all existing and future cleanup agreements or guidance and relevant Department of Defense (DoD) and Army and USACE policy, for the duration of the contract. Actions and projects under the authority of the Defense Environmental Restoration Program (DERP) for Formerly Used Defense Sites (FUDS) shall be accomplished in accordance with ER 200-1-3, FUDS Program Policy.

The Contractor shall perform all the necessary environmental investigation, design, and remediation work as required to meet specific performance objectives to be established for each task order. Remediation services shall be conducted in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act (SARA), and National Oil and Hazardous Substances Contingency Plan (NCP) requirements, with regulatory coordination, as appropriate, provided by the Lead Regulator.

The desired goal at the conclusion of a response shall be the achievement of all Remedial Action Objectives (RAOs) established in the Army approved Decision Document. Achievement shall be measured by obtaining both Lead Regulator concurrence on the response endpoint and Army approval of the Response Complete (RC) and/or Remedy in Place (RIP) milestones or any other milestone included in the performance work statement for individual task orders.

2.0 GENERAL REQUIREMENTS

A performance work statement (PWS) will be prepared for each individual task order. The PWS will include specific performance objectives and performance elements. The time frame and specific procedures for each item of work will be described in the individual task order. The description of stated herein provides a general understanding of the contractor functions to be performed. Individual task orders will contain the specific requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract.

2.1 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

2.2 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

2.3.1 Contract Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirements specified in each task order. The contractor must maintain continuity between the support operations and the contractor's corporate offices.

2.3.2 Contract Administration

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall be available within two hours during normal duty hours to meet with Government personnel designated by the contracting officer to discuss problem areas. After normal duty hours, the contractor shall be available within twenty-four hours or by the next business morning, whichever is earliest. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.3.3 Personnel Administration

The contractor shall provide the following management and support as required. The contractor shall provide for employees during designated Government non-work days or other periods where Government offices are closed due to weather or security conditions. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the scope requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks. The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs). Time expended on contract tasks by contractor personnel will be reported weekly to the Task Leader and may be requested for review by the COR, or Government POC for the specific contractor.

2.4 Subcontract Management

The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the KO or Contracting Officer Representative (COR).

2.5 Contractor Personnel, Disciplines, and Specialties

The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor categories, labor rates, and man-hours utilized in the performance of each Task Order issued hereunder will be the minimum necessary to accomplish the task. The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

At a minimum, the contractor must be able to provide the following disciplines with the required professional qualifications (appropriate education, experience, and professional registration and certifications) in order to successfully accomplish the assigned work:

a. Project Manager

b. Safety and Health Manager

c. Senior UXO Supervisor

d. UXO Safety Officer

e. UXO QC Specialist

f. Geophysicist

g. Geologist

h. Chemist

i. Risk Assessor

Project Manager – The PM will serve as the single point of contact for the task order and shall be responsible for the management of the work, approval of all plans, and compliance with all federal, state, and local laws and regulations. The PM shall also maintain close communication and coordination with USACE and stakeholders for the duration of the contract, including monthly progress reports and cost reporting, as applicable. The PM shall have the following qualifications:

· College degree in engineering, geology, chemistry, biology or related field and professional registration, as applicable;

· A minimum of eight (8) years of project management experience, with a minimum of five (5) years of experience managing MMRP projects.

· A working knowledge of federal, state, and local laws, regulations, and guidance.

· Relevant experience conducting MMRP projects in the US Southeast; and

· Experience and/or working knowledge of risk management.

Safety and Health Manager, Geophysicist, Geologist, Chemist, Risk Assessor – Minimum qualifications:

· College degree in geology, chemistry, biology or related field and professional registration in their respective field, as applicable;

· Five (5) years of experience in technical leadership for contracts/programs with a minimum of three (3) years in their respective field;

· A working knowledge of federal, state, and local laws, regulations, and guidance.

· Relevant experience conducting MMRP projects in the US Southeast;

All UXO personnel shall meet the minimum qualifications in Department of Defense Explosives Safety Board (DDESB) Technical Pamphlet 18.

2.6 Location and Hours of Work

Accomplishment of the results contained in this SOW requires work within SAD AOR and at various contractor, subcontractor, and Government facilities (mainly in the continental United States). Specific locations for field work will be determined at the task order level. Normal workdays are Monday through Friday except US Federal Holidays. Workers typically work eight (8) hours per day, 40 hours per week. Work may be required outside of typical work hours and will be determined at the task order level.

2.7 Travel / Temporary Duty (TDY)

Travel to other government facilities or other contractor facilities may be required and will be specified at the task order level. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures). Travel costs will be negotiated for each task order as applicable.

The contractor shall use government vehicles when requested, authorized, and determined to be advantageous to the government. This will be specified at the task order level. It is understood that the contractors’ liability insurance will cover all contract personnel operating government vehicles. If not specified, the contractor shall provide any and all necessary transportation to fulfill the requirements of the contract.

2.8 Public Involvement

All public participation coordination will be approved by the USACE With the direction and approval of the USACE, the Contractor will provide the necessary support to initiate, schedule, and address all public involvement activities of the project (e.g., preparation of briefings, presentations, fact sheets, newsletters, articles/public notices to news media, and notifications to RAB members). The Contractor will be responsible for requesting and addressing all public comments. USACE shall attend and represent the Government at all meetings with the public.

A Restoration Advisory Board (RAB) may be established for FUDS property and meets every year. Activities required to support the RAB meetings will be included in this effort. The selected Contractor will be responsible for the minutes of all RAB meetings and will submit these minutes to the USACE for approval. The Contractor will also secure a meeting location for each scheduled meeting and will provide all equipment necessary to support these meetings.

2.9 Project Stakeholders

For the purposes of this SOW, project stakeholders may include the USACE, the State Lead Regulator, the United States Environmental Protection Agency (USEPA), the landowners, and the RAB. Level of involvement may change depending on the project and the state. The Contractor will be responsible for obtaining comments for, and appropriate approval or concurrence on project deliverables consistent with applicable regulatory drivers and agreements for each site.

2.10 Contract Manpower Reporting Application (CMRA)

Contractors will be required to fulfill the accounting needs for Contract Services/Contractor Manpower Reporting (UNCLASSIFIED) during execution of work contracted for DoD. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL contractor manpower (including subcontractor manpower) required for performance of this task order. The name of the data site is “Contract Manpower Reporting Application” (CMRA).

The Contractor shall input all required information into the Contract Manpower Reporting Application (CMRA) website at https://cmra.army.mil. The required schedule for reporting is shown below.

Initial CMRA Reporting: Within 10 days following contract award.

Intermediate CMRA Reporting: Quarterly and specifically in the month of October, no later than 15 OCT (inclusive of all amounts invoiced in the current fiscal year against this contract).

Final CMRA Reporting: No later than 15 days following the final invoice request.

The Contractor shall enter all required information and information below into CMRA:

· Contracting Office, Contracting Officer and Contracting Officer’s Representative.

· Contract number, including task and delivery order number.

· Beginning and ending dates covered by reporting period.

· Contractor names, address, phone number, e-mail address, and identity of contractor employee entering data.

· Estimated direct labor hours (including subcontractors).

· Estimated direct labor dollars paid this reporting period (including subcontractors).

· Total payments (including subcontractors).

· Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different).

· Estimated data collection cost.

· Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purpose of reporting this information).

· Locations where contractor and subcontractor perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website).

3.0 SPECIAL REQUIREMENTS

This section describes the special requirements for this contract. The following sub-sections provide details of various considerations on this contract.

3.1 Security and Safety

DD Forms 254: Overarching security requirements and Contractor access to classified information shall be as specified in the basic DD Form 254, which will be further identified in the DD Form 254 for each TO, as required. All contractor personnel with access to unclassified information systems, including e-mail, shall have at a minimum a favorable National Agency Check (NAC).

Visitor Group Security Agreement. The contractor shall sign a Contractor Visitor Group Security Agreement to protect classified information involved in performance under this contract or Task Order. The Agreement will outline responsibilities in the following areas: Contractor security supervision; Standard Practice Procedures; access, accountability, storage, and transmission of classified material; marking requirements; security education; personnel security clearances; reports; security checks; security guidance; emergency protection; protection of government resources; DD Forms 254; periodic security reviews; and other responsibilities, as required.

3.2 Monthly Status Report, Monthly Financial Section, Invoice.

The contractor shall submit, according to each task order, a monthly narrative status report and an invoice, both in electronic format. This report and a payment invoice will be provided for approval by the 10th working day of the month following the month in which the services were performed. The monthly status report shall include project break out by hours for each task performed and brief summary of each task and shall be in Microsoft Word and PDF format to the authorized Contracting Officers Representative (COR). COR's will be assigned at the task order level. Generally invoicing procedures will be tailored at the task order level.

3.3 Government Furnished Information

Government Furnished Information related to the required services will be provided at the task order level.

3.4 Environmental Requirements

The Contractor, the Contractors subcontractors, and the Contractors suppliers shall perform all work in full compliance with applicable Federal, State, and Local environmental laws and regulations including the following: pertinent Occupational Safety and Health Administration and Department of Transportation requirements, National Environmental Policy Act, Clean Water Act, Clean Air Act, Endangered Species Act, National Historic Preservation Act, Fish and Wildlife Conservation Act, Federal Insecticide, Fungicide, and Rodenticide Act, Asbestos Hazard Emergency Response Act, Noise Control Act, Pollution Prevention Act, Toxic Substances Control Act, Resource Conservation and Recovery Act as amended by the Hazardous and Solid Waste Amendments, and Comprehensive Environmental Response and liabilities Act as amended by the Superfund Amendments and Reauthorization Act. Any incidents of spills, releases, or noncompliance with regulations noted by the Contractor shall immediately be brought to the attention of the Contracting Officer with written notice provided as soon as possible thereafter. Nothing in this contract shall relieve the Contractor of his responsibility to comply with these laws and regulations. Further, the Contractor shall obtain all environmental permits, licenses, and/or certificates required by each task order. When required, the Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform the work as defined in each task order Scope of Work. The Contractor shall provide necessary labor, supervision, insurance, vehicles, equipment, packing materials, labels, waste analysis, lab packing, weight slips, and manifest forms to safely and legally transport and dispose of, or recycle, solid non-hazardous waste, hazardous waste, and hazardous materials. The Contractor shall perform all work in accordance with 40 CFR Parts 190 through 289 and 49 CFR Parts 100 through 177.

3.5 Applicable Directives

The contractor shall comply with all documents listed as mandatory for each individual task order.

3.6 Quality

This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.

3.6.1 Quality Control

The Contractor will be required to develop a Task Order QCP and maintain an effective quality control program to ensure services are performed in accordance with the IDIQ task order and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is the means by which he assures himself that his work complies with the requirement of the contract.

The finalized QCP will be accepted by the Government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."

3.6.2 Quality Assurance Surveillance Plan (QASP)

The Government shall monitor the Contractors performance under each Task Order in accordance with the Government’s QASP.

4.0 DELIVERABLES

The contractor shall provide deliverables as described in subsequent task orders. Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in CDRLs and/or other means TBD.

Examples of Deliverables List:

Number
Name
Frequency
Quantity
001
Quality Control Plan
002
Contractor Manpower Reporting
003
All other deliverables to be determined at the task order level

5.0 RELATED DOCUMENTS

Related documents will be provided at the task order level, as required for that particular project.

INITIAL TASK ORDER PWS

PERFORMANCE WORK STATEMENT

for

MMRP Site Inspection at

Former Homerville Bombing and Gunnery Range

Homerville, Georgia

FUDS Property No. I04GA0044

29 June 2015

1 INTRODUCTION AND OBJECTIVES

1.1 Introduction

This PWS supports the Environmental Compliance and Environmental Restoration programs within the FUDS Program. These missions are covered under the basic scope of the contract. The work required under this Performance Work Statement (PWS) falls under the Formerly Used Defense Sites (FUDS) Installation Restoration (IR) Military Munitions Response Program (MMRP) category. All activities in this PWS shall be conducted in full compliance with USACE, Department of the Army (DA), and Department of Defense (DOD) regulations, guidance, standards, and manuals.

1.2 Project Objectives

The primary goal of the MMRP Site Inspection (SI) is to collect the minimum amount of information necessary to make one of the following decisions: 1) whether or not a Remedial Investigation/ Feasibility Study (RI/FS) is required at a site, 2) whether or not an immediate response is needed, or 3) whether the site qualifies for no further action. The SI will address Munitions and Explosives of Concern (MEC) hazards (including both UXO and DMM) as well as Munitions Constituents (MC) issues for the MMRP eligible sites. The secondary goal of the SI is to collect information to complete the Munitions Response Site Prioritization Protocol (MRSPP) for risk prioritization of the Munitions Response Sites (MRS).

2 BACKGROUND

2.1 Description of Former Homerville Bombing and Gunnery Range

The former Homerville Bombing and Gunnery Range (HBGR) property is located near Homerville, Georgia, in Clinch and Ware Counties. The property lies approximately 21 miles southwest of Waycross, Georgia, along the western edge of the Okefenokee National Wildlife Refuge.

2.2 History of the FUDS Property

In 1942, the Army Air Forces built Homerville Bombing and Gunnery Range to support the mission of Waycross Army Air Field dive bombing and fighter training program. Land acquisition (21,697 acres under permit from the Department of Interior and 10,290 acres leased from private owners for a total of 31,987 acres) commenced in 1942 and the range opened on 4 June 1943. Potentially, HBGR included another 10,220 acres of land used as a range safety fan buffer zone located to the northeast and south of the confirmed 5.5 mile wide by 9.5 mile long boundary, for a total of 42,207 acres. Another document stated that the HBGR was 42,240 acres in size. An unlabeled map dated September 1943 shows the Homerville Bombing and Gunnery Range boundary extending outside the rectangular shaped property boundary.

Targets were located on leased property on the western third of the property. The remaining eastern two thirds of land, located in the Okefenokee National Wildlife Refuge which were acquired through permit, were used as a range safety fan buffer area.

The Homerville Bombing and Gunnery Range was used by combat units of the Third Air Force at Waycross, Georgia. Range activities at Homerville Bombing and Gunnery Range included a combination dive bombing/ practice rocket range, a skip bombing range, two submachine gun ranges, one rifle range, one pistol range, one combination air to ground gunnery range/rocket range, and an air to ground strafing range. None of the acquired historical documentation, aerial photography, or the 2011 property inspection indicates high explosives use. Confirmed munitions used on Homerville Bombing and Gunnery Range included practice bombs, small arms ammunition, and practice rockets.

On 4 June 1943, the Homerville Bombing and Gunnery Range opened with one bombing range, one aerial gunnery range, and five buildings. By July 1943, the Third Air Force authorized the construction of a skip bombing range; and additional range construction requirements for a rifle range, a pistol range, and two sub-machine gun ranges were undertaken. In September 1943, a landing strip was built near the skip bombing range; and conversion of the ground gunnery range to a ground rocket range was scheduled for completion in May 1945. Twelve targets were constructed, of which two targets were designated by the installation to be fifty foot radii white circles for the rocket range. Additionally the dive bomb range was converted into a combination dive bomb rocket range.

During 1944, a chemical spray range was approved for the use of FS smoke (screening smoke) and colored water dispersed from tanks located within airplanes. The range was located 0.5 miles southeast of the skip bombing range and was used until 1945. There is no explosive hazard from dispersing FS smoke from the spray tanks.

During September 1945, the Homerville Bombing and Gunnery Range was used for the last time and close down procedures commenced. By October 1945, all areas of the Homerville Bombing and Gunnery Range had reportedly been decontaminated, cleared of all scrap metal, and inspected for duds, unexploded projectiles and bombs. The range was closed on 25 October 1945. By the end of January 1946, the range was inactivated and all installed government property was removed and returned to Waycross AAF. In 1947, the U.S. Dept. of Interior terminated the permit covering 21,697 acres of land. The actual termination date of the leased portion of the range is thought to be 1952. The Department of Interior property is currently part of the Okefenokee National Wildlife Refuge and the former leased portion of the range is privately owned and used for timber harvesting.

No evidence of the storage or use of chemical warfare materials was found at Homerville Bombing and Gunnery Range.

2.3 History of USACE Environmental Work at Former Homerville Bombing and Gunnery Range

A Preliminary Assessment (PA) was completed for HBGR in September 2012. On the basis of the PA, four MMRP projects were identified with the potential for Military Munitions contamination. The Site Inspection is the next step in the CERCLA process to identify risk at each of these project sites.

2.4 Project Descriptions

2.4.1 Project 01: (MMRP) – Bombing/Rocket Range

The 3,108 acre Bombing/Rocket Range is located in the northwestern portion of the Homerville Bombing and Gunnery Range FUDS. It consists of portions of the submachine gun range (north) and submachine gun range (east), and the entire pistol range, dive bombing target, and combination dive bombing target/rocket range. The munitions used consist of small arms, practice bombs, and practice rockets. On 4 June 1943 the bombing range opened and was converted into a combination bombing/rocket range by May 1945. The last known use of the range was during September 1945. None of the acquired historical documentation indicates high explosives use. No munitions debris or any remaining indication of past military use was found during the property visit conducted during September 2011.

2.4.2 Project 02: (MMRP) – Small Arms Range

The 1,412 acre Small Arms Ranges consists of the rifle range and portions of submachine gun range (north) and submachine gun range (east). The small arms ranges were constructed during 1943 and the last known use of the entire Homerville Bombing and Gunnery Range was September 1945. None of the historical documentation acquired indicates any other type of munitions being used besides small arms. Only some concrete debris, which may have been from target butts, was observed during the property visit conducted during September 2011. The entire area is a tree farm and has been plowed and replanted several times since government use.

2.4.3 Project 03: (MMRP) – Skip Bombing Range

The 630 acre Skip Bombing Range was constructed in 1943 and used between July 1943 and September 1945. The Skip Bombing Range measures 0.5 miles by 0.75 miles and has an 800 foot by 1,200 foot target area. The southeast corner of the skip bombing range overlaps the Aerial Ground Gunnery Range and is addressed in Project 04. An October 1950 dedudding operations report indicated the removal of six tons of buried M38A2 scrap from this area. Munitions used include practice bombs and small arms. None of the documents obtained indicate high explosives use. A partially buried M1A1 fuse for the M38A2 practice bomb was observed during the September 2011 property visit.

2.4.4 Project 04: (MMRP) – Aerial Ground Gunnery Range

The 3,108 acre Aerial Ground Gunnery/Rocket Range is located in the southwest corner of the Homerville bombing and Gunnery Range FUDS Property. Headquarters Third Air Force authorized the construction of an aerial gunnery ground strafing course on 13 August 1943. Sometime later an aerial ground gunnery range was constructed and then in March 1945 this was rebuilt and converted into a combination aerial ground gunnery and rocket range. The combination ground gunnery rocket range opened in May 1945 and was used until September 1945. A small portion of the Skip Bombing Range overlaps this MRS and is addressed within this project as well. A .50 caliber shell casing and a 6 foot long by 2 foot wide and 12 inch thick concrete pad, likely used for holding strafing targets, were observed during the September 2011 property visit.

3 GENERAL REQUIREMENTS

3.1 Responsibilities

The Contractor shall perform and assume all responsibility for the accuracy and completeness of the work and services for the described project in accordance with established criteria, standards, and instructions. Should the Contractor receive any directions or instructions which are beyond the scope of work, the Contractor shall not proceed with the work but shall notify the Contracting Officer (KO) in writing, describing the changes and the impact on the effort within 10 calendar days.

3.2 Professional Judgment

The Contractor shall continuously review the PWS, and all work during the progress of the task order, for potential changes that would be in the best interest of the Government. If changes are needed, the Contractor shall contact the Project or Technical Manager to discuss the needs or recommendations and follow-up with a Confirmation Notice within three workdays. The Contractor shall use professional judgment to make suggestions to improve the quality of the work, reduce any unnecessary work (and associated costs), and improve the final product (workplan, design, report, etc.). The Contractor shall also ensure that the USACE and its customers (Base, Installation, or other project stakeholders, etc.) meet all reporting requirements under all applicable regulations.

3.3 Release of Information

The Contractor shall not publicize, nor release in any manner, information or data with regard to projects on which they may be working or negotiating with this office; nor discuss prior to public release by this office, a project, any future project/program, or any planning with anyone not directly concerned with the project. Any inquiries regarding these matters shall be referred to the KO.

The above restrictions are not intended to interfere with notification of Federal, state and local agencies as may be required by applicable laws and regulations regarding releases of hazardous materials and substances and other such materials covered therein. To this end, the Contractor is obliged to be familiar with applicable Federal, State, and local laws, regulations and procedures regarding such reporting. Such notifications should also be made when there is a reasonable likelihood of harm to persons on or around the project area resulting from a release of potentially dangerous material. The Contractor shall coordinate such notifications with the KO.

3.4 Contractor Methods

These shall be used to achieve task order objective at the specified level of performance as stated in the PWS. The Contractor will be evaluated periodically during performance of this task order to ensure compliance with the PWS and to document that acceptance criteria, delivery schedule, and the overall completion date are being met. This evaluation will be performed according to a Quality Assurance Surveillance Plan (QASP). A programmatic QASP will be provided by the Government as a starting point for the project specific QASP. A Final QASP will be supplied to the Contractor and used by the Government to evaluate the Contractor’s performance.

Failure to adequately complete any service or submittal to at least a satisfactory level of quality or timeliness shall result in a repeat of the work at no cost to the Government and a poor performance evaluation may be given at the end of the project. If the Contractor is delayed by or through unanticipated Government actions, the completion date will be extended by a comparable number of calendar days before a reduction in compensation to the Contractor begins.

4 TASK REQUIRMENTS

4.1 General

This PWS consists of the following major tasks and subtasks. The Contractor’s proposal should be structured the same as these tasks.

Task 1: Stakeholder Involvement

Task 2: Technical Project Planning

Task 3: Preparation of Project Plans

Task 4: MMRP Site Inspection Field Work

Task 5: Reports and Routine Project Reporting

Task 6: Contractor Manpower Reporting

4.2 TASK 1: Stakeholder Involvement

OBJECTIVE:

The Contractor will act as the central coordination point in the identification and involvement of all stakeholders in the SI process. Early stakeholder involvement is key to developing the trust necessary for ensuring that the work performed will meet expectations and requirements.

REQUIREMENTS:

The level of effort for this task includes:

· Work closely with the USACE Project Manager (PM) to identify key stakeholders for the site, including regulators and their expected roles and level of involvement in the SI process. Distribute a complete point of contact information sheet to all stakeholders.

· Work with the designated points of contact to plan and coordinate a project kickoff meeting with key stakeholders (to include regulators) on the MMRP SI project at the site. Prepare and present an overview of the MMRP and SI process proposed for the site. Solicit stakeholder input and prepare and submit minutes of comments, agreements, and action items from the meeting.

DELIVERABLES:

The deliverables for this task are the meeting notifications, agendas, handouts, and the execution of the meetings. The Contractor shall provide a conference line and telephone number to all attendees via email prior to all telecom meetings. The agenda and handouts shall be provided NLT 7 days prior to the meetings. Meeting notifications and minutes shall be produced for all meetings, including the teleconferences. Draft minutes should be provided to all attendees within 7 calendar days. Any revisions needed, based on attendee’s comments, will be incorporated into the Final minutes within 5 days.

4.3 Task 2: Technical Project Planning

OBJECTIVE:

Upon completion of the initial stakeholder coordination, the Contractor shall solicit input on the remaining SI work using the formal USACE Technical Project Planning (TPP) process in accordance with EM 200-1-2. Working with the designated stakeholder points of contact, plan and coordinate a facilitated TPP session not to exceed one day for key stakeholders (including regulators).

DELIVERABLE:

The goal of TPP will be to develop, with stakeholder input and concurrence, the scope and data quality objectives (DQOs) for the development of the site specific SI Work Plan.

4.4 TASK 3:…

This is the start of the file's text. The full file is on GovTribe.